Analisa Harga Satuan DHOWNIE

  • Published on
    12-Jul-2015

  • View
    278

  • Download
    7

Transcript

<p>Analisa Harga satuan Material1. Surface Course Data mix design Kadar Aspal Optimum (KAO) = 5,685 % Berat jenis aspal Agregat yang digunakan : Fraksi Fraksi Sand Dust Berat jenis efektif agregat = 10 % = 36 % = 10 % = 44 % = 2,682 = 1,026</p> <p>Berat jenis campuran (max teoritis) =a r a kti a r as a as a a</p> <p>== 2,4567</p> <p>2. Lapis permukaan (laston) per meter panjang jalan Volume total lapisan permukaan = 2,540 m3 Berat total lapisan permukaan = 2,540 x 2,4567 = 6,240 Ton 3. Berat aspal = KAO x Berat total lapisan permukaan = 5,685% x 6,240 = 0,3547 Ton = 354,7 Kg</p> <p>1. Volume aspal =</p> <p>== 0, 3457 m3 2. Berat agregat = (100 KAO) x berat total = (100 5,685)% x 6,240 = 5,8857 Ton 3. Berat fraksi agregat = % fraksi campuran x berat agregat a r at = 10 % x 5,8857 = 0,5886 a r at = 36 % x 5,8857 = 2,1189 % sand % dust = 10 % x 5,8857 = 0.5886 = 44 % x 5,8857 = 2,5897</p> <p>4. Volume fraksi agregat A r at = = = 0,2195 m3 A r at = = = 0,7900 m3 Sand = = = 0,2195 m3 Dust = = = 0,9656 m3</p> <p> Peralatan1. Alat berat yang digunakan Asphalt Mixing Plant (AMP) Dump Truck Asphalt Finisher Pneumatic Tyre Roller Loader Tandem Roller Asphalt Sprayer</p> <p>2. Perhitungan kapasitas alat a. Digunakan AMP tipe Batching Plant dengan kapasitas 5500 Kg Tiap batch dengan kapasitas teoritis = 40 ton/jam Efisiensi = 0,75 QAMP = 0,75 x 40 = 30 ton/jam Digunakan : 30 / 30 = 1 unit b. Loader QL = Dimana : QL = Kapasitas Loader, (m3/jam) q E = Kapasitas bucket, (2,3 m3) = Efisiensi (0,75)</p> <p>Ws = Waktu Siklus Ws = Dimana : D F Z Ws = = (25/50) x 2 + 0,35 = 1,35 menit QL = x 1,7 = Jarak material dengan could bin = 25 m = Kecepatan maju, (50 m/menit) = Waktu Tetap = 0,35 menit</p> <p>= 76,67 m3/jam x 1,7 = 130,34 ton/jam Digunakan : = = , unit</p> <p>c. Dump truck Q= Dimana : q E Cwh = Kapasitas Dump truck (10 ton) = Efisiensi = Waktu siklus</p> <p>Cwh = Dimana : D F F t1 t2</p> <p>+</p> <p>+ t1 +</p> <p>+ t2</p> <p>= Jarak Amp Sile = Kecepatan berangkat, (50 Km/jam) = Kecepatan pulang, (400 Km/jam) = waktu buang = waktu mengatur posisi</p> <p>Cwh =</p> <p>+</p> <p>+ 10 +</p> <p>+5</p> <p>= 72 menit Q = = = 6,25 m3/jam Digunakan :</p> <p>d. Asphalt Finisher Digunakan Negata NF 38.V.T Lebar Paving = 2,55 3,8 m (dipakai 3,5 m (B)) Kecepatan Rolling (v) = 3 m/menit Tebal pengaspalan = 16,5 cm Efisiensi (E) = 0,70 Q = B . V . t . Bd . E = 3,5 . 180 . 0,165 . 2,55 . 0,7 = 56,2275 ton/jam Digunakan : = = , unit</p> <p>e. Tandem Roller Q= Dimana : Q V H N = Produksi alat per jam = Kecepatan operasi, (Km/jam) = Tebal pemadatan (16,5 cm) = Jumlah lintasan</p> <p>W = Lebar pemadatan efektif (1,20 m)</p> <p>Q= = 8,84 m3 x 2,25 = 19,89 m3 Digunakan : = = , unit</p> <p>f. Pneumatic Tyre Roller Digunakan untuk intermediate rolling 10 passing = 12 lintasan (N) Lebar efektif = 1,8 m Kecepatan Rolling (v) = 5 Km/jam Tebal pengaspalan = 16,5 cm Efisiensi (E) = 0,80 Q = = 30 m3 x 2,25 = 67,5 ton/jam Digunakan : = = , unit</p> <p>g. Asphalt Sprayer Q = Dimana : Q V Is E Q = = 320 liter/jam x 2,25 = 720 km/jam Digunakan : = = , unit = Produksi alat per jam = Volume Tangki, (800 liter) = Waktu siklus termasuk pemanasan = 2 jam = Efisiensi = 0,8</p> <p>Wc = Kebutuhan asphalt 39574 liter</p> <p>3. Alat yang Digunakan dan Kapasitas Produksi 1 unit AMP 1 unit loader 5 unit Dump truck 1 unit asphalt finisher 2 unit tandem roller 2 unit pneumatic tyre roller 2 unit asphalt sprayer kapasitas 30 ton/jam kapasitas 130,34 ton/jam kapasitas 6,25 x 5 = 31,25 ton/jam kapasitas 56,2275 ton/jam kapasitas 19,89 ton/jam kapasitas 67,5 x 2 = 135 ton/jam kapasitas 72 x 2 = 144 ton/jam</p> <p>4. Koefisien Alat AMP 1/30 = 0,03333 Loader 1/130,34 = 0,00767 Dump truck 1/31,25 = 0,03200 Asphalt finisher 1/56,2275 = 0,01778 Tandem roller 1/19,89 = 0,05028 Pneumatic tyre roller 1/135 = 0,00741 Asphalt sprayer 1/144 = 0,00695</p> <p> Tenaga1. Perhitungan Jumlah Tenaga Kerja Mandor : 2 orang (1 orang di AMP dan 1 orang dilapangan) Pekerja : 12 orang (4 orang di AMP dan 8 orang dilapangan) Waktu kerja per hari Produksi per hari Koefisien mandor Koefisien pekerja = 8 jam = 7 x 30 ton = 210 ton/hari = = = 0,11667 = 0,4</p> <p>2. Koefisien Upah -</p>