Annexure IV LIST OF WORKS COSTING RS. 2 CRORES AND ABOVE COMPLETED DURING THE YEAR 2008-09 (PERIOD 1-4-08 TO 31-12-08) Sl. No. Name of Work Location Zone A/A & E/S Amount (Rs. In lacs) Date of A/A & E/S Achieve ment upto Dec'07 Remarks MINISTRY OF URBAN DEVELOPMENT 1 Augmentation of Sub Station with 4x2000 KVA, 11/0.433 KV Transformer for North Block, New Delhi. North Block CE(E) NDR 321 28.08.20 06 100% Work completed Other Ministries/Departments 1 Code No: 00000006120 C/o Swimming Pool for SAI, Netaji Subhas Centre, Salt Lake Kolkata Kolkat a KCC- III EZ-I 336.28 10FEB.0 4 100% Work completed 2 C/o Resdl. Qtrs. (8 /Ty-II, 8 /Ty-III, 8 /Ty-IV & Officer's Hostel) for CPWD at Bamunimaidan, Guwahati. Guwa hati NEZ 226.63 02-Aug- 05 100% Work completed 3 C/o Electronic Design Centre for SAMEER at Perungudi (Design and Testing Lab Building). SH: C/o Retaining wall, U.G. sump providing and laying approach road Chenn ai SZ.I 554.83 31- Dec'08 100% Work completed 4 C/o 2 nos 120 men Jawans living barrack with cook house cum dining hall & lav. block at Fatikchera. (i) Building work. Fatikc hera NEZ 526.36 06-Mar- 06 100% Work completed

Annexure IV - Central Public Works Department, …cpwd.gov.in/AnnualReport/annex4-52008-2009.pdfSiliguri EZ-I 298.62 14-Aug-06 100.00 % Work completed 8 Augmentation of Sub-Station

Embed Size (px)

Citation preview

Annexure IV

LIST OF WORKS COSTING RS. 2 CRORES AND ABOVE COMPLETED DURING THE YEAR 2008-09 (PERIOD 1-4-08 TO 31-12-08)

Sl. No.

Name of Work

Location Zone

A/A & E/S Amount (Rs. In lacs)

Date of A/A & E/S

Achievement upto Dec'07

Remarks

MINISTRY OF URBAN DEVELOPMENT

1

Augmentation of Sub Station with 4x2000 KVA, 11/0.433 KV Transformer for North Block, New Delhi.

North Block

CE(E) NDR

321 28.08.20

06 100%

Work completed

Other Ministries/Departments 1 Code No:

00000006120 C/o Swimming Pool for SAI, Netaji Subhas Centre, Salt Lake Kolkata

Kolkata

KCC-III

EZ-I 336.28 10FEB.04

100% Work completed

2 C/o Resdl. Qtrs. (8 /Ty-II, 8 /Ty-III, 8 /Ty-IV & Officer's Hostel) for CPWD at Bamunimaidan, Guwahati.

Guwahati

NEZ 226.63 02-Aug-05

100% Work completed

3 C/o Electronic Design Centre for SAMEER at Perungudi (Design and Testing Lab Building). SH: C/o Retaining wall, U.G. sump providing and laying approach road

Chennai

SZ.I 554.83 31-Dec'08

100% Work completed

4 C/o 2 nos 120 men Jawans living barrack with cook house cum dining hall & lav. block at Fatikchera. (i) Building work.

Fatikchera

NEZ 526.36 06-Mar-06

100%

Work completed

5 C/o Security and retaining wall in ITBP, SHQ (NE-1) campus at Khating Hills, Itanagar, Ar. Pradesh.

Itanagar

NEZ 371.79 16-Nov-06

100% Work completed

6 C/o 153 Nos. various residential quarters for 22nd Bn., SSB, Ranidanga (Ty-I/12 Nos., Ty-II/34 Nos., Ty-III/2, Ty-IV/4 Nos. & Ty-V/1 No.)

Ranidanga

EZ1 828.68 27-Mar-06

100% Work completed

7 C/o Residential quarters for BSF Bn. at Baikunthapur.

Bailkunthpur, Siliguri

EZ-I 298.62 14-Aug-06

100.00%

Work completed

8 Augmentation of Sub-Station at Krishi Bhawan, New Delhi

Krishi Bhawan, New Delhi

NDZ-1 333.77 24-Jan-01

100% Work completed

Annexure IV A

LIST OF WORKS COSTING RS. 2 CRORES AND ABOVE TARGETTED FOR COMPLETION DURING 2008-09(1-1-09 TO 31-3-

09) Sl. No.

Name of Work Location Zone A/A & E/S Amount (Rs. In lacs)

Date of A/A & E/S

Remarks

MINISTRY OF URBAN DEVELOPMENT

1

Repair, Rehabilitation at Asia House at K.G. Marg, New Delhi i/c restoration & external finishing).

New Delhi NDZ-II 217 16-Jun-

06

Work in progress. TDC Jan'09

2

Upgradation and improvement of common areas, toilets, lift fascia, stair cases including replacement of rusted steel windows with Aluminium windows in Block no. 9 to 14 Blocks at CGO complex New Delhi.

CGO complex,Lodhi

Road,New Delhi

NDZ-III 322.24 09-Oct-

07

Work in progress. TDC Mar'09

Other Ministries/Departments

1

Repair, rehabilitation , I/c restoration and external finishing of Asia house KG marg New delhi.

New Delhi NDZ-II 217.6 19.07.06

Work in progress. TDC Jan'09

2

C/O Residential accommodation for I.Tax Deptt. at Sector-20, Panchkula, Haryana i/c W/S, S/I, drainage, E/I SH: T-I/6 Nos., T-II/28

Panchkula NZ-I 869.49 3/04.

Work in progress. TDC Mar'09

Nos. (Eight Storeyed), T-III/54 Nos. (Eight Storeyed), T-IV/20 Nos. (Six Storeyed) T-V/3 & T-VI/5 Nos.( Duplex), Substation, Enquiry office and development works.

3

C/o Regional Training Institute and Hostel Building for CAG at Banra Kurla Complex,Mumbai.

Mumbai WZ-I 4598.00 15-Sep-

06

Work in progress. TDC Jan'09

4 C/o 800 Room Boys Hostel for ISM, Dhanbad. Dhanbad EZ-II 2429.00

01-Sep-07

Work in progress. TDC Jan'09

5

C/o 800 Room Boys Hostel for ISM, Dhanbad.SH: Living-2 blocks kitchen and dining hall i/c W/S, S/I & Drainage (Package-II)

Dhanbad EZ-II 1368.00 24.11.07

Work in progress. TDC Jan'09

6 Laying of Synthetic Athletic Track at SAI, Sub-Centre Guwahati.

Guwahati NEZ 300.00 08-Mar-

05

Work in progress. TDC Jan'09

7

C/o Ground & first floor of the Addl. Girls' Hostel Block for 94 students of Institute of Hotel Management at Hengrabari, Guwahati, Assam

Hengrabari, Guwahati

NEZ 262.00 15-Sep-

07

Work in progress. TDC Mar'09

8 C/o Office Bldg. for I.T. Deptt. At Cuttack Cuttak EZ-II 877.46 Sep-07

Work in progress. TDC Mar'09

9 C/o Phase B work at JNV Distt.. Mansa. Mansa NZ-I 230.81 01/08.

Work in progress. TDC Jan'09

10

C/O Kendriya Vidhyalaya, Devsaini Village at Aligarh. (SH : C/O School building and residential quarters type-IV-1no., Type-III-4nos., Type-II-4nos i/c internal / external water supply sewerage system and development work.

Aligarh NZ-II 474.23 01/07

Work in progress. TDC Mar'09

11

C/o School of Humanities & Education for Mizoram University at Aizawl (PH-II).

Aizawl NEZ 477.31 12-Jan-

06

Work in progress. TDC Mar'09

12 C/o Boys Hostel at P.C.B. Hostel for University of Allahabad.

Allahabad NZ-II 460.99 07-Sep-

07

Work in progress. TDC Mar'09

13

C/o office building for Customs and Central Excise at E.M. Bye Pass,Kolkata. SH:-Interior decoration,furniture and furnishing.

EM Bypass, kolkata

EZ-I 961.73 05-Mar-

08

Work in progress. TDC Mar'09

14

C/o Office Building for income Tax Department at Himmatnagar i/c development & bulk Services.

Himmat nagar WZ-I 283.37 07-May

Work in progress. TDC Mar'09

15

C/o Regional Training Institute & Hostel Building for CAG at Bandra Kurla Complex, Mumbai.

Mumbai WZ-I 4598 06-Sep

Work in progress. TDC Feb'09

16 C/o New Block for KV including IEI. Erna-kulam SZIII 285.82 39119

Work in progress. TDC Jan'09

17

C/o Air Craft Hanger & other Associated works / Facilities for NAL at Belur Campus.

B'lore SZIII 1186.14 39213

Work in progress. TDC Feb'09

18

C/o fencing under Ph-III along IBB in Coochbehar district of West Bengal sector (a) From BP No. 906/4-S to 915/3-S, BP No.939/3-S to 347/MP, BP No. 947/MP to 948/6-S, BP No. 948/6-S to 953/1-S, BP No.954/6-S. Length-44.88 Km.

Coochbehar IBBZ 2957.2 39003

Work in progress. TDC Mar'09

19

C/o Phase-III fencing along IBB in Dakshin Dinajpur District of West Bengal Sector [Length: 51.563 kms]

Balurghat IBBZ 3536.52 39003

Work in progress. TDC Mar'09

20

C/o Phase-III fencing along IBB in Dakshin Dinajpur District of West Bengal Sector (Part III) [Length: 17.16 kms]

Balurghat IBBZ 1250.43 39003

Work in progress. TDC Mar'09

21 C/o road and fencing under Ph-II along IBB in Malda District of WB

BP No. 218/1-S to BP No.

216/MP and IBBZ 1304 37966

Work in progress. TDC Mar'09

sector loop area (9.34 Km)

216/MP to 213/MP, Malda

22

C/o IBB Road and Fencing between BP No. 243/MP to 262/2S [Length:Fence 2.48 kms & Road 2.28 kms] in Dakshin Dinajpur District of West Bengal Sector. SH: C/o IBB road, fencing & Culverts

Balurghat IBBZ 364.83 38875

Work in progress. TDC Mar'09

23

C/o IBB Road and Fencing under Ph-II along IBB in Dakshin Dinajpur Distt. Of West Bengal Sector Part-V(Fencing with road 6.022 km, Fencing with patrol track- 2.377 km) [Total length: 9.339 kms]

Balurghat IBBZ 774.32 38772

Work in progress. TDC Mar'09

24

C/o Admn.cum allied service/workshop building for 50 trainees, staff qtrs, T-II/2,T-III/2 & T-IV/1No. & other misc.dev.work at RVTI, Panipat

Panipat NZ-I 499.69 30-Mar-

07

Work in progress. TDC Jan'09

25

Construction of Boundary Wall, Sentry Booth, Gates etc. of Afghan Parliament at Kabul including 3% contingencies and 3% Direction Charges

Kabul

Project Manage

r (Kabul)

554.13

13-May-08 /

24-Jun-08

Work in progress. TDC Jan'09

26

C/o High level bridge with Approaches at village Chauda across river Sakartode on Khanvel Khardi Rd. in UT Daman

Silvassa WZ-I 376.61 09-Jul-

07

Work in progress. TDC Feb'09

27

Aesthetic improvement of GPRA qtrs. under 2/J of ‘J’ Division at Sarojini Nagar, New Delhi during 2007-08 (Phase-I).

Sarojini Nagar NDZ-III 103.75 26-Jul-

07

Work in progress. TDC Feb'09

28

C/o 79 nos (23 nos type 1, 48 nos type 3, 6 nos type 4 and 2 nos type 5) quarters for BSF at Thekkalur, Coimbatore.

Avinashi SZ-1 441 31-Mar-

06

Work in progress. TDC Mar'09

Annexure V NEW SANCTIONS RECEIVED DURING 2008-09

(Works costing more than Rs.2 Crores)

Sl. No.

Name of Work

Location Clinet Zone

A/A & E/S Amount (Rs. In lacs)

Date of A/A & E/S

1. Pdg. & Installation for air-conditioning with variable refrigerant volume system in North Block, New Delhi.

New Delhi GPOA NDR 1825.00 1.4.08

2. C/O A-I TYPE (SINGLE SECTIONS ) WITH SCINENCE LAB SCHOOL BLDG AND 9 UNITS OF STAFF QTRS FOR KENDRIYA VIDALAYA AT BSF CAMPUS, RAJOURI (J&K).

RAJOURI KVS NZ-I 670.83 21.05.08

3. Extenstion of departmental building under ME & MME department of ISM, Dhanbad(Phase-B)

Dhanbad ISM EZ-II 296.41 16.06.08

4. C/o 120 Men barrack at CSD&W at Bhopal

Bhopal CSD&W CZ 258.06 04.04.08

5. C/o Additional floor (third floor) for library at NIT Trichy

Trichy NIT SZ-I 448.70 24.05.08

6. Main Building for Indira Gandhi National Open University at Madurai.

Madurai IGNOU SZ-I 419.85 13.06.08

7. C/O New building of Urdu Academy at A.M.U., Aligarh.

Aligarh AMU NZ-II 250.00 25-Jul-08

8. C/o 60 Room (120 seated) Girls Hostel at ISMU at Dhanbad

Dhanbad ISMU EZ-II 543.56 16-Jun-08

9. C/o 144 Nos. T-IV qts (4 storeyed) i/c Garrage and Boundary wall at ISMU, Dhanbad

Dhanbad ISMU EZ-II 2443.92 16-Jun-08

10. C/o A Type School Building, 21 Unit staff qtrs for KV at Saharsa

Saharsa KVS EZ-II 864.04 23.05.08

11. C/o A Type School Building, 09 Unit staff qtrs, Boundary wall etc. for KV, Mashrakh

Mashrakh KVS EZ-II 841.85 24.06.08

12. C/o School building, Staff qtrs boundary wall etc for KV, Arrah Bihar

Arrah KVS EZ-II 795.83 19-May-08

13. C/o Regional office building for CWC and office of GFCC at Patna

Patna GFCC EZ-II 850.00 05-Sep-08

14. C/o staff qtrs for KV at Danapur. SH: T-III-8 (D/S) & T-II-8 (D/S) i/c Internal W/S & S/I & Development of site

Danapur KVS EZ-II 273.98 16-Sep-08

15. C/o Additional accommodation for KV Behrampur,

Ganjam KVS EZ-II 250.00 08-Apr

16. C/o Doppler Weather Radar Building at Paradeep, Bhubnaneswar

Paradeep Audit

General EZ-II 520.00 15.04.08

17. C/o Office Bldg. for I.T. Deptt. At Cuttack

Cuttak INCOME

TAX EZ-II 863.86 07-Sep

18. (vii) Construction of Fuji Guruji and Dr. Ambedkar study centre i/c internal water supply, santary installations and drainage work for MGAHV at Wardha. (Ground floor only).

Wardha SCZCC WZ-II 200.00 13-Dec-08

19. Construction of office building for the central Excise Customs Department at plot No. 155, sector P -34 NH, Jaishta & Vaishakh, CIDCO Nasik, Commissionerate, Nasik.

Nasik M/o finance WZ-II 864.81 14-May-08

20. C/o. Hostel and Non-Resdl. Buillding under Hydrology project for NWA at khadakwasla, Pune. SH :- Extension of Krishna hostel (18 Nos. single occupancy rooms). Additional mess facility, 2 nos. classromm, 1 no. Computer lab and Director chambers under Hydrology Project-II for

Pune NIC WZ-II 409.40 22-Aug-08

NWA at Khadakwasla, Pune.

21. National Data Centre at NIC, Pune.

Pune C&CE WZ-II 1910.59 21-Aug-08

22. Setting up of . 3-tier data centre at N.I.C,Pune

Pune M/O

LABOUR CE(E)W

R 1910.00 21-Aug-08

23. C/o. additional 2 nos. 150- Men's hostel and 1 no. 150 Women's Hostel for Pondicherry University, Puducherry

Kalapet JNV SZ-I 1776.67 24-Jul-08

24. C/o. additional 1 no. Mess block of 450 nos. capacity for Pondicherry University at Puducherry

Kalapet JNV SZ-I 254.64 24-Jul-08

25. C/o. Doppler Weather Radar Building at CDR Station, Karaikal.

Karaikal NIFT SZ-I 479.97 16-Jul-08

26. C/o. 32 rooms Exe. Hostel, 1 no. Ty. VI and 2 nos. Ty.V qtrs. For National Power Training Institute at Neyveli

Neyveli NIFT SZ-I 383.87 27-Aug-08

27. C/o Additional floor (third floor) for library at NIT Trichy

Trichy IHM SZ-I 448.70 24-May-08

28. C/o 328 seated Girls Hostel

Trichy SEBI SZ-I 1066.04 06-Aug-08

29. C/o Boys Hostel block 7 for NIT Trichy

Trichy SEBI SZ-I 1021.94 06-Aug-08

30. C/o Boys Hostel block 9 for NIT Trichy

Trichy BANK SZ-I 1021.94 06-Aug-08

31. Main Building for Indira Gandhi National Open University at Madurai

Madurai BANK SZ-I 419.85 13-Jun-08

32. Office building for Passport office, Marripalem, Visakhapatnam

Visakhapatnam SAI SZ-II 1163.00 14-May-08

33. Construction of Academic Block for Arts for MGU at Nalgonda

Hyderabad SAI SZ-II 1339.51 02-Aug-08

34. Construction of Gent 's Hostel Block and Dining area for MGU at Nalgonda

Hyderabad SAI SZ-II 1053.33 02-Aug-08

35. C/o Training Institute Complex for G.S.I. At Bandlaguda, Hyd. SH: Auditorium and Conference Hall

Hyderabad SAI SZ-II 292.80 22-Aug'08

36. C/o Guest House and Officers' Hostel, Staff Hostel & Dining Block for GSI Hyderabad

Hyderabad UNIVERSI

TY SZ-II 1197.04 22-Aug'08

37. C/o Administrtive Building Engineering and Transport Block Canteen Parking Complex & Development works for GSI at Bandlaguda Hyderabad

Hyderabad UNIVERSI

TY SZ-II 1182.52 22-Aug'08

38. C/o Sports Complex, Air conditioning, Rain water harvesting and drains etc. for GSITI at Bandlaguda, Hyderabad

Hyderabad UNIVERSI

TY SZ-II 603.02 22-Aug'08

39. Additional infrastructure facilities for JNIDBI staff college at Gachibowli, Hyd.

Hyderabad UNIVERSI

TY SZ-II 1167.00 00-Aug'08

40. C/o NFDB office, Residential Bldg, And developoment works at Rajender Nagar, Hyderabad.

Hyderabad UNIVERSI

TY SZ-II 1722.00 00-June'08

41. Vertical Expansion of the Girls hostel for MANUU at Gacchibowli, Hyderabad.

Hyderabad UNIVERSI

TY SZ-II 277.89 06-Sep'08

42. C/O School of Education and Training Centre for MANUU at Gachhibowli Hyd .

Hyderabad CAZRI SZ-II 849.10 20-Sep'08

43. C/O School of Languages ,Linguistics and Indology for MANUU at Gachhibowli Hyd

Hyderabad FSI SZ-II 732.10 05-Sep'08

44. Providing and laying internal roads at MANUU campus, Gacchibowli, Hyderabad.

Hyderabad FSI SZ-II 209.04 06-Sep'08

45. C/o Addl. Class rooms for KV No, 1.

Calicut M/O

SHIPPING SZ III 517.26 09-Jul-08

46. C/o Acadamic block for Kannur University, Manjeswaram.

Kasargod M/O

SHIPPING SZ III 341.40 14-Jul-08

47. C/o Laboratory-cum-Administrative block for Appex Hi-tech Inistitute.

B'lore SAT SZ III 800.00 06-May-08

48. C/o 4th & 5th floor over the existing E & F block, NIFT.

B'lore SAT SZ III 389.00 15-May-08

49. C/o Reverberation chamber at ISITE, ISAC campus for NAL, Marathahalli.

B'lore SAT SZ III 578.86 07-Aug-08

50. C/o Executive Hostel for PSTI .

B'lore SAT SZ III 266.92 18-Aug-08

51. C/o Building for Regional Design & Technical Development Centre at nandini Layout.

B'lore

M/O HEALTH &

FAMILY WELFARE

SZ III 844.53 07-Aug-08

52

Construction and improvement of rear boundary wall along Mughal Road from Vijay Ghat in Samadhi Complex, New Delhi.

Delhi MoUD NDZ-II 465.80 15-May-08

53

Replacement of existing sound system i/c simultaneous interpretation, Automatic Vote recording system and display for AVR system in Lok Sabha Chamber Parliaement House, New Delhi.

PH LSS PLP

(Elect.) 497.51 02-May-08

54

b) Integrated Develpmet of Samadhi Complex in Delhi (SH: Electrical Works at Veer Bhumi Shakti Sthal, Shanti Van, Kisan Ghat & Sanghrash sthal)

Various samadhis GPOA NDZ-II 289.41 12-May-08

55 Modernisation of Sena Bhawan, New Delhi

Sena Bhawan M.o.D. NDR 3337.00 14-Jan-08

56

Providing Air Conditioning System at First Floor at Nirman Bhawan, New Delhi.

Nirman Bhawan, New Delhi.

M/o UD NDR 635.34

18/1/2001W-1(DGW)

dt. 15/05/2008

57

C/o Residential qtrs. for officers and staff of Lok Sabha Sectt. at Setor-2, R.K. Puram, New Delhi. SH: C/o Boundary Wall including levellng of entire plot area.

R.K. Puram Sector-2

Lok Sabha Sectt.

NDZ-III 200.80 30-Jun-08

58

Providing central air-conditioning system in hall no. 18 at Pragati Maidan, New Delhi.

New Delhi ITPO NDZ-IV 2584.00 29 Aug-08

59

C/o NOC Building and Incubation Centre for Software Technology Parks of India at Electronic City, Sector-18, Gurgaon, Haryana.

Gurgaon STPI NDZ-IV 2272.00

24.10.2008

60

Replacement of 4 Nos. 20 passengers 2.5 m/sec. for Block No.10, 13 and 14, CGO Complex, Lodhi Road, New Delhi.

CGO Complex, New Delhi

MOUD CE(DR) 295.40 15-May-08

61 C/o 200 Bedded Hostel at SAI Complex at Joshi Chauhan Sonepat.

Sonepat SAI NZ-I 316.47 21-Apr-08

62 C/o 200 bedded hostel for boys at NIS Patiala.

Patiala SAI NZ-I 944.71 12-May-08

63

C/o GPRA for Central Govt. employee at Sector-38-A & B, Chd. (Phase-I) SH: C/o T-V/41 Nos. qtrs. including + 5 Parking, Type-VI 3 Nos. Qtrs + 1 Parking including development of site & bulk services including electric sub-station.

CHD. UDM NZ-I 1421.47 15-May-08

64

C/o Resdl. Accomm. For KV at Gandhi Nagar (J&K). Sh: T-II/8 Nos. (F/S), T-III/8 Nos. (F/S), T-IV, 5 Nos. T-V/1 No. (F/S) Servent Qtr for T-V Qtr.

Jammu KVS NZ-I 301.62 10-Jun-08

65 C/o Mega Hostel for Girls Phase-I, NIT Jalandhar. SH: 80 Seater (F/S) Hostel.

Jalandhar NIT NZ-I 447.86 16-June.-

08

66 C/o Mega Hostel for Boys (Phase-I), at NIT, Jalandhar.

Jalandhar NIT NZ-I 6342.96 31-Oct-08

67

C/o A-I Type School Bldg., 09 units Staff Qtrs.and Boundary Wall for Kendriya Vidyalaya Hiranagar (J&K).

Hiranagar KVS NZ-I 594.72 10-Jun-08

68

Construction of New Block consiting of Lecture Halls, Kitchens, labs, bakery, confectionary & activity rooms etc. at IHM Kufri, Shimla Hills (H.P.)

Shimla IHM NZ-I 576.44 30-Sept-

08

69 C/o 1500 seating auditorium at IIIT, Allahabad.

Allahabad IIIT NZ-II 1446.25 08-Jun-08

70 C/o Computer Centre at IIIT, Allahabad.

Allahabad IIIT NZ-II 4792.75 08-Jun-08

71 C/o Boys Hostel-4 at IIIT, Allahabad.

Allahabad IIIT NZ-II 1224.04 08-Jun-08

72 C/o office building for SIB at Pandeypur, Varanasi.

Varanasi M/0 Home

Affairs NZ-II 237.99 26-Jun-08

73

C/o Front portion of 1st floor of Administrative building at RGSC, Barkachha, Mirzapur (UP).

Mirzapur BHU NZ-II 214.44 01-Nov-08

74 C/o JNV Kannauj Phase-B Kannauj JNV NZ-II 240.99 18-Jan-08

75

C/o 'A' type school bldg.,09 units staff qtrs, boundary wall etc. at Kendriya Vidyalaya, Mati Akbarpur (UP).

Mati KVS NZ-II 810.10 15-Jun-08

76 Construction of boys hostel for Central school for Tibetan at Mussoorie.

Mussoorie

CENTRAL SCHOOL

FOR TIBETANS

NZ-II 403.41 02-Apr-08

77 C/o Executive Hostel at Mahanadi block for LBSNAA, Mussoorie.

Mussoorie DOPT NZ-II 510.54 10-Sep-08

78

C/o Training institute, auditorium and warden lodge for NRLC at Jankipuram, Lucknow.

Lucknow NRLC NZ-II 758.91 13-Oct-08

79 C/o Office building for Census Operation at Lucknow.

Lucknow Census NZ-II 611.24 27-Aug-08

80 Development of Kayad Vishram Sthali under JnNURM.

Ajmer JnNURM NZ-III 1538.75 03-Apr-08

81 C/o Multipurpose hall for KV No. 1 at Bajajr Nagar, Jaipur

Jaipur KVS NZ-III 228.00 30-Apr-08

82 C/o Office building for Income Tax at Bharatpur.

Bharatpur Income tax NZ-III 238.92 01-Apr.-08

83 C/o Office building for Income Tax Department at Matigara, Siliguri.

Siliguri Income tax EZ-I 342.97 10-Jul-08

84

C/o Residential quarters & guest house for Officers and Officials of Income Tax Department at Himachal Vihar, Matigara, Siliguri.

Siliguri Income tax EZ-I 797.36 06-Aug-08

85

Construction of boys hostel (840 seated capacity) for National Institute of Technology at Durgapur.

Durgapur NIT,

DURGAPUR

EZ-I 2689.94 01-Apr-08

86

Construction of girls hostel (264 seated capacity) for National Institute of Technology at Durgapur.

Durgapur NIT,

DURGAPUR

EZ-I 1018.87 01-Apr-08

87 C/o Petroleum Engineering Annexure Building at ISM Dhanbad

Dhanbad ISM EZ-II 912.52 16-June-08

88 C/o 48 Nos. Type V Qtrs (Block A) at ISM, Dhanbad

Dhanbad ISM EZ-II 1226.00 16-June-08

89 C/o Work Shop Bldg. under M.E & M.M.E. Deptt. Of ISM at Dhanbad

Dhanbad ISM EZ-II 336.86 16-June-08

90

C/o Additional Class Rooms for Secondary Section (D/S) and Primary Section (D/S) for KV at Talbania, Puri.

Tabania, Puri KVS EZ-II 420.05 07-Jul-08

91

C/o Clinic cum Hospital at Veterinary College Campus, OUAT, Bhubaneswar.

Bhubaneswar OUAT EZ-II 350.00 20-Jun-08

92

C/o Office Building (Four storeyed) of ASI at Samantrapur, Bhubaneswar.

Samantrapur, Bhubaneswar

ASI EZ-II 885.14 13-Aug-08

93

Resurfacing of Runway, Taxi tract and Apron surface i/c Runway painting at ARC, Doom Dooma

Doom Dooma ARC- Civil Aviation

NEZ 390.59 07-Apr-08

94

Construction of office building for the central Excise Customs Department at plot No. 155, sector P -34 NH, Jaishta & Vaishakh, CIDCO Nasik, Commissionerate, Nasik.

Nasik C&CE WZ-II 864.81 14-May-08

95

C/o. Hostel and Non-Resdl. Buillding under Hydrology project for NWA at khadakwasla, Pune. SH :- Extension of Krishna hostel (18 Nos. single occupancy rooms). Additional mess facility, 2 nos. classromm, 1 no. Computer lab and Director chambers under Hydrology Project-II for NWA at Khadakwasla, Pune.

Pune CWC WZ-II 409.40 22-Aug-08

96 National Data Centre at NIC, Pune.

Pune NIC WZ-II 1910.59 21-Aug-08

97 C/o Office cum Residential Complex for CBI at Jabalpur (MP).

Jabalpur CBI CZ 472.61 24-Jun-08

98 C/o 18 nos Class rooms at KV Bilaspur

Bilaspur KVS CZ 250.52 7-May-08

99 C/O office building, for Director General of Mines and Safty, Jabalpur.

Jabalpur M/O

LABOUR CZ 354.74 29-Sep-08

100 Construction of Office Building for NABARD at Port Blair.

Port Blair NABARD SZ-I 322.60 16-Oct-08

101 C/o. additional 2 nos. 150- Men's hostel and 1 no. 150 Women's Hostel for Pondicherry University, Puducherry

Kalapet UNIVERSI

TY SZ-I 1776.67 24-Jul-08

102 C/o. additional 1 no. Mess block of 450 nos. capacity for Pondicherry University at Puducherry

Kalapet UNIVERSI

TY SZ-I 254.64 24-Jul-08

103 C/o. Doppler Weather Radar Building at CDR Station, Karaikal.

Karaikal IMD SZ-I 479.97 16-Jul-08

104

C/o. 32 rooms Exe. Hostel, 1 no. Ty. VI and 2 nos. Ty.V qtrs. For National Power Training Institute at Neyveli

Neyveli NPTI SZ-I 383.87 27-Aug-08

105 C/o. new lecture hall complex for Pondicherry University at Puducherry

Kalapet University SZ-I 424.83 28-Oct-08

106 C/o 328 seated Girls Hostel Trichy NIT SZ-I 1066.04 06-Aug-08

107 C/o Boys Hostel block 9 for NIT Trichy

Trichy NIT SZ-I 1021.94 06-Aug-08

108 Main Building for Indira Gandhi National Open University at Madurai

Madurai NIT SZ-I 419.85 13-Jun-08

109 Office building for Passport office, Marripalem, Visakhapatnam

Visakhapatnam MEA SZ-II 1163.00 14-May-08

110 Construction of Academic Block for Arts for MGU at Nalgonda

Hyderabad M G U SZ-II 1339.51 02-Aug-08

111 Construction of Academic Block for Science for MGU at Nalgonda

Hyderabad M G U SZ-II 1354.83 02-Aug-08

112

Construction of Gent 's Hostel Block and Dining area for MGU at Nalgonda

Hyderabad M G U SZ-II 1053.33 02-Aug-08

113

C/o Training Institute Complex for G.S.I. At Bandlaguda, Hyd. SH: Auditorium and Conference Hall

Hyderabad GSI SZ-II 292.80 22-Aug'08

114

C/o Guest House and Officers' Hostel, Staff Hostel & Dining Block for GSI Hyderabad

Hyderabad GSI SZ-II 1197.04 22-Aug'08

115

C/o Administrtive Building Engineering and Transport Block Canteen Parking Complex & Development works for GSI at Bandlaguda Hyderabad

Hyderabad GSI SZ-II 1182.52 22-Aug'08

116

C/o Sports Complex, Air conditioning, Rain water harvesting and drains etc. for GSITI at Bandlaguda, Hyderabad

Hyderabad GSI SZ-II 603.02 22-Aug'08

117 Additional infrastructure facilities for JNIDBI staff college at Gachibowli, Hyd.

Hyderabad IDBI SZ-II 1167.00 01-Aug'08

118

C/o NFDB office, Residential Bldg, And developoment works at Rajender Nagar, Hyderabad.

Hyderabad NFDB SZ-II 1722.00 00-June'08

119

Vertical Expansion of multimedia centre building for MANNU at Gachibowli, Hyderabad.

Hyderabad MANUU SZ-II 258.61 00-May'08

120

C/O School of Education and Training Centre for MANUU at Gachhibowli Hyd .

Hyderabad MANUU SZ-II 849.10 20-Sep'08

121

C/O School of Languages ,Linguistics and Indology for MANUU at Gachhibowli Hyd

Hyderabad MANUU SZ-II 732.10 05-Sep'08

122

Providing and laying internal roads at MANUU campus, Gacchibowli, Hyderabad.

Hyderabad MANUU SZ-II 209.04 06-Sep'08

123 C/o Laboratory-cum-Administrative block for Appex Hi-tech Inistitute.

B'lore M/O

LABOUR SZ III 800.00 06-May-08

124 C/o 4th & 5th floor over the existing E & F block, NIFT.

B'lore M/O

TEXTILE SZ III 389.00 15-May-08

125 C/o Reverberation chamber at ISITE, ISAC campus for NAL, Marathahalli.

B'lore

M/O SCIENCE

AND TECHNO-

LOGY

SZ III 578.86 07-Aug-08

126 C/o Executive Hostel for PSTI .

B'lore M/O

POWER SZ III 266.92 18-Aug-08

127

C/o Building for Regional Design & Technical Development Centre at nandini Layout.

B'lore M/O

TEXTILE SZ III 844.53 07-Aug-08

128 C/o 100 bedded hostel . B'lore SAI SZ III 725.00 27-Oct-08

129 C/o new Club building for Merchant Navy Personnel, Willingdon Island.

Cochin MMD SZ III 415.67

13.10.2008

130 C/o Addl. Class rooms for KV No, 1.

Calicut KVS SZ III 517.26 09-Jul-08

131 C/o Acadamic block for Kannur University, Manjeswaram.

Kasargod UNIVER-

SITY SZ III 341.40 14-Jul-08

132 C/o and upgradation of existing 50 mtr, 25 mtr and 10 mtr shooting ranges.

B'lore SAI SZ III 592.19 31-Oct-08

133

Purchase and installation of 10KVA DG sets in the Income Tax Offices in CCIT, Chennai region, D.P. Thottam, Puducherry & west shanmugapuram, Villupuram-2.

Puducherry C&CE SZ-I 424.83 23-Oct-08

134

C/o ITBP road to Indo-China Border from Sonam to PDA,PDA to Mendi and PDA to Sumla in the State of Uttarakhand (Length=22.05 Km)

Indo-China Border

M/O HOME AFFAIR

BFZ 6398.00 24-Apr-08

135

C/o ITBP road to Indo-China Border from Niti to Geldung in the State of Uttarakhand (Length= 24 Km)

Indo-China Border

M/O HOME AFFAIR

BFZ 6224.00 24-Apr-08

136

Improvement of infrastructure at Attari /Wagah Border in Punjab Sector at Indo-Pak Border. ( A) P/F 15ft high new fencing with IRC fabric /wire mesh on either side of Railway Track length of track -2 km. &Shelter near gate No 103

Attari M/O HOME

AFFAIR BFZ 363.00 10-Apr-08

137

C/o ITBP road to Indo-China Border from Giaganj to Kerang in the State of Sikkim

Giagang to Kerang

MHA (ITBP)

IBBZ 3554.00 24-Apr-08

138

C/o ITBP road to Indo-China Border from Thangu to Muguthang in the State of Sikkim(Length-31.00 Km)

Thangu to Muguthang

MHA(ITBP) IBBZ 6361.00 24-Apr-08

139

C/o ITBP road to Indo-China Border from Domabang to gora La in the State of Sikkim(Length-46.00 Km)

Domang to Gorala

MHA (ITBP)

IBBZ 13165.00 24-Apr-08

140 C/o Combined amenity / community centre for SHQ BSF Mawpat, Shillong

Mawpat, Shillong BSF NEZ 234.73 02-Apr-08

141 C/o 177 Quarters (Type II/143 and Type III/34) i/c development & bulk services for 151 BN BSF at BSF Campus-1, Mundra Road,Bhuj.

Bhuj BSF WZ1 1456.43 28-Apr-08

142 C/o Admn. Block at HQ Tripura FTR. BSF at Salbagan.

Salbagan BSF NEZ 475.57 22-Apr-08

143 C/0 250 Nos. Quarters (240 Nos. T-II, 8 No. T-IV & 2 No. T-V) at GC, CRPF, Bijnore, Lucknow.

Lucknow CRPF NZ2 1896.88 04/08

144 C/o Boundary wall with 2 main Gates, 6 nos. watch towers, 18 nos sentry posts & Guard Room for CRPF at Dayapur, Silchar, Assam.

Dayapur, Silchar CRPF NEZ 299.00 25-Apr-08

145 C/o T-II/16 Nos. (F/S) Qtrs. For I.T.B.P. at Reckong Peo (H.P.) i/c Dev. of site.

Reckong Peo ITBP NZ1 243.57 30-April-08

146 C/o 107 Nos. Residential quarters for BSF at Roopnagar. SH: Ty-II/72 Nos., Ty-III/ 34 Nos., Ty-V/1 No., Servant quarter and garrage - 1 No. including internal water supply and sanitary installation.

Roopnagar, Siliguri Central

Circle.

BSF EZ1 849.68 25-Apr-08

147 C/o T-II-155 Nos. Total 20 Blocks ( 19 Blocks F/S & 1 Block 3 Units), T-III-16 Nos.(F/S), T-IV-2 Nos., T-V-1 No. with Garrage i/c sewerage, Drainage & Water supply for 103 Bn. BSF at Kishanganj

Kishanganj BSF EZ2 1561.65 19.05.08

148 C/o T-II-135 Nos. Total 17 Blocks ( 16 Blocks F/S & 1 Block 3 Units), T-III-8 Nos.(F/S), T-IV-2 Nos., T-V-1 No. with Garrage i/c sewerage, Drainage & Water supply for 10 Bn. BSF at Kishanganj

Kishanganj BSF EZ2 1315.87 19.05.08

149 C/o Admn. Bldg. With sand Model Hall for 10 Bn. HQ at BSF Campus, Kishanganj

Kishanganj BSF EZ2 204.11 19.05.08

150 C/o T-II-42 Nos. Total 6 Blocks ( 5 Blocks F/S & 1 Block 2 Units), T-III-14 Nos.(1 Block (F/S) & 1 Block 6 Units), T-IV-3 Nos.i/c sewerage, Drainage & Water supply for sector HQ. BSF at Kishanganj

Kishanganj BSF EZ2 591.43 19.05.08

151 C/O BOUNDARY WALL/GUARD ROOM/MAIN GATE & SANTARY POST AT GROUP CENTRE CRPF LETHPORA PULWAMA

LETHPORA CRPF NZ1 429.98 Jun-08

152 Rough cost estimate for the work "RAF Bn. At Jamshedpur for CNE revision".

Jamshedpur CRPF EZ2 4928.35 13.05.08

153 C/o T-III/8 No(D/S) and T-II/24(T/S) Qtrs. for 18th Bn. I.T.B.P, Jalandhar.

Jalandhar

ITBP NZ1 241.42 29.-May-08

154 C/O Admn. Block at ITBP Campus, Patiala.

Patiala ITBP NZ-I 368.77 06-Jun-08

155 Construction of T-II (T/S) 60 Nos. residential quarters for 3rd Bn. S.S.B. at Almora.

Almora SSB NZ-II 528.24 9-Jul-08

156 C/o 1 No. 120 Men Barrack for NGO's (Phase-I SH: 60 Men barrack and kitchen/dinning) at CSD&W Bhopal

Bhopal SSB CZ 258.07 4-Apr-08

157 C/o Admn Building, Quarter Guard & Store Block at G.C., C.R.P.F., Bilaspur (CG)

Bilaspur CRPF CZ 985.62 16-May-08

158 C/o Internal road (length-4300 metres) and cross drainage for STC BSF Baikunthapur (SH: Earth works WBM, Premix Carpeting and cross drainage works).

Baikunthapur Siliguri

BSF EZ-I 258.95 2-Jul-08

159 C/o BOP Building at BOP Hqr. Bhanga ( in East Chanparan District) under 13th BN, SSB, Piprakothi

East Champaran SSB EZ-II 218.23 16.06.08

160 C/o 22 nos. Resdl. Qrtrs. (3-T/IV,7-T/III,12-T/ II & 6 nos. Deptl. Garages for SIB at Aizawl, Mizoram.

Aizawl SIB NEZ 391.78 04-Jul-08

161 C/o 120 Men barrack for BSF at Jaganu, Udhampur.

UDHAMPUR B.S.F NZ-I 224.21 7-Jun-08

162

C/o GO's mess for BSF campus at Labana, Jaipur including internal W/S, S/I & Drainage.

Jaipur BSF NZ-III 268.23 15-Sep-08

163 C/o Boundary wall with guard room and sentry post at BSF Campus, Nalkata.

Nalkata BSF NEZ 312.5 30-Sep-08