ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA KONSTRUKSI PONDASI TIANG PANCANG BETON BERTULANG DAN TIANG PANCANG PIPA BAJA (STUDI KASUS : PEMBANGUNAN JEMBATAN AIR KERANAK KECAMATAN SIMPANG TERITIP, BANGKA BARAT) Skripsi Diajukan Untuk Memenuhi Persyaratan Guna Meraih Gelar Sarjana S-1 Oleh: FERDIAN SUKMA 104 15 11 024 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS BANGKA BELITUNG 2020

ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

i

ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

KONSTRUKSI PONDASI TIANG PANCANG BETON

BERTULANG DAN TIANG PANCANG PIPA BAJA

(STUDI KASUS : PEMBANGUNAN JEMBATAN AIR KERANAK

KECAMATAN SIMPANG TERITIP, BANGKA BARAT)

Skripsi

Diajukan Untuk Memenuhi Persyaratan

Guna Meraih Gelar Sarjana S-1

Oleh:

FERDIAN SUKMA

104 15 11 024

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS BANGKA BELITUNG

2020

Page 2: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

ii

Page 3: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

iii

Page 4: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

iv

Page 5: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

v

Page 6: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

vi

INTISARI

Proyek pembangunan Jembatan Air Keranak di Kecamatan Simpang Teritip,Bangka Barat merupakan salah satu pembangunan jembatan yang menggunakanpondasi tiang pancang beton bertulang. Pada proyek ini sebelumnya direncanakanmenggunakan pondasi tiang pancang pipa baja namun dikarenakan rusaknya alatpemancangan sehingga mengakibatkan proses pembuatan jembatan menjaditertunda dan pihak kontraktor mengganti pondasi menjadi pondasi tiang pancangbeton bertulang. Tujuan dari penelitian ini antara lain membandingkan dayadukung dan penurunan tiang yang dihasilkan serta membandingkan anggaranbiaya yang diperlukan untuk konstruksi pondasi tiang pancang beton bertulangdengan pipa baja. Data yang digunakan pada penelitian ini dari hasil pengujiansondir di lapangan. Perhitungan daya dukung pondasi menggunakan 3 metodeyakni Metode Schmertmann dan Nottingham (1975), Metode Philliponant (1980)dan Metode Aoki dan De Alancer, perhitungan penurunan tiang tunggalmenggunakan Metode Vesic (1970) dan perhitungan penurunan tiang kelompokmenggunakan Metode Vesic (1977). Berdasarkan hasil analisis dan perhitunganyang telah dilakukan, perhitungan daya dukung pondasi tiang pancang betonbertulang lebih besar 16,257% dibandingkan dengan tiang pancang pipa baja.Pada penurunan pondasi tiang pancang beton bertulang 65,224% lebih besardibandingkan dengan tiang pancang pipa baja. Pada perhitungan anggaran biayapondasi tiang pancang beton lebih besar 25,463% dibandingkan dengan tiangpancang pipa baja.

Kata kunci: pondasi, tiang pancang, daya dukung, penurunan, anggaran biaya.

Page 7: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

vii

ABSTRACK

Project Air Keranak Bridge construction in Simpang Teritip Subdistrict, WestBangka is a bridge construction that uses reinforced concrete pile foundations. Inthis project, it was previously planned to use a steel pipe pile foundation, but dueto the damage to the piling tool, the bridge construction process was delayed andthe contractor replaced the foundation into a reinforced concrete pile foundation.The purpose of this research among others, to compare the bearing capacity andreduction of the resulting pile and to compare the budget required for theconstruction of reinforced concrete pile foundations with steel pipes. The dataused in this research are from the results of cone penetration test. The calculationof the bearing capacity of the foundation uses 3 methods, those are TheSchmertmann and Nottingham Method (1975), The Philliponant Method (1980)and The Aoki and De Alancer Method, the calculation of single pile reductionuses the Vesic Method (1970) and the calculation of group pile reduction uses theVesic Method (1977). Based on the results of the analysis and calculations thathave been carried out, the calculation of the bearing capacity of reinforcedconcrete pile foundations is 16.257% greater than the steel pipe piles. Thereduction of reinforced concrete pile foundations is 65,224% greater than steelpipe piles. In the calculation of the budget, the cost of a concrete pile foundationis 25,463% greater than steel pipe piles.

Keywords: Foundation, pile, bearing capacity, reduction, budget required.

Page 8: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

viii

HALAMAN PERSEMBAHAN

Puji syukur kepada Allah SWT atas rahmat dan karunia-Nya sehingga

penulis dapat menyelesaikan Skripsi ini. Penulis menyampaikan ucapan

terimakasih yang sebesar-besarnya kepada:

1. Allah SWT, Tuhan semesta alam

2. Orang tuaku yang tersayang, yang selalu memberikan semangat dalam

hidupku, orang yang tak pernah lelah menyayangiku, dan juga yang telah

memberikan banyak pembelajaran dalam hidup;

3. Kedua Saudaraku, Zahra Sulistia Ningsi dan Fahris Firli, yang telah membuat

persaudaraan ini begitu berarti;

4. Bapak Wahri Sunanda, S.T., M.Eng selaku Dekan Fakultas Teknik

Universitas Bangka Belitung;

5. Ibu Yayuk Apriyanti, S.T., M.T selaku Ketua Jurusan Teknik Sipil

Universitas Bangka Belitung sekaligus dosen pembimbing akademik;

6. Ibu Ferra Fahriani, S.T., M.T dan Ibu Yayuk Aprianti, S.T., M.T selaku dosen

pembimbing Utama;

7. Ibu Revy Safitri, S.T., M.T selaku dosen pembimbing akademik;

8. Teman-teman tongkorongan grup PAKDE, Octri, Andri, Sabarudin,

Muhammad Nadim dan Jefri Pepew yang tidak pernah lelah membantu push

rank dan yang selalu bersedia untuk direpotkan mulai dari pengerjaan skripsi

sampai selesai;

9. Sahabat-sahabatku Baruna, Rere, Ayew, Zulpan, Ajan dan Agung yang selalu

mendengar keluh kesah selama ini;

10. Teman-teman seperjuangan kelas B, Erizami (Riri), Meissy, Riska (Cabe),

Yuyu, Fauziah, Witri, Okke, Putri, Reka, Yulian, Suhendi, Asmawi (Zhang),

Sobirin, dan Ardian;

11. Teman Sejoli dan Semoga menjadi Teman Hidup, Tari Aprianti yang selalu

memberikan dukungan dan selalu menyertai penulis;

12. Serta teman-teman Teknik Sipil yang tidak dapat disebut satu persatu.

Page 9: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

ix

KATA PENGANTAR

Dengan memanjatkan puji syukur kehadirat Allah SWT atas limpahan rahmat dan

hidayah-Nya sehingga penulis dapat menyelesaikan tugas akhir yang berjudul

“ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

KONSTRUKSI PONDASI TIANG PANCANG BETON BERTULANG

DAN TIANG PANCANG PIPA BAJA (STUDI KASUS : PEMBANGUNAN

JEMBATAN AIR KERANAK KECAMATAN SIMPANG TERITIP,

BANGKA BARAT)”. Skripsi ini merupakan salah satu syarat untuk mencapai

gelar Sarjana Strata Satu (S-1) pada Jurusan Teknik Sipil Fakultas Teknik

Universitas Bangka Belitung.

Dalam proses penyusunan skripsi ini, penulis menyadari bahwa terselesainya

skripsi ini berkat bantuan dari berbagai pihak baik secara langsung maupun tidak

langsung. Pada kesempatan inni penulis ingin menyampaikan rasa terimakasih

yang sebesar-besarnya kepada:

1. Bapak Wahri Sunanda, S.T., M.Eng. selaku Dekan Fakultas Teknik

Universitas Bangka Belitung;

2. Ibu Yayuk Apriyanti, S.T., M.T. selaku Ketua Jurusan Teknik Sipil Fakultas

Teknik Universitas Bangka Belitung sekaligus Pembimbing pendamping

yang telah memberikan arahan serta masukan sehingga Penulis dpat

menyelesaikan skripsi dengan baik;

3. Ibu Ferra Fahriani, S.T., M.T. selaku Pembimbing utama skripsi serta

pembimbing akademi yang telah memberikan masukan dan arahan baik di

perkuliahan maupun skripsi;

4. Bapak Indra Gunawan, S.T., M.Eng. selaku Penguji pertama yang telah

memberikan masukan dan arahan dengan baik dalam penyempurnaan skripsi

ini;

5. Ibu Desy Yofianti, S.T., M.T. selaku Penguji pendamping yang telah

memberikan masukan dan arahan dengan baik dalam penyempurnaan skripsi

ini;

Page 10: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

x

6. Abang Heru selaku Staf Jurusan Teknik Sipil Universitas Bangka Belitung

yang telah membantu dalam keperluan administrasi semasa perkuliahan;

7. Seluruh Staf Pengajar Jurusan Teknik Sipil Universitas Bangka Belitung yang

telah memberikan ilmu yang bermanfaat selama proses belajar;

8. Kepala BAUK dan BAAK di lingkungan Fakultas Teknik Universitas

Bangka Belitung yang telah membantu dalam proses administrasi skripsi ini;

9. PT Bangka Cakra Karya yang telah membantu menyediakan data proyek

untuk penelitian saya ini;

10. Serta semua pihak yang tidak dapat disebutkan satu persatu.

Penulis menyadari sepenuhnya bahwa dalam penulisan skripsi ini masih

banyak kekurangan dan keterbatasan. Oleh karena itu, penulis mengharapkan

saran yang membangun agar tulisan ini bermanfaat bagi perkembangan ilmu

pengetahuan ke depannya.

Balunijuk, 23 November 2020

Penulis

Page 11: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xi

DAFTAR ISI

SAMPUL DEPAN ........................................................................................ i

HALAMAN PERSETUJUAN...................................................................... ii

HALAMAN PENGESAHAN....................................................................... iii

HALAMAN PERNYATAAN KEASLIAN PENELITIAN......................... iv

HALAMAN PERNYATAAN PERSETUJUAN PUBLIKASI.................... v

INTISARI .................................................................................................. vi

ABSTRACK .................................................................................................. vii

HALAMAN PERSEMBAHAN ................................................................... viii

KATA PENGANTAR .................................................................................. ix

DAFTAR ISI................................................................................................. xi

DAFTAR GAMBAR .................................................................................... xv

DAFTAR TABEL......................................................................................... xvi

BAB I PENDAHULUAN............................................................................. 1

1.1 Latar Belakang ............................................................................... 1

1.2 Rumusan Masalah .......................................................................... 2

1.3 Batasan Masalah............................................................................. 3

1.4 Tujuan Penelitian............................................................................ 4

1.5 Manfaat Penelitian.......................................................................... 4

1.6 Keaslian Peneltian .......................................................................... 4

1.7 Sistematika Penulisan..................................................................... 4

BAB IITINJAUAN PUSTAKA DAN LANDASAN TEORI ...................... 6

2.1 Tinjauan Pustaka ............................................................................ 6

2.2 Landasan Teori ............................................................................... 8

2.2.1 Tanah................................................................................... 8

2.2.2 Penyelidikan Tanah............................................................. 8

2.2.3 Pengertian Pondasi .............................................................. 10

2.2.4 Pondasi Tiang Pancang ....................................................... 12

2.2.5 Tiang Pancang Beton .......................................................... 12

Page 12: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xii

2.2.6 Tiang Pancang Baja............................................................. 13

2.2.7 Daya Dukung Pondasi Tiang Pancang Beton dan

Pondasi Tiang Pancang Pipa Baja Tunggal dari Uji

Sondir .................................................................................. 14

2.2.8 Efesiensi Tiang (Eg)............................................................ 20

2.2.9 Daya Dukung Tiang Pancang Kelompok............................ 21

2.2.10 Daya Dukung Ijin Tiang .................................................... 22

2.2.11 Penurunan Tiang................................................................ 23

2.2.12 Penurunan Ijin Tiang ......................................................... 24

2.2.13 Perhitungan Rencana Anggaran Biaya (RAB) .................. 25

BAB III METODE PENELITIAN................................................................ 27

3.1 Lokasi Penelitian ............................................................................ 27

3.2 Bahan Dan Alat Penelitian ............................................................. 27

3.2.1 Bahan................................................................................... 27

3.2.2 Alat...................................................................................... 27

3.3 Langkah Penelitian ......................................................................... 28

3.3.1 Diagram Alir Penelitian ...................................................... 28

3.3.2 Pengumpulan Data .............................................................. 30

3.3.3 Data Sekunder ..................................................................... 30

3.3.4 Analisis Pondasi .................................................................. 31

BAB IV ANALISIS HASIL DAN PEMBAHASAN ................................... 34

4.1 Data Tanah ..................................................................................... 34

4.2 Perhitungan Daya Dukung Tiang Tunggal Berdasarkan

Data Sondir .................................................................................... 35

4.2.1 Daya Dukung Tiang Pancang Beton (Titik Sondir S-01) ... 35

4.2.2 Daya Dukung Tiang Pancang Pipa Baja

(Titik Sondir S-01) .............................................................. 41

4.2.3 Daya Dukung Tiang Pancang Beton (Titik Sondir S-02) ... 46

4.2.4 Daya Dukung Tiang Pancang Pipa Baja

(Titik Sondir S-02) .............................................................. 52

Page 13: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xiii

4.3 Perhitungan Daya Dukung Tiang Kelompok ................................. 57

4.3.1 Perhitungan Efiensi Tiang................................................... 58

4.3.2 Daya Dukung Kelompok Tiang Pancang Beton

(Titik S-01).......................................................................... 59

4.3.3 Daya Dukung Kelompok Tiang Pancang Pipa Baja

(Titik S-01).......................................................................... 61

4.3.4 Daya Dukung Kelompok Tiang Pancang Beton

(Titik S-02).......................................................................... 62

4.3.5 Daya Dukung Kelompok Tiang Pancang Pipa Baja

(Titik S-02).......................................................................... 64

4.4 Perbandingan Hasil Nilai Daya Dukung Tiang .............................. 66

4.5 Perhitungan Penurunan Tiang Tunggal .......................................... 67

4.5.1 Penurunan Tiang Pancang Beton (Titik Sondir S-01)......... 68

4.5.2 Penurunan Tiang Pancang Pipa Baja (Titik Sondir S-01)... 69

4.5.3 Penurunan Tiang Pancang Beton (Titik Sondir S-02)......... 71

4.5.4 Penurunan Tiang Pancang Pipa Baja (Titik Sondir S-02)... 73

4.6 Perhitungan Penurunan Tiang Kelompok ...................................... 75

4.6.1 Penurunan Kelompok Tiang Pancang Beton

(Titik Sondir S-01) .............................................................. 75

4.6.2 Penurunan Kelompok Tiang Pancang Pipa Baja

(Titik Sondir S-01) .............................................................. 77

4.6.3 Penurunan Kelompok Tiang Pancang Beton

(Titik Sondir S-02) .............................................................. 79

4.6.4 Penurunan Kelompok Tiang Pancang Pipa Baja

(Titik Sondir S-02) .............................................................. 80

4.7 Perbandingan Hasil Analisis Penurunan Tiang .............................. 82

4.8 Perhitungan Anggaran Biaya Satu Buah Pondasi Tiang Pancang.. 83

4.8.1 Perhitungan Anggaran Biaya Pondasi Tiang Pancang

Beton ................................................................................... 83

4.8.2 Perhitungan Anggaran Biaya Pondasi Tiang Pancang

Pipa Baja ............................................................................. 84

Page 14: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xiv

4.8.3 Perbandingan Anggaran Biaya Satu Buah Pondasi

Tiang Pancang..................................................................... 85

BAB V PENUTUP........................................................................................ 87

5.1 Kesimpulan..................................................................................... 87

5.2 Saran ............................................................................................... 87

DAFTAR PUSTAKA

LAMPIRAN

Page 15: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xv

DAFTAR GAMBAR

Gambar 2.1 Tiang Pancang Pracetak ............................................................ 13

Gambar 2.2 Tiang Pancang Baja................................................................... 14

Gambar 2.3 Kurva Desain Untuk Tiang Pada Tanah Lempung.............. 15

Gambar 2.4 Kurva Desain Untuk Tiang Pada Tanah Pasir ..................... 15

Gambar 3.1 Lokasi Penelitian ....................................................................... 27

Gambar 3.2 Diagram Alir Penelitian ............................................................ 29

Gambar 4.1 Titik Sondir Proyek Pembangunan Jembatan Air Keranak

Kecamatan Simpang Teritip Kabupaten Bangka Barat ........... 34

Gambar 4.3 Grafik Nilai ∝clay Daya Dukung Tiang Tunggal ..................... 42

Gambar 4.4 Grafik Nilai ∝clay Daya Dukung Tiang Tunggal ..................... 47

Gambar 4.5 Grafik Nilai ∝clay Daya Dukung Tiang Tunggal ..................... 53

Gambar 4.6 Gambar tiang pancang kelompok.............................................. 58

Gambar 4.7 Panjang antar tiang .................................................................... 75

Page 16: ANALISIS PERBANDINGAN DAYA DUKUNG DAN BIAYA

xvi

DAFTAR TABEL

Tabel 2.1 Variasi nilai ............................................................................. 17

Tabel 2.2 Variasi nilai ............................................................................. 18

Tabel 2.3 Variasi nilai ( ) ..................................................... 18

Tabel 2.4 Variasi nilai ............................................................................. 18

Tabel 2.5 Faktor Empirik Fb & .............................................................. 19

Tabel 2.6 Faktor Adhesi tanah αs................................................................. 20

Tabel 2.7 Batas Penurunan Maksimum ........................................................ 25

Tabel 4.1 Hasil Perhitungan Daya Dukung Tiang Tunggal .......................... 66

Tabel 4.2 Hasil Perhitungan Daya Dukung Tiang Kelompok ...................... 67

Tabel 4.3 Hasil Perhitungan Penurunan Tiang Tunggal ............................... 82

Tabel 4.4 Hasil Perhitungan Penurunan Tiang Kelompok ........................... 82

Tabel 4.5 Perhitungan Anggaran Biaya Pondasi Tiang Pancang Beton ....... 84

Tabel 4.6 Perhitungan Anggaran Biaya Pondasi Tiang Pancang

Pipa Baja....................................................................................... 85

Tabel 4.7 Perbandingan Anggaran Biaya Pondasi Tiang Pancang

Beton dengan Tiang Pancang Pipa Baja....................................... 86