Tinggi Muka Air (H 1.20 Tinggi Muka Air (H 0.91 Bang/Pot Saluran Jarak Profi Galian Timbunan CP. P0 24.0 BLS.6 26.0 P- 1 2.30 8.37 50.0 P- 2 50.0 P- 3 7.34 50.0 CP- a 50.0 P- 4 Linning 1.25 4.49 50.0 P- 5 Linning 0.10 2.32 50.0 P- 6 Linning 50.0 P- 7 Linning 50.0 P- 8 Linning 50.0 P- 9 Linning 50.0 P- 10 Linning 50.0 P- 11 Linning 50.0 CP- c Linning 50.0 P- 12 Linning 0.42 2.94 50.0 P- 13 Linning 50.0 P- 14 Linning 50.0 CP- d Linning 50.0 P- 15 Linning 1.13 1.15 50.0 P- 16 1.59 2.27 50.0 P- 17 50.0 CP- e 0.69 1.38 50.0 Jenis Konstruks i Cross Area (m 2 )

Analisa Dan RAB

Embed Size (px)

Citation preview

Page 1: Analisa Dan RAB

Tinggi Muka Air (H) = 1.20Tinggi Muka Air (H) = 0.91

Bang/Pot SaluranJarak

Profi Galian Timbunan Galian

CP. P024.0

BLS.626.0

P- 1 2.30 8.37 29.9050.0

P- 250.0

P- 3 7.34 115.0050.0

CP- a50.0

P- 4 Linning 1.25 4.49 62.5050.0

P- 5 Linning 0.10 2.32 33.7550.0

P- 6 Linning50.0

P- 7 Linning50.0

P- 8 Linning50.0

P- 9 Linning50.0

P- 10 Linning50.0

P- 11 Linning50.0

CP- c Linning50.0

P- 12 Linning 0.42 2.94 104.0050.0

P- 13 Linning50.0

P- 14 Linning50.0

CP- d Linning50.0

P- 15 Linning 1.13 1.15 155.0050.0

P- 16 1.59 2.27 68.0050.0

P- 1750.0

CP- e 0.69 1.38 114.0050.0

Jenis Konstruksi

Cross Area (m2) Volume Pekerjaan Tanah (m3)

Page 2: Analisa Dan RAB

P- 1850.0

P- 19 0.24 4.93 46.5050.0

P- 2050.0

CP- f 0.27 2.75 25.5050.0

P- 2150.0

P- 22 1.43 0.82 85.0050.0

P- 23 1.85 2.31 82.0050.0

P- 2450.0

CP- g 0.52 4.56 118.5050.0

P- 2550.0

P- 26 0.20 4.08 36.0050.0

P- 2750.0

P- 28 3.65 1.79 192.5050.0

CP- h50.0

P- 29 1.02 3.60 233.5050.0

P- 30 1.95 2.41 74.2550.0

P- 3150.0

P- 32 1.16 3.40 155.5050.0

CP- i50.0

P- 33 0.88 2.06 102.0050.0

P- 3450.0

P- 3550.0

P- 36 1.76 2.08 198.0050.0

P- 37 Lining 2.56 1.98 108.0050.0

P- 38 Lining50.0

P- 39 2.64 0.45 260.0050.0

CP- j50.0

Page 3: Analisa Dan RAB

P- 40 2.84 2.61 274.0050.0

P- 4150.0

P- 42 2.79 1.85 281.5050.0

CP- k50.0

P- 43 2.09 0.98 244.0050.0

P- 4450.0

P- 45 3.20 1.36 264.5050.0

CP- l50.0

P- 46 2.96 2.08 308.0050.0

P- 4750.0

P- 48 3.19 2.66 307.5050.0

CP- m50.0

P- 49 2.77 4.61 298.0050.0

P- 5050.0

P- 51 2.14 1.30 245.5050.0

CP- n Lining50.0

P- 52 Lining34.5

BM. 1 (BLS.10) 3,260.50 Lining 143.92

JUMLAH 4,766.32

BM. 1 (BLS.10)15.5

P- 0 0.83 3.20 6.4350.0

P- 150.0

P- 250.0

P- 350.0

P- 4 1.36 1.25 219.0040.0

BLS.10 / BM. 2 78.050.0

Page 4: Analisa Dan RAB

P- 6950.0

P- 7050.0

P- 7150.0

P- 7250.0

P- 7350.0

P- 7450.0

P- 7550.0

P- 7650.0

P- 7750.0

P- 7850.0

P- 7950.0

P- 8050.0

P- 8132.0

BM .3 (BLS.11) 490.96

JUMLAH 937.50 716.39

Jumlah Panjang Sal 4,198.00

Page 5: Analisa Dan RAB

Area SSLS.10 = 2.1924 m2Area SSLS.11 = 1.9574 m2

Gebalan Rumput

Timbunan (m')

108.81 57.00

109.62

785.50 109.62

109.62

591.50

170.25

1,052.00

409.00

85.50 109.62

109.62

182.50 109.62

Volume Pekerjaan Tanah (m3)Beton

Bertulang

(m3) (m2)

Page 6: Analisa Dan RAB

109.62

315.50 109.62

109.62

384.00 109.62

109.62

178.50 109.62

78.25 109.62

109.62

343.50 109.62

109.62

432.00 109.62

109.62

293.50 109.62

109.62

269.50 109.62

150.25 109.62

109.62

290.50 109.62

109.62

273.00 109.62

109.62

109.62

310.50 109.62

101.50

121.50 109.62

109.62

Page 7: Analisa Dan RAB

153.00 109.62

109.62

223.00 109.62

109.62

141.50 109.62

109.62

117.00 109.62

109.62

172.00 109.62

109.62

237.00 109.62

109.62

363.50 109.62

109.62

295.50 109.62

109.62

119.93

8,749.49 5,209.14

24.80 30.34

97.87

97.87

97.87

445.00 97.87

78.30

Page 8: Analisa Dan RAB

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

97.87

451.25 62.64

921.05 1,835.06

Page 9: Analisa Dan RAB

A. DAFTAR HARGA SATUAN UPAH

No URAIAN SATUAN

1 Mandor OH 50,000.00

2 Kepala tukang OH 60,000.00

3 Tukang OH 50,000.00

4 Pekerja OH 35,000.00

5 Sopir (Dump Truck dan Alat Berat) OH 55,000.00

6 Sopir Pembantu OH 45,000.00

7 Operator OH 65,000.00

8 Pembantu Operator OH 45,000.00

9 Mekanik Terlatih OH 60,000.00

10 Mekanik Pmbantu OH 45,000.00

B. DAFTAR HARGA SATUAN BAHAN

No URAIAN SATUAN

1 Aspal Bitumen kg 5,500.00

2 Batu Bata bh 620.00

3 Batu Kali m3 160,000.00

4 Besi beton kg 7,700.00

5 Drain Hole buah 3,500.00

6 Gemuk (Grase) kg 13,800.00

7 Kawat beton kg 14,400.00

8 Kayu Bekisting m3 1,824,000.00

9 Kayu Sembarang m3 720,000.00

10 Kerikil Bersih m3 160,000.00

11 Lempengan Rumput m2 22,200.00

12 Minyak Aspal ltr 5,250.00

13 Minyak Premium ltr 5,625.00

14 Minyak Solar ltr 5,250.00

15 Minyak Pelumas ltr 33,000.00

16 Pasir Pasangan m3 110,000.00

17 Pasir Urug m3 70,000.00

18 Paku kayu kg 9,360.00

19 Paku seng kg 16,200.00

20 Semen Portland zak 38,400.00

21 Tanah Timbunan m3 51,650.00

HARGA (Rp)

HARGA (Rp)

Lhokseumawe, April 2006PT. BEURABO CONSULTANT

(IR. SUTIRTA)DirektrisDirektur

Page 10: Analisa Dan RAB

ANALISA PERALATAN BACKHOE / EXCAVATOR( Anl. P. 5. 1 )

A. DATA PERALATAN :1. Nama Alat : Backhoe / Excavator2. M e r k : Komatzu3. Type / Model : PC. 2004. Kapasitas : 0.80 m35. Engine : ISUZU6. Isi Karakter : 51 Liter7. Umur Ekonomis : 5 Th8. Jam Kerja / Tahun : 2,000.00 9. Harga Pokok : = Rp. 930,000,000.00

10. Harga Track : = Rp. 46,500,000.00 11. Nilai Sisa : Rp. 10.00% x Rp. 883,500,000.00 = Rp. 88,350,000.00 12. Harga Penyusutan : Rp. 930,000,000.00 - Rp. 88,350,000.00 = Rp. 841,650,000.00

B. TAKSIRAN PRODUKSI1. Swelling : 25.00 %2. Kapasitas : 0.80 / 1.25 = 0.64 m33. Dapat Melakukan Gerak : 2.50 Circle Time4. Produksi Maksimum Teoritis : 0.64 x 2.50 x 60 = 96.00 m3 / Jam (BCM)

C. FAKTOR KOREKSI1. Angle Of Swing : 120.00 Derajat2. Faktor Swing Dan Depth : 0.883. Eff Kerja Siang : 0.834. Kondisi Kerja : 0.755. Faktor Muat Diambil Rata-rata : 0.956. Faktor Koreksi : 0.88 x 0.83 x 0.75 x 0.95 = 0.52 7. Taksiran Produksi : 0.52 x 96.00 = 49.96 = 50.00 m3 / Jam

D. BIAYA PERALATAN

I. BIAYA - BIAYAI. 1 BIAYA PEMILIKAN

Penyusutan : Rp. 841,650,000.00 / 5 x 2.000 = Rp. 84,165.00 Bunga Bank : 24.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 111,600.00 Pajak PPH : 2.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 11,625.00 Gudang : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00 Asuransi : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00

: JUMLAH = Rp. 209,715.00 :

I. 2 BIAYA OPERASIBahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250.00 = Rp. 86,625.00 Minyak Pelumas : 1.050 x 0.12 Ltr @ Rp. 33,000.00 = Rp. 4,158.00 Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000.00 = Rp. 2,772.00 Gemuk / Grease : 1.100 x 0.07 Kg @ Rp. 13,800.00 = Rp. 1,062.60 Filter Oli : 0.004 x 1.00 Buah @ Rp. 75,000.00 = Rp. 300.00 Filter Solar : 0.002 x 1.00 Buah @ Rp. 120,000.00 = Rp. 240.00 Filter Udara : 0.001 x 1.00 Buah @ Rp. 1,200,000.00 = Rp. 1,200.00 Operator : 1.00 Oh @ Rp. 8,125.00 = Rp. 8,125.00 Co. Operator : 1.00 Oh @ Rp. 5,625.00 = Rp. 5,625.00 Mekanik : 0.20 Oh @ Rp. 7,500.00 = Rp. 1,500.00 Co. Mekanik : 0.40 Oh @ Rp. 5,625.00 = Rp. 2,250.00 Bahan Pelengkap : 1.00 Oh @ Rp. 1,328.13 = Rp. 1,328.13

JUMLAH = Rp. 115,185.73

I. 3 BIAYA PERBAIKAN : 6.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 27,900.00 JUMLAH = Rp. 27,900.00

REKAPITULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………………= Rp. 209,715.00 BIAYA OPERASI : …………………………………………………………………………………………………………= Rp. 115,185.73 BIAYA PERBAIKAN : …………………………………………………………………………………………………………= Rp. 27,900.00 BIAYA EXCAVATOR : …………………………………………………………………………………………………………= Rp. 352,800.73

HARGA SATUAN PEKERJAANKAPASITAS GALIAN : 50.00 m3 / JamHARGA GALIAN : Rp. 352,800.73 / 50.00 = Rp. 7,056.01 / m3

Dibulatkan ………………… = Rp. 7,056.00 / m3

Page 11: Analisa Dan RAB

ANALISA PERALATAN DUMP TRUCK( Anl. P. 5. 3 )

A. DATA PERALATAN :1 . Nama Alat : Dump Truck2 . M e r k : FUSO3 . Type / Model : FM. 1904 . Kapasitas : 6 - 8 Ton 4 - 5 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,0007 . Harga Ban Timmer Ring : Rp. 1,969,500 x 6 = Rp. 11,817,0008 . Harga Pokok : Rp. 300,000,0009 . Nilai Sisa : 10.00% x Rp. 300,000,000 = Rp. 30,000,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp. 30,000,000 = Rp. 270,000,000

B. TAKSIRAN PRODUKSI :1 . Kapasitas : 5.00 m32 . Swelling : 30.00 %3 . Kapasitas Nyata : 5.00 / 1.30 = 3.85 m34 . Jarak Angkut

a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 1000.00 m'

1. Kecepatan Dalam Keadaan Isi :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 60.00 Km / Jam = 1,000.00 m' / Menit

2. Kecepatan Dlm Keadaan Kosong :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 80.00 Km / Jam = 1,333.33 m' / Menit

3. Speed Factor : 0.804. Dump Truck : 0.35 Menit5. Manuver : 0.85 Menit6. Waktu Muat : 5 / 84 x 60 = 3.57 Menit7. Travel Time : 1,000 / 1,000 + 1,000 / 1,333.33 = 1.75 Menit8. Total Circle Time : 0.35 + 0.85 + 3.57+ 1.75 = 6.52 Menit9. Produksi Maksimum Teoritis : (60 / 6.52) x 3.85 = 35.39 m310. Produksi Nyata : 0.80 x 35.39 = 28.32 m3 / Jam

C. BIAYA PERALATAN :

I. BIAYA - BIAYAI.1. BIAYA PEMILIKAN

Penyusutan : Rp. 270,000,000 / 5.00 / 2,000 = Rp. 27,000.00Bunga Bank : 24.00% x Rp. 300,000,000 / 2,000 = Rp. 36,000.00Pajak PPH : 2.50% x Rp. 300,000,000 / 2,000 = Rp. 3,750.00Gudang : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00Asuransi : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00

JUMLAH = Rp. 68,250.00I.2. BIAYA OPERASI

Bahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250 = Rp. 86,625.00Minyak Pelumas : 1.050 x 0.37 Ltr @ Rp. 33,000 = Rp. 12,820.50Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000 = Rp. 2,772.00Gemuk / Grease : 1.100 x 0.02 Kg @ Rp. 13,800 = Rp. 303.60Filter Oli : 0.004 x 1.00 Buah @ Rp. 42,000 = Rp. 168.00Filter Solar : 0.002 x 1.00 Buah @ Rp. 36,000 = Rp. 72.00Filter Udara : 0.001 x 1.00 Buah @ Rp. 120,000 = Rp. 120.00Ban : 1.000 / 2,000.00 Buah @ Rp. 1,969,500 = Rp. 984.75Mekanik : 0.20 Mh @ Rp. 7,500 = Rp. 1,500.00Co. Mekanik : 0.40 Mh @ Rp. 5,625 = Rp. 2,250.00D r i v e r : 1.00 Mh @ Rp. 6,875 = Rp. 6,875.00Co. Driver : 1.00 Mh @ Rp. 5,625 = Rp. 5,625.00Bahan Pelengkap : 1.00 Ls @ Rp. 1,000 = Rp. 1,000.00

JUMLAH = Rp. 121,115.85

I.3. BIAYA PERBAIKAN : 6.00% x Rp. 300,000,000 / 2,000 = Rp. 9,000.00JUMLAH = Rp. 9,000.00

REKAPUTULASI BIAYA :BIAYA PEMILIKAN : ………………………………………………………………………………………………= Rp. 68,250.00BIAYA OPERASI : ………………………………………………………………………………………………= Rp. 121,115.85BIAYA PERBAIKAN : ………………………………………………………………………………………………= Rp. 9,000.00

BIAYA DUMP TRUCK : ………………………………………………………………………………………………= Rp. 198,365.85

HARGA SATUAN PEKERJAANKAPASITAS ANGKUT : 28.32 m3 / JamHARGA ANGKUT TANAH DENGANJARAK 1 KM : Rp. 198,365.85 / 28.32 m3 / Jam = Rp. 7,005.62 / m3

Dibulatkan …………………….. = Rp. 7,006.00 / m3

Page 12: Analisa Dan RAB

ANALISA PERALATAN VIBRATOR ROLLER( Anl. P. 5. 4 )

A. DATA PERALATAN :1 . Nama Alat : VIBRATOR ROLLER2 . M e r k : Dynopac3 . Type / Model : CA. 254 . Kapasitas : 0.70 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,000 Jam7 . Harga Pokok : Rp. 300,000,0008 . Harga Roller : Rp. 35,000,0009 . Nilai Sisa : 10.00% x Rp 265,000,000 = Rp. 26,500,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp 35,000,000 = Rp. 238,500,000

B. TAKSIRAN PRODUKSI :1 . Produksi Maksimum Teoritis : (W x S x L) / P (1.20 x 1.500 x 0.20) / 4 = 90 m3/jam

2 . Faktor Koreksi :a. Efisiensi Kerja : 0.70b. Kondisi Kerja : 0.70Faktor Koreksi : 0.70 x 0.70 = 0.49 m3/jam

3 . Taksiran Produksi : (90 x 0.49) = 44.10 m3/jam

C. BIAYA PERALATAN :

I. BIAYA LANGSUNGI.1. BIAYA PEMILIKAN

a. Penyusutan : Rp. 238,500,000 / 5 / 2,000 = Rp. 23,850.00 /jam

b. Bunga Bank, Gudang : 20% x (6.00/10.00) x 300,000,000 / 2,000 = Rp. 18,000.00 /jamJUMLAH = Rp. 41,850.00 /jam

I.2. BIAYA OPERASI DAN PERAWATANa. Bahan Bakar (Solar) : ……………………………… 15.00 Ltr @ Rp. 5,250 = Rp. 78,750.00 /jamb. Minyak Pelumas : ……………………………… 0.40 Ltr @ Rp. 33,000 = Rp. 13,200.00 /jamc. Minyak Hydroulic : ……………………………… 0.20 Ltr @ Rp. 33,000 = Rp. 6,600.00 /jamd. Oli Transmisi : ……………………………… 0.15 Ltr @ Rp. 71,250 = Rp. 10,687.50 /jame. Gemuk / Grease : ……………………………… 1.00 Kg @ Rp. 13,800 = Rp. 13,800.00 /jamf. Operator : ………………………………………………………………@ Rp. 8,125 = Rp. 8,125.00 /jamg. Co. Operator dan Mekanik : ………………………………………………………………@ Rp. 7,500 = Rp. 7,500.00 /jam

JUMLAH = Rp. 138,662.50 /jam

I.3. BIAYA PERBAIKAN : 10.00% x (Rp. 300,000,000 - Rp. 35,000,000) / 2,000 = Rp. 13,250.00 /jamJUMLAH = Rp. 13,250.00 /jam

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3) …………………………………= Rp. 193,762.50 /jam

II. BIAYA TIDAK LANGSUNG : 15.00% x Rp. 193,762.50 JUMLAH = Rp. 29,064.38 /jam

JUMLAH ( I + II ) = Rp. 222,826.88 /jam

HARGA SATUAN PEKERJAANRp. 222,826.88 / 44.10 m3/jam = Rp. 5,052.76 / m3

Dibulatkan ………… = Rp. 5,053.00 / m3

Page 13: Analisa Dan RAB

RENCANA ANGGARAN BIAYA

Kegitan : PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR RUAS BLS.6 - BLS.10 dan BLS.10 - BLS.11Lokasi : Kecamatan Lhoksukon - Kabupaten Aceh Utara

No Uraian Analisa Stn Kuantitas

I. PEKERJAAN PERSIAPAN

1 Pematokan/cek pengukuran Taksir - Ls 550,000.00 2,500,000.00

2 Sewa Direksi Keet Taksir - Ls 1,500,000.00 1,500,000.00

3 Pengeringan (Dewatering) Taksir - Ls 3,000,000.00 3,000,000.00

4 Mobilisasi dan Demobilisasi alat Taksir - Ls 4,000,000.00 4,000,000.00

Jumlah 11,000,000.00

II. PEKERJAAN SALURAN

A. Ruas BLS.6 - BLS10 3,260.5 m

1. Galian Tanah (Alat Berat) Anl. AB.1 4,766.32 7,056.00 33,631,118.64

2. Timbunan Tanah Hasil Galian Anl.A.16 4,766.32 9,250.00 44,088,413.75

3. Timbunan Tanah Didatangkan Anl. AB.1b 3,983.17 76,621.50 305,196,460.16

4. Beton Bertulang K-175

(Lining Saluran panjang L = mtr) Supl. V 5,209.142 1,961,700.40 10,218,776,729.74

Jumlah 10,601,692,722.28

B. Ruas BLS.10 - BLS.11 1,173.8 m

1. Galian Tanah (Alat Berat) Anl. AB.1 716.39 7,056.00 5,054,865.48

2. Timbunan Tanah Hasil Galian Anl.A.16 716.39 9,250.00 6,626,630.63

3. Timbunan Tanah Didatangkan Anl. AB.1b 204.66 76,621.50 15,681,164.64

4. Beton Bertulang K-175

(Lining Saluran panjang L = mtr) Supl. V 1,835.063 1,961,700.40 3,599,842,840.27

Jumlah 3,627,205,501.02

III. PEKERJAAN LAIN-LAIN

1 Administrasi Kontrak Taksir - Ls 1,000,000.00 1,000,000.00

2 Adm. Progress dan Pelaporan Taksir - Ls 1,000,000.00 1,000,000.00

3 Adm. Foto Dukumentsi Taksir - Ls 500,000.00 500,000.00

4 P3K Taksir - Ls 500,000.00 500,000.00

5 Pembuatan Papan Nama Proyek Taksir unit 1.00 200,000.00 200,000.00

Jumlah 3,200,000.00

Harga Satuan (Rp)

Harga Pekerjaan (Rp)

m3

m3

m3

m3

m3

m3

m3

m3

Page 14: Analisa Dan RAB

PEKERJAAN PERENCANAAN TEKNISJARINGAN IRIGASI, WADUK DAN PENANGGULANGAN BANJIR

RUAS BLS.6 - BLS.10 dan BLS.10 - BLS.11KECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN ………………………………………… Rp 11,000,000

II. PEKERJAAN SALURAN (L = 4,434.30 meter)

A. Ruas BPL.16 -BPL.17 (SSPL.17) (L = 3,260.50 meter) …………………………….. Rp 10,601,692,722

B. Ruas BPL.17 -BPL.18 (SSPL.18) (L = 1,173.80 meter) …………………………….. Rp 3,627,205,501

III. PEKERJAAN LAIN-LAIN ………………………………………… Rp 3,200,000

J u m l a h Rp 14,243,098,223

Dibulatkan Rp 14,243,098,000

TERBILANG:

" Empat Belas Milyar Dua Ratus Empat Puluh Tiga Juta Sembilan Puluh Delapan Ribu Rupiah"

Lhokseumawe, April 2006PT BEURABO CONSULTANT

(IR. SUTIRTA)Direktris

Menyetujui,Ka.Bid. Program dan Hidrologi

Dinas Sumber Daya Air Kabupaten Aceh Utara

(IR. HASANUDDIN)Nip. 390 012 616

Mengetahui,Kepala Dinas Sumber Daya Air

Kabupaten Aceh Utara

(IR. MAWARDI)Pembina/Nip. 390 012 231

Page 15: Analisa Dan RAB

DAFTAR ANALISAPT. BEURABO CONSULTANTJl. Listrik No 10 Tlp. (0645)-44000 - LHOKSEUMAWE

ANL. SUPL.V : 1 M3 BETON BETON BERTULANG

A. Beton Cor (1:3:5)

Tenaga Kerja ;

6.0000 Org Pekerja @ Rp 35,000.00 Rp 210,000.00

0.3000 Org Mandor @ Rp 50,000.00 Rp 15,000.00

1.0000 Org Tukang @ Rp 50,000.00 Rp 50,000.00

0.1000 Org Kepala Tukang @ Rp 60,000.00 Rp 6,000.00

Bahan ;

0.8200 M3 Kerikil Bersih @ Rp 160,000.00 Rp 131,200.00

8.5000 Zak Semen (PC) @ Rp 38,400.00 Rp 326,400.00

0.5400 M3 Pasir Beton @ Rp 110,000.00 Rp 59,400.00 Jumlah 798,000.00

B. Pekerjaan Besi Beton ( 100 Kg )

Tenaga Kerja ;

9.0000 Org Pekerja @ Rp 35,000.00 Rp 315,000.00

9.0000 Org Tukang Besi @ Rp 50,000.00 Rp 450,000.00

3.0000 Org Kepala Tukang @ Rp 60,000.00 Rp 180,000.00

Bahan ;

110.0000 Kg Besi Beton @ Rp 7,700.00 Rp 847,000.00

2.0000 Kg Kawat Beton @ Rp 14,400.00 Rp 28,800.00

Rp 1,820,800.00

0.0100 Untuk 1 Kg Besi Beton = 1/100 @ Rp 1,820,800.00 18,208.00

C. Cetakan Beton 10 M2

Tenaga Kerja ;

0.2000 Org Pekerja @ Rp 35,000.00 Rp 7,000.00

0.0100 Org Mandor @ Rp 50,000.00 Rp 500.00

0.5000 Org Tukang @ Rp 50,000.00 Rp 25,000.00

0.0500 Org Kepala Tukang @ Rp 60,000.00 Rp 3,000.00

Bahan ;

0.4000 m3 Kayu Bekesting @ Rp 1,824,000.00 Rp 729,600.00

0.4000 Kg Paku @ Rp 9,360.00 Rp 3,744.00

Jumlah Rp 768,844.00

0.1000 Untuk 1 m2 Beton Cor = 1/10 @ Rp 768,844.00 7,688.44

D. Membongkar Cetakan

Upah Membongkar Cetakan dan Menyiram Beton

4.0000 Org Pekerja @ Rp 35,000.00 Rp 140,000.00 Jumlah 140,000.00

REKAPITULASIUntuk 1 m3 Beton Memerlukan 52 Kg Besi

1.0000 m3 A. Beton Cor (1:3:5) @ Rp 798,000.00 798,000.00

52.0000 kg B. Pekerjaan Besi Beton ( 100 Kg @ Rp 18,208.00 946,816.00

10.0000 m2 C. Cetakan Beton 10 M2 @ Rp 7,688.44 76,884.40

D. Membongkar Cetakan @ Rp 140,000.00 140,000.00

Jumlah 1,961,700.40

Lhokseumawe, April 2006PT. BEURABO CONSULTANT

(IR. SUTIRTA)Direktris