13
Perhitungan Volume Beton Bertulang NO. Patok Jumlah Volume (m) (m3) (m) BAU-8 GAMBAR TIPIKAL SA B.1 Volume = 2.056 45.0 0.00 B.2 75.0 B.3 0.00 74.4 B.4 75.0 B.5 78.0 Volume (m3) = B.6 30.4 B.7 0.00 44.0 B.8 72.4 B.9 50.0 20.55 B.10 0.00 42.4 17.43 B.11 50.0 20.55 B.12 64.0 26.30 B.13 50.0 20.55 B.14 50.0 20.55 B.15 49.6 20.39 0.00 B.16 20.4 8.38 B.17 48.0 19.73 B.18 50.0 20.55 B.19 67.4 27.70 B.20 73.4 30.17 B.21 50.0 20.55 B.22 50.0 20.55 B.23 50.0 20.55 B.24 50.0 20.55 0.00 B.25 18.6 7.64 BP.1 JUMLAH 1,328.00 342.69 0.00 0.00 Jarak Konstruksi Volume Linning Saluran Bertulan 1 1

Analisa Dan RAB (BAU.8 - BP.1)

Embed Size (px)

Citation preview

Perhitungan Volume Beton Bertulang

NO. PatokJarak Konstruksi

Jumlah Volume

(m) (m3) (m) KETERANGAN

BAU-8 GAMBAR TIPIKAL SALURAN

B.1 Volume = 2.05645.0 0.00

B.275.0

B.3 0.0074.4

B.475.0

B.578.0 Volume (m3) =

B.630.4

B.7 0.0044.0

B.872.4

B.950.0 20.55

B.10 0.0042.4 17.43

B.1150.0 20.55

B.1264.0 26.30

B.1350.0 20.55

B.1450.0 20.55

B.1549.6 20.39 0.00

B.1620.4 8.38

B.1748.0 19.73

B.1850.0 20.55

B.1967.4 27.70

B.2073.4 30.17

B.2150.0 20.55

B.2250.0 20.55

B.2350.0 20.55

B.2450.0 20.55 0.00

B.2518.6 7.64

BP.1

JUMLAH 1,328.00 342.69 0.00 0.00

Volume Linning Saluran Beton

Bertulang (m3)

1.60

0.63

0.301

1

KETERANGAN

GAMBAR TIPIKAL SALURAN

0.41

1.60

0.63

0.301

1

Perhitungan Volume Pekerjaan Tanah Rehabilitasi Saluran Sekunder Ruas BAU.8 - BP.1 D.I. Alue Ubay Kab. Aceh Utara

(lanjutan)

CROSSKOORDINAT GALIAN KOORDINAT TIMBUNAN

X Y XY YX X Y XY YX GALIAN TIMBUNAN

B.25 - 9.954 - 6.83 - 9.004 - 5.44 0.19 0.18

0.69 9.645 6.18 8.59 0.60 8.400 4.91 5.07

0.89 9.004 8.87 - 0.60 8.137 5.07 1.59

- 9.954 - - 0.20 8.393 1.76 -

- - - - - 9.004 - -

- -

Jumlah 01 15.05 15.42 11.74 12.10

- 8.328 - 1.14 - 8.393 - 15.73 0.01 0.29

0.14 8.306 1.12 1.14 1.87 8.393 15.43 15.73

0.14 8.200 1.14 - 1.87 8.236 15.25 9.81

- 8.328 - - 1.19 8.139 10.00 -

- - - - - 8.393 - -

Jumlah 02 2.26 2.28 40.68 41.27

- 8.216 - 1.13 - 8.236 - 5.25 0.00 0.15

0.14 8.236 1.12 1.13 0.64 9.038 5.29 3.77

0.14 8.200 1.13 - 0.42 8.295 3.43 -

- 8.216 - - - 8.236 - -

- - - - - - - -

Jumlah 03 2.25 2.25 8.73 9.02

- 9.038 - 1.62 - - - - 0.27 -

0.18 9.638 1.80 6.54 - - - -

0.68 10.045 6.77 9.34 - - - -

0.93 9.968 8.41 - - - - -

- 9.038 - - - - - -

Jumlah 04 16.97 17.50 - -

JUMLAH (01 + 02 + 03 + 04) 0.46 0.62

AREA (m2)

PERHITUNGAN VOLUME PEKERJAAN TANAHPERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIRSALURAN SEKUNDER BAU.8 - BP.1 - D.I. ALUE UBAYKECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

Jarak AREA (m2) Volume (M3)

Profi Langsung Galian Timbunan Galian Timbunan

B.0 0.00 0.00

BAU.8 0.00 0.00 0.00 0.00

B.1 0.00 0.00 0.00 0.0045.0

B.2 45.0 0.00 0.00 0.00 0.0075.0

B.3 120.0 0.00 0.00 0.00 0.0074.4

B.4 194.4 0.00 0.00 0.00 0.0075.0

B.5 269.4 0.00 0.00 0.00 0.0078.0

B.6 347.4 0.00 0.00 0.00 0.0030.4

B.7 377.8 0.00 0.00 0.00 0.0044.0

B.8 421.8 0.00 0.00 0.00 0.0072.4

B.9 494.2 0.00 0.00 0.00 0.0050.0

B.10 544.2 0.91 0.21 22.64 5.2042.4

B.11 586.6 0.93 0.02 38.94 4.7850.0

B.12 636.6 1.28 0.31 55.27 8.1664.0

B.13 700.6 0.88 0.06 69.07 11.7150.0

B.14 750.6 1.42 0.12 57.40 4.3350.0

B.15 800.6 1.81 0.04 80.80 4.0149.6

B.16 850.2 2.41 0.08 104.86 3.1220.4

B.17 870.6 0.34 - 28.06 0.8348.0

B.18 918.6 1.41 - 41.92 0.0050.0

B.19 968.6 0.74 0.17 53.82 4.1367.4

B.20 1036.0 - - 25.07 5.5773.4

B.21 1109.4 - - 0.00 0.0050.0

B.22 1159.4 0.65 0.26 16.35 6.4850.0

B.23 1209.4 0.04 0.54 17.38 19.8750.0

B.24 1259.4 0.01 1.20 1.31 43.2650.0

B.25 1309.4 0.46 0.62 11.88 45.3618.6

BP.1 1328.0 - -

JUMLAH 1,328.0 624.72 166.83

Bangunan Air / Pot Saluran

A. DAFTAR HARGA SATUAN UPAH

No URAIAN SATUAN

1 Mandor OH 50,000.00

2 Kepala tukang OH 60,000.00

3 Tukang OH 50,000.00

4 Pekerja OH 35,000.00

5 Sopir (Dump Truck dan Alat Berat) OH 55,000.00

6 Sopir Pembantu OH 45,000.00

7 Operator OH 65,000.00

8 Pembantu Operator OH 45,000.00

9 Mekanik Terlatih OH 60,000.00

10 Mekanik Pmbantu OH 45,000.00

B. DAFTAR HARGA SATUAN BAHAN

No URAIAN SATUAN

1 Aspal Bitumen kg 5,500.00

2 Batu Bata bh 620.00

3 Batu Kali m3 160,000.00

4 Besi beton kg 7,700.00

5 Drain Hole buah 3,500.00

6 Gemuk (Grase) kg 13,800.00

7 Kawat beton kg 14,400.00

8 Kayu Bekisting m3 1,824,000.00

9 Kayu Sembarang m3 720,000.00

10 Kerikil Bersih m3 160,000.00

11 Lempengan Rumput m2 22,200.00

12 Minyak Aspal ltr 5,250.00

13 Minyak Premium ltr 5,625.00

14 Minyak Solar ltr 5,250.00

15 Minyak Pelumas ltr 33,000.00

16 Pasir Pasangan m3 110,000.00

17 Pasir Urug m3 70,000.00

18 Paku kayu kg 9,360.00

19 Paku seng kg 16,200.00

20 Semen Portland zak 38,400.00

21 Tanah Timbunan m3 51,650.00

HARGA (Rp)

HARGA (Rp)

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING CONSULTANT

(IR. M. NASIR)Wakil Direktur

URAIAN ANALISIS HARGA SATUAN ALAT

JENIS PEKERJAAN : Analisa Galian Saluran (Lebar Atas Saluran B = 4 - 16 m)ITEM PEMBAYARAN : C.2JENIS ALAT : EXAVATOR 100SATUAN : m3PROPINSI : NANGGROE ACEH DARUSSALAMLOKASI : KABUPATEN ACEH UTARATAHUN ANGGRARAN : 2006NO URAIAN KODE KOEF SATUAN KETA URAIAN PERALATAN

1 Jenis Peralatan : EXAVATOR 1002 Tenaga Pw 105.00 HP3 Kapasitas Cp 1.20 M34 Alat Baru a. Umur Ekonomis A 5.00 Tahun

b. Jam Kerja Dalam Satu Tahun W 2,000.00 Jamc. Harga Alat B 860,000,000.00 Rupiah

5 Alat yang dipakai a. Umur Ekonomis A' 5.00 Tahun alat barub. Jam Kerja Dalam Satu Tahun W' 2,000.00 Jam alat baruc. Harga Alat B' 860,000,000.00 Rupiah alat baru

B BIAYA PASTI PERJAM KERJA1 Nilai Sisa Alat =10% x B C 86,000,000.00 Rupiah2 Faktor angsuran modal D 0.334 -

3 Biaya Pasti Perjama. Biaya pengambilan modal E 129,404.95 Rupiah

b. Ansuransi dll F 860.00 Rupiah

Biaya Pasti Perjam =(E + F) G 130,264.95 Rupiah

C BIAYA OPERASI PERJAM KERJA1 Bahan bakar =(0.125-0.175 ltr/Hp/Jam) x Pw x Ms H 96,468.75 Rupiah2 Pelumas =(0.01-0.02 ltr/Hp/Jam) x Pw x Mp I 69,300.00 Rupiah3 Perawatan dan Perbaikan K 75,250.00 Rupiah

W'4 Operator =(1 orang Perjam) U1 L 8,125.00 Rupiah5 Pembantu Operator =(1 orang Perjam) U2 M 5,625.00 Rupiah

Biaya Pasti Perjam =(H + I + K + L + M) P 254,768.75 Rupiah

D TOTAL BIAYA SEWA ALAT PERJAM = (G + P) S 385,033.70 Rp/jam

E LAIN-LAIN1 Tingkat suku bunga i 20.00 %/tahun2 Upah operator/sopir U1 8,125.00 Rp/Jam3 Upah pembantu operator U2 5,625.00 Rp/Jam4 Bahan bakar bensin Mb Rp/Liter5 Bahan bakar solar Ms 5,250.00 Rp/Liter6 Minyak pelumas Mp 33,000.00 Rp/Liter

= i x (1 + i )^A' (1 + i )^A' - 1

= (B' - C) x D W'= 0.002 x B' W'

=(0.125-0.175 ) x B'

ANALISA PERALATAN BACKHOE / EXCAVATOR( Anl. P. 5. 1 )

A. DATA PERALATAN :1. Nama Alat : Backhoe / Excavator2. M e r k : Komatzu3. Type / Model : PC. 2004. Kapasitas : 0.80 m35. Engine : ISUZU6. Isi Karakter : 51 Liter7. Umur Ekonomis : 5 Th8. Jam Kerja / Tahun : 2,000.00 9. Harga Pokok : = Rp. 930,000,000.00

10. Harga Track : = Rp. 46,500,000.00 11. Nilai Sisa : Rp. 10.00% x Rp. 883,500,000.00 = Rp. 88,350,000.00 12. Harga Penyusutan : Rp. 930,000,000.00 - Rp. 88,350,000.00 = Rp. 841,650,000.00

B. TAKSIRAN PRODUKSI1. Swelling : 25.00 %2. Kapasitas : 0.80 / 1.25 = 0.64 m33. Dapat Melakukan Gerak : 2.50 Circle Time4. Produksi Maksimum Teoritis : 0.64 x 2.50 x 60 = 96.00 m3 / Jam (BCM)

C. FAKTOR KOREKSI1. Angle Of Swing : 120.00 Derajat2. Faktor Swing Dan Depth : 0.883. Eff Kerja Siang : 0.834. Kondisi Kerja : 0.755. Faktor Muat Diambil Rata-rata : 0.956. Faktor Koreksi : 0.88 x 0.83 x 0.75 x 0.95 = 0.52 7. Taksiran Produksi : 0.52 x 96.00 = 49.96 = 50.00 m3 / Jam

D. BIAYA PERALATAN

I. BIAYA - BIAYAI. 1 BIAYA PEMILIKAN

Penyusutan : Rp. 841,650,000.00 / 5 x 2.000 = Rp. 84,165.00 Bunga Bank : 24.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 111,600.00 Pajak PPH : 2.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 11,625.00 Gudang : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00 Asuransi : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00

: JUMLAH = Rp. 209,715.00 :

I. 2 BIAYA OPERASIBahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250.00 = Rp. 86,625.00 Minyak Pelumas : 1.050 x 0.12 Ltr @ Rp. 33,000.00 = Rp. 4,158.00 Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000.00 = Rp. 2,772.00 Gemuk / Grease : 1.100 x 0.07 Kg @ Rp. 13,800.00 = Rp. 1,062.60 Filter Oli : 0.004 x 1.00 Buah @ Rp. 75,000.00 = Rp. 300.00 Filter Solar : 0.002 x 1.00 Buah @ Rp. 120,000.00 = Rp. 240.00 Filter Udara : 0.001 x 1.00 Buah @ Rp. 1,200,000.00 = Rp. 1,200.00 Operator : 1.00 Oh @ Rp. 8,125.00 = Rp. 8,125.00 Co. Operator : 1.00 Oh @ Rp. 5,625.00 = Rp. 5,625.00 Mekanik : 0.20 Oh @ Rp. 7,500.00 = Rp. 1,500.00 Co. Mekanik : 0.40 Oh @ Rp. 5,625.00 = Rp. 2,250.00 Bahan Pelengkap : 1.00 Oh @ Rp. 1,328.13 = Rp. 1,328.13

JUMLAH = Rp. 115,185.73

I. 3 BIAYA PERBAIKAN : 6.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 27,900.00 JUMLAH = Rp. 27,900.00

REKAPITULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………………= Rp. 209,715.00 BIAYA OPERASI : …………………………………………………………………………………………………………= Rp. 115,185.73 BIAYA PERBAIKAN : …………………………………………………………………………………………………………= Rp. 27,900.00 BIAYA EXCAVATOR : …………………………………………………………………………………………………………= Rp. 352,800.73

HARGA SATUAN PEKERJAANKAPASITAS GALIAN : 50.00 m3 / JamHARGA GALIAN : Rp. 352,800.73 / 50.00 = Rp. 7,056.01 / m3

Dibulatkan ………………… = Rp. 7,056.00 / m3

ANALISA PERALATAN DUMP TRUCK( Anl. P. 5. 3 )

A. DATA PERALATAN :1 . Nama Alat : Dump Truck2 . M e r k : FUSO3 . Type / Model : FM. 1904 . Kapasitas : 6 - 8 Ton 4 - 5 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,0007 . Harga Ban Timmer Ring : Rp. 1,969,500 x 6 = Rp. 11,817,0008 . Harga Pokok : Rp. 320,000,0009 . Nilai Sisa : 10.00% x Rp. 320,000,000 = Rp. 32,000,000

10 . Harga Penyusutan : Rp. 320,000,000 - Rp. 32,000,000 = Rp. 288,000,000

B. TAKSIRAN PRODUKSI :1 . Kapasitas : 5.00 m32 . Swelling : 30.00 %3 . Kapasitas Nyata : 5.00 / 1.30 = 3.85 m34 . Jarak Angkut

a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 1000.00 m'

1. Kecepatan Dalam Keadaan Isi :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 60.00 Km / Jam = 1,000.00 m' / Menit

2. Kecepatan Dlm Keadaan Kosong :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 80.00 Km / Jam = 1,333.33 m' / Menit

3. Speed Factor : 0.804. Dump Truck : 0.35 Menit5. Manuver : 0.85 Menit6. Waktu Muat : 5 / 84 x 60 = 3.57 Menit7. Travel Time : 1,000 / 1,000 + 1,000 / 1,333.33 = 0.85 Menit8. Total Circle Time : 0.35 + 0.85 + 3.57+ 1.75 = 6.52 Menit9. Produksi Maksimum Teoritis : (60 / 6.52) x 3.85 = 35.39 m310. Produksi Nyata : 0.80 x 35.39 = 28.32 m3 / Jam

C. BIAYA PERALATAN :

I. BIAYA - BIAYAI.1. BIAYA PEMILIKAN

Penyusutan : Rp. 288,000,000 / 5.00 / 2,000 = Rp. 28,800.00Bunga Bank : 24.00% x Rp. 320,000,000 / 2,000 = Rp. 38,400.00Pajak PPH : 2.50% x Rp. 320,000,000 / 2,000 = Rp. 4,000.00Gudang : 0.50% x Rp. 320,000,000 / 2,000 = Rp. 800.00Asuransi : 0.50% x Rp. 320,000,000 / 2,000 = Rp. 800.00

JUMLAH = Rp. 72,800.00I.2. BIAYA OPERASI

Bahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250 = Rp. 86,625.00Minyak Pelumas : 1.050 x 0.37 Ltr @ Rp. 33,000 = Rp. 12,820.50Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000 = Rp. 2,772.00Gemuk / Grease : 1.100 x 0.02 Kg @ Rp. 13,800 = Rp. 303.60Filter Oli : 0.004 x 1.00 Buah @ Rp. 42,000 = Rp. 168.00Filter Solar : 0.002 x 1.00 Buah @ Rp. 36,000 = Rp. 72.00Filter Udara : 0.001 x 1.00 Buah @ Rp. 120,000 = Rp. 120.00Ban : 1.000 / 2,000.00 Buah @ Rp. 1,969,500 = Rp. 984.75Mekanik : 0.20 Mh @ Rp. 7,500 = Rp. 1,500.00Co. Mekanik : 0.40 Mh @ Rp. 5,625 = Rp. 2,250.00D r i v e r : 1.00 Mh @ Rp. 6,875 = Rp. 6,875.00Co. Driver : 1.00 Mh @ Rp. 5,625 = Rp. 5,625.00Bahan Pelengkap : 1.00 Ls @ Rp. 1,000 = Rp. 1,000.00

JUMLAH = Rp. 121,115.85

I.3. BIAYA PERBAIKAN : 6.00% x Rp. 320,000,000 / 2,000 = Rp. 9,600.00JUMLAH = Rp. 9,600.00

REKAPUTULASI BIAYA :BIAYA PEMILIKAN : ……………………………………………………………………………………………………= Rp. 72,800.00BIAYA OPERASI : ……………………………………………………………………………………………………= Rp. 121,115.85BIAYA PERBAIKAN : ……………………………………………………………………………………………………= Rp. 9,600.00

BIAYA DUMP TRUCK : ……………………………………………………………………………………………………= Rp. 203,515.85

HARGA SATUAN PEKERJAANKAPASITAS ANGKUT : 28.32 m3 / JamHARGA ANGKUT TANAH DENGANJARAK 1 KM : Rp. 203,515.85 / 28.32 m3 / Jam = Rp. 7,187.50 / m3

Dibulatkan …………………….. = Rp. 7,188.00 / m3

ANALISA PERALATAN VIBRATOR ROLLER( Anl. P. 5. 4 )

A. DATA PERALATAN :1 . Nama Alat : VIBRATOR ROLLER2 . M e r k : Dynopac3 . Type / Model : CA. 254 . Kapasitas : 0.70 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,000 Jam7 . Harga Pokok : Rp. 300,000,0008 . Harga Roller : Rp. 35,000,0009 . Nilai Sisa : 10.00% x Rp 265,000,000 = Rp. 26,500,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp 35,000,000 = Rp. 238,500,000

B. TAKSIRAN PRODUKSI :1 . Produksi Maksimum Teoritis: (W x S x L) / P (1.20 x 1.500 x 0.20) / 4 = 90 m3/jam

2 . Faktor Koreksi :a. Efisiensi Kerja : 0.70b. Kondisi Kerja : 0.70Faktor Koreksi : 0.70 x 0.70 = 0.49 m3/jam

3 . Taksiran Produksi : (90 x 0.49) = 44.10 m3/jam

C. BIAYA PERALATAN :

I. BIAYA LANGSUNGI.1. BIAYA PEMILIKAN

a. Penyusutan : Rp. 238,500,000 / 5 / 2,000 = Rp. 23,850.00 /jam

b. Bunga Bank, Gudang : 20% x (6.00/10.00) x 300,000,000 / 2,000 = Rp. 18,000.00 /jamJUMLAH = Rp. 41,850.00 /jam

I.2. BIAYA OPERASI DAN PERAWATANa. Bahan Bakar (Solar) : ……………………………… 15.00 Ltr @ Rp. 5,250 = Rp. 78,750.00 /jamb. Minyak Pelumas : ……………………………… 0.40 Ltr @ Rp. 33,000 = Rp. 13,200.00 /jamc. Minyak Hydroulic : ……………………………… 0.20 Ltr @ Rp. 33,000 = Rp. 6,600.00 /jamd. Oli Transmisi : ……………………………… 0.15 Ltr @ Rp. 71,250 = Rp. 10,687.50 /jame. Gemuk / Grease : ……………………………… 1.00 Kg @ Rp. 13,800 = Rp. 13,800.00 /jamf. Operator : ………………………………………………………………@ Rp. 8,125 = Rp. 8,125.00 /jamg. Co. Operator dan Mekanik : ………………………………………………………………@ Rp. 7,500 = Rp. 7,500.00 /jam

JUMLAH = Rp. 138,662.50 /jam

I.3. BIAYA PERBAIKAN : 10.00% x (Rp. 300,000,000 - Rp. 35,000,000) / 2,000 = Rp. 13,250.00 /jamJUMLAH = Rp. 13,250.00 /jam

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3) …………………………………= Rp. 193,762.50 /jam

II. BIAYA TIDAK LANGSUNG : 15.00% x Rp. 193,762.50 JUMLAH = Rp. 29,064.38 /jam

JUMLAH ( I + II ) = Rp. 222,826.88 /jam

HARGA SATUAN PEKERJAANRp. 222,826.88 / 44.10 m3/jam = Rp. 5,052.76 / m3

Dibulatkan ………… = Rp. 5,053.00 / m3

RENCANA ANGGARAN BIAYA

Kegitan : PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR SALURAN SEKUNDER BAU.8 - BP.1Lokasi : Kecamatan Lhoksukon - Kabupaten Aceh Utara

No Uraian Analisa Stn Kuantitas

I. PEKERJAAN PERSIAPAN

1 Pematokan/cek pengukuran Taksir - Ls 1,000,000.00 1,000,000.00

2 Sewa Direksi Keet Taksir - Ls 2,000,000.00 2,000,000.00

3 Pengeringan (Dewatering) Taksir - Ls 3,000,000.00 3,000,000.00

4 Mobilisasi dan Demobilisasi alat Taksir - Ls 5,000,000.00 5,000,000.00

Jumlah 11,000,000.00

II. PEKERJAAN SALURAN

Rehabilitasi Saluran Ruas BAU.8 - BP.1 691.80 m

1. Galian Tanah (Alat Berat) Anl. AB.1 m3 166.83 7,190.16 1,199,524.09

2. Galian Tanah + Dibuang (Alat Berat) Anl. AB.1a m3 457.89 14,378.16 6,583,658.44

3. Timbunan Tanah Hasil Galian Anl.A.16 m3 166.83 9,250.00 1,543,163.67

4. Beton Bertulang K-175 (Linning Saluran) Supl. Vc 284.33 1,451,876.40 412,812,016.81

5. Beton Bertulang K-175 (Lantai Saluran) Supl. Vb 166.02 1,834,244.40 304,521,255.29

Supl. Va 65.15 2,690,020.40 175,254,829.06

Jumlah 901,914,447.36

III. PEKERJAAN LAIN-LAIN

1 Administrasi Kontrak Taksir - Ls 1,500,000.00 1,500,000.00

2 Adm. Progress dan Pelaporan Taksir - Ls 700,000.00 700,000.00

3 Adm. Foto Dukumentsi Taksir - Ls 500,000.00 500,000.00

4 P3K Taksir - Ls 500,000.00 500,000.00

5 Pembuatan Papan Nama Proyek Taksir unit 1.00 400,000.00 400,000.00

Jumlah 3,600,000.00

Harga Satuan (Rp)

Harga Pekerjaan (Rp)

m3

m3

6. Beton Bertulang K-175 Balok 14/28 (Diafragma dan Memanjang)

m3

PERBAIKAN DAN PEMBANGUNANJARINGAN IRIGASI DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER RUAS BAU.8 - BP.1KECAMATAN PAYA BAKONG - KABUPATEN ACEH UTARA

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN Rp. 11,000,000.00

II. PEKERJAAN SALURAN (L = 691.80 meter) Rp. 901,914,447.36

III. PEKERJAAN LAIN-LAIN Rp. 3,600,000.00

J u m l a h Rp. 916,514,447.36

Dibulatkan Rp. 916,514,000.00

TERBILANG:

Sembilan Ratus Enam Belas Juta Lima Ratus Empat Belas Ribu Rupiah

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING

CONSULTANT

(Ir. M. NASIR)Wakil Direktur

Menyetujui,Ka.Bid. Program dan Hidrologi

Dinas Sumber Daya Air

(Ir. HASANUDDIN)Nip. 390 012 616

Mengetahui,Penanggungjawab Kegiatan

Kepala Dinas Sumber Daya AirKabupaten Aceh Utara

(Ir. MAWARDI)Pembina/Nip. 390 012 231

DAFTAR ANALISACV. TOTAL ENGINEERING CONSULTANTJl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE

Anl. A.1 : 1 M3 GALIAN TANAH BIASA

0.7500 Org Pekerja @ Rp 35,000.00 Rp 26,250.00

0.0250 Org Mandor @ Rp 50,000.00 Rp 1,250.00

Jumlah Rp 27,500.00

Anl. A.16 : 1 M3 TIMBUNAN TANAH / DIRATAKAN / DITIMBRIS

0.2500 Org Pekerja @ Rp 35,000.00 Rp 8,750.00 0.0100 Org Mandor @ Rp 50,000.00 Rp 500.00

Jumlah Rp 9,250.00

Anl. AB.1 : 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,190.16 Rp 7,190.16

Jumlah Rp 7,190.16

Anl. AB.1a : 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT DAN MENGANGKUT

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,190.16 Rp 7,190.16 1.0000 unit Dump Truck (Anl. P.5.3) @ Rp 7,188.00 Rp 7,188.00

Jumlah Rp 14,378.16

Anl. AB.1b : 1 M3 TIMBUNAN TANAH DIDATANGKAN (MENGGUNAKAN ALAT BERAT)

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,190.16 Rp 7,190.16

1.0000 unit Vibrator (Anl. P.5.4) @ Rp 5,053.00 Rp 5,053.00

1.2500 m3 Tanah Timbun @ Rp 51,650.00 Rp 64,562.50

Jumlah Rp 76,805.66

Anl. G.41 : 1 m3 BETON COR 1 : 2 : 3

6.0000 org Pekerja @ Rp 35,000.00 Rp 210,000.00 0.3000 org Mandor @ Rp 50,000.00 Rp 15,000.00 1.0000 org Tukang Batu @ Rp 50,000.00 Rp 50,000.00 0.1000 org Kepala Tukang @ Rp 60,000.00 Rp 6,000.00 0.8200 m3 Kerikil Bersih @ Rp 160,000.00 Rp 131,200.00 8.5000 zak Semen PC @ Rp 38,400.00 Rp 326,400.00 0.5400 m3 Pasir Pasangan @ Rp 110,000.00 Rp 59,400.00

Jumlah Rp 798,000.00 Dibulatkan Rp 798,000.00

ANL. SUPL.V : 1 M3 BETON BETON BERTULANG

A. Beton Cor (1:2:3)

Tenaga Kerja ;

6.0000 Org Pekerja @ Rp 35,000.00 Rp 210,000.00

0.3000 Org Mandor @ Rp 50,000.00 Rp 15,000.00

1.0000 Org Tukang @ Rp 50,000.00 Rp 50,000.00

0.1000 Org Kepala Tukang @ Rp 60,000.00 Rp 6,000.00

Bahan ;

0.8200 M3 Kerikil Bersih @ Rp 160,000.00 Rp 131,200.00

8.5000 Zak Semen (PC) @ Rp 38,400.00 Rp 326,400.00

0.5400 M3 Pasir Beton @ Rp 110,000.00 Rp 59,400.00 Jumlah 798,000.00