12
ASIC R&D at Fermilab R. Yarema October 30, 2003

ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

Embed Size (px)

Citation preview

Page 1: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

ASIC R&D at Fermilab

R. Yarema

October 30, 2003

Page 2: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 2

ASICs are Critical to Most Detector Systems

SVX4 – CDF & DO

VLPC readout - DO

Pixel readout - BTEV

Silicon strip readout - BTEV PMT & HPD - CMS Control ASIC - CMS

Page 3: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 3

Detector and ASIC Development • Detector R&D often begins first without a clear idea of how to

read out the detector .– “What kind of chip do you have that might be used to readout signals

from a ……. detector??”

• ASIC R&D usually begins later– Virtually every progress review involving a chip says that not enough

time is allotted for ASIC development• Chip demands keep increasing• Specifications keep changing• Processes keep changing• Development starts too late

– An ASIC is frequently on the critical path

• Detector and ASIC development need to proceed in parallel.

Page 4: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 4

New ASIC efforts at Fermilab• Charge Digitizer (QIE) for BTEV PMTs

– For PMT readout (negative current input)– Desire 0.15% resolution, dynamic range of 65,000:1– Auto ranging current splitter with precision integrators

and embedded ADC– Device planned to have 8 binary weighted ranges and an

8 bit FADC– 132 ns clock– Pipelined operation with latency of 3 or 4 clock cycles– Controlled impedance input for cable termination (50

ohms)– Design in early stages– Submission targeted for early ’04 in AMS 0.8u BiCMOS

Page 5: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 5

• TDC for BTEV– Multi-channel TDC, 8 or 16 channels– 1 nsec resolution– Data scarification (read only hit channels)– 132 nsec beam crossing– Include various miscellaneous functions– Radiation tolerant design (TID, SEU) in 0.25 µ

• Resonant Mode Converter Chip (RMCC)– Useful for LC detector R&D, BTEV, Off-axis neutrinos, etc– Integrated Cockcroft-Walton based voltage control chip with internal

reference, DAC, ADC and op amps.– Serial programming interface with 12 bit DAC.– 12 bit ADC for voltage and temperature read back.– Polarity programmable with pin selection.– 10-20 µa @ 1000 V– Up to 5KV possible, higher with special drive circuit– Low ripple– Provides relatively inexpensive single channel voltage control and read back

for high voltage applications.

Page 6: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 6

Future ASIC R&D Projects• Very Deep Submicron CMOS technology (0.13 to 0.09 µm)

– In the last 12 years, designs have moved from 3.0 µ to 0.25 µ feature sizes. (SVX => SVX2 => SVX3 => SVX4)

– Move to smaller feature sizes will inevitably occur.• Processes will become obsolete• Need for higher resolution detectors

– Move offers challenges• Lower voltage range, less analog voltage range• Different approach to radiation hardness, new

libraries• Cost management, masks are extremely expensive

($500K/set)• International collaborations for qualifying processes

– Move requires substantial effort and time- start soon.

Page 7: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 7

• APD Readout Chip (readout chip for small signals)– Multiple channel (64?) readout device for applications

like Neutrino Off-Axis Detector and LC Calorimeter R&D.

– Must operate with low input signals (2000 e).– Have performed test with in-house designed chip

(MASDA) for amorphous silicon detectors, which shows low noise operation is possible.

– APDs are cooled to –40°C to reduce dark current.– New design to be optimized for APDs with minimum

S/N=10.

Page 8: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 8

• Readout Chip for RPCs and GEMs– Possible application in Linear Collider and Neutrino Off-

Axis Detector.– Single chip with different front end amplifiers for

different detectors.– Multi-channel device (8-32 channels, size mostly related to

RPC layout).– One bit ADC– Timestamp each hit.– Store hits in local buffers, read out periodically.– Non-triggered system

• Read out timestamps and channel ID into trigger processor

• Use timestamps to construct hits• Works well for low event rates and low noise rates

Page 9: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 9

• Multi-channel Mini-strip Readout ASIC– Designed for silicon strip upgrades requiring higher

luminosity such as SLHC and Phenix (work for others).

• Design for Cin = 0.2 – 1 pf (50 x 2000-10000 um cells)

• High channel count, e.g. 512 ch/chip• Relaxed bump bonding pitch

– Challenges• Chip power distribution• Back side current connection for lower noise• Cooling

– Borrow from experience on SVX4 and FPIX2

Page 10: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 10

• CCD and Monolithic Active Pixel Sensors (MAPS)– Alternate technologies for future detectors– ASIC for CCD projects like the Linear Collider

• 20 x 20 um cells• Radiation concerns (~10 Krads)• 25-50 Mhz readout on 8-30 readout amplifiers/CCD• Internal 8 bit FADC• Cluster processing

– MAPS hold great potential for HEP and space • Combined detector and readout chip with ADCs• Very small pixel cells (3 um x 3 um)• Low mass (thin to 50 um)

– MASDA• Amorphous silicon detector with integrated transistors for

medical imaging – low noise, high resolution, slow readout.

Page 11: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 11

ASIC Design Group

• Particle Physics Division– Electrical Engineering Department -70

• Board level and other hardware design• ASIC Design

– ASIC designers - 5» Full custom analog» Full custom mixed signal

– Testing – group of 5» Wafer and robotic testing of packaged parts» Radiation studies

Page 12: ASIC R&D at Fermilab R. Yarema October 30, 2003. Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout

October 30, 2003 Long Range Planning Committee 12

Summary

• ASICs have been and will continue to be critical to new detector development.

• ASIC development is costly in terms of tools and chip fabrication.

• ASIC R&D is needed to keep pace with new process features and design challenges.

• ASIC R&D needs to be adequately funded and proceed along with detector development