31
1 | Page Request for Tender Academic Health Wellness Support Centre Project (The Village) Addendum #2 April 11, 2017 RFT #: 17-002 Project Number: 1670 Issued: March 30, 2017 Closing Date: April 25, 2017 Closing Time: 2:00:00 pm EDT

April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Embed Size (px)

Citation preview

Page 1: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

1 | P a g e

Request for Tender Academic Health Wellness Support Centre

Project (The Village) Addendum #2

April 11, 2017

RFT #: 17-002 Project Number: 1670

Issued: March 30, 2017

Closing Date: April 25, 2017

Closing Time: 2:00:00 pm EDT

Page 2: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Addendum - Clarifying Answers

2 | P a g e

This addendum forms a part of RFT 17-002 Academic Health Wellness Support Centre Project (The Village)

Remove:

PART 1 GENERAL 1.5 CONTRACT/BID DOCUMENTS

.5 Queries / Addenda .4 Clarifications requested by Bidders must be in writing and emailed to the RFT Coordinator

before April 12, 2017. The reply may be in the form of an addendum, a copy of which will be posted to MERX no later than April 18, 2017.

Replace with:

PART 1 GENERAL 1.5 CONTRACT/BID DOCUMENTS

.5 Queries / Addenda .4 Clarifications requested by Bidders must be in writing and emailed to the RFT Coordinator

before April 18, 2017 at 11:00:00am EDT. The reply may be in the form of an addendum, a copy of which will be posted to MERX no later than April 18, 2017.

Add: All changes and updates as identified in the attached Appendix A.

Page 3: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Canadore College of Applied Arts & Technology Academic Health Wellness Support Centre Project (The Village) RFT 17-002, Project No. 1670

00900

ADDENDUM NO. 2

Issued April 11, 2017

Page 1 of 4

1 General

The following amendments are hereby made an integral part of the Contract Documents for the above project, including all applicable sub-contractors affected.

Included attachments are as follows: Door and Frame Schedule Door Elevations – DD.1 and DD.2 Frame Elevations – FE.1 to FE.7 Sketches AD2.01 to AD2.13.

Indicate the receipt of this Addendum on the specified Tender Form as required.

2 Amendments

2.1 PROJECT MANUAL – SPECIFICATIONS

.1 Section 01021 Allowances

.1 Item 1.4.1 .1 At the end of the first sentence replace the ‘question mark’ symbol with a period. .2 Delete the following items from the list of allowance items:

.4 Curtain and Track

.7 Window Screening and Blinds

.13 Asbestos Abatement Clarification – Work / Supply and installation the above noted items removed from the list of allowances shall be included in the base bid price. Clarification to list of Allowance items – Unless specifically indicated in the drawings and specifications all work shall be included in the base bid. All allowance items are in addition to all indicated work.

.2 Section 02530 .1 Delete in its entirety.

Clarification – Refer to various specification Sections same division for work carried under this specification.

.3 Section 09653 Resilient Athletic Flooring .1 Add item 2.1.2 - ‘Conner PowerDek Flek’ 10mm thick is an approved alternate.

.4 Room Finish Schedule .1 Mens Washroom 315 and Womens Washroom 317 – Delete RB Base. Per interior elevations all

wall tile extends to the floor. .2 Add Room F302B IT Storage. See notes below Sheet A2.08. Floor to be SHV-1 with RB base,

painted gypsum walls and painted gypsum ceiling @ 2400 aff.

.5 Door and Screen Schedule .1 Delete the Door and Screen Schedule along with the Door and Frame Elevations. Replace with

attached Door and Frame Schedule along with attached Door and Frame Elevations. Door Elevations are numbered DD.1 and DD.2. Frame Elevations are numbered FE.1 to FE.7. Note on the Door and Frame Schedule all revisions this addendum are highlighted in yellow.

.2 Add General Notes – Door DN325A

APPENDIX A

Page 4: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Canadore College of Applied Arts & Technology Academic Health Wellness Support Centre Project (The Village) RFT 17-002, Project No. 1670

00900

ADDENDUM NO. 2

Issued April 10, 2017

Page 2 of 4

1. General Contractor is to confirm exact final height of new ceilings in Rooms N325 and N326 with the Consultant prior to ordering the Partition.

2. Should Door not be installed prior to Owner occupancy the General Contractor shall provide an acoustically insulated temporary partition similar to Partition Type ‘P3’ in lieu of the door until the door is able to be installed.

.3 Add General Notes – Door DD302 1. Provide sliding surface door hardware per Section 08710, Item 2.1.9.

.4 Add General Note – Doors DN325A and DM304A .1 Door manufacturer is to fully coordinate with the steel fabricator exact location of overhead

track layout, fastening requirements of the track to the steel framing and all hanging bolt locations.

.5 See attached sketch AD2.01 for door details not otherwise already indicated in the drawings. .6 See attached sketch AD2.02 for Hollow Metal Frame Throat Size Schedule. All hollow metal

frames to be wrap around type with the exception of all doors installed in partition type ‘P7’ and all exterior walls.

2.2 DRAWINGS

.1 General 1. All room names with a ‘□’ instead of a letter, refer to Room Finish Schedule for appropriate

Room Name. 2. All structural grid bubbles on architectural drawings with a ‘□’ instead of a letter, refer to

Structural Engineering drawings for proper label. .2 Sheet A0.01

.1 Refer to ‘Interior Partition Schedule’ .1 Delete all references in the schedule to ‘Refer to Note 8’.

Clarification – Note 8 on the ‘General Notes Partition and Furring Schedules’ still applies

to the project but the reference didn’t apply to all partitions it was noted in. Apply Note 8

as applicable to the appropriate partition type. .2 Add Partition Type ‘P5a’ – Partition type ‘P5a’ is the same as ‘P5’ but the double layer of

gypsum is to be installed on 1 side of the stud only. .3 Sheet A0.02

.1 Drawing 1/A0.02 .1 Drawing Title to say ‘Overall Key Plan’. .2 Within drawing notations replace ‘□’ with ‘X’

.2 Drawing 2/A0.02 – In drawing title and notations replace ‘□’ with the letter ‘K’ .1 Drawing 3/A0.02 .1 Drawing title to Read ‘Suite Key Plan’ .2 Departments Legend – ‘Snoe□elen Room’ and replace with Snoezelen Room. .4 Sheet A0.03

.1 Delete ‘OBC Data Matri□’ and replace with ‘OBC Data Matrix’ .5 Sheet A0.04

.1 Fire Separation Legend – Replace all instances of ‘Hori□ontal’ and replace with ‘Horizontal’ .2 Provide 1 hour fire resistance rating around Room F302A Cold Storage. .6 Sheet A0.05

Page 5: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Canadore College of Applied Arts & Technology Academic Health Wellness Support Centre Project (The Village) RFT 17-002, Project No. 1670

00900

ADDENDUM NO. 2

Issued April 10, 2017

Page 3 of 4

.1 Delete drawing 7/A0.05 and replace with attached sketch AD2.03. .2 Add typical details per attached sketches AD2.04 and AD2.05. The attached details are typical

and limited to new work in existing building. AD2.04 is a typical detail for interference of new and existing mechanical and structural work in acoustically rated partitions that do not require a fire rating. AD2.05 are typical details for interference and penetrations at fire rated partitions in addition to those already on the sheet. All typical details as noted above within this addendum and as indicated on Sheet A0.05 pertain also to existing partitions. Provide all required work at existing partitions to meet the criteria of these details. Assume all existing partitions to remain are similar in construction to Partition Type ‘P3’ per Interior Partition Schedule Sheet A0.01.

Clarification – All details on Sheet A0.05 indicated on the Tender drawings pertain to the complete project both Existing Building and New Construction.

.7 Sheet A2.01

.1 Notes – Add the following notes: 10. Hand over existing drinking fountain to Owner for the purpose of reuse outside of this

work. Fountain is located in Corridor 325 approximately outside new Universal Washroom 325.

11. Infill all existing duct penetrations from partitions indicated to remain due to mechanical removals with partition assembly to match qualities of that partition.

.8 Sheet A2.05

.1 Add the following note to IT Room 331 – Provide a 1 hour fire resistance rating around room 331. See typical details for all work to existing wall to achieve required rating. Fire seal at head of wall as detailed.

.9 Sheet A2.06

.1 See attached sketch 2/AD2.06 for revisions to firewall along gridline ‘1’ indicating revised wall

types. .10 Sheet A2.07

.1 Relocate door DD302 on same wall to accommodate sliding hardware. Door opening shall be 950 X 2150 high. Return painted gypsum around door opening jambs and head. Provide 1200 high end wall corner guards each jamb. Provide plywood blocking inside wall at door head to extents as required to mount sliding door hardware per manufacturers instructions. See attached sketch 1/AD2.06.

.11 Sheet A2.08

.1 See attached sketch 1/AD2.07 for revisions to Room F302 Indigenous Prehealth. Revision includes the addition of Room F302B IT Storage and associated door DF302B.

.2 Room S303 Observation Room – Revise reference number to screen from ‘S303’ to ‘SS303’.

.3 Clarification – Partition between Vestibule 307 and Early Childhood Education is not hatched or labeled. Partition to be type ‘P3’ per general notes Sheet A0.01. See attached sketch 2/AD2.07.

.4 See attached sketch 2/AD2.07 for revisions to furring and dimension to shower wall in Washroom M306.

.12 Sheet A7.04

.1 See attached sketch AD2.08 for interior elevations revisions to the Student Run Clinic. .13 Sheet A7.07

Page 6: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Canadore College of Applied Arts & Technology Academic Health Wellness Support Centre Project (The Village) RFT 17-002, Project No. 1670

00900

ADDENDUM NO. 2

Issued April 10, 2017

Page 4 of 4

.1 See attached sketch AD2.09 for revisions to Elevations C, E and G to add Casework Panels. On Elevation C coordinate routing of exhaust duct with mechanical drawings as indicated.

.14 Sheet A7.09

.1 See attached sketch AD2.10 for interior elevations inside room F302A. On radius wall not indicated on sketch install 19mmX89mm vertical lap joint cedar planks from top of wall base to underside of ceiling entire wall. All cedar inside room including both shelving and planks to remain unfinished.

.15 Sheet A7.13

.1 Revise Drawing Title for drawing 3/A7.13 to ‘Janitor 324’. .2 See attached sketch 2/AD2.11 for revisions to Janitor Room 324 to add dimensions to the

casework. All casework this room to be .3 See attached sketch 1/AD2.11 for revisions to Elevation ‘A’ on drawing 1/A7.13.

.16 A9 Interior Details

.1 See attached sketch AD2.12 for interior details in Early Childhood Education Room E301 indicating work to complete suspended wood frame “Nest”.

.2 See attached sketch AD2.13 for various interior details. .1 1/AD2.13 details work to complete the end of all of the low walls as indicated in Dental

Clinic D301. .2 2/AD2.13 is a detail at the edge of the mirror in Mens and Womens Washrooms 315 and

317. Refer to drawing 5/A7.14, Elevation ‘A’ and 6/A7.14, Elevation ‘A’ for mirror location. .3 3/AD2.13 is a ceiling detail at the bulkhead in Corridor C306 behind door DC306. .4 4/AD2.13 is a typical headboard detail behind all beds (NIC) in the Nursing Labs. Refer to

drawings 1/A7.13 and 2/A7.14. Panels to be fully adhered to wall. Do not paint behind headboards.

2.3 MECHANICAL / ELECTRICAL ADDENDA

.1 None issued for this Addendum.

2.4 CIVIL ADDENDA

.1 None issued for this Addendum.

End of Addendum

Page 7: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Page DS-1 of 3EVANS BERTRAND HILL WHEELER ARCHITECTURE INC. DOOR & FRAME SCHEDULE

PROJECT CC ACADEMIC HEALTH WELLNESS CENTRE

PROJECT NO 1670

DATE April 2017

ULC HDWE GLAZING REMARKS

NO. ROOM TYPE MAT FIN WIDTH HT TYPE MAT FIN LABEL

D201 STAIRS A TBHM PT 2-1050 2150 1 TBHM PT - CL - Note 10

D204 ELECTRICAL ROOM A HM PT 950 2150 1 HM PT 45 MIN CL -

D205 OXYGEN STORAGE A HM PT 950 2150 1 HM PT 45 MIN CL -

D206 IT ROOM A HM PT 950 2150 1 HM PT 45 MIN CL -

D207 DENTAL COMPRESSORS A HM PT 950 2150 1 HM PT - - -

D300 VESTIBULE F TBAL SP 2-1050 2150 CW TBAL SP - CL TIGU NOTE 2

D300A VESTIBULE SP SP SP 2-1050 2400 18 SP SP - SP SP SEE SECTION 08412, SEE NOTES 2, 11 and 12

D301 CORRIDOR A HM SP 2-1050 2150 1 HM SP 90 MIN CL - MAG HOLD OPEN

D306 CORRIDOR F TBAL SP 950 2150 CW TBAL SP - CL TIGU

D307 VESTIBULE F TBAL SP 1050 2150 CW TBAL SP - CL TIGU NOTE 2

D307A VESTIBULE E AL SP 1050 2150 14 AL SP - CL T NOTE 2

D308 JANITOR A HM PT 950 2150 1 HM PT - CL -

D309 UNIVERSAL WASHROOM A HM PT 950 2150 1 HM PT - CL - NOTE 2

D310 CONSULT/MEET ROOM SP SP SP 950 2400 20 SP SP - SP, CL SP SEE SECTION 08412, SEE NOTES 11 and 12

D311 CONSULT SP SP SP 950 2400 19 SP SP - SP, CL SP SEE SECTION 08412, SEE NOTES 11 and 12

D313 CORRIDOR E AL SP 1050 2150 15 AL SP - CL T

D314 VESTIBULE F TBAL SP 1050 2150 CW TBAL SP - CL TIGU NOTE 2

D314A VESTIBULE E AL SP 1050 2150 16 AL SP - CL T NOTE 2

D316 BARRIER FREE WR A HM PT 950 2150 1 HM PT - CL - NOTE 2

D319 EXIT STAIRS A HM PT 950 2150 5 HM PT 45 MIN CL FR

D324 JANITOR A HM PT 950 2150 1 HM PT - CL -

D323 CORRIDOR B HM PT 950 2150 4 HM PT 45 MIN CL FR

D323A CORRIDOR B HM PT 950 2150 1 HM PT 45 MIN CL FR

D325 UNIVERSAL WASHROOM A HM PT 950 2150 1 HM PT - CL - NOTE 2

D328 MECH CLOSET A HM PT 750 2150 1 HM PT 45 MIN CL -

D331 IT ROOM A HM PT 950 2150 1 HM PT 45 MIN CL -

D330 CORRIDOR A HM PT 950 2150 1 HM PT 45MIN CL -

D329 STAIRS A HM PT 950 2150 1 HM PT 45MIN CL -

S310 WAITING - SP SP - - 21 SP SP - - SP SEE SECTION 08412

DN301 CORRIDOR A HM PT 1200 2150 1 HM PT - CL -

DN302 CLASSROOM C HM PT 950 2150 1 HM PT - - T

DN304 PULMINARY FUNCTION TESTING C HM PT 1200 2150 1 HM PT 45MIN CL FR

DN304A PULMINARY FUNCTION TESTING A HM PT 1200 2150 1 HM PT - - -

DN305 LOW FEDILITY LAB C HM PT 1200 2150 1 HM PT - CL T

DN307 CONTROL ROOM C HM PT 950 2150 1 HM PT - T

DN308 ANTE ROOM C HM PT 1200 2150 1 HM PT - T

DN309 OR / BARIATRIC ROOM C HM PT 1200 2150 1 HM PT - - T

DN310 WASHROOM D HM PT 1070+450 2150 1 HM PT - - - Lock Down Lief

DN312 SOILED LINENS A HM PT 950 2150 1 HM PT - -

DN313 CLEAN LINENS C HM PT 950 2150 1 HM PT - CL T

DN314 CORRIDOR A HM PT 1200 2150 1 HM PT - CL -

DN315 STORAGE A HM PT 950 2150 1 HM PT - -

DN315A STORAGE A HM PT 1200 2150 1 HM PT - - -

DN317 WAITING C HM PT 950 2150 1 HM PT - T

DN318 CHANGE ROOM A HM PT 950 2150 1 HM PT - -

DN319 LOW FEDILITY LAB C HM PT 1200 2150 1 HM PT - T

DN320 DEBRIEF C HM PT 950 2150 1 HM PT - T

DN321 MEN'S CHANGE ROOM A HM PT 950 2150 1 HM PT - CL -

DN322 WOMEN'S CHANGE ROOM A HM PT 950 2150 1 HM PT - CL -

DN323 HIGH FIDELITY LAB C HM PT 1200 2150 1 HM PT - T

DN324 CONTROL ROOM C HM PT 950 2150 1 HM PT - - MG VEIW TO ROOM N323

DN325 DEBRIEF / CLASSROOM C HM PT 950 2150 1 HM PT - T

DN325A DEBRIEF / CLASSROOM G SP SP EL EL SP SP SP - SP - SEE SECTION 10650

NURSING

DOOR FRAME

COMMON AREAS

Issue 4/10/2017

Page 8: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Page DS-2 of 3EVANS BERTRAND HILL WHEELER ARCHITECTURE INC. DOOR & FRAME SCHEDULE

PROJECT CC ACADEMIC HEALTH WELLNESS CENTRE

PROJECT NO 1670

DATE April 2017

ULC HDWE GLAZING REMARKS

NO. ROOM TYPE MAT FIN WIDTH HT TYPE MAT FIN LABEL

DOOR FRAME

DN326 DEBRIEF / CLASSROOM C HM PT 950 2150 1 HM PT - - T

DN327 STORAGE A HM PT 950 2150 1 HM PT - - -

DN327A STORAGE A HM PT 950 2150 1 HM PT - - -

DN328 HIGH FIDELITY LAB C HM PT 1200 2150 1 HM PT - - T

DN329 CONTROL ROOM C HM PT 950 2150 1 HM PT - - MG VIEW TO ROOM N328

SN304 PULMINARY FUNCTION TESTING - - - - - 9 HM PT 45MIN - FR

SN307 CONTROL ROOM - - - - - 10 HM PT - - MG VIEW TO ROOM N309

SN317 WAITING - - - - - 13 HM PT - - T OPAQUE FILM ON GLAZING BY CASH ALLOWANCE

SN324 CONTROL ROOM - - - - - 7 HM PT - - MG VIEW TO ROOM N323, MITRED GLASS CORNER

SN329 CONTROL ROOM - - - - - 7R HM PT - - MG VIEW TO ROOM N328, MITRED GLASS CORNER

DC302 DOCTOR'S OFFICE A HM PT 950 2150 1 HM PT - -

DC303 EXAM ROOM CARDIO A HM PT 950 2150 1 HM PT - -

DC304 EXAM ROOM CAST REMOVAL A HM PT 950 2150 1 HM PT - -

DC305 PHLOBOTAMY CHAIR A HM PT 950 2150 1 HM PT - -

DC306 CORRIDOR SP SP SP 950 2400 25 SP PT - SP SP SEE SECTION 08412, SEE NOTES 11 and 12

DC307 SOILED LINENS A HM PT 950 2150 1 HM PT - -

DC308 CLEAN LINEN SUPPLIES/EQUIP A HM PT 1050 2150 1 HM PT - CL -

DD301 DENTAL CLINIC SP SP PT 950 2400 27 SP PT - SP T SEE SECTION 08412, SEE NOTES 11 and 12

DD302 SOILED ROOM A HM SP 950 2150 - - - - SP SEE SECTION 08710 FOR SLIDING DOOR HARDWARE

DD303 DISPENSING CLEAN C HM PT 950 2150 1 HM PT - - T

DD304 DENTAL LAB B TBHM PT 950 2150 1 TBHM PT - - TIGU NOTE 6

DD314 CLEAN STORAGE MEDICAL A HM PT 950 2150 1 HM PT - - -

DD316 STORAGE FILES A HM PT 950 2150 1 HM PT - - -

DD317 FLEX OFFICE C HM PT 950 2150 1 HM PT - - T

DD318 FLEX OFFICE C HM PT 950 2150 1 HM PT - - T

DD319 FLEX OFFICE C HM PT 950 2150 1 HM PT - - T

DD320 CORRIDOR A HM PT 1050 2150 1 HM PT - CL -

DF301 SMUDGING ROOM A AHM PT 950 2150 1 AHM PT - CL - SEE SECTION 08348

DF301A SMUDGING ROOM A AHM PT 950 2150 1 AHM PT - CL - SEE SECTION 08348

DF302 INDIGENOUS PREHEALTH B HM PT 950 2150 1 HM PT - - T

DF302A COLD STORAGE A TBHM PT 950 2150 1 TBHM PT 45MIN CL - WEATHER STRIPPING

DF302B IT STORAGE A HM PT 2150 1 HM PT

DF303 CORRIDOR E AL AL 1050 2150 17 AL SP - CL T

DF304 COMMUNITY KITCHEN B HM PT 950 2150 1 HM PT - - T

DF304A COMMUNITY KITCHEN C HM PT 950 2150 1 HM PT 45 MIN CL FR

DF304B COMMUNITY KITCHEN A HM PT 2-1050 2150 1 HM PT 45 MIN CL -

DF305 INDIGENOUS STUDIES B HM PT 1050 2150 2 HM PT 45 MIN CL FR

DF305A INDIGENOUS STUDIES F TBAL SP 1050 2150 CW TBAL SP - CL TIGU NOTE 1

DF305B INDIGENOUS STUDIES H SP SP 2700 3000 DWG SP SP - SP SP SEE SECTION 08362, NOTE 7

DF306 ELDER'S ROOM B HM PT 950 2150 1 HM PT - - T

DF307 CHANGE ROOM A TBHM PT 950 2150 1 TBHM PT - CL - REFER TO A1 SERIES OF DRAWINGS

DF308 TOOL STORAGE A HM PT 950 2150 1 HM PT - CL - REFER TO A1 SERIES OF DRAWINGS

DF309 WOOD STORAGE A HM PT 2-950 2150 1 HM PT - CL - REFER TO A1 SERIES OF DRAWINGS

SF307 CHANGE ROOM - - - - - 8 TBHM PT - - TIGU REFER TO A1 SERIES OF DRAWINGS

DH301 CONSULT / EXERCISE / FLEX SP SP SP 950 2400 22 SP SP - SP SP SEE SECTION 08412, SEE NOTES 11 and 12

DH301A CONSULT / EXERCISE / FLEX B HM PT 950 2150 1 HM PT - - T

DH302 CLASSROOM FLEX LEARNING B HM PT 950 2150 1 HM PT - - T

DH303 COUNCELLING A HM PT 950 2150 1 HM PT - - -

DH303A COUNCELLING A HM PT 950 2150 1 HM PT - - -

DH303B COUNCELLING A HM PT 950 2150 1 HM PT - - -

STUDENT RUN CLINIC

SEMI HEATED OUTBUILDING

DENTAL CLINIC

FIRST NATIONS

HOLISTIC MENTAL HEALTH

Issue 4/10/2017

Page 9: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Page DS-3 of 3EVANS BERTRAND HILL WHEELER ARCHITECTURE INC. DOOR & FRAME SCHEDULE

PROJECT CC ACADEMIC HEALTH WELLNESS CENTRE

PROJECT NO 1670

DATE April 2017

ULC HDWE GLAZING REMARKS

NO. ROOM TYPE MAT FIN WIDTH HT TYPE MAT FIN LABEL

DOOR FRAME

DH304 COUNCELLING A HM PT 950 2150 1 HM PT - - -

DH304A COUNCELLING A HM PT 950 2150 1 HM PT - - -

SH301 CONSULT / EXERCISE / FLEX - - - - - 24 SP SP - - SP SEE SECTION 08412

SH301A CONSULT / EXERCISE / FLEX - - - - - 23 SP SP - - SP SEE SECTION 08412

SH301B CONSULT / EXERCISE / FLEX - - - - - 12 HM PT - - T PROVIDE VISION GLASS IN LIEU OF SPANDREL GLASS

SH303 COUNSELLING - - - - - 10 HM PT - - MG VIEW TO ROOM H303

SH303A COUNSELLING - - - - - 10 HM PT - - MG VIEW TO ROOM H303

SH304 COUNSELLING - - - - - 10 HM PT - - MG VIEW TO ROOM H304

SH304A COUNSELLING - - - - - 10 HM PT - - MG VIEW TO ROOM H304

DS301 BUFFER ZONE A HM PT 950 2150 1 HM PT - CL -

DS302 SNOEZELEN ROOM C AHM PT 950 2150 1 AHM PT - CL SP SEE SECTION 08348

DS303 OBSERVATION ROOM C HM PT 950 2150 1 HM PT - - T

SS301 OBSERVATION ROOM - - - - - 11 HM PT - - T

SS301A BUFFER ZONE - - - - - 12 TBHM PT - - TIGU

SS303 OBSERVATION ROOM - - - - - 10 TBHM PT - - MG/TIGU VIEW TO ROOM S302

DE301 EARLY CHILD EDUCATION C HM PT 950 2150 3 HM PT - - T

DE302 STORAGE A HM PT 950 2150 1 HM PT - - -

DM301 STORAGE C HM PT 950 2150 1 HM PT - - T

DM303 THERAPY SP SP SP 950 2400 25 SP SP - SP SP SEE SECTION 08412, SEE NOTES 11 and 12

DM304 OT GROUP SPACE C HM PT 950 2150 1 HM PT - CL T

DM304A OT GROUP SPACE J SP SP EL EL DWG SP SP - SP SP SEE SECTION 10651

DM305 STORAGE A HM PT 950 2150 1 HM PT - - -

DM306 WASHROOM A HM PT 950 2150 1 HM PT - CL -

SM303 THERAPY - - - - - 12 HM PT - - T

ABBREVIATIONS

ALNON THERMALLY BROKEN

ALUMINUMFR SP

AHM ACOUSTIC HOLLOW METAL HM T

CL CLOSER PBTBAL RM REMOVEABLE MULLION

PGWGTBHM THERMALLY BROKEN HOLLOW METAL MHO MAGNETIC HOLD OPEN DEVISE

CW CURTAIN WALL (Frame Integral

to )PT

TIGU TEMPERED INSULATING GLASS UNIT

MG MIRRORED GLASS ELDWG SEE DRAWINGS

NOTES

1. Frame is integral to curtain wall.

2.

3.

4. Provide electronic hold open device.

5. See drawings for frame and hardware details.

6.

7. All work this door, per specification Section 08362 Sectional Metal Overhead Doors. See Drawings for door and frame details.

8.

9

10

11 Coordinate with electrical drawings for all electronic security. Provide hardware to suite.

12 Door elevation inlcuded in frame elevation

SEE SPECIFICATION

NON THERMALLY BROKEN

HOLLOW METAL

Doors and frames to be acoustically sealed. Provide sweep and weatherstripping perimeter of frame to be carried by Section 08710

Specification.

See Drawings for further frame details.

Power door operator required.

SNOEZELEN ROOM

FIRE RATED GLASS

EARLY CHILDHOOD EDUCATION

Megnetic Hold Open Device is requires

SEE DOOR/FRAME ELEVATION

MOBILITY CLINIC

POLISHED GEORGION WIRE

GLASS

PAINT

Exterior Weatherstripping

TEMPERED GLASS

PANIC BARTHERMALLY BROKEN ALUMINUM

Provide removable mullion

Issue 4/10/2017

Page 10: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 11: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 12: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 13: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 14: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 15: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 16: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 17: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 18: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 19: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Drawing name: J:\2016\1670 Canadore Wellness Academic Centre\1670 Post Tender Drawings\1670_DOOR FRAME ELEVATIONS.dwg

project

title

checked by:

project no:

drawn by:

scale:

date: Apr 10, 2017

dwg no:

1:5 1670

AL BRBACADEMIC HEALTH WELLNESS SUPPORTCENTRE (THE VILLAGE)CANADORE COLLEGENORTH BAY, ONTARIO

FRAME DETAILS

Page 20: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

Drawing name: J:\2016\1670 Canadore Wellness Academic Centre\1670 Post Tender Drawings\1670_DOOR FRAME ELEVATIONS.dwg

project

title

checked by:

project no:

drawn by:

scale:

date: Apr 10, 2017

dwg no:

- 1670

AL BRBACADEMIC HEALTH WELLNESS SUPPORTCENTRE (THE VILLAGE)CANADORE COLLEGENORTH BAY, ONTARIO

HOLLOW METAL FRAME THROATSIZE SCHEDULE

Page 21: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

1670

BRBJWE

1:10

REVISED DRAWING 7/A0.05

CANADORE COLLEGE - ACADEMICHEALTH WELLNESS SUPPORT CENTRE100 COLLEGE DRIVENORTH BAY, ONTARIO

Page 22: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

STRUCTURE

ACOUSTICALLY RATED STEEL STUD PARTITION

1670

BRBJWE

1:10

TYPICAL DETAIL - INTERFERENCE @ACOUSTICALLY RATED PARTITION

CANADORE COLLEGE - ACADEMICHEALTH WELLNESS SUPPORT CENTRE100 COLLEGE DRIVENORTH BAY, ONTARIO

Page 23: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

STRUCTURE

ACOUSTICALLY AND FIRE RATED STEEL STUD PARTITION

STRUCTURE

NON ACOUSTICALLY RATED FIRE RATED STEEL STUD PARTITIONDUCT PENETRATION @

FIRE RATED STEEL STUD PARTITION

1670

BRBJWE

1:10

TYPICAL DETAILS - INTERFERENCE ANDPENETRATIONS @ FIRE RATED PART.

CANADORE COLLEGE - ACADEMICHEALTH WELLNESS SUPPORT CENTRE100 COLLEGE DRIVENORTH BAY, ONTARIO

Page 24: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

D302SOILEDROOM

1ALIC

C301INTERDISCIPLINARY

TEAM CONSULT

DD30

2DC302

DC30

6

P1

P1

P4

P3P4

RWLEP

CG

CG

HD CGCG

N304PULMINARYFUNCTIONTESTING

318

317WOMENS

WASHROOM

DN304A

D301

P2

P2

SN30

4

F2

P

A2.108

F

J

2/A7.01

2/A7.01

P9

P5a

1670

BRBJWE

1:100

REVISED DRAWINGS A2.06 AND A2.07REVISIONS DOOR DD302, CORRIDOR 301

CANADORE COLLEGE - ACADEMICHEALTH WELLNESS SUPPORT CENTRE100 COLLEGE DRIVENORTH BAY, ONTARIO

SCALE 1:100REVISIONS DOOR DD3021

AD2.06

SCALE 1:100REVISIONS VESTIBULE 3072

AD2.06

Page 25: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct

WB

W

TV

TV

WB

WBH303

COUNSELLING

F302INDIGENOUSPREHEALTH

F302ACOLD

STORAGE

327STORAGE

DH303

DF3

01A

SH303

SH303A

D327

DH301A

DH302

DF302A

P1CG

D31

3

P3a

P3a

F2

F2

P1

P7

P4

F2

RWL

312CORRIDOR

RWLL K

3/A7.02

DF302B

F2

F302BIT

STORAGE

CG

CG

WB

CG

CG

M304OT / GROUP

SPACE

M306WASHROOM

M305STORAGE

306CORRIDOR

307VESTIBULE

D307

D307A

DE30

1

DM306

DM304A

P4

P1

P1DM305WB

TV

PBPB

PBPB

M

M

DM30

4

PB

P1

F2

HR

RWL

F2 FFHF2

QR 3/A7.02

1670

BRBJWE

1:100

REVISED DRAWING A2.08REVISION ROOM F302, VESTIBULE 307

CANADORE COLLEGE - ACADEMICHEALTH WELLNESS SUPPORT CENTRE100 COLLEGE DRIVENORTH BAY, ONTARIO

SCALE 1:100REVISIONS ROOM F3021

AD2.07

SCALE 1:100REVISIONS VESTIBULE 3072

AD2.07

Page 26: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 27: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 28: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 29: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 30: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct
Page 31: April 11, 2017 March 30, 2017 April 25, 2017 - · PDF fileStructural Engineering drawings for proper label. ... .1 Drawing 1/A0.02 ... Elevation C coordinate routing of exhaust duct