ANALISA HARGA SATUAN PEKERJAAN MEDAN

Kota:Medan

No.URAIAN KOEFISIEN SATHARGA SATUANJUMLAH (RP)

IPEKERJAAN PERSIAPAN

11 M PAGAR SENG GELOMBANG TINGGI : 2 M

aTiang kayu borneo 4/6 0.05 m3 5,400,000.00 270,000.00

bSemen PC (abu-abu) 0.05 sak 54,000.00 2,700.00

cSeng gelombang 1.20 sak 57,500.00 69,000.00

dPasir beton 0.01 m3 92,000.00 460.00

eSplit (batu pecah) 0.01 m3 270,000.00 2,430.00

fBalok kayu borneo 4/6 0.05 m3 5,400,000.00 270,000.00

gPaku 5 - 10 cm 0.06 kg 17,500.00 1,050.00

hMeni Besi 0.45 kg 22,000.00 9,900.00

iTukang kayu 0.20 org 87,500.00 17,500.00

jPembantu tukang 0.10 org 50,000.00 5,000.00

Jumlah 648,040.00

Dibulatkan 648,040.00

21 M PAGAR KAWAT BERDURI TINGGI : 1,8 M

aTiang kayu borneo 4/6 0.05 m3 5,400,000.00 270,000.00

bSemen PC (abu-abu) 0.04 sak 54,000.00 2,160.00

cKawat Duri 2.50 kg 155,000.00 387,500.00

dPasir beton 0.01 m3 92,000.00 460.00

eSplit (batu pecah) 0.01 m3 270,000.00 2,430.00

fPaku 5 - 10 cm 0.06 kg 17,500.00 1,050.00

gTukang kayu 0.20 org 87,500.00 17,500.00

hPembantu tukang 0.30 org 50,000.00 15,000.00

Jumlah 696,100.00

Dibulatkan 696,100.00

31 M1 PENGUKURAN & PEMASANGAN BOWPLANK

aKayu kaso 5/7 borneo 0.02 m3 5,400,000.00 108,000.00

bPaku 5 - 10 cm 0.02 kg 17,500.00 350.00

cPapan papan kayu terentang 2/20 0.00 m3 1,448,200.00 5,792.80

dTukang kayu 0.10 org 87,500.00 8,750.00

ePembantu tukang 0.10 org 50,000.00 5,000.00

Jumlah 127,892.80

Dibulatkan 127,890.00

41 M2 PEMBUATAN KANTOR DIREKSI

aKayu kaso 5/7 borneo 0.02 m3 5,400,000.00 108,000.00

bPapan kayu terentang 0.18 m3 1,448,200.00 260,676.00

cPaku semua ukuran 0.85 kg 17,500.00 14,875.00

dBesi strip 1.10 kg 14,100.00 15,510.00

eSemen PC (abu-abu) 35.00 kg 54,000.00 1,890,000.00

fPasir pasang 0.15 m3 84,000.00 12,600.00

gPasir beton 0.10 m3 92,000.00 9,200.00

hSplit (batu pecah) 0.15 m3 270,000.00 40,500.00

iBata merah 30.00 bh 650.00 19,500.00

jSeng gelombang 180 x 90 x 0,05 cm 1.20 lbr 61,750.00 74,100.00

kSeng Plat BJLS 32 1.00 m2 33,300.00 33,300.00

lKawat harmonika 2.00 m2 24,500.00 49,000.00

mKaca polos 3 mm 0.08 m2 90,000.00 7,200.00

nKunci tanam standart 0.15 bh 55,000.00 8,250.00

oTriplek 120 x 240 x 0,4 cm 0.06 lbr 53,750.00 3,225.00

pTukang kayu 2.00 org 87,500.00 175,000.00

qTukang batu 1.00 org 87,500.00 87,500.00

rPembantu tukang 2.00 org 50,000.00 100,000.00

Jumlah 2,908,436.00

Dibulatkan 2,908,430.00

51 M2 PEMBUATAN GUDANG PROYEK

aKayu kaso 5/7 borneo 0.02 m3 5,400,000.00 108,000.00

bPapan kayu terentang 0.10 m3 1,448,200.00 144,820.00

cPaku 0.30 kg 17,500.00 5,250.00

dSemen PC (abu-abu) 0.21 sak 54,000.00 11,340.00

ePasir beton 0.03 m3 92,000.00 2,760.00

fSplit (batu pecah) 0.05 m3 270,000.00 13,500.00

gSeng gelombang 180 x 90 x 0,05 cm 1.20 lbr 61,750.00 74,100.00

hTukang kayu 1.00 org 87,500.00 87,500.00

iPembantu tukang 1.00 org 50,000.00 50,000.00

Jumlah 497,270.00

Dibulatkan 497,270.00

61 M2 MEMBERSIHKAN LOKASI ROYEK

aPembantu tukang 0.10 org 50,000.00 5,000.00

Jumlah 5,000.00

Dibulatkan 5,000.00

7 1 M2 MEMBERSIHKAN PUING-PUING

aPembantu tukang 0.20 org 50,000.00 10,000.00

Jumlah 10,000.00

Dibulatkan 10,000.00

8 1 BH MEMBERSIHKAN TUNGGUL TANAMAN

aPembantu tukang 2.00 org 50,000.00 100,000.00

Jumlah 100,000.00

Dibulatkan 100,000.00

9 1M2 PEMBUATAN JALAN MASUK PROYEK

aBatu belah 15/20 0.10 m3 128,200.00 12,820.00

bKoral 5/7 ( sirtu ) 0.05 m3 82,000.00 4,100.00

cPasir urug 0.01 m3 67,000.00 670.00

dPembantu tukang 1.00 org 50,000.00 50,000.00

Jumlah 67,590.00

Dibulatkan 67,500.00

10 1 M3 PEMBONGKARAN BETON

aPembantu tukang 6.20 org 50,000.00 310,000.00

Jumlah 310,000.00

Dibulatkan 310,000.00

11 1 M3 PEMBONGKARAN DINDING BATA

aPembantu tukang 4.60 org 50,000.00 230,000.00

Jumlah 230,000.00

Dibulatkan 230,000.00

12 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOK

aPapan kayu borneo 0.02 m3 5,660,000.00 113,200.00

bBalok kayu borneo 5/7 0.02 m3 5,400,000.00 108,000.00

cPasir beton 0.08 m3 92,000.00 7,360.00

dSplit (batu pecah) 0.15 m3 270,000.00 40,500.00

eSemen abu - abu 0.50 sak 54,000.00 27,000.00

fTukang kayu 0.13 org 87,500.00 11,375.00

gPembantu tukang 0.38 org 50,000.00 19,000.00

Jumlah 326,435.00

Dibulatkan 326,400.00

IIPEKERJAAN TANAH

11 M3 GALIAN TANAH SEDALAM 1 M

aPembantu tukang 0.40 org 50,000.00 20,000.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 21,500.00

Dibulatkan 21,500.00

21 M3 GALIAN TANAH SEDALAM 2 M

aPembantu tukang 0.53 org 50,000.00 26,500.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 28,000.00

Dibulatkan 28,000.00

31 M3 GALIAN TANAH SEDALAM 3 M

aPembantu tukang 0.74 org 50,000.00 37,000.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 38,500.00

Dibulatkan 38,500.00

41 M3 GALIAN TANAH KERAS SEDALAM 1 M

aPembantu tukang 0.45 org 50,000.00 22,500.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 24,000.00

Dibulatkan 24,000.00

51 M2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CM

aPembantu tukang 0.05 org 50,000.00 1,250.00

bTukang gali 0.02 org 75,000.00 1,125.00

Jumlah 2,375.00

Dibulatkan 2,370.00

61 M3 PEMBUANGAN TANAH SEJAUH 150 M

aPembantu tukang 0.42 org 50,000.00 21,000.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 22,500.00

Dibulatkan 22,500.00

7 1 M3 URUGAN TANAH KEMBALI

aPembantu tukang 0.19 org 50,000.00 9,500.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 11,000.00

Dibulatkan 11,000.00

8 1 M3 PEMADATAN TANAH

aPembantu tukang 0.50 org 50,000.00 25,000.00

bTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 26,500.00

Dibulatkan 26,500.00

9 1 M3 URUGAN PASIR

aPasir urug 1.20 m3 67,000.00 80,400.00

bPembantu tukang 0.30 org 50,000.00 15,000.00

cTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 96,900.00

Dibulatkan 96,900.00

10 1 M3 URUGAN TANAH

aTanah urug 1.20 m3 78,000.00 93,600.00

bPembantu tukang 0.30 org 50,000.00 15,000.00

cTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 110,100.00

Dibulatkan 110,100.00

11 1 M3 URUGAN SIRTU

aSirtu ( koral ) 1.20 m3 82,000.00 98,400.00

bPembantu tukang 0.25 org 50,000.00 12,500.00

cTukang gali 0.02 org 75,000.00 1,500.00

Jumlah 112,400.00

Dibulatkan 112,400.00

IIIPEKERJAAN PONDASI

11 M3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps

aBatu belah 1.10 m3 128,200.00 141,020.00

bSemen PC (abu-abu) 4.04 sak 54,000.00 218,160.00

cPasir pasang 0.49 m3 84,000.00 40,740.00

dPembantu tukang 1.50 org 50,000.00 75,000.00

eTukang batu 0.60 org 87,500.00 52,500.00

Jumlah 527,420.00

Dibulatkan 527,420.00

21 M3 PASANG PONDASI BT KALI , 1 Pc : 4 Ps

aBatu belah 1.10 m3 128,200.00 141,020.00

bSemen PC (abu-abu) 3.26 sak 54,000.00 176,040.00

cPasir pasang 0.52 m3 84,000.00 43,680.00

dPembantu tukang 1.50 org 50,000.00 75,000.00

eTukang batu 0.60 org 87,500.00 52,500.00

Jumlah 488,240.00

Dibulatkan 488,240.00

31 M3 PASANG PONDASI BT KALI , 1 Pc : 5 Ps

aBatu belah 1.10 m3 128,200.00 141,020.00

bSemen PC (abu-abu) 2.72 sak 54,000.00 146,880.00

cPasir pasang 0.54 m3 84,000.00 45,696.00

dPembantu tukang 1.50 org 50,000.00 75,000.00

eTukang batu 0.60 org 87,500.00 52,500.00

Jumlah 461,096.00

Dibulatkan 461,090.00

4 1 M3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )

aBatu belah 1.20 m3 128,200.00 153,840.00

bPasir urug 0.30 m3 67,000.00 20,100.00

cPembantu tukang 0.78 org 50,000.00 39,000.00

dTukang batu 0.39 org 87,500.00 34,125.00

Jumlah 247,065.00

Dibulatkan 247,000.00

5 1 M3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr

aSemen PC (abu-abu) 6.72 sak 54,000.00 362,880.00

bPasir...