Perhitungan Volume Beton Brtulang, Gebalan Rumput dan Bitumen NO. Patok Jumlah Volume (m) (m) KETERANGAN 50.0 300.00 GAMBAR TIPIKAL SALURAN A.1 Volume = 2.056 50.0 A.2 50.0 A.3 616.80 50.0 A.4 50.0 A.5 50.0 Volume (m3) = 2.06 A.6 50.0 100.00 A.7 205.60 50.0 A.8 50.0 200.00 A.9 50.0 A.10 411.20 50.0 A.11 50.0 A.12 50.0 348.00 A.13 47.0 A.14 43.4 A.15 67.6 715.49 A.15 44.0 A.17 50.0 A.18 46.0 JUMLAH 948.00 948.00 1,949.09 Jarak Konstruksi Beton Bertulan g (m3) A.0 / BS.3 A.19 / BS.4

Analisa Dan RAB (BS.3 - BS.4)

Embed Size (px)

Citation preview

Page 1: Analisa Dan RAB (BS.3 - BS.4)

Perhitungan Volume Beton Brtulang, Gebalan Rumput dan Bitumen

NO. PatokJumlah Volume

(m) (m) KETERANGAN

50.0 300.00 GAMBAR TIPIKAL SALURANA.1 Volume = 2.056

50.0A.2

50.0A.3 616.80

50.0A.4

50.0A.5

50.0 Volume (m3) = 2.06A.6

50.0 100.00

A.7 205.6050.0

A.850.0 200.00

A.950.0

A.10 411.2050.0

A.1150.0

A.1250.0 348.00

A.1347.0

A.1443.4

A.1567.6 715.49

A.1544.0

A.1750.0

A.1846.0

JUMLAH 948.00 948.00 1,949.09

Jarak Konstruksi

Beton Bertulang

(m3)

A.0 / BS.3

A.19 / BS.4

Page 2: Analisa Dan RAB (BS.3 - BS.4)

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BS.3 - BS.4 D.I. Alue Ubay Kab. Aceh Utara

(lanjutan)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

X Y XY YX X Y XY YX GALIAN TIMBUNAN

- - 0.00 0.00 - - - - 0.00 0.00

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

- - 0.00 0.00 - - - -

0.00 0.00 - -

Jumlah 01 0.00 0.00 0.00 0.00

0.00 0.00 - - 0.00 0.00 0.00 0.00

0.00 0.00 - - 0.00 0.00

0.00 0.00 - - 0.00 0.00

0.00 0.00 - - 0.00 0.00

Jumlah 02 0.00 0.00 0.00 0.00

JUMLAH (01 + 02) 0.00 0.00

AREA (m2)

Page 3: Analisa Dan RAB (BS.3 - BS.4)

PERHITUNGAN VOLUME PEKERJAAN TANAHPERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIRSALURAN SEKUNDER BAS.3 - BS.4 - D.I. ALUE UBAYKECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

Jarak AREA (m2) Volume (M3)

Profi Langsung Galian Timbunan Galian Timbunan

50.0A.1 50.0 3.00 0.69 74.98 17.33

50.0A.2 100.0 0.75 0.00 93.84 17.33

50.0A.3 150.0 3.04 3.52 94.86 87.99

50.0A.4 200.0 2.10 0.00 128.49 87.99

50.0A.5 250.0 2.29 0.35 109.76 8.73

50.0A.6 300.0 1.70 0.09 99.82 10.92

50.0A.7 350.0 0.83 0.00 63.19 2.20

50.0A.8 400.0 1.41 0.00 55.93 0.00

50.0A.9 450.0 0.91 0.01 57.98 0.18

50.0A.10 500.0 0.94 0.00 46.08 0.18

50.0A.11 550.0 0.54 0.28 36.93 6.90

50.0A.12 600.0 0.39 0.25 23.41 13.15

50.0A.13 650.0 3.07 3.25 86.68 87.37

47.0A.14 697.0 72.20 76.26

43.4A.15 740.4 - - - -

67.6A.16 808.0 - - - -

44.0A.17 852.0 - - - -

50.0A.18 902.0 - - - -

46.0

948.0 - - - -

JUMLAH 948.0 1,044.14 416.55

Bangunan Air / Pot Saluran

A.0 / BS.3

A.19 / BS.4

Page 4: Analisa Dan RAB (BS.3 - BS.4)

A. DAFTAR HARGA SATUAN UPAH

No URAIAN SATUAN

1 Mandor OH 50,000.00

2 Kepala tukang OH 60,000.00

3 Tukang OH 50,000.00

4 Pekerja OH 35,000.00

5 Sopir (Dump Truck dan Alat Berat) OH 55,000.00

6 Sopir Pembantu OH 45,000.00

7 Operator OH 65,000.00

8 Pembantu Operator OH 45,000.00

9 Mekanik Terlatih OH 60,000.00

10 Mekanik Pmbantu OH 45,000.00

B. DAFTAR HARGA SATUAN BAHAN

No URAIAN SATUAN

1 Aspal Bitumen kg 5,500.00

2 Batu Bata bh 620.00

3 Batu Kali m3 160,000.00

4 Besi beton kg 7,700.00

5 Drain Hole buah 3,500.00

6 Gemuk (Grase) kg 13,800.00

7 Kawat beton kg 14,400.00

8 Kayu Bekisting m3 1,824,000.00

9 Kayu Sembarang m3 720,000.00

10 Kerikil Bersih m3 160,000.00

11 Lempengan Rumput m2 22,200.00

12 Minyak Aspal ltr 5,250.00

13 Minyak Premium ltr 5,625.00

14 Minyak Solar ltr 5,250.00

15 Minyak Pelumas ltr 33,000.00

16 Pasir Pasangan m3 110,000.00

17 Pasir Urug m3 70,000.00

18 Paku kayu kg 9,360.00

19 Paku seng kg 16,200.00

20 Semen Portland zak 38,400.00

21 Tanah Timbunan m3 51,650.00

HARGA (Rp)

HARGA (Rp)

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING CONSULTANT

(IR. M. NASIR)Wakil Direktur

Page 5: Analisa Dan RAB (BS.3 - BS.4)

URAIAN ANALISIS HARGA SATUAN ALAT

JENIS PEKERJAAN : Analisa Galian Saluran (Lebar Atas Saluran B = 4 - 16 m)ITEM PEMBAYARAN : C.2JENIS ALAT : EXAVATOR 100SATUAN : m3PROPINSI : NANGGROE ACEH DARUSSALAMLOKASI : KABUPATEN ACEH UTARATAHUN ANGGRARAN : 2006NO URAIAN KODE KOEF SATUAN KETA URAIAN PERALATAN

1 Jenis Peralatan : EXAVATOR 1002 Tenaga Pw 105.00 HP3 Kapasitas Cp 1.20 M34 Alat Baru a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam Satu Tahun W 2,000.00 Jamc. Harga Alat B 860,000,000.00 Rupiah

5 Alat yang dipakai a. Umur Ekonomis A' 5.00 Tahun alat barub. Jam Kerja Dalam Satu Tahun W' 2,000.00 Jam alat baruc. Harga Alat B' 860,000,000.00 Rupiah alat baru

B BIAYA PASTI PERJAM KERJA1 Nilai Sisa Alat =10% x B C 86,000,000.00 Rupiah2 Faktor angsuran modal D 0.334 -

(1 + i )^A' - 1 3 Biaya Pasti Perjam

a. Biaya pengambilan modal E 129,404.95 Rupiah W'

b. Ansuransi dll F 860.00 Rupiah W'

Biaya Pasti Perjam =(E + F) G 130,264.95 Rupiah

C BIAYA OPERASI PERJAM KERJA1 Bahan bakar =(0.125-0.175 ltr/Hp/Jam) x Pw x Ms H 96,468.75 Rupiah2 Pelumas =(0.01-0.02 ltr/Hp/Jam) x Pw x Mp I 69,300.00 Rupiah3 Perawatan dan Perbaikan K 75,250.00 Rupiah

W'4 Operator =(1 orang Perjam) U1 L 8,125.00 Rupiah5 Pembantu Operator =(1 orang Perjam) U2 M 5,625.00 Rupiah

Biaya Pasti Perjam =(H + I + K + L + M) P 254,768.75 Rupiah

D TOTAL BIAYA SEWA ALAT PERJAM = (G + P) S 385,033.70 Rp/jam

E LAIN-LAIN1 Tingkat suku bunga i 20.00 %/tahun2 Upah operator/sopir U1 8,125.00 Rp/Jam3 Upah pembantu operator U2 5,625.00 Rp/Jam4 Bahan bakar bensin Mb Rp/Liter5 Bahan bakar solar Ms 5,250.00 Rp/Liter6 Minyak pelumas Mp 33,000.00 Rp/Liter

= i x (1 + i )^A'

= (B' - C) x D

= 0.002 x B'

=(0.125-0.175 ) x B'

Page 6: Analisa Dan RAB (BS.3 - BS.4)

ANALISA PERALATAN BACKHOE / EXCAVATOR( Anl. P. 5. 1 )

A. DATA PERALATAN :1. Nama Alat : Backhoe / Excavator2. M e r k : Komatzu3. Type / Model : PC. 2004. Kapasitas : 0.80 m35. Engine : ISUZU6. Isi Karakter : 51 Liter7. Umur Ekonomis : 5 Th8. Jam Kerja / Tahun : 2,000.00 9. Harga Pokok : = Rp. 930,000,000.00

10. Harga Track : = Rp. 46,500,000.00 11. Nilai Sisa : Rp. 10.00% x Rp. 883,500,000.00 = Rp. 88,350,000.00 12. Harga Penyusutan : Rp. 930,000,000.00 - Rp. 88,350,000.00 = Rp. 841,650,000.00

B. TAKSIRAN PRODUKSI1. Swelling : 25.00 %2. Kapasitas : 0.80 / 1.25 = 0.64 m33. Dapat Melakukan Gerak : 2.50 Circle Time4. Produksi Maksimum Teoritis : 0.64 x 2.50 x 60 = 96.00 m3 / Jam (BCM)

C. FAKTOR KOREKSI1. Angle Of Swing : 120.00 Derajat2. Faktor Swing Dan Depth : 0.883. Eff Kerja Siang : 0.834. Kondisi Kerja : 0.755. Faktor Muat Diambil Rata-rata : 0.956. Faktor Koreksi : 0.88 x 0.83 x 0.75 x 0.95 = 0.52 7. Taksiran Produksi : 0.52 x 96.00 = 49.96 = 50.00 m3 / Jam

D. BIAYA PERALATAN

I. BIAYA - BIAYAI. 1 BIAYA PEMILIKAN

Penyusutan : Rp. 841,650,000.00 / 5 x 2.000 = Rp. 84,165.00 Bunga Bank : 24.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 111,600.00 Pajak PPH : 2.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 11,625.00 Gudang : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00 Asuransi : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00

: JUMLAH = Rp. 209,715.00 :

I. 2 BIAYA OPERASIBahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250.00 = Rp. 86,625.00 Minyak Pelumas : 1.050 x 0.12 Ltr @ Rp. 33,000.00 = Rp. 4,158.00 Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000.00 = Rp. 2,772.00 Gemuk / Grease : 1.100 x 0.07 Kg @ Rp. 13,800.00 = Rp. 1,062.60 Filter Oli : 0.004 x 1.00 Buah @ Rp. 75,000.00 = Rp. 300.00 Filter Solar : 0.002 x 1.00 Buah @ Rp. 120,000.00 = Rp. 240.00 Filter Udara : 0.001 x 1.00 Buah @ Rp. 1,200,000.00 = Rp. 1,200.00 Operator : 1.00 Oh @ Rp. 8,125.00 = Rp. 8,125.00 Co. Operator : 1.00 Oh @ Rp. 5,625.00 = Rp. 5,625.00 Mekanik : 0.20 Oh @ Rp. 7,500.00 = Rp. 1,500.00 Co. Mekanik : 0.40 Oh @ Rp. 5,625.00 = Rp. 2,250.00 Bahan Pelengkap : 1.00 Oh @ Rp. 1,328.13 = Rp. 1,328.13

JUMLAH = Rp. 115,185.73

I. 3 BIAYA PERBAIKAN : 6.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 27,900.00 JUMLAH = Rp. 27,900.00

REKAPITULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………………= Rp. 209,715.00 BIAYA OPERASI : …………………………………………………………………………………………………………= Rp. 115,185.73 BIAYA PERBAIKAN : …………………………………………………………………………………………………………= Rp. 27,900.00 BIAYA EXCAVATOR : …………………………………………………………………………………………………………= Rp. 352,800.73

HARGA SATUAN PEKERJAANKAPASITAS GALIAN : 50.00 m3 / JamHARGA GALIAN : Rp. 352,800.73 / 50.00 = Rp. 7,056.01 / m3

Dibulatkan ………………… = Rp. 7,056.00 / m3

Page 7: Analisa Dan RAB (BS.3 - BS.4)

ANALISA PERALATAN DUMP TRUCK( Anl. P. 5. 3 )

A. DATA PERALATAN :1 . Nama Alat : Dump Truck2 . M e r k : FUSO3 . Type / Model : FM. 1904 . Kapasitas : 6 - 8 Ton 4 - 5 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,0007 . Harga Ban Timmer Ring : Rp. 1,969,500 x 6 = Rp. 11,817,0008 . Harga Pokok : Rp. 300,000,0009 . Nilai Sisa : 10.00% x Rp. 300,000,000 = Rp. 30,000,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp. 30,000,000 = Rp. 270,000,000

B. TAKSIRAN PRODUKSI :1 . Kapasitas : 5.00 m32 . Swelling : 30.00 %3 . Kapasitas Nyata : 5.00 / 1.30 = 3.85 m34 . Jarak Angkut

a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 1000.00 m'

1. Kecepatan Dalam Keadaan Isi :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 60.00 Km / Jam = 1,000.00 m' / Menit

2. Kecepatan Dlm Keadaan Kosong :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 80.00 Km / Jam = 1,333.33 m' / Menit

3. Speed Factor : 0.804. Dump Truck : 0.35 Menit5. Manuver : 0.85 Menit6. Waktu Muat : 5 / 84 x 60 = 3.57 Menit7. Travel Time : 1,000 / 1,000 + 1,000 / 1,333.33 = 0.85 Menit8. Total Circle Time : 0.35 + 0.85 + 3.57+ 1.75 = 6.52 Menit9. Produksi Maksimum Teoritis : (60 / 6.52) x 3.85 = 35.39 m310. Produksi Nyata : 0.80 x 35.39 = 28.32 m3 / Jam

C. BIAYA PERALATAN :

I. BIAYA - BIAYAI.1. BIAYA PEMILIKAN

Penyusutan : Rp. 270,000,000 / 5.00 / 2,000 = Rp. 27,000.00Bunga Bank : 24.00% x Rp. 300,000,000 / 2,000 = Rp. 36,000.00Pajak PPH : 2.50% x Rp. 300,000,000 / 2,000 = Rp. 3,750.00Gudang : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00Asuransi : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00

JUMLAH = Rp. 68,250.00I.2. BIAYA OPERASI

Bahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250 = Rp. 86,625.00Minyak Pelumas : 1.050 x 0.37 Ltr @ Rp. 33,000 = Rp. 12,820.50Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000 = Rp. 2,772.00Gemuk / Grease : 1.100 x 0.02 Kg @ Rp. 13,800 = Rp. 303.60Filter Oli : 0.004 x 1.00 Buah @ Rp. 42,000 = Rp. 168.00Filter Solar : 0.002 x 1.00 Buah @ Rp. 36,000 = Rp. 72.00Filter Udara : 0.001 x 1.00 Buah @ Rp. 120,000 = Rp. 120.00Ban : 1.000 / 2,000.00 Buah @ Rp. 1,969,500 = Rp. 984.75Mekanik : 0.20 Mh @ Rp. 7,500 = Rp. 1,500.00Co. Mekanik : 0.40 Mh @ Rp. 5,625 = Rp. 2,250.00D r i v e r : 1.00 Mh @ Rp. 6,875 = Rp. 6,875.00Co. Driver : 1.00 Mh @ Rp. 5,625 = Rp. 5,625.00Bahan Pelengkap : 1.00 Ls @ Rp. 1,000 = Rp. 1,000.00

JUMLAH = Rp. 121,115.85

I.3. BIAYA PERBAIKAN : 6.00% x Rp. 300,000,000 / 2,000 = Rp. 9,000.00JUMLAH = Rp. 9,000.00

REKAPUTULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………= Rp. 68,250.00BIAYA OPERASI : …………………………………………………………………………………………………= Rp. 121,115.85BIAYA PERBAIKAN : …………………………………………………………………………………………………= Rp. 9,000.00

BIAYA DUMP TRUCK : …………………………………………………………………………………………………= Rp. 198,365.85

HARGA SATUAN PEKERJAANKAPASITAS ANGKUT : 28.32 m3 / JamHARGA ANGKUT TANAH DENGANJARAK 1 KM : Rp. 198,365.85 / 28.32 m3 / Jam = Rp. 7,005.62 / m3

Dibulatkan …………………….. = Rp. 7,006.00 / m3

Page 8: Analisa Dan RAB (BS.3 - BS.4)

ANALISA PERALATAN VIBRATOR ROLLER( Anl. P. 5. 4 )

A. DATA PERALATAN :1 . Nama Alat : VIBRATOR ROLLER2 . M e r k : Dynopac3 . Type / Model : CA. 254 . Kapasitas : 0.70 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,000 Jam7 . Harga Pokok : Rp. 300,000,0008 . Harga Roller : Rp. 35,000,0009 . Nilai Sisa : 10.00% x Rp 265,000,000 = Rp. 26,500,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp 35,000,000 = Rp. 238,500,000

B. TAKSIRAN PRODUKSI :1 . Produksi Maksimum Teoritis: (W x S x L) / P (1.20 x 1.500 x 0.20) / 4 = 90 m3/jam

2 . Faktor Koreksi :a. Efisiensi Kerja : 0.70b. Kondisi Kerja : 0.70Faktor Koreksi : 0.70 x 0.70 = 0.49 m3/jam

3 . Taksiran Produksi : (90 x 0.49) = 44.10 m3/jam

C. BIAYA PERALATAN :

I. BIAYA LANGSUNGI.1. BIAYA PEMILIKAN

a. Penyusutan : Rp. 238,500,000 / 5 / 2,000 = Rp. 23,850.00 /jam

b. Bunga Bank, Gudang : 20% x (6.00/10.00) x 300,000,000 / 2,000 = Rp. 18,000.00 /jamJUMLAH = Rp. 41,850.00 /jam

I.2. BIAYA OPERASI DAN PERAWATANa. Bahan Bakar (Solar) : ……………………………… 15.00 Ltr @ Rp. 5,250 = Rp. 78,750.00 /jamb. Minyak Pelumas : ……………………………… 0.40 Ltr @ Rp. 33,000 = Rp. 13,200.00 /jamc. Minyak Hydroulic : ……………………………… 0.20 Ltr @ Rp. 33,000 = Rp. 6,600.00 /jamd. Oli Transmisi : ……………………………… 0.15 Ltr @ Rp. 71,250 = Rp. 10,687.50 /jame. Gemuk / Grease : ……………………………… 1.00 Kg @ Rp. 13,800 = Rp. 13,800.00 /jamf. Operator : ………………………………………………………………@ Rp. 8,125 = Rp. 8,125.00 /jamg. Co. Operator dan Mekanik : ………………………………………………………………@ Rp. 7,500 = Rp. 7,500.00 /jam

JUMLAH = Rp. 138,662.50 /jam

I.3. BIAYA PERBAIKAN : 10.00% x (Rp. 300,000,000 - Rp. 35,000,000) / 2,000 = Rp. 13,250.00 /jamJUMLAH = Rp. 13,250.00 /jam

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3) …………………………………= Rp. 193,762.50 /jam

II. BIAYA TIDAK LANGSUNG : 15.00% x Rp. 193,762.50 JUMLAH = Rp. 29,064.38 /jam

JUMLAH ( I + II ) = Rp. 222,826.88 /jam

HARGA SATUAN PEKERJAANRp. 222,826.88 / 44.10 m3/jam = Rp. 5,052.76 / m3

Dibulatkan ………… = Rp. 5,053.00 / m3

Page 9: Analisa Dan RAB (BS.3 - BS.4)

RENCANA ANGGARAN BIAYA

Kegitan : PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR SALURAN SEKUNDER BS.3 - BS.4 D.I. Alue UbayLokasi : Kecamatan Lhoksukon - Kabupaten Aceh Utara

No Uraian Analisa Stn Kuantitas

I. PEKERJAAN PERSIAPAN

1 Pematokan/cek pengukuran Taksir - Ls 1,000,000.00 1,000,000.00

2 Sewa Direksi Keet Taksir - Ls 2,000,000.00 2,000,000.00

3 Pengeringan (Dewatering) Taksir - Ls 3,000,000.00 3,000,000.00

4 Mobilisasi dan Demobilisasi alat Taksir - Ls 5,000,000.00 5,000,000.00

Jumlah 11,000,000.00

II. PEKERJAAN SALURAN

Rehabilitasi Saluran Ruas BS.3 - BS.4 778.20 m

1. Galian Tanah (Alat Berat) Anl. AB.1 m3 416.55 7,190.16 2,995,039.82

2. Galian Tanah + Dibuang (Alat Berat) Anl. AB.1a m3 627.59 14,196.16 8,909,398.89

3. Timbunan Tanah Hasil Galian Anl.A.16 m3 416.55 9,250.00 3,853,058.62

4. Beton Bertulang K-175 (Linning Saluran) Supl. Vb 252.32 1,834,244.40 462,816,547.01

5. Beton Bertulang K-175 (Lantai Saluran) Supl. Vb 183.50 1,834,244.40 336,583,847.40

Supl. Va 71.26 2,690,020.40 191,690,853.70

Jumlah 1,006,848,745.44

III. PEKERJAAN LAIN-LAIN

1 Administrasi Kontrak Taksir - Ls 1,500,000.00 1,500,000.00

2 Adm. Progress dan Pelaporan Taksir - Ls 700,000.00 700,000.00

3 Adm. Foto Dukumentsi Taksir - Ls 500,000.00 500,000.00

4 P3K Taksir - Ls 500,000.00 500,000.00

5 Pembuatan Papan Nama Proyek Taksir unit 1.00 400,000.00 400,000.00

Jumlah 3,600,000.00

Harga Satuan (Rp)

Harga Pekerjaan (Rp)

m3

m3

6. Beton Bertulang K-175 Balok 14/28 (Diafragma dan Memanjang)

m3

Page 10: Analisa Dan RAB (BS.3 - BS.4)

PEKERJAAN PERENCANAAN TEKNISJARINGAN IRIGASI, WADUK DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BS.3 - BS.4KECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN Rp. 11,000,000.00

II. PEKERJAAN SALURAN (L = 778.20 meter) Rp. 1,006,848,745.44

III. PEKERJAAN LAIN-LAIN Rp. 3,600,000.00

J u m l a h Rp. 1,021,448,745.44

Dibulatkan Rp. 1,021,448,000.00

TERBILANG:

Satu Milyar Dua Puluh Satu Juta Empat Ratus Empat Puluh Delapan Ribu Rupiah

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING

CONSULTANT

(IR. M. NASIR)Wakil Direktur

Menyetujui,Ka.Bid. Program dan Hidrologi

Dinas Sumber Daya Air

(IR. HASANUDDIN)Nip. 390 012 616

Mengetahui,Penanggungjawab Kegiatan

Kepala Dinas Sumber Daya AirKabupaten Aceh Utara

(IR. MAWARDI)Pembina/Nip. 390 012 231

Page 11: Analisa Dan RAB (BS.3 - BS.4)

B. Pekerjaan Besi Beton ( 100 Kg )

Tenaga Kerja ;

9.0000 Org Pekerja @ Rp 35,000.00 Rp 315,000.00

9.0000 Org Tukang Besi @ Rp 50,000.00 Rp 450,000.00

3.0000 Org Kepala Tukang @ Rp 60,000.00 Rp 180,000.00

Bahan ;

110.0000 Kg Besi Beton @ Rp 7,700.00 Rp 847,000.00

2.0000 Kg Kawat Beton @ Rp 14,400.00 Rp 28,800.00

Rp 1,820,800.00

0.0100 Untuk 1 Kg Besi Beton = 1/100 @ Rp 1,820,800.00 18,208.00

C. Cetakan Beton 10 M2

Tenaga Kerja ;

0.2000 Org Pekerja @ Rp 35,000.00 Rp 7,000.00

0.0100 Org Mandor @ Rp 50,000.00 Rp 500.00

0.5000 Org Tukang @ Rp 50,000.00 Rp 25,000.00

0.0500 Org Kepala Tukang @ Rp 60,000.00 Rp 3,000.00

Bahan ;

0.4000 m3 Kayu Bekesting @ Rp 1,824,000.00 Rp 729,600.00

0.4000 Kg Paku @ Rp 9,360.00 Rp 3,744.00

Jumlah Rp 768,844.00

0.1000 Untuk 1 m2 Beton Cor = 1/10 @ Rp 768,844.00 7,688.44

D. Membongkar Cetakan

Upah Membongkar Cetakan dan Menyiram Beton

4.0000 Org Pekerja @ Rp 35,000.00 Rp 140,000.00 Jumlah 140,000.00

REKAPITULASIANL. SUPL.Va : 1 M3 BETON BETON BERTULANG

Untuk 1 m3 Beton Memerlukan 92.00 Kg Besi

1.0000 m3 A. Beton Cor (1:2:3) @ Rp 798,000.00 798,000.00

92.0000 kg B. Pekerjaan Besi Beton ( 100 Kg @ Rp 18,208.00 1,675,136.00

10.0000 m2 C. Cetakan Beton 10 M2 @ Rp 7,688.44 76,884.40

D. Membongkar Cetakan @ Rp 140,000.00 140,000.00

Jumlah 2,690,020.40

ANL. SUPL.Vb : 1 M3 BETON BETON BERTULANG

Untuk 1 m3 Beton Memerlukan 45.00 Kg Besi

1.0000 m3 A. Beton Cor (1:2:3) @ Rp 798,000.00 798,000.00

45.0000 kg B. Pekerjaan Besi Beton ( 100 Kg @ Rp 18,208.00 819,360.00

10.0000 m2 C. Cetakan Beton 10 M2 @ Rp 7,688.44 76,884.40

D. Membongkar Cetakan @ Rp 140,000.00 140,000.00

Jumlah 1,834,244.40

ANL. SUPL.Vc : 1 M3 BETON BETON BERTULANG

Untuk 1 m3 Beton Memerlukan 24.00 Kg Besi

1.0000 m3 A. Beton Cor (1:2:3) @ Rp 798,000.00 798,000.00

24.0000 kg B. Pekerjaan Besi Beton ( 100 Kg @ Rp 18,208.00 436,992.00

10.0000 m2 C. Cetakan Beton 10 M2 @ Rp 7,688.44 76,884.40

D. Membongkar Cetakan @ Rp 140,000.00 140,000.00

Jumlah 1,451,876.40

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING CONSULTANT

(Ir. M. Nasir)Wakil Direktur

Page 12: Analisa Dan RAB (BS.3 - BS.4)

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING CONSULTANT

(Ir. M. Nasir)Wakil Direktur