NEWEA – 2017 Annual Conference & Exhibit January 24, 2017 “Design/Build” for Trenchless Rehabilitation Find and Fix: lessons for success Nicholas J. Rystrom, P.E. Jonathan E. Kunay, P.E.

“Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

January24,2017

“Design/Build”forTrenchlessRehabilitationFindandFix:lessonsforsuccess

NicholasJ.Rystrom,P.E.JonathanE.Kunay,P.E.

Page 2: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

Outline

§ CityofRevereStats§ ProjectBackground§ Find&FixApproach§ IdentificationofPotentialScenarios§ DevelopmentofSpecifications§ Conclusions

2

Page 3: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

CityofRevere,Massachusetts

3

Page 4: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

CityofRevere,MA

§ Population:55,000

§ LandArea:10mi2

§ 99MilesofSanitarySewers§ ClayPipe§ 100YearsOld

§ 12PumpingStations

4

Page 5: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

ConsentDecree(CD)CivilActionNo.1:10-cv-11460

§ Enteredintoin2010withMassDEP &USEPA

§ ViolationsofCleanWaterAct

§ ComplianceRequirements§ Eliminatesanitaryseweroverflows(SSOs)

§ CapacityAssessment§ SewerSystemEvaluationSurvey(SSES)§ ComprehensiveWastewaterManagementPlan(CWMP)§ ComprehensiveStormwater ManagementPlan(CSMP)§ IllicitDischargeDetection&EliminationPlan(IDDE)

5

Page 6: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

CapacityAssessment

§ FlowMeteringProgram

§ DelineateFlowMeterAreas

§ PrioritizeAreastoInvestigate

§ PerformSSES

6

Page 7: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

SewerSystemEvaluationSurvey(SSES)

§ AcceleratedTimeline

§ FlowIsolation

§ 4,000gpd/idm

§ CCTVInspections

§ ManholeInspections

7

Page 8: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

SewerSystemEvaluationSurvey(SSES)

§ WidespreadDefectsFound

§ SewerPipes

§ Manholes

§ DuetoMaterial&Age

§ 100YearOldClaySewers

8

Page 9: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

ComprehensiveWastewaterMasterPlan

§ BasedonMetering&SSESResults

§ LargePortionofSystemtobeRehabilitated

§ PrivateInflowRemoval

§ DrainageImprovements

§ MeetRequirementsofConsentDecree

9

Page 10: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

ComprehensiveRehabilitationProgram

§ EffectivelyAddressWidespreadDefects

§ Consistsof:

§ Cured-In-PlacePipe(CIPP)Lining

§ ServiceLateralConnectionLining

§ ManholeRehabilitation

§ PrivateInflowRemoval

§ 25,000– 30,000LFAreas

10

Page 11: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

ComprehensiveRehabilitationProgram

§ ProventoRemoveHighPercentagesofInfiltration/Inflow

§ 40%- 70%

§ SuccessfullyImplementedinVariousMunicipalitiesThroughouttheCountry

§ RecommendedandInitiatedintheCityofRevere,MA.

11

Page 12: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ PerformSewerSystemInvestigations

§ CCTVInspection

§ ManholeInspection

§ DevelopDesignDrawings&Specifications

12

Page 13: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ CCTVInspectionCosts

13

PipeSize(inches)

CCTVInspection&PreparatoryCleaning

CCTVInspection&HeavyCleaning

8”-10” $1.25- $1.65/ft $2.00– $3.00/ft

12”-15” $1.50- $1.75/ft $3.00- $3.50/ft

24”– 36” $2.50- $3.00/ft $9.00- $10.00/ft

Page 14: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ ManholeInspectionCosts

§ VaryBasedonType

14

InspectionType Cost

SurfaceInspection $55- $75/each

VideoInspection $100- $125/each

Page 15: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ DevelopDesignDrawings&Specifications

§ ReviewCCTVInspectionVideos

§ IdentifyLocations&ExtentsofSpotRepairs

§ DeterminePipeSize,Material,Depth,NumberofServiceConnections(open/capped),DropConnections

§ DefineSurfaceConditions

§ ReviewManholeInspections

§ DetermineRehabilitationRecommendations(Cementitious/EpoxyLining,Frame&CoverReplacement)

15

Page 16: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ DesignDrawings&Specifications

§ ExtentsofCIPPLining&SpotRepairs

§ ManholeRehabilitationActions

§ DetailHowSpotRepairsandTrenchlessRehabilitationArePerformed

§ ApprovedMaterials&InstallationMethods

16

Page 17: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

TraditionalComprehensiveRehabilitationDesignApproach

§ DesignDrawings&Specifications§ ContainPermitObligations

§ Wetlands

§ StateHighwayAccess

§ AdjacentBuriedInfrastructure

§ PermitRequirements

§ SpecialMaterials/Procedures(ControlDensityFill)

§ PavementThickness

§ TrafficManagement

17

Page 18: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

Find&FixMethod

§ “Design/Build”forTrenchlessRehabilitation

§ CanSaveMoneyandReduceProjectDuration

§ EliminatetheNeedtoPerformInspectionsPriortoDesign

§ SuccessDirectlyRelatedtoCompletenessofDesignSpecifications

§ CarryItemstoCoverallTypesofScenariosThatMayBeEncounteredDuringConstruction

§ ConstructionOversite(ResidentEngineering)isEquallyImportant

18

Page 19: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ SpotReplacementofSewers§ FederalorStateOwnedRoadways

§ SpecialPavingRequirements

§ GenericPermits

§ GroundSurfaceFeatures

§ PrivateProperty

§ Easements

§ CurbingTypes

§ SubsurfaceConditions§ Cobbles,RailTies,Contaminated/UnsuitableSoils,Etc.

19

Page 20: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit20

Page 21: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ PreviouslyLinedPipe

§ MayRequireLateralLining

§ ServicesNotProperlyReinstated

§ CappedServicesReinstated

§ ProtrudingTapsNotGroundDown

21

Page 22: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ MultipleProtrudingTaps

§ PreventsAccessfromBothSides

§ TypicalRotaryCutterCannotBeUsed

§ LateralReinstatementDeviceIsNeeded

§ EquipmentNotUsuallyOwnedbyCCTVContractor

22

Page 23: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ LargeChangesinQuantities

§ SewersMightBeLinedorPVCPipe

§ LessLiningThanOriginallyThought

§ GISDatabaseCouldHaveInaccuratePipeSizes

§ BidItemsforSpecificSizesCouldbeLargerorSmaller

§ ReviewRecordDrawings

23

Page 24: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ UnknownServiceLateralConnections

§ Status:ActiveorCappedisUnknown

§ DyeTestingMayBeRequiredtoConfirm

§ IncorrectReinstatementCouldResultinBackupsorNeedforShortLiner

24

Page 25: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ SurchargedSewers

§ InitialCCTVInspectionCannotbePerformed

§ BypassPumpingMayBeRequiredtoPerformInspection/Rehabilitation

25

Page 26: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ ProjectDelays/ContractDuration

§ ManyUnknownsThatCouldCauseDelays

§ ExtraSpotRepairs

§ ChangesinLinerQuantitiesAffectCIPPOrdering

§ ProjectsCouldExtendIntoWinterMonths§ CertainRehabilitationProductsDoNotWorkinColdWeather

26

Page 27: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ UnknownInfrastructure

§ ConnectivityIssues

§ MissingorExtraSewerPipes

§ MissingorExtraManholes

§ ManholesCouldBeBuried

27

Page 28: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DeterminationofPotentialScenarios

§ AdditionalTrenchlessOptions

§ ConventionalDigandReplaceSpotRepairNotPossible

§ UtilityConflicts

§ DepthofRepair

§ OtherRehabilitationTechniquesMayBeNeeded

§ PipeBursting

28

Page 29: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ DevelopmentofRobustandDetailedTechnicalSpecificationsisCriticaltoSuccess

§ UniqueBidItemsRequired

§ EnhancedLanguageinMeasurement&PaymentNeeded

29

Page 30: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ SpotReplacementofSewers

§ IncludeBidItemstoAccountforVariousPossibilities

§ PipeSize

§ Depth

§ LengthofRepair

§ SurfaceandSubsurfaceConditions

§ EstimateQuantitiesBasedonReviewofSystem

30

Page 31: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

SpotReplacementBidItemsItemNumber Description EstimatedQuantity Unit UnitPrice Total

14a

RemoveandReplace(8-inthru12-in)existingVCsewer(0'-8'deep)up

to8linearfeet11 Each $7,743.25 $85,175.75

14b

RemoveandReplace(8-inthru12-in)existingVCsewer(9'-12'deep)up

to8linearfeet8 Each $7,924.38 $63,395.04

14c

RemoveandReplace(8-inthru12-in)existingVCsewer(13'-16'deep)

upto8linearfeet4 Each $10,867.50 $43,470.00

14d

RemoveandReplace(8-inthru12-in)existingVCsewer(17-20'deep)

upto8linearfeet1 Each $12,075.00 $12,075.00

15a

RemoveandReplace(8-inthru12-in)existingVCsewer(0'-8'deep)beyond8linearfeetspecifiedin

Item14a20 LinearFoot $370.75 $7,415.00

15b

RemoveandReplace(8-inthru12-in)VCSewer(9'-12'deep)beyond8linearfeetspecifiedinItem14b

16 LinearFoot $370.75 $5,932.00

15c

RemoveandReplace(8-inthru12-in)existingVCsewer(13'-16'deep)beyond8linearfeetspecifiedin

Item14c8 LinearFoot $302.40 $2,419.20

15d

RemoveandReplace(8-inthru12-in)VCSewer(17'-20'deep)beyond8

linearfeetspecifiedinItem14d4 LinearFoot $302.40 $1,209.60

31

Page 32: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ SpotReplacementofSewers

§ IncludeDetailedLanguageinMeasurementandPayment

§ RestoringPrivateProperty

§ RemovingTrolleyTracks

§ RestoringSidewalksandCurbing

§ DisposingofUnsuitable/ContaminatedSoils

32

Page 33: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

RestoringPrivateProperty

33

Page 34: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

CobbledStreets

34

Page 35: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

Trolley/StreetcarTracks

35

Page 36: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

SidewalksandCurbing

36

Page 37: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

ContaminatedSoils

37

Page 38: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ SpotReplacementofSewers

§ DigginginStateOwnedRoadwaysorEasements

§ PermitRequirements

§ ReducedWorkingHours

§ DifficultAccess

38

Page 39: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

SpotReplacementBidItems

ItemNumber Description EstimatedQuantity Unit UnitPrice Total

21

RemoveandReplace(8-inthru12-in)existingVC

sewer(0'-8'deep),inStateHighway,upto8linear

feet

2 Each $8,223.25 $16,446.50

22

RemoveandReplace(8-inthru12-in)existingVC

sewer(0'-8'deep),inStateHighway,beyond8linearfeetspecifiedinItem21

10 LinearFoot $400.75 $4,007.50

23

RemoveandReplace(8-inthru12-in)existingVCsewer(9'-12'deep),in

cross-countryareas,upto8linearfeet

1 Each $8,500.00 $8,500.00

24

RemoveandReplace(8-inthru12-in)VCSewer(9'-12'deep),incross-countryareas,beyond8linearfeet

specifiedinItem23

5 LinearFoot $375.50 $1,877.50

39

Page 40: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ PreviouslyCIPPLinedSewers

§ IfServiceLateralLiningisPartofScope

§ IncludeBidItemsFor:

§ AdditionalServiceLateralReinstatement/Brushing

§ InstallationofShortLiners

§ GrindingDownProtrudingTaps

40

Page 41: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ MultipleProtrudingTaps

§ CannotBeCutWithRotaryCutter

§ ChangedCondition

§ IncludeBidItemForGrindingDownProtrudingTapwithLateralReinstatementEquipment

41

ItemNumber Description EstimatedQuantity Unit UnitPrice Total

8

Grind-downMultipleProtrudingTapsUsingLateralReinstatement

Equipment12 each $442.50 $5,310.00

Page 42: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ DyeTesting

§ StatusofAllServiceConnectionsWillNotBeKnown

§ RiskinReinstatingorNotReinstatingServices

§ IncludeBidItemForDyeTestingofServices

42

Page 43: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ Dewatering/BypassPumping

§ SewersCouldBeSurcharged

§ MustbeCleanedandInspected

§ IncludeBidItemForDewatering/BypassPumping/HeavyCleaning

43

ItemNumber Description EstimatedQuantity Unit UnitPrice Total

48

Dewater/BypassPumpandPerformTelevisionInspectionofSewerPipe- 8"-24"

5,271 LinearFoot $3.00 $15,813.00

Page 44: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

DevelopmentofSpecifications

§ AdditionalTrenchlessAlternatives

§ SpotReplacementofSewersNotAlwaysPossible

§ UtilityConflicts

§ DepthofRepair

§ IncludeBidItemForPipeBursting

§ DetailedLanguagewithAssumptionsonPipeSize

44

Page 45: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

Conclusions

§ Find&FixMethodis“Design/Build”forTrenchlessRehabilitation§ CanSaveMoneyandTime§ AllowMunicipalitiestoRehabilitateLargePortionsoftheirSewerSystem§ DetailedSpecificationsareCrucialtoLimitChangeOrders

45

Page 46: “Design/Build” for Trenchless Rehabilitation Nicholas J ... · § Comprehensive Wastewater Management Plan (CWMP) ... § State Highway Access § Adjacent Buried Infrastructure

NEWEA– 2017AnnualConference&Exhibit

Contactus!

46

JonathanE.Kunay,[email protected]

Findmoreinsightsthroughourwaterpartnershipatcdmsmith.com/waterand@CDMSmith

NicholasJ.Rystrom,[email protected]