6
Windsor Solar Project DRAFT Water Assessment Report APPENDIX A Supplementary Information

APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

Windsor Solar Project DRAFT Water Assessment Report

P a g e | 27

APPENDIX A

Supplementary Information

Page 2: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

APPENDIX A1

Official Plan Mapping

Page 3: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

!

!

!

!

!

!

!

!

!!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

GRAND MARAIS DRAIN

LITTLE

RIVE

R

E C ROW EXPY

WALKE

R RD

TECUMSEH RD E

HOWA

RD AV

E

WYANDOTTE ST E

LAUZO

N PKY

DOUG

ALL AV

E

BASELINE RD

BANW

ELL RD

COUNTY RD 42

HURO

N CHU

RCH R

D

PILLET

TE RD

OJIBWAY PKY

MALDEN

RD DOMI

NION B

LVD

MATCHETT

E RD

9TH CO

N RD

COUN

TY RD

17

RHODES DR

PROVINCIAL RD

TECUMSEH RD W

PRINCE RD

GEOR

GE AV

E

CAMP

BELL

AVE

CENTRA

L AVE

CABANA RD W

SANDWICH ST

OUELL

ETTE A

VE

8TH CO

N RD

MCHUGH ST

CLOVE

R AVE

DOUGALL PKY

MCDO

UGALL

ST

DROU

ILLAR

D RD

SEMINOLE STOTTAWA ST

JEFFER

SON B

LVD

LAUZO

N RD

CABANA RD E

PAREN

T AVE

CRAW

FORD

AVE LIN

COLN

RD

GILES BLVD

WYANDOTTE ST W

FOREST GLADE DR

UNIVERSITY AVE W

7TH CO

N RD

NORTH TALBOT RD6TH

CON R

DMA

RENT

ETTE A

VE

SOUTH NATIONAL ST

CHRY

SLER C

ENTRE

WEST GRAND BLVD

PLYMOUTH DR

GRAND MARAIS RD W

COUSINEAU RD

LITTLE RIVER RD

RICHMOND ST

LAUZO

N RD

GRAND MARAIS RD E

TOWN OF LASALLE

TOWN OF TECUMSEH

DETROIT RIVER

CITY OF DETROIT

Refer to Schedule E:City Centre

TUNN

ELRAIL

TUNN

EL

BRIDG

E

SCHEDULE D:LAND USE

City of Windsor Official Plan Volume IDate of OMB Approval : September 25, 2000Office Consolidation : September 7, 2012

RESIDENTIAL

FUTURE URBANAREA

FUTURE EMPLOYMENTAREA

AIRPORT

MAJORINSTITUTIONAL

COMMERCIALCENTRE

COMMERCIALCORRIDOR

BUSINESS PARK WATERFRONT PORT INDUSTRIAL

WATERFRONT RECREATION

NATURALHERITAGE

MIXED USE

OPEN SPACE

WATERFRONTRESIDENTIAL

0 1,500 3,000750Meters [

AS AMENDED BY:OPA# 2 - Approved: Dec. 11, 2000 OPA#13 - Approved: Nov. 22, 2001OPA#17 - Approved: Jan. 3, 2002OPA#18 - Approved: Mar. 15, 2002OPA#21 - Approved: July 16, 2002OPA#12 - Approved: Aug. 21, 2002OPA#24 - Approved: Oct. 7, 2002OPA#23 - Approved: Oct. 9, 2002OPA# 5 - Approved: Oct. 29, 2002OPA#27 - Approved: Dec. 16, 2002 (Superseded by OPA #40)OPA#28 - Approved: Dec. 16, 2002OPA#30 - Approved: Apr. 7, 2003OPA#31 - Approved: Apr. 14, 2003OPA#32 - Approved: May 5, 2003OPA#34 - Approved: May 20, 2003OPA#33 - Approved: June 2, 2003OPA#35 - Approved: Aug. 11,2003OPA#37 - Approved: Feb 19, 2004 (Superseded by OPA #40)OPA#36 - Approved : March 3, 2004OPA#39 - Approved : March 26, 2004OPA#38 - Approved : July 21, 2004OPA#40 - Approved : July 21, 2004OPA #44 - Approved : January 6, 2005OPA #47 - Approved : May 10, 2005OPA #48 - Approved : August 18, 2005OPA #59 - Approved : March 27, 2007OPA #62 - Approved : June 15, 2007OPA #64 - Approved : September 20, 2007OPA #60 - Approved : May 7, 2007 - (Former Township of Sandwich South)OMB Decision/Order No. 2667 - October 5, 2007OPA #70 - Approved : April 20, 2009OPA #73 - Approved : September 7, 2006OMB Decision/Order No. 2513 - February 12, 2009 OPA #74 - Approved : December 4, 2009OPA #80 - Approved : November 22, 2010

OPA #2

OPA #13

OPA #17

OPA #18

OPA #21

OPA #12

OPA #24

OPA #23

OPA #5OPA #28

OPA #30

OPA #31

OPA #32

OPA #34

OPA #33

OPA #35

OPA #36

OPA #39 OPA #38

OPA #40

OPA #44

OPA #47

OPA #48

OPA #59OPA #62

OPA #64

OPA #70

OPA #73

OPA #74OPA #21

OPA #80

Page 4: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

GRAND MARAIS DRAIN

LITTLE

RIVE

R

GLAD

STONE

AVE

COLLEGE AVE

RIVERSIDE DR

E C ROW EXPY

WALKE

R RD

TECUMSEH RD E

HOWA

RD AV

E

WYANDOTTE ST E

LAUZO

N PKY

DOUG

ALL AV

E

BASELINE RD

BANWE

LL RD

COUNTY RD 42

HURO

N CHU

RCH R

D

PILLET

TE RD

OJIBWAY PKY

MALDEN

RD DOMI

NION B

LVD

MATCHET

TE RD

9TH CO

N RD

COUN

TY RD

17

RHODES DR

PROVINCIAL RD

TECUMSEH RD W

PRINCE RD

GEOR

GE AV

E

CAMP

BELL A

VE

CENTRA

L AVE

CABANA RD W

SANDWICH ST

OUELL

ETTE A

VE

8TH CO

N RD

DOUGALL PKY

MCDO

UGALL

ST

DROU

ILLAR

D RD

SEMINOLE STOTTAWA ST

JEFFER

SON B

LVD

LAUZO

N RD

CABANA RD E

PAREN

T AVE

CRAW

FORD

AVE LIN

COLN

RD

GILES BLVD

WYANDOTTE ST W

FOREST GLADE DR

UNIVERSITY AVE W

7TH CO

N RD

NORTH TALBOT RD

6TH CO

N RD

MAREN

TETTE

AVE

SOUTH NATIONAL ST

CHRYS

LER CE

NTRE

WEST GRAND BLVD

PLYMOUTH DR

GRAND MARAIS RD W

COUSINEAU RD

LITTLE RIVER RD

RICHMOND ST

LAUZO

N RD

GRAND MARAIS RD E

TOWN OF TECUMSEH

CITY OF DETROIT

TOWN OF LASALLE

DETROIT RIVERTUNN

ELRAIL

TUNN

EL

BRIDG

E

0 1,400 2,800700Meters[

SCHEDULE B:GREENWAY SYSTEM

City of Windsor Official Plan Volume IOffice Consolidation: September 7, 2012

LINKAGES

NATURAL HERITAGE COMMUNITY ANDREGIONAL PARKS

WEATERWAYCORRIDORS

WATERFRONTRECREATION

RECREATIONWAYS

LEGEND

Notes :1. Other linkages are achieved by the bikeway as designated on Schedule F : Roads and Bikeways.

2. The extension of Linkages into the Town of LaSalle and the Town of Tecumseh are conceptual and subject to agreement

with the respective municipalities.

PROPOSEDRECREATIONWAYS

Refer toSPRING GARDEN

SECONDARY PLANin Vol. II

of this Plan

Refer toEAST RIVERSIDE

SECONDARY PLANin Vol. II

of this Plan

Page 5: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

APPENDIX A2ERCA Regulated Areas

Page 6: APPENDIX A · 2018. 2. 1. · BRIDGE RAIL TUNNEL TUNNEL SCHEDULE D: LAND USE City of Windsor Official Plan Volume I Date of OMB Approval : September 25, 2000 Office Consolidation

ERCA Internet Mapping

1: 5/20/2014

Notes THIS MAP IS NOT TO BE USED FOR NAVIGATION

Copyright the Essex Region Conservation Authority, 2014. Data herein isprovided by ERCA on an 'as is' basis. Assessment parcel provided by Teranet

Enterprises Inc. Data layers that appear on this map may or may not beaccurate, current, or otherwise reliable. 38,212

1,273.90 636.95

Legend

Meters

1:100 yr Flood Line

Limit of Regulated Area

Drains

Municipal Boundary