ANDHRA PRADESH
POWER GENERATION CORPORATION LIMITED
Tender Specification No.610000448
SDSTPS-2x800 MW - Outsourcing of services of 34 numbers Contractor’s workmen to assist in Round the clock operations of ETP from DCS system, Monitoring the CPU regeneration system like DCS operation and resin separation, Steam and Water samples collection for Unit-I&II /SDSTPS for a period of twelve months from 01-04-2019 to 31-03-2020.
Online Bids invited On
APGENCO e-procurement Platform
SUPERINTENDING ENGINEER
(GENERATION-III)
VIDYUT SOUDHA, GUNADALA-520 004
VIJAYAWADA, ANDHRA PRADESH
Ph: (0866) 2526 836, 126 & 123; Fax: (0866) 2526 699
2
CONTENTS OF THE SPECIFICATION
S.No. Description
Part-I : PRE QUALIFICATION/TECHNICAL BID
1. Summary Sheet
2. Section–I: Important Instructions to the bidders. 3. Section–II: Online Bid Submission Procedure. 4. Section–III: Pre Qualification Bid Requirements. 5. Section–IV: Schedule of works & Prices
6. Section-V: Special terms & conditions– Annexure-I . General terms & conditions – Annexure-II.
7. Section-VI: Formats of Bank Guarantees - Annexure III, IV, V & VI.
8. Schedules I to VIII
Part-II: PRICE BID
[Proforma for price proposal Format].
(Not to be uploaded with PQB, only to be uploaded with Price bid/Commercial bid)
3
ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
O/o. Superintending Engineer/ Generation-III/ Vidyut Soudha/ Gunadala – 520004 Ph/Fax.No.0866 – 2526836/ 2526699
*****
Summary Sheet:
1. Department Name Andhra Pradesh Power Generation Corporation Limited
2. Circle/Division Name Superintending Engineer/ Generation-III/ APGENCO/ Vidyut Soudha/ Gunadala-520004.
3. Tender Specification No. 610000448
4. Description of work Outsourcing of services of 34 numbers Contractor’s workmen to assist in Round the clock operations of ETP from DCS system, Monitoring the CPU regeneration system like DCS operation and resin separation, Steam and Water samples collection for Unit-I&II /SDSTPS for a period of twelve months from 01-04-2019 to 31-03-2020.
5. Contract period 12 months i.e. from 01.04.2019 to 31.03.2020.
6. Estimated value of the work Rs.1,05,47,523.00 (Rupees One Crore Five Lakhs Forty Seven Thousand Five Hundred and Twenty Three Only).The estimated value includes pay, other allowance, ESI, EPF, Earned Leaves & Paid Holidays, Terminal Benefits, Safety Amenities, Supervision Charges, Labour Welfare Fund, Goods & Service Tax @ 18%.
7. EMD to be paid(DD/BG from any nationalized banks)
a) EMD shall be submitted for Rs.3,11,000.00 (Rupees Three Lakhs Eleven Thousand Only) without fail.
(i)The tenderer should furnish Rs.1,00,000/- (Rupees One
Lakh Only) in the form of Demand Draft.The D.D. shall be drawn in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada.
(ii)The remaining amount of EMD in the form of Bank
guarantee (BG) for an amount of Rs.2,11,000/- (Rupees Two Lakhs Eleven Thousand Only) from any Nationalized bank/Scheduled bank in the prescribed EMD proforma enclosed in the tender document.
b) In case of PEMD holders: Bidders having PEMD Facility accorded by APGENCO,
with adequate validity, shall submit stipulated EMD of Rs.3,11,000.00 (Rupees Three Lakhs Eleven Thousand Only)
as follows: (i)The tenderers having PEMD approval with value
Rs.2,50,000/- should furnish (a) Rs.1,00,000/- (Rupees One
Lakh only) in the form of Demand Draft in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada and should enclose a copy of PEMD approval letter issued by APGENCO.
4
(ii)The tenderers having PEMD approval with value
Rs. 5,00,000/- should enclose a copy of PEMD approval letter issued by APGENCO and Rs.1,00,000/- (Rupees One
Lakh only) in the form of Demand Draft in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada
c) Alternatively the bidders can also pay the total EMD amount i.e. Rs.3,11,000.00 (Rupees Three Lakhs Eleven Thousand Only) in the form of Demand Draft drawn in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada.
d) Exemption for SSI/NSIC units: The SSI Units registered
with either the NSIC or the Dept of Industries/ Govt. of AP, are eligible for exemption from payment of EMD.
For further details refer clause (3) of Section-V : Annexure –II (General terms & conditions).
All the bidders shall invariably upload the scanned copies of Demand Draft/Bank Guarantee towards EMD/PEMD
approval letter/EMD exemption letter, along with the Bid, in APGENCO e-procurement platform and this will be the primary requirement to consider the bid responsive.
8. Nature of tender
Open tender in two part bid (i) Prequalification bid and (ii) price bid
9. Schedule available date and time
From 18:00Hrs on 04.02.2019 onwards
10. Bid submission closing date & time.
13:00Hrs on 25.02.2019
11. Bid submission by On line
12. Bid validity 120 days from the opening of price bid
13. Pre bid meeting Not applicable
14. Pre-Qualification /Technical bid opening date(Qualification and eligibility stage )
At 15:00Hrs on 25.02.2019
15. Price bid opening date & time At 15:00Hrs on 27.02.2019
16. Place of opening of tender O/o. The Superintending Engineer (Generation-III), APGENCO, 3rd Floor, Vidyut Soudha, Gunadala – 520004, Vijayawada.
17. Contact Details Ph: (0866) 2526 836, (0866) 2526 126 Fax: (0866) 2526 699.
18. Officer Inviting Bids O/o.Superintending Engineer (Generation-III).
19. Eligibility Criteria As per Tender document
20. Site Location SDSTPS – Sri Damodaram Sanjeevaiah Thermal Power Station, APGENCO, Nellore District.
21. Important scanned Documents to be up loaded for technical bid
As per the Checklist is available at page no.(40).
5
Note:
(1) The SSI Units registered with either the NSIC or the Dept of Industries/Govt. of AP, are eligible for exemption from payment of EMD. However, they should apply in advance by enclosing a valid SSI/NSIC certificate, and obtain exemption from the Chief General Manager (Adm, IS & ERP)/ APGENCO/Vidyut Soudha/Gunadala, well before submitting Tender.
(2) Responsibility for correctness of the information and legibility of the documents submitted in the online bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will not only be rejected but the bidder will be BLACKLISTED.
(3) APGENCO shall not be liable & responsible in any manner whatsoever for
your failure to access & submit offer on the APGENCO e-tendering site due to loss of internet connectivity, electricity failure, virus attack, problem with PC, digital signature certificate or any other unforeseen circumstances etc.
6
SECTION-I: IMPORTANT INSTRUCTIONS TO THE BIDDER M/s. Andhra Pradesh Power Development Company Ltd (APPDCL), Vijayawada is the owner of the 2x800MW-Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) located at Nelatur Village, Muthukur (Mandal),Nellore Dist., Andhra Pradesh. This enquiry is floated by APGENCO on behalf of APPDCL. The Purchase order will be placed on the successful bidder by M/s. APPDCL only.
APPDCL or CORPORATION or PURCHASER: shall mean Andhra Pradesh Power Development
Company Ltd., having its Office at Plot No.29, Road No.1, Central Excise Colony, Vijayawada – 520 008.
APGENCO or CORPORATION: shall mean Andhra Pradesh Power Generation Corporation Ltd., (a Govt. of A.P Undertaking), a company incorporated in India under Companies Act 1956, having its Office at Vidyut Soudha, Gunadala, Vijayawada–520 004, (AP).
SUPPLIER or CONTRACTOR or VENDOR or SUCCESSFUL BIDDER: shall mean the Bidder on whom LOI/PO is issued against this Tender Specification.
PROJECT LOCATION & NEAREST RAIL: Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) is located on shore of Bay of Bengal at Nelatur Village, Muthukur Mandal, Nellore Dist., Andhra Pradesh. The nearest railway station is Nellore situated on Chennai Broad gauge line, which is about 23KM from the site.
APGENCO/APPDCL standard terms & conditions are stipulated in the Annexure-II. Requirements specific to this enquiry are stipulated in the remaining sheets and will take preference over the standard terms, in case of any ambiguity.
(1) General & Special Terms and Conditions: The tenderers are requested to read the Corporation Special & General Terms and Conditions furnished in the Annexure- I & II. The acceptance or otherwise to the above terms and conditions with reference to the following shall be specifically indicated by the tenderers, in the absence of which it will be construed that the tenderer accepts the APPDCL terms and conditions.
1. Payment Terms 2.Security deposit & special/additional security deposit 3.EMD 4.Validity of tender 5.Schedule of works 6.Insurance (ESI) 7.Liquidated damages 8.Penalty etc.
(2) The bids being two parts consist of (i) Pre-Qualification bid or Technical bid and (ii) Price bid.
i) Pre-Qualification or Technical Bid:
The bidders need to scan and upload the required documents in meeting Pre Qualification Requirements, Latest Income Tax Return filed, Goods & Service Tax Registration Certificate, Copy of PAN Card and scanned copy of EMD DD, EMD Exemption letter, if any /Permanent EMD acceptance letter issued by APGENCO, if any etc along with the Pre-Qualification bid/Technical bid as per Schedule I to VI (duly filled in) of the tender specification, duly signed on each page with seal. Checklist is available at page no.(40).
7
ii) Price Bid or Commercial Bid: The Bidders shall scan & upload the Price Proposal duly filled in, signed & stamped. (Not to be uploaded with PQB, only to be uploaded with Price bid/commercial bid. If uploaded with PQB the tender will be rejected)
(3) Prospective Bidders are advised to intimate the undersigned, about their interest to
participate in the tendering process, so as to enable this Office to keep them informed about any updations on the subject.
(4) Any clarifications shall be obtained prior to submission of offer itself. (5) Bidders are advised not to make any assumptions or inferences, on their own. (6) Since Bids are invited in two parts, in case the particulars furnished in the Price Bid are
found to be at variance with the terms & conditions etc indicated in the Techno-Commercial Bid, the Bid will be processed at the terms which are more advantageous to APGENCO.
(7) Notwithstanding anything stated above, APGENCO reserves the right to assess the
tenderers’ capability to execute the contract, should the circumstances warrant such assessment in the Overall interest of APGENCO. In respect of Qualification of the tenderers, the decision of APGENCO is final.
(8) It is not binding on APGENCO to accept the lowest Bid, or any other Bid. APGENCO
reserves the right to place Orders on different Bidders or reject any or all tenders without assigning any reason.
(9) The Bids will be opened at the time and date specified in the tender notice by Superintending Engineer or his authorized assistant in the presence of such of the tenderers or their authorized representatives with valid authorization, who may desire to be present. (10) The price-bids of such tenderers, who are determined to have complied with the eligibility
criteria will only be opened.
(11) If due date for opening of the tenders happens to be a Public holiday, the opening of tenders will be done on the next working day at the same time specified originally for opening.
8
SECTION-II : ONLINE BID SUBMISSION PROCEDURE
1) Registration with APGENCO e-procurement platform:
Only those bidders, who are registered on the APGENCO e-procurement website are eligible to participate. For any queries on registration and online bid submission, on APGENCO e-Procurement website, the bidders may have to contact HELP DESK of Service provider on https://etender.apgenco.gov.in.
The details of e-Procurement tenders can be accessed from APGENCO e-Procurement website i.e. https://etender.apgenco.gov.in. The bidder may login using their login id & password to view all tenders available for the bidder. Alternatively, the bidder can access APGENCO e-tender site by using the link provided in www.apgenco.gov.in website.
2) Pre-requisites to submit tenders on line:
(a) The bidder should have a valid User ID and password to access APGENCO e-Procurement website. A system generated password is sent to the bidder at the time the bidder is registered as a SRM Vendor.
(b) The bidder should have a legally valid Class II/Class III digital certificates and encryption certificates as per Indian IT Act from the licensed Certifying Authorities operating under the Root Certifying Authority of India (RCAI), Controller of Certifying Authorities (CCA) of India.
(c) The bidder should have internet connectivity, preferably broadband.
3) Instructions for obtaining Digital Certificate:
(a) In order to bid for APGENCO e-tenders all the vendors are required to obtain a legally valid Class II/ Class III digital certificate and encryption certificate as per Indian IT Act from the licensed. Certifying Authorities (CA) operating under the Root Certifying Authority of India (RCAI), Controller of Certifying Authorities (CCA) of India (http://www.cca.gov.in/). (b) For obtaining Digital Certificate, visit the site of the licensed CA using internet
browser. Apply online for a class 3 digital certificate for the designated individual with organization name. Ensure the Digital Certificate is legally valid in India. For making payment and submission of documents required for issue of the Digital Certificate, follow the instructions on the CA's website.
(c) Use the class 3 Digital Certificate thus obtained for online bidding on APGENCO e-Procurement site. Links to some of the licensed CA's are provided below: http://www.tcs-ca.tcs.co.in/ http://www.apts.gov.in/ http://www.safescrypt.com/ https://www.ncodesolutions.com/ http://mtnldigitalsignature.com
9
4) Technical Settings:
For all the technical setting of PC, bidders are requested to go through the
“Guidelines to Bidders for participating in APGENCO's e-Procurement Tenders”
provided in the APGENCO e-Procurement site i.e. https://etender.apgenco.gov.in.
5) Bid Attachments:
The bidders should not upload multiple files with same file name. If you wish to upload a new version of an already uploaded file, please ensure that the file name is numbered (e.g. if you have already uploaded a file named abc.pdf and wish to upload a new version of the same, you may upload it with the name abc_v2.pdf).
6) Vendor Registration:
The Bidders should submit the online vendor registration requests, well in advance before the Bid submission deadline at least 2 working days before submission deadline. 7) All the bidders are requested to view bidder manual (RFx & Auction) i.e Bidder
Training document for Supplier Relationship Management (SRM) provided in the APGENCO e-Procurement site, https://etender.apgenco.gov.in.
8) Tender Document:
(a) The Bidder is requested to download the tender document and read and
understand clearly all the terms and conditions mentioned in the tender
Document. Any clarifications shall be sought from the Tender Inviting Authority,
prior to submission of Offer only.
(b) APGENCO reserves the right to amend or modify the tender and its conditions on or before the bid Schedule Closing Date &Time.
(c)It is the responsibility solely of the Bidder, to keep track of any changes by
viewing the Addendum/Corrigendum issued by the Tender Inviting Authority,
from time to time, in the APGENCO e-Procurement website. The Department
calling for tenders shall not be responsible for any claims/problems arising out of
this.
9) The bidders should fulfill any other pre-requisites mentioned in the tender documents of a specific tender. The tenderer should read and understand clearly the general instructions and terms and conditions of the tender document before uploading of documents and submission of the tender.
10) Online Submission of Bids:
(a) Bids are invited, online, on APGENCO e-Procurement website, in Two
Parts viz.,
10
-- Part-I or Pre-Qualification Bid (PQB) and
-- Part-II or PRICE BID (also referred as COMMERCIAL BID on APGENCO
e-Procurement Platform).
(b) The Bidder shall submit his Bid online, on APGENCO e-Procurement
platform ie., https: //etender.apgenco.gov.in, as per the procedure given
below.
(c)The bidders shall register on the APGENCO e-procurement Website, i.e. on https://etender.apgenco.gov.in and submit their bids online. Offline bids will not be entertained by the Tender Inviting Authority, for the tenders published in APGENCO e-Procurement website. Any offline submission of the bid will be rejected and action deemed fit will be taken against the bidder according to the norms of APGENCO e-procurement.
(d)The bidders need to scan and upload the Earnest Money Deposit in specified form & for requisite amount and required documents as per the tender requirements duly signed on each page with seal owning responsibility for their correctness/authenticity.
11) Opening of Tenders:
(a)Part-I i.e. ‘Pre-qualification Bid/Technical Bid’ or PQB, will be opened ONLINE, at the time and place specified in the tender notice by the Superintending Engineer or his authorized assistant in the presence of such of the bidders or their authorized representatives with valid authorization, who may desire to be present. (b)Evaluation of Pre-Qualification Bids: The Department shall carry out the
technical bid evaluation solely based on the uploaded documents/Certificates etc, DD/BC/BG towards EMD in the e-procurement system and Part-II: ’Price
Bid’ or ‘COMMERCIAL BID’s of the responsive Bidders shall be opened ONLINE, at the time and place indicated.
(c)Evaluation of Price Bids: The Department shall carry out the price bid evaluation
based on the terms & conditions quoted by the bidders and also as per the APGENCO procedure in vogue
(d)It is the responsibility of the Bidder to ensure that the PRICE BID is completely in
line with the PQB. In case the terms indicated in Part-II are found to be different from those indicated in Part-I, APGENCO reserves the right to either consider the terms more favourable to APGENCO, or to reject the Bid, outright.
(e)Bidders are requested to ensure that they do not upload Part-II, ie., Price
Bid/Commercial Bid, along with Part-I: ie., Pre-Qualification/Technical
Bid.APGENCO reserves the right to disqualify those Bidders, whose PQBs are found to contain Price Bids also.
11
The Department will notify the successful bidder for submission of original hard copies of all uploaded documents, DD/BC/BG towards EMD prior to entering into agreement.
12) Intending bidders can contact the office of The Superintending Engineer (Generation - III), APGENCO, 3rd Floor, A-Block, Vidyut Soudha, Gunadala -520004,Vijayawada for any clarification/information on any working day during working hours. Phone: 0866-2526836/126/123.
13) Submission of Hard Copies:The successful tenderer shall submit the hard copies of tender documents along with original EMD to the Superintending Engineer (Generation-III) or any of his authorized representative either directly or through his agent or by registered post or by courier service before stipulated time given to him before placing the Purchase Order. The date of submission of hard copies will be intimated after finalizing of the successful tenderer through mail to the registered e-mail ID on APGENCO e-procurement website.The receipt of the same within the stipulated date shall be the responsibility of the successful bidder. A copy of valid Contractors Registration proceedings shall be enclosed along with the hard copies of Tender documents.
14) If the due date for opening of the tenders happens to be a Public holiday, the
opening of the tenders will be done on the next working day at the same time and venue as specified originally for opening. APGENCO reserves the right to amend or modify the tender document and its conditions.
15) Regarding Online Bidding:
(a) Notwithstanding the particulars/guidelines stipulated in this document, all the
bidders are advised to get themselves acquainted with the latest rules &
regulations governing submission of Bids, on the APGENCO e-Procurement
platform.
(b) It is the responsibility of the Bidder, to ensure that the scanned copies uploaded
to the APGENCO e-Procurement website, are legible.
(c) Online Offers which are found to be either incomplete or corrupted, are liable to
be rejected. In order to avoid any such possibility, it is recommended that once
the Bid is completely uploaded, the Bidder shall verify the uploaded documents
& particulars, downloading the documents, if necessary. The Bidder shall be
solely responsible for ensuring that all requisite documents have been
successfully uploaded.
16) DISCLAIMER: (a) This Tender Specification, and any subsequent addenda/amendments etc, will be
made available on APGENCO’s e-procurement website, and can be downloaded free of cost. The Bidders shall be solely responsible, for ensuring that their Bids are completely in line with the requirements stipulated therein.
12
(b)The Specifications stipulated in these documents, are indicative only. It is the responsibility of the Bidder to ensure that the materials/equipment offered, are completely as per Site requirements. The Bidders are advised to depute their representatives to Site, to study Site conditions, ascertain/assess site requirements,
collect all necessary particulars etc. (c)Any discrepancies in the requirements stipulated in these documents, shall be
brought to the notice of the undersigned, and clarifications shall be obtained prior to submission of Offer itself. Bidders are advised not to make any assumptions or inferences, on their own.
(d)The Tenderer should read and understand clearly the general instructions and terms and conditions of the tender document before uploading of documents and submission of the tender.
(e)If due date for opening of the tenders happens to be a Public holiday, the opening of tenders will be done on the next working day at the same time specified originally for opening.
(f)APGENCO reserves the right to amend or modify the tender and its conditions before the due date & time of Schedule Closing.
(g)The contractors have to upload the information preferably in Zip format. (h)Any other condition regarding receipt of tenders in conventional method appearing in the tender documents may please be treated as not applicable.
(i)Notwithstanding anything stated above, APGENCO reserves the right to assess the tenderers’ capability to execute the contract, should the circumstances warrant such assessment in the Overall interest of APGENCO. In respect of Qualification of the tenderers, the decision of APGENCO is final.
(j)APGENCO reserves the right to split the order on more than one bidder, in any manner or reject any or all tenders without assigning any reason.
17) Bid Submission Acknowledgement:
The bidder shall complete all the processes and steps required for Bid submission. The system will generate an acknowledgement with a unique bid submission
number after completing all the prescribed steps and processes by the bidder. Users may also note that the bids for which an acknowledgement is not generated by the APGENCO e-Procurement system are treated as invalid or not saved in the system. Such invalid bids are not made available to the Tender Inviting Authority for processing the bids. APGENCO shall not responsible for incomplete bid submission by users.
18) The contractors have to upload the information preferably in Zip format. Any other
condition regarding receipt of tenders in conventional method appearing in the tender documents may please be treated as not applicable.
13
Note: PQB documents shall be uploaded in C-Folder Attachments (Non-Price components) only.
Any information if required, may contact superintending Engineer (Generation-III) through email: [email protected] No. 0866– 2526836/126/123/128.
Superintending Engineer (Generation-III)
14
SECTION-III: PREQUALIFICATION BID (PQB) REQUIREMENTS:
The tenderer shall upload/furnish the satisfactory documentary evidence to establish the following PREQUALIFICATION BID (PQB) requirement without any ambiguity.
(1) The tenderer shall upload/furnish all the documentary evidence in respect of the following
Eligibility criteria.
a) Experience:
The bidder should have minimum continuous experience of six (06) months in Providing man power assistance (or) Providing of contractor’s workmen on outsourcing basis in “Carrying out the Water treatment operations and chemical lab analysis” in 500MW or above capacity thermal unit during the last Five years prior to the date of tender opening. Documentary evidence to this effect shall be submitted compulsorily. The experience certificates issued by circle head or station head are only acceptable.
b) EPF, PAN and Goods & Service Tax : The bidder should have valid EPF, PAN and Goods & Service tax registration certificate. Copies of relevant documents duly attested shall be furnished as documentary evidence.
c) Earnest Money Deposit (EMD) for requisite amount shall be furnished.
Note:(i)The bidder shall have sound financial status and shall undertake that he/she does not in any way cause any inconvenience for the payment to labour etc., and shall comply with all relevant rules and regulations of labour laws. (ii)The bidder shall furnish the documentary evidence in support of qualifying
requirements as stipulated above failing which bids are liable for rejection. (2) EMD (Bid Security):
(a) EMD shall be submitted for Rs.3,11,000.00 (Rupees Three Lakhs Eleven Thousand Only) without fail.
(i) The tenderer should furnish Rs.1,00,000/- (Rupees One Lakh Only) in the form of Demand Draft.The DD shall be drawn in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada.
(ii)The remaining amount of EMD in the form of Bank Guarantee (BG) for an amount of
Rs.2,11,000/- (Rupees Two Lakhs Eleven Thousand Only) from any Nationalized bank/Scheduled bank in the prescribed EMD proforma enclosed in the tender document.
(b) In case of PEMD holders: Bidders having PEMD Facility accorded by APGENCO, with adequate validity, shall
submit stipulated EMD of Rs.3,11,000.00 (Rupees Three Lakhs Eleven Thousand Only) as follows:
(i)The tenderers having PEMD approval with value Rs.2,50,000/- (Rupees Two Lakhs Fifty
Thousand Only) should furnish Rs.1,00,000/- (Rupees One Lakh only) in the form of Demand Draft in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada and should enclose a copy of PEMD approval letter issued by APGENCO.
15
(ii)The tenderers having PEMD approval with value Rs.5,00,000/- should furnish Rs.1,00,000/- (Rupees One Lakh only) in the form of Demand Draft in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada and should enclose a copy of PEMD approval letter issued by APGENCO.
(c) Alternatively the bidders can also pay the total EMD amount i.e. Rs.3,11,000.00 (Rupees
Three Lakhs Eleven Thousand Only) in the form of Demand Draft drawn in favour of “Pay Officer/APGENCO/ Vidyut Soudha”, payable at Vijayawada.
(d) Exemption for SSI/NSIC units: The SSI Units registered with either the NSIC or the Dept
of Industries/ Govt. of AP, are eligible for exemption from payment of EMD.
For further details refer clause (3) of Section-V : Annexure –II (General terms & conditions).
(3) Validity of Tender: The tender should be kept valid for 120 days from the date of Opening of price bids. (4) Details of the schedules to be filled and submitted by the tender along with the tender.
(5) The Bidders have to fill all the schedules – I to VII and upload along with their PO copies in support of documentary evidence, while submitting the e-tenders along with PQB.
Note:
Notwithstanding anything stated above, APGENCO reserves the right to assess the tenderer’s capability to execute the contract, should the circumstances warrant such assessment in the overall interest of APGENCO.In respect of qualification of Bidders, the decision of APGENCO is final.
Responsibility for correctness of the information submitted in the online bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will not only be rejected but the bidder will be BLACKLISTED.
16
SECTION – IV: SCHEDULE OF WORKS & PRICES
Name of work: Outsourcing of services of 34 numbers Contractor’s workmen to assist in Round the clock operations of ETP from DCS system, Monitoring the CPU regeneration system like DCS operation and resin separation, Steam and Water samples collection for Unit-I&II /SDSTPS for a period of twelve months from 01-04-2019 to 31-03-2020.
(A) SCHEDULE OF WORK:
1. The regeneration process of CPUs includes DCS Operation for resin transfer from vessel
to regeneration station vice versa, needs continuous presence in its location from starting
to ending of the process.
2. During CPU Regeneration process CRUD Removal, Separation of Cation and Anion
resins, drawl and handling of chemicals for acid/alkali injection to Cation and anion
resins, operation of acid/alkali dosing pumps, operation of manual valves during above
processes.
3. Neutralisation of CPU effluent by mixing Caustic soda lye and Hydrochloric acid and
operation of Neutral pit.
4. Testing during CPU regeneration like turbidity, conductivity and Silica at CPU Vessels
and CPU regeneration station.
5. Monitoring and recording of SWAS Online parameters every hour for units I &II.
6. Collection of steam and water samples for every two hours of the both units I&II.
7. Mixing of chemicals like Ammonia and Hydrazine in dosing tanks of units I &II round
the clock.
8. Observing the dosing tank levels and operation of dosing pumps and handling the
oxygen gas cylinders and assistance in testing of samples.
9. Observing the oxygen dosing system, recording the oxygen flow and oxygen cylinder
discharge pressure at CPP outlet and BFP discharge every hour for Units-I&II, testing of
dissolved oxygen in all SWAS samples for every two hours
10. Testing of various parameters like pH, Conductivity, silica, Iron, Hydrazine reserve,
chlorides and Sodium in SWAS samples and CPU samples for both units I & II.
11. Assistance for round the clock ETP operations such as DCS operations, monitoring of
dosing tanks levels and dosing rates, operations of pumps and valves, handling and
mixing of dosing chemicals, samples collections, analysis and recording the parameters.
The above scope of work includes but not limited, the Contractor shall ensure to maintain trouble free operation of the equipment as per the site requirement and instructions of the APGENCO/APPDCL officials.
17
Any minor modification works that are required for trouble free operation of the equipment shall be carried out without any extra cost. The necessary spare materials that are required to carry out the work will be arranged by APPDCL.
(A) SCHEDULE OF PRICES:
Note:
Pay, Other allowance, Earned Leave @4.93% & Paid Holidays @2.19%, EPF, ESI, Safety amenities (Lump sum of Rs.3,000/- per labour per annum), Terminal benefits, Labour welfare fund and Goods & Service tax @18% are as mentioned above.
The contractor should pay the remuneration to labour as per APGENCO G.O.O.NO. 409/JS(Per)/2018, Dtd.29.11.18,Circular Memo No.JS(Per)/DS(Estt)/AS(IR)/PO-
Sl.
No.
Category Man power
Requirement
per day
Rate/
Month
(Rs.)
Amount per
month(Rs.)
I Pay
1 Skilled 8 12003 96,024.00
2. Semi-Skilled 12 9780 1,17,360.00
3. Un-Skilled 14 8284 1,15,976.00
4. Total Pay (1+2+3) 34 3,29,360.00 II Other allowances
5. Skilled 8 8595 68,760.00
6. Semi-Skilled 12 7364 88,368.00
7. Un-Skilled 14 8189 1,14,646.00
8. Total Other allowances (5+6+7)
34 2,71,774.00
9. Total Remuneration (4+8) 6,01,134.00
10. Earned Leave @ 4.93% on (Sl.No.4) 16,237.45
11. Paid Holidays @ 2.19% on ( Sl.No.4) 7,212.98
12. Service Incentive (who have completed 10 yrs of service as on 01.04.2018)
0.00
13. EPF @ 13% on ( Sl.No.4) 42,816.80
14. ESI @ 4.75% on ( Sl.No.[9]+[11]+[12]) 28,896.48
15. Terminal benefits @ 4.11% on ( Sl.No.4) 13,536.70
16. Safety amenities 8,500.00
17. Welfare fund @ Rs.70/- per person per year 198.33
18. GST @ 18% on all (Sl.No.[9] to [17]) 1,29,335.89
19. Amount per Month 8,47,868.63
20. Total Amount for 12 Months 1,01,74,423.56
21. Supervision Charges (Excluding GST) [Limited to 8% on Sl.No.(4)]
To be quoted in the enclosed
PART-II (PRICE BID)
18
F/66/2018, Dt.03.01.2019 & Circular Memo No.JS(Per)/DS(Estt)/AS(IR)/PO-F/66/2018, Dt.30.01.2019
Payment of EPF, ESI (The ceiling limit of Gross Salary of labour for applicability
of ESI is Rs.21,000/- per Month as per ESI act) and Goods & Service Tax will be reimbursed at actuals against the production of documentary evidence to the extent of mandatory nature.
TDS is mandatory and it shall be recovered as per applicable rates.
The contractor should provide safety amenities as per the tender conditions.
Documentary evidence shall be submitted and payment will be released
accordingly.
Please Note:
The contractor should inspect the work site to collect the details of all equipment and to get himself acquainted with the site working conditions, prior to quoting the rates. No extra rate on the plea that he has not understood the full scope of work indicated in the schedule will be entertained at a later date. For site inspection, the intending tenderer may contact the Chief Engineer/O&M/SDSTPS or concerned Superintending Engineers.
Any request for revision of value of the contract after finalization will not be entertained except statutory nature.
APPDCL is at liberty to go for short closer of the contract or to reduce the works on pro-rata basis based on the site requirements, by giving an advance notice of 10 to 15 days.
Signature of the Tenderer (With office seal)
19
SECTION- V
ANNEXURE-I : SPECIAL TERMS & CONDITIONS
(1) Deployment of contractors workmen: - The contractor shall provide 34 numbers contractors workmen per day for water treatment plant and chemical lab of Unit-I&II of SDSTPS. Among 34 numbers, 08numbers Skilled, 12 numbers Semi- skilled and 14 numbers are Un-skilled.
(2) The contractor should not cause inconvenience to the APPDCL works due to lack of adequate manpower for the works entrusted to the contractor.In such case the contractor will be suspended from participating in the tenders in APGENCO/APPDCL for a period of Three Years.
(3) All the personnel deployed by the CONTRACTOR shall be treated as the personnel of CONTRACTOR and not of the APGENCO/APPDCL.They shall be, and shall always be treated for all purposes as employees of CONTRACTOR only.
(4) The CONTRACTOR shall abide by the provisions of the Contract Labour (Regulation and Abolition) Act, 1970 and maintain necessary records in terms of Minimum Wages Act as
laid down by the Government of Andhra Pradesh. The agency shall be responsible for maintenance of concerned records of all its employees. The agency shall comply with all statutory rules and regulations of government. Original vouchers/chalans showing the contribution made towards EPF and ESI/GIS shall be produced. Otherwise recovery will be made from the contractor to that extent.
(5) All the statutory provisions like EPF,ESI, labour license shall be provided by the
contractor including payment of minimum wages from time to time as applicable for the workers engaged.
(6) The bill of the contractor for the work executed will be passed only on receipt of copies of EPF remittances made by the contractor to the concerned EPF authorities in the independent EPF code No. held by the respective contractor. The copies of Insurance premium paid covering the labour engaged by him against each of work contract also shall be produced to the concerned field officers enabling them to regulate bills. The EPF will be paid at actual on production of remittance challan.
(7) The contractor should render the bill for the work done and also for the amount
remitted towards EPF.
(8) The CONTRACTOR shall engage labour who is experienced in similar field of
work, for carrying subject work.
(9) The CONTRACTOR shall also comply with the provisions under Factories Act
1948 from time to time.
(10) The CONTRACTOR shall obtain valid labour license for carrying out operation and
maintenance, any expenditure towards the above shall be to the contractors account only.
20
(11) Site-in-charge and workmen shall maintain cordial relations with the concerned
Engineers.
(12) Site-in-charge and supervisors should have good control over the staff engaged by them.
(13) Site-in-charge should be available in the Site and follow up the working condition
of the equipment from time to time. Any repairs, if necessary should be carried out round the clock.
(14) The CONTRACTOR shall follow statutory rules, regulations and instructions given by
APPDCL from time to time for smooth operation of the system. If any deviation found in
the following statutory rules, the contractor only shall be responsible.
(15) If at any time hereafter any disputes or differences arise between the parties here to
and/or their respective successors and assigns with regard to the operation or
interpretation of any of the terms and conditions or provision thereof or regarding any
rights and liabilities of the respective parties and/or any other matter or thing arising out
of any/or relating or touching these presents, the same shall be referred to the APPDCL
for its decision which shall be final and binding on both parties.
(16) Any dispute arising out of this contract shall be instituted only in the court having
jurisdiction in Vijayawada/Amaravathi city.No suit or other legal procedure will be
instituted elsewhere.
(17) The Contractor is deemed to be the Principal Employer in respect of the personnel
deployed by him in execution of works and also shall be responsible to pay both the EPF
contributions payable by himself as a principal employer and also on behalf of the
personnel employed to PF authorities concerned in the independent PF Account Number
held by him. The returns, records/registers as required under the EPF & MP Act, 1952
shall be maintained by the Contractor and follow the rules therein. The proof of
remittance of EPF shall be enclosed while claiming the monthly bills. The PF number of
any other agency/sister concern or any other organization shall not be used for the above
purpose.
(18) The Contractor shall comply with labour laws and pay the workmen as per APGENCO
G.O.O.No.409/JS(Per)/2018, dt:29.11.2018,Circular Memo No.JS(Per)/DS(Estt)/
AS(IR)/PO-F/66/2018, Dt.03.01.2019 & Circular Memo No.JS(Per)/DS(Estt)/
AS(IR)/PO-F/66/2018, Dt.30.01.2019, compensation and contributions in respect of the
personnel deployed by him under payment of Wages Act 1936, Contract Labour (R&A)
Act 1970, Workmen’s Compensation Act 1923, Minimum Wages Act 1948, Employees
liability Act 1938, Industrial Disputes Act 1947, Maternity benefit Act 1961, Child Labour
(Regulation and abolition) Act 1986, Employees Provident Fund (Misc.) Act 1952
including any modifications there under from time to time.
21
(19) If the commissioner of Labour, Government of Andhra Pradesh enhances the basic
wages in future, the monthly remuneration that is being paid to the contractors
labour/outsources workers in APGENCO will be compared with the enhanced gross
wages of commissioner of labour and whichever is higher will be paid.The relevant
clauses will be amended as per the necessity and the contract value will be revised
accordingly. The wages shall be paid through bank Accounts of the
workmen.Enhancement of monthly remuneration shall not be linked to any further
revision of the remuneration to the outsourced personnel working in Govt Department.
(20) The Contractor should obtain Insurance coverage under ESI Act 1948 to all the personnel
deployed during the entire period of execution of work.Any expenditure towards the
above is to Contractors account only.The Contractor is responsible to pay both the ESI
contributions payable by himself as a principal employer and also on behalf of the
personnel employed to ESI authorities concerned in the independent ESI Account
Number held by him. The proof of ESI remittance shall be enclosed while claiming the
monthly bill.
(21) The contract is not transferable.Part work or full work shall not be sublet under any
circumstances to other firms/agencies by the contractor.
(22) It is the responsibility of the Contractor to ensure all the terms and conditions of tender specification are abided.
(23) The contractor shall follow the Rule of Reservation (ROR) as per APGENCO Memo No.
D(HR)/CGM(HR)/ DS(O&M)/LO(T)/PO/1194/2010 dt.04.08.12.
(24) The CONTRACTOR shall assist in Round the clock operations of ETP from DCS system,
Monitoring the CPU regeneration system like DCS operation and resin separation, Steam
and Water samples collection as directed by engineer-in-charge effectively.
(25) The work shall be carried out to the satisfaction of APPDCL Engineers and as per the
scope of work and guidelines issued by the Engineer in-charge.
(26) The works shall not be hampered due to non availability of required man power. If the
contractor fails to provide the required manpower, he shall have to bear a penalty.
(27) The APGENCO/APPDCL is not responsible for any accidents to the labour employed by
the contractor.
(28) If there is any loss or damage to the APGENCO/APPDCL property due to the negligence
of labour employed by the contractor should be made good of the loss as assessed by the
APPDCL Engineer concerned.
(29) The contractor is not entitled for claiming towards any loss or damage in case the contract
is to be suspended for some time or to be closed for some reason or other and for which he
is not eligible for any compensation.
22
(30) The entire area of operation shall be kept in neat and tidy condition by the CONTRACTOR to the satisfaction of the Engineer in-charge. The operation of the water treatment plant and chemical lab shall be done round the clock (24 Hours in 3 Shifts).
(31) The Contractor shall be responsible for shut down of system for want of manpower.Any
failure to provide required manpower causing emergency situation and the work is
attended by the Concerned Superintending Engineer, the charges will be deducted from
the running bills.
(32) The CONTRACTOR shall not cause any damage to the plant and equipment of SDSTPS
and to the roads and colony etc in case any damage is caused to the property of SDSTPS,
the CONTRACTOR shall indemnify for all such damages or losses or the same will be
recovered from the bill.
(33) The work should be done without any inconvenience to the other staff working at site by suitably coordinating with them.
(34) The work should be carried-out without any damage to the equipments in the area. The contractor is responsible for any damage to the equipment of the Corporation.
(35) The CONTRACTOR shall maintain trouble free operation of the equipment of water treatment plant and chemical lab of SDSTPS units effectively round the clock throughout the period of the contract.
(36) Any change in the scope of work that is required for trouble free operation of the equipment shall be carried out without any extra cost. The necessary spare materials that are required to carry out the work will be arranged by
APGENCO/APPDCL.
(37) The contractor shall maintain daily operation and maintenance log sheet, history of the equipment and follow the maintenance schedule of all equipment.
(38) The Contractor scope includes assistance in general periodical overhauling of the equipment as well as annual overhauling works.
(39) The APDSS (Andhra Pradesh Detailed Standard Specification) & General principles of Engineering contracts manual will be followed in general.
(40) In the event of CONTRACTOR is not satisfying any of the above terms and conditions, the APGENCO/APPDCL has the sole discretion to terminate the contract by giving due notice to the CONTRACTOR.
(41) SAFETY AND ACCIDENTS:
The contractor should observe safety rules and provide safety appliances to his workmen. Necessary precautionary measures will have to be taken to prevent any accidents. Corporation will not be held responsible towards the payment of compensation for those who got involved in the accident.
23
(42) SAFETY CONDITIONS
(a) The contractor should not allow his workmen to wear loose garments like lungies, dhoties etc., and smoke cigarettes, cigar, beedi etc., while at work, inside the power House premises. The contractor shall ensure that his workmen wear either full pant or half pant while at work inside the Power House premises.
(b) All relevant personnel protective equipment including safety helmets (for all works) should be worn by the contractor and his workmen while at work.
(c)All the appropriate and relevant safety measures stipulated under the Factories Act.1948 made there under should be scrupulously complied with by the contractor and his workmen without any compromises. (d) For any safety violation and non-compliance of the statutory Act. and rules prescribed respectively under the Factories act.1948 made there under the contractor is liable for the imposition of penalty up to Rs.5,000/-(Rupees Five thousand only) per spell as decided by the CE/O&M/SDSTPS depending upon the severity and gravity of the violation. (e) The term SDSTPS includes all areas which come within the control of the Chief Engineer/O&M/SDSTPS for the purpose of Factory Act. (43) SAFETY AMENITIES:
a) The Contractor must supply all the safety appliances such as safety shoes, safety helmets, face masks, etc., and ensure that the staff is using the same.
b) The Contractor must supply necessary Safety appliances like good quality filter type
respirators (or) nose masks, poking forks to all his workmen everyday at his cost. If
cloggy or shabby respirators are found supplied to his workmen, it will be taken as that
respirators are not supplied and department will supply the respirators and recover the
entire expenditure thus incurred with centages including taxes from the contractor’s bills.
During rainy season, the contractor must supply raincoats to all his workmen.
c) The contractor should provide two pairs of uniform including stitching charges.
d) Procurement of all safety items and uniforms shall be taken after obtaining approval
from the safety officer and Factory Manager.
(44) BIO-METRIC ATTENDANCE SYSTEM:
Bio-Metric attendance system to the contract labour will be followed to monitor the attendance, leave records etc. The contractor has to bear charges towards access card and integration of contractor & labourer’s data with bio-metric attendance system of APPDCL. Hence the contractor shall furnish the following details of the labourers deployed by him at the time of awarding of contract and before commencement of work at site to APPDCL.
i) Contractor Name, ii) Supervisor Name, iii) Contact Phone Number,
iv) Work Order Number, v) Number of Persons, vi) Name of the Labourer
vii) Father Name, viii) Date of Birth, ix) Gender, x) Social Status, xi) Aaadhar Card
Number, xii) Photograph, xiii) Educational Qualification, xix) Category of Labourer
(Highly Skilled/Skilled/Semi-Skilled/Un-Skilled), xv) Validity, xvi) Material and xvii)
Thumb impression/Iris- to obtain at the time of entering the details of the labourer.
(45) The contractor should have sound financial status and does not cause any inconvenience
for the payment to manpower.
24
SECTION – V ANNEXURE-II: GENERAL TERMS AND CONDITIONS
1. REJECTION OF TENDERS:
The tender will be rejected if it is:
a. Not confirming to Tender specification. b. With validity less than what is specified in the tender. c. Not accompanied by the required EMD d. A black listed firm or contractor.
2. APGENCO/APPDCL reserves the right.
a) Not to accept the lowest or any tender. b) To divide/split and award the contract to one or more contractors if necessary. c) To revise quantum/schedule of any or all the items covered by this specification while
placing orders. d) To reject/cancel any or all the tenders at any stage without assigning any reason. e) To relax/waive any of the conditions stipulated in the Tender specification as deemed
necessary in the interest of the organization.
3. (A) EARNEST MONEY DEPOSIT(EMD): 3.1 Offers must accompany EMD of requisite amount as specified in tender enquiry
failing which offer shall be liable for rejection. Bank guarantee wherever required should be from Nationalized Banks only. EMD can be furnished by way of DD/Banker’s cheque drawn in favour of “Pay Officer/APGENCO/Vidyut Soudha”, Payable at Vijayawada (or) by way of Bank Guarantee in the prescribed EMD proforma.
3.2 Submission of EMD in any other form shall not be considered and shall be treated as disqualified.
3.3 EMD will not carry any interest. 3.4 EMD of the successful tenderer will be retained as part of Security Deposit. 3.5 The EMD of the rejected/un- successful tenderer will be returned after finalization of
the contract. 3.6 The EMD shall be forfeited, if
i) Bidder withdraws the bid before expiry of its validity. ii) Successful bidder does not accept the order/ LOI or fails to enter into a
contract within validity period of offer. iii) Successful bidder fails to furnish Security Deposit within 15 days from the
date of issue of P.O. / LOI. iv) The bidder submits any false documentary evidence or misinformation.
(B) EXEMPTION OF NSIC/SSI UNITS FROM PAYMENT OF EMD The firms registered with NSIC/SSI shall apply and obtain exemption for EMD for each tender before quoting. The exemption of EMD shall be considered on case to case basis in respect of NSIC/SSI subject to the following conditions.
a) The bidder shall submit a copy of the valid certificate of registration either with NSIC or Government of Andhra Pradesh indicating details such as Monetary Limit, details of items covered in the registration, validity period of certificate etc.
b) The items offered must be in the list of items for which the firm is registered.
c) The quoted price shall be less than the monetary limit stipulated in the registration certificate.
25
4. PERMANENT/ STANDING EMD:
4.1 The bidder may deposit with APGENCO, the permanent fixed deposit of Rs.5,00,000/- (Rupees Five Lakhs only)) as EMD in the form of DD/Pay order/ Banker’s cheque drawn in favour of Pay Officer/APGENCO/Vidyut Soudha”, Payable at Vijayawada.In case of BG, it shall be valid for a period of three years constituting the said sum as security for due compliance with the obligations undertaken in the offer submitted by the bidder.
4.2 Please note that PEMD submitted in the form of BG should be furnished and got approved from this office prior to the submission of tender.
5. CONTRACT PRICE:
5.1 The contract price shall be firm in Rupees and inclusive of pay, other Allowance, EPF,ESI, EL&PH, Terminal benefits, Safety Amenities, Supervision charges, Labour Welfare Fund, supervision charges, Goods & Service Tax and detailed break up for the same is furnished at page no.(17).
5.2 It will be deemed that the rates quoted by the tenderers are inclusive of all incidental items of work not necessarily mentioned in the schedule but are nevertheless essential for the contract and complete execution of the work.
6. TERMS OF PAYMENT:
a. 100% of monthly rate will be made within 30days after satisfactory completion of work on pro-rata basis once in a month duly recovering the amount for absenteeism days. The recovery amount towards absenteeism shall be deducted on pro-rata basis only on pay and other allowance only. Income Tax, TDS and other statutories will be deducted from the bills as per the prevailing rate. Bills shall be submitted in full shape in all respects along with proof of payment to the labour and remittance of EPF, ESI, and GST to the extent of mandatory for making payment as above.
b. When there are complaints from the labour department about non –payment & less payment of wages to the labourers employed by the contractor for the execution of the work under agreement, the Chief Engineer /SDSTPS shall have full powers to withhold the bills claimed by the contractor pending clearance certificate from the labour department and act as per the directions given by the labour department. c. Payment of the EPF, ESI/Insurance and Goods & Service Tax shall be reimbursed at actuals against the production of documentary evidence to the extent of mandatory nature. d. BILLING SCHEDULE: The contractor shall prepare & submit month wise break up of total contract price to the CE/O&M/SDSTPS and get the same approved by the CE/O&M/SDSTPS prior to commencement of works. Any payment under this contract shall be made only after the above approval. e. Documentary evidence shall be submitted for payment of safety amenities.
7. STATUTORY VARIATION:- Any variation up or down in statutory levy or new levy introduced after opening of the tender /after placing of the order & during the agreed contract period under this specification shall be to the account of the corporation.
8. A) COMPULSORY SECURITY DEPOSIT:
8.1. The successful Tenderer shall furnish security deposit equal to 5% of value of work order within 15 days from the date of issue of Letter of Intent/ Purchase Order for proper fulfillment of the terms and conditions of the contract. The amount of security shall be forfeited to the extent of financial loss suffered by the Corporation, if Contractor fails to execute the order and fulfill its terms and conditions. Security deposit may be furnished by Demand Draft drawn in favour of SAO, APPDCL payable to APPDCL or bank guarantee in lieu of cash from any nationalized
26
bank in prescribed proforma covering the validity of contract period with a further claim period of six months thereafter.
8.2 Security deposit shall be returned back to the contractor as soon as order is fully executed and contractor has met all contractual obligations and there is nothing outstanding either against this purchase order or any other purchase order placed by the corporation on the Contractor.
B) SPECIAL/ADDITIONAL SECURITY DEPOSIT: The successful Tenderer, whose
tendered value is less by more than 25% of the Corporation estimated value, shall furnish a additional security deposit equal to 5% of the Corporation estimated value within 15 days from the date of issue of Letter of Indent/ Purchase Order for proper fulfillment of the terms and conditions of the contract. The amount shall be forfeited to the extent of financial loss suffered by the Corporation, if Contractor fails to execute the order and fulfill its terms and conditions.
Deposit may be furnished by Demand Draft drawn in favour of SAO, APPDCL on any Nationalized bank, payable to APPDCL or bank guarantee in lieu of cash from any Nationalized bank in prescribed proforma covering the validity of contract period with a further claim period of six months thereafter. Deposit shall be returned back to the contractor as soon as order is fully executed and contractor has met all contractual obligations and there is nothing outstanding either against this purchase order or any other purchase order placed by the corporation on the Contractor.
9. FORCE MAJEURE:
9.1 If at any time during the continuance of this contract the performance in whole or in part in any obligation under this contract shall be prevented or delayed by reasons of any war, hostility, acts of public enemy, acts on civil commotion strikes, lockouts, sabotages, fire, floods, explosions, epidemics, Natural calamities, quarantine restrictions or other acts of God (herein after referred to as eventualities) then provided notice on the happening of any such eventuality is given by the tenderer to the corporation immediately from the date of occurrence thereof , neither party shall by reasons of such eventuality, be entitled to terminate this contract nor shall have any claim for damages against the other in respect of such non -performance or delay in performance and deliveries under this contract shall be resumed as soon as practicable after such eventuality has come to an end or ceased to exist.
9.2 No price variation shall be allowed during the period of force majeure and Liquidated damages would not be levied for this period.
9.3 At the option of corporation, the order may be cancelled. Such cancellation, would be without any liability whatsoever on the part of the corporation. In event of such cancellation, Contractor shall refund any amount advanced or paid to him by the corporation and deliver back any materials issued to him by the corporation and
release facilities, if any provided by the corporation.
10. LIQUIDATED DAMAGES:
10.1 If the Contractor fails to take up the works, the contract will be cancelled and an amount of 5% of the contract value will be levied as penalty.
10.2 The contractor is liable to pay to APPDCL the amount of loss sustained by the Corporation in the event of non execution of orders if any placed on them either in full or part to the satisfaction of the Corporation under the terms & conditions of the contract and in the event of placing orders for such works on some other firms at higher price.
27
11. INSTITUTION OF SUITS:
All and any disputes or differences arising out of or touching this order shall be decided only by Courts or Tribunals situated Vijayawada/Amaravati.No suit or other legal proceedings shall be instituted elsewhere.
12. SCHEDULE OF WORKS:
Only one schedule of work is enclosed to this tender specification. The works mentioned above are indicative only with a view to enable the tenderers to quote their over all rate. The contractor will have no claim for any upward or down ward revision in works indicated in the schedule. The rates quoted should be FIRM till the tenure of contract.
13. SUBLETTING OF CONTRACT:
The contract is not transferable. Part work or full work shall not be sublet under any circumstances to other firms/agencies by the contractor to whom the work is awarded.
14. TERMINATION OF CONTRACT:
The contract is liable to be terminated by the Corporation at any time during the currency of the contract with an advance notice of 10 to 15 days, forfeiting the Security Deposit, in case the performance or progress of the contractor is not satisfactory. The poor performance will be recorded for future works.
Also please note that this contract is liable for termination at any stage in the event of any
change in Corporation policy on contract. APGENCO/APPDCL is at liberty to go for short closer of the contract or to reduce the man power on pro-rata basis based on the site requirements, by giving an advance notice of 10 to 15 days.
15. DAMAGES TO CORPORATION PERSONNEL OR PROPERTY:
The contractor shall be responsible for any damage to the property and personnel of Corporation, any other agency within the power station area and its connected equipment of Chemical lab and water treatment plant arising out of carelessness and negligence on the part of himself or his employees. The work should be carried out without hindrance to the work of the power house and with full Cooperation with other contractors if any for other works and the damage caused to the Electricity posts, sheds, tracks, lines or any other property consequent to rough driving of vehicles by the contractor’s drivers would be made good. The relevant cost of damages will be debited from the contractor’s bill together with centage charges.
16. DISPUTE:
In the case of dispute or difference of opinion between the contractor and the departmental representatives at site in matter relating to day to day works and interpretation of the contract, the decision of concerned Chief Engineer/ O&M/ SDSTPS shall be final and binding.
17. CONTRACT LABOUR LICENCE:
17.1. The contractor should fulfill strictly all the conditions as stipulated in the contract labour regulation and abolition Act. 1970 and the Rules made there under.
17.2. The contract shall be terminated if the contractor fails to obtain license compulsorly under section 12 of the contract (Labour Regulation and Abolition) Act. 1970 before commencement of work at site.
18. INSURANCE/ESI:
18.1 The contractor should take insurance/ESI according to nature/elevation of work for all his work men, who are engaged in work at site before commencement of work and kept the same in force till the contract is completed.
28
18.2 The above policy should be produced to the Engineer in charge immediately when called for. Without the insurance policy and labour license, the contractor will not be permitted to commence the works.
18.3. Recoveries will be made from Contractors bills for any liability of the accidents and refund of the same, considered later after the claims is fully settled by the insurance authorities.
19. WORK ON HOLIDAYS:
Work shall be carried out including on Sundays and other important national holidays.
20. PENALTY CLAUSE:
Penalty will be imposed to the maximum extent of 5% of the total contract value i) If there is any unsatisfactory performance or any negligence on the part of the contractor. ii) If any work suffers for want of sufficient no. of workmen. iii) If any accident occurs due to the carelessness of the contract workers. iv)If there is any deviation or if the special conditions are not fulfilled. v) The up keeping personnel at all location should carry out the cleaning job to the satisfaction of APPDCL.
vi) If the absenteeism exceeds 5%, additional penalty will be levied @ two times of the “Cost of the labour” who are absent, without linking to other penalties and ceiling limit, subject to a condition that if gate passes are issued to the substitute labour.For calculating penalty, actual number of absentees are to be considered and “pay including other allowance”, is to be considered to arrive “Cost of Labour”. If gate passes are not provided by APPDCL, to the substitute labour in place of absentees, this additional penalty is not be applicable.
21. GENERAL CONDITIONS
(Applicable for all items of work :)
21.1 The contractor should inspect the work site and get himself acquainted with the site conditions, prior to quoting the rates. No extra rate on the plea that he has not understood the full scope of work indicated in the schedule will be entertained at a later date. For site inspection, the intending tenderer may contact the Chief Engineer /O&M/ SDSTPS.
21.2 If the contractor fails to complete any part (or) full of the schedule of the work, the same will be executed departmentally, (OR) by engaging another agency and the entire expenditure thus incurred with centages will be recovered from the contractor's bill.
21.3 The contractor should engage his workmen in three shifts everyday. No workmen should be engaged for more than 48 hours in a week.
21.4 The contractor must follow the Factory Act and Labour Act Strictly during the contract period. The contractor shall conduct periodical medical examination of the contractors labour engaged as per labour and factory act.
21.5 Before commencing the work, the contractor must obtain necessary labour license and insurance policy and hand over the following to the Engineer in charge.
a) Site taken over letter
b) List of authorized site representatives
c) Copy of the labour insurance policy
d) Copy of Labour license.
21.6 The contractor should keep the work area clean and free from food pockets, papers, leaves etc.
21.7 No workmen below the age of 18 Years should be engaged by the contractor.
29
SECTION – VI ANNEXURE-III: Guide-lines for submission of Bank Guarantee
The Bank Guarantee shall fulfill the following conditions failing which it shall not be considered valid:
1. Bank guarantee shall be executed on non-judicial stamp paper of applicable value purchased in the name of bank.
2. Non-judicial stamp paper shall be used within 6 months from the date of purchase Bank
Guarantee executed on the stamp paper of more than 6 months old shall be treated as invalid.
3. The contents of the bank guarantee shall be as per our proforma. 4. The bank guarantee should be executed by a nationalized/scheduled Bank.
5. The executor of bank guarantee (Bank Authority) should mention the power of attorney no.
and date executed in his/her favour authorizing him/her to sign the document or produce the photostat copy of power of attorney.
6. All conditions, corrections, deletion in the bank guarantee should be authenticated by signature of bank officials signing the bank guarantee.
7. Each page of bank guarantee shall bear signature and seal of the Bank.
8. Two persons should sign as witnesses mentioning their full name and address. 9. Bank guarantee check list.
S.No Checklist YES NO
1. a. Is the BG executed on non-judicial stamp paper of appropriate value?
b. Is the date of sale of non-judicial stamps paper is not more than six more than six months prior to date of execution of BG?
2. Whether the BG has been issued by a scheduled Bank or Bank acceptable to APGENCO (applicability of the bank should be in line with the provision of tender documents).
3. Is the foreign bank guarantee, confirmed by a Nationalized/ scheduled bank in India (as applicable)?
4. Does the content of BG compare with standard APGENCO Proforma?
5. Is the amount and validity of BG in line with tender enquiry/purchase orders provision?
6. a. Are the factual details such as Tender Enquiry No., Bid specifications No., PO value etc. are correct?
b. Whether overwriting /cutting, if any, on the BG authenticated under the signature and seal of Executing Officer of the Bank?
7. a. Has the executing officer of the bank indicated his name, designation and power of attorney No. / Signing Power No. etc. on BG?
b. Is each page of BG duly signed/initialized by the executing officer and last page is signed with full particulars as required in the APGENCO’s standard proforma of BG and under the seal of the Bank?
c. Is BG No. and Date mentioned on all the pages of BG?
d. Does the last page of BG carry the signature of two witnesses along side the signature of the executing officer?
30
SECTION-VI: Annexure-IV
BANK GUARANTEE PROFORMA FOR EARNEST MONEY DEPOSIT (This Deed of Bank Guarantee has to be executed on a Non-Judicial stamped paper worth Rs.100/-) Whereas …………registered…..…and having its registered office at ……… (here-in-after called the “tenderer”) has submitted their bid dated………….for the supply of…………(Here-in-after called “the Bid”)………… KNOW ALL MEN by these presents that we…………. (Hereinafter called “the Bank”) are bound unto Chief General Manager (Adm, IS & ERP), APGENCO,
Vidyut Soudha, Vijayawada (hereinafter called “the purchaser”) for and on behalf of the above said bidder to the sum of Rs.……… …. for which payment will and truly to be made to the said purchaser, the bank binds itself, its successors and assigns by these presents, subject to the conditions here in after contained; and Sealed with the common Seal of the said Bank this …….day of……20 ; THE CONDITIONS OF THIS OBLIGATION ARE:
1. When the successful tenderer does not accept the order after issue of preliminary acceptance letter / letter of intent / purchase order;
2. When the successful tenderer fails to furnish the security deposit within 30 days from the date of issue of preliminary acceptance letter or the letter of intent or Purchase Order;
3. When the tender is disqualified for reasons outlined in the bid documents; and 4. When the tenderer alters his prices or withdraws his offer during the validity period,
We undertake to pay to the purchaser the above amount within one week without any delay demur upon receipt of its first written demand without the purchaser having to substantiate his demand, without referring to the supplier and without questioning the right of APGENCO to make such demand or the propriety or legality of the demand provided that in its demand the purchaser will note that the amount claimed by it is due to it owing to any of the occurrence of the above mentioned conditions, specifying the occurred condition or conditions. We, Name and Address of the Bank, also agree that, (a) The Bank Guarantee shall be unconditional and absolute, (b) It shall be without delay or demur, if claim arises and (c) It shall guarantee all the losses, claims, damages and costs suffered by APGENCO. We, Name and Address of the Bank, lastly undertake not to revoke this Guarantee during its currency, except with the previous consent of the Corporation in writing. Notwithstanding anything contained in the foregoing our liability under this guarantee is restricted to Rs………………. Our guarantee shall remain in force until __________. Unless a claim is made to the Bank within 3 months from that date, all your rights under this guarantee shall be forfeited and we shall be relieved and discharged from all liability hereunder.
We _________ Bank Limited lastly undertake not to revoke this guarantee during its currency except with the previous consent of APGENCO in writing. The Bank Guarantee shall be valid for a period of 270 days from the date of opening of pre-
qualification with a claim period of 3 months.
In witness where of signed this Guarantee on this ______Day _______20 for __ Bank Ltd. at ………., Signature: Designation: Address: Seal: Witness 1: Witness 2:
31
SECTION VI
Annexure-V : BANK GUARANTEE PROFORMA FOR PERMANENT EARNEST MONEY DEPOSIT HOLDERS
This Bank Guarantee has to be executed on a Non-Judicial stamped Paper worth Rs. 100/- and shall be issued by Nationalized/Scheduled Bank.
WHEREAS the Andhra Pradesh Power Generation Corporation Ltd. hereinafter called ‘The Corporation’ has afforded a facility to persons submitting tenders in response to notice of the Corporation calling for tenders for supply of materials or rendering of services permitting tenders who furnish a permanent E.M.D. of Rs.5,00,000/- in the shape of Bank Guarantee in lieu of cash to have their tenders considered without separate payment of earnest monies with each tender. Whereas the ……………… has offered the guarantee of this Bank, the………… Bank towards the fixed Earnest Money Deposit and the Corporation has agreed to accept the same and the obligations of the tenderer have been incorporated in agreement dated………… which shall be read as part of this guarantee. We……………. Bank Ltd., do hereby undertake to indemnify and keep indemnified the Andhra Pradesh Power Generation Corporation Ltd. against any losses, claims, damages and costs suffered by the Corporation by reason of any breach of the tenderer aforementioned of any terms and conditions of any of the tender quotations or the tenders submitted by the tenderer which are considered by the Corporation in accordance with the terms of the agreement dated…………. of the Contract entered into pursuant to such tenders.
We ………………………. Bank Ltd., further agree that the guarantee herein contained shall remain in full force and effect up to and inclusive of the………………… and that it shall continue to be enforceable till all the terms and conditions of the Corporation under or by virtue of any of the said tender quotations or tenders or contracts have been fully compiled with and its claims satisfied, or discharged or till the Chief General Manager (Adm, IS & ERP), certifies that the terms and conditions of the said tender quotation have been fully and properly carried out by the said M/s …………………………………………….. and accordingly discharges the guarantee subject, however that the Corporation shall have no right under this bond after the expiry of ……………………. (period) from the date of its execution.
We the guarantor bank undertake to pay unconditionally and absolute without any delay and demur the amount guaranteed here under or such part thereof as required within one week of the sum being demanded by the APGENCO without reference to the Contractor and without questioning the right of the Corporation to make such demand or propriety or legality of the demand. We …………………………………. Bank Limited lastly undertake not to revoke this guarantee during its currency except with the previous consent of the Corporation in writing.
Notwithstanding anything contained in the foregoing our liability under this guarantee is restricted to Rs.5,00,000/- (Rupees Five Lakhs only).Our guarantee shall remain in the force until…………. Unless a claim under the guarantee is made against us within 6 months from the date, all your rights under this guarantee shall be forfeited and we shall be relieved and discharged from all liability hereunder. Dated………………day of….…………… for ……………… Bank Limited. Signature…………………………Designation………………………. Address…………………………………………………….. Seal……………………………….
Note: The Bank Guarantee shall be valid for a period of 3 years from the date of submission with a further claim period of 6 months.
32
SECTION VI
Annexure-VI: PROFORMA FOR AGREEMENT FOR PERMANENT EARNEST MONEY DEPOSIT
This agreement has to be executed on a Non-Judicial stamped Paper worth Rs.30/-
Whereas the ANDHRA PRADESH Power Generation Corporation Ltd. hereinafter called “THE CORPORATION” has afforded a facility to persons submitted tenders in response to notices of the Corporation calling for tenders for supply of materials or rendering of services, permitting tenders who furnish a Permanent Earnest Money Deposit of Rs.5,00,000/- in the shape of Bank Guarantee in lieu of cash to have their tenders considered without separate payment of Earnest Monies with each tender. Whereas we M/s.………………………………… hereinafter called the tenderer, intent to avail the said facility and do hereby furnish the fixed Earnest Money Deposit of Rs.5,00,000/- in the shape of Bank Guarantees of the …………………………….. Bank. IT IS HEREBY AGREED AND DECLARED AS FOLLOWS:
1) The Bank Guarantee furnished herewith shall in the first instance be valid for
………………… years.
2) So long as the Bank Guarantee is in force all tenders submitted by the tenderer in response to notices of the Corporation inviting tenders shall be considered by the Corporation without payment or Earnest Money for each tender.
3) If there is any default on the part of the tenderer, in respect of the tender or the
contract resulting there from the Corporation shall have the unilateral right to call upon the Bank to forthwith pay to the Corporation a sum equivalent to the loss sustained by the Corporation by reason of such default.
4) Where any such amounts have been claimed from and paid by Bank the Corporation
shall not be bound to consider any tender of that tenderer submitted thereafter unless the Bank guarantee has been restored to the level of Rs.5,00,000/-. However, in special cases the Corporation may consider any tender before the guarantee is restored to the full amount of Rs.5,00,000/-. If a separate Earnest Money Deposit is given for the short fall and the tenderer undertakes in writing to make good the short fall in Bank Guarantee within two months of the opening the tender.
Dated the………………….…. 20 for……………………………………………..…
Signature of Tenderer Name:
Designation: Address:
33
SCHEDULE - I
Schedule of General Particulars
1 Name of the Bidder :
2 Address of the Bidder :
3
Telegraphic/Telex address of the Bidder :
4 Bidder’s proposal Number and date :
5 Bid Validity Period (not less than 120 days) : Yes
6 All Schedules filled in : Yes
7
All deviations brought out in the schedule of deviations i.e., Schedule - VII :
8 Details of corporate existence of the company such as articles of association, partner ship deed etc., :
9 Particulars of registration with Government, Quasi-Government or Public Undertaking :
10 Name of Bidder’s Officer to whom reference may be made for expeditious coordination :
11 Residence and office telephone No. :
12 Telex/Fax No. :
13 Whether the terms of payment as stipulated in bid documents is acceptable. :
Note: Bidder should furnish complete company profile with the name of the Directors along with their office and residence telephone numbers.
34
SCHEDULE - II
1 Details of Works of similar type and magnitude carried out
Name of the Tenderer:
S. No.
Name of work Place & Country
Tendered cost Date of completion
(*) It should be mentioned that whether the work was executed by the Bidder or sublet out to another firm.
Signature:
Name:
Designation:
Company:
Date:
Seal of the Company
35
SCHEDULE – III
Details of other works tendered for and on hand as on the date of submission of this tender *
Name of the Tenderer:
On Hand Work tendered for
Sl.
No.
Name of
work
Place & country
Tendered cost
Cost of remaining
work
Anticipated date of
completion
Estimate cost
Dt. when decision is expected
Stipulated Period of completio
n
Remarks
1 2 3 4 5 6 7 8 9 10
(*) It should be clarified whether the work is being executed by the Bidder or sublet out to another firm.
Signature:
Name:
Designation:
Company:
Date:
Seal of the Company
36
SCHEDULE – IV
Details of various personnel available with the tenderer at present
Name of the Tenderer:
S. No.
Designation Name Qualifications Professional Experience
Remarks
1 2 3 4 5 6
Signature: Name : Designation : Company : Date :
Seal of the Company
37
SCHEDULE –V
Details of Financial Standing of the Tenderer
S. No. Name of the Bank Actual Balance at the
Credit of the Tenderer Permissible over draft
Total Credit
Remarks
Signature:
Name :
Designation :
Company :
Date :
Seal of the Company
38
SCHEDULE-VI
DECLARATION
We hereby declare that
b) we have not been blacklisted in any department to any reasons. c) we have not been demoted to lower category in any department for not
filing the tenders after buying the tender schedules in a whole year and their registration had not been cancelled for a similar default in two consecutive years.
d) we are agree to get disqualified themselves for any wrong declaration in respect of the above and get their tender summarily rejected.
e) The soft copies uploaded by us are genuine. Any incorrectness / deviation noticed can be viewed seriously and apart from cancellation of the Purchase Order, forfeiting the Bid security; criminal action can be initiated including suspension of business and/ or black listing.
Seal of company Signature Name.
39
SCHEDULE - VII
Deviations from the Specification
Bidder’s Name and Address:
To, Andhra Pradesh Power Generation Corporation Ltd
________________________________________________ ________________________________________________
Dear Sirs, Sub:- ___________________________________________________________against Tender Specification No.___________________________________ dated______- 2019.
***
We confirm that following are the only deviations and variations from any exception to specifications and tender documents for the above mentioned subject works against Tender specification No.________ which are irrespective of what-so-ever has been stated to the contrary anywhere else of our offer. These deviations and variations are exhaustive. Except for these deviations, the entire contract shall be executed as per specifications and tender documents. Further, we agree those additional conditions, if any, found in our offer other than those stated below, save that pertaining to any rebates offered shall not be given effect to.
____________________________________________________________________________________ Sl.No. Description of Ref. of page, * Monetary Implications
of deviation clause, conditions in case of of bid documents withdrawal
Rs. (in figures) Rs. (in words)
*Note: Here the tenderer should indicate the amount of money, if any, which he would, charge extra
(i.e. in addition to the rates quoted by him) for withdrawal of his conditions/deviations and accepting the condition as stipulated in tender documents. (Use additional sheet of the same size and format if necessary).
Date: Signature: ______________________
Place: Name: _________________________
Designation: ______________________
(Company Seal______________)
40
SCHEDULE – VI : CHECK LIST
Documents to be submitted along with the Bid
The bidders are invariably requested to check whether the soft copies/legible scanned copies of the following documents are uploaded in APGENCO e-procurement website with appropriate linking mentioned therein.
(PART-I)
(I) Documents to be submitted along with the PQB:
(PART-II)
(II) Documents to be submitted along with the Price bid:
(Not to be uploaded with PQB)
Sl.No Description Linking
1 Price Bid Commercial Bid (with Price bid)
Sl.No Description Linking
1 Copy of Certificate of firm registration With PQB
2 Copy of registration certificate as contractor with any SEB/Power corporation/ Thermal station
With PQB
3 Copy of certificate of Incorporation/Partnership deed etc
With PQB
4 Copy of EPF With PQB
5 Copy of Group Insurance/ESI With PQB
6 Copy of PAN and Latest IT returns With PQB
7 Copy of Balance sheet for last 3 years With PQB
8 Copy of Labour License certificate With PQB
9 Copy of Goods & Services Tax (GST) registration
With PQB
10 Copy of Experience Certificate With PQB
11 Previous work Order Copies With PQB
12 Bid Schedules With PQB
41
Part-II (PRICE BID) **Not to be uploaded with the PQB Documents**
To be uploaded with Price bid only
Tender Specification No:610000448 Offer No & Date:
Sl.No Description Estimate Amount per Annum (i.e., 12
Months) (Rs.)
Quoted price per Annum
(Rs.)
1 Supervision Charges (Excluding GST)
3,16,186.00
Total Quoted Price (in Words) Rs.:
Please Note:
Goods & Service Tax (GST) extra as applicable. Contractor should quote in LUMPSUM. Negative values are not acceptable and
liable for rejection.
Signature of the Tenderer (With office seal)