NO. Patok Jumlah Volume (m) (m) KETERANGAN A.101 (BLS-04 198.30 24.00 A.102 25.00 A.103 25.00 407.70 A.104 50.00 A.105 50.00 A.106 24.30 24.00 144.50 A.111 50.00 A.112 297.09 50.00 A.113 20.50 Gorong-Gorong 10.50 28.00 A.114 57.57 17.50 A.115/Jembatan 12.50 474.80 A.116 25.00 A.117 50.00 A.118 50.00 A.119 50.00 A.120 50.00 A.121 50.00 A.122 25.00 976.19 A.123 20.00 A.124 25.00 A.125 15.00 A.126 24.30 A.127 18.00 A.128 50.00 A.129 10.00 BLS-05 JUMLAH 845.60 845.60 1,738.55 Jarak Konstruksi Beton Bertulan g (m3) A.107 - A.110 (Linning Saluran

Analisa Dan RAB (BAU.8 - BP.1)

Embed Size (px)

Citation preview

Page 1: Analisa Dan RAB (BAU.8 - BP.1)

NO. Patok

Jarak Konstruksi Jumlah Volume

(m) (m) KETERANGAN

A.101 (BLS-04

198.30

24.00

A.10225.00

A.10325.00 407.70

A.10450.00

A.10550.00

A.10624.30

24.00

144.50

A.11150.00

A.112 297.09

50.00

A.11320.50

Gorong-Gorong10.50

28.00A.114 57.57

17.50

A.115/Jembatan12.50

474.80

A.11625.00

A.11750.00

A.11850.00

A.11950.00

A.12050.00

A.12150.00

A.12225.00 976.19

A.12320.00

A.12425.00

A.12515.00

A.12624.30

A.12718.00

A.12850.00

A.12910.00

BLS-05

JUMLAH 845.60 845.60 1,738.55

Beton Bertulang

(m3)

A.107 - A.110 (Linning Saluran

Page 2: Analisa Dan RAB (BAU.8 - BP.1)

A. DAFTAR HARGA SATUAN UPAH

No URAIAN SATUAN

1 Mandor OH 50,000.00

2 Kepala tukang OH 60,000.00

3 Tukang OH 50,000.00

4 Pekerja OH 35,000.00

5 Sopir (Dump Truck dan Alat Berat) OH 55,000.00

6 Sopir Pembantu OH 45,000.00

7 Operator OH 65,000.00

8 Pembantu Operator OH 45,000.00

9 Mekanik Terlatih OH 60,000.00

10 Mekanik Pmbantu OH 45,000.00

B. DAFTAR HARGA SATUAN BAHAN

No URAIAN SATUAN

1 Aspal Bitumen kg 5,500.00

2 Batu Bata bh 620.00

3 Batu Kali m3 160,000.00

4 Besi beton kg 7,700.00

5 Drain Hole buah 3,500.00

6 Gemuk (Grase) kg 13,800.00

7 Kawat beton kg 14,400.00

8 Kayu Bekisting m3 1,824,000.00

9 Kayu Sembarang m3 720,000.00

10 Kerikil Bersih m3 160,000.00

11 Lempengan Rumput m2 22,200.00

12 Minyak Aspal ltr 5,250.00

13 Minyak Premium ltr 5,625.00

14 Minyak Solar ltr 5,250.00

15 Minyak Pelumas ltr 33,000.00

16 Pasir Pasangan m3 110,000.00

17 Pasir Urug m3 70,000.00

18 Paku kayu kg 9,360.00

19 Paku seng kg 16,200.00

20 Semen Portland zak 38,400.00

21 Tanah Timbunan m3 51,650.00

HARGA (Rp)

HARGA (Rp)

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING CONSULTANT

(IR. M. NASIR)Wakil DirekturDirektur

Page 3: Analisa Dan RAB (BAU.8 - BP.1)

ANALISA PERALATAN BACKHOE / EXCAVATOR( Anl. P. 5. 1 )

A. DATA PERALATAN :1. Nama Alat : Backhoe / Excavator2. M e r k : Komatzu3. Type / Model : PC. 2004. Kapasitas : 0.80 m35. Engine : ISUZU6. Isi Karakter : 51 Liter7. Umur Ekonomis : 5 Th8. Jam Kerja / Tahun : 2,000.00 9. Harga Pokok : = Rp. 930,000,000.00

10. Harga Track : = Rp. 46,500,000.00 11. Nilai Sisa : Rp. 10.00% x Rp. 883,500,000.00 = Rp. 88,350,000.00 12. Harga Penyusutan : Rp. 930,000,000.00 - Rp. 88,350,000.00 = Rp. 841,650,000.00

B. TAKSIRAN PRODUKSI1. Swelling : 25.00 %2. Kapasitas : 0.80 / 1.25 = 0.64 m33. Dapat Melakukan Gerak : 2.50 Circle Time4. Produksi Maksimum Teoritis : 0.64 x 2.50 x 60 = 96.00 m3 / Jam (BCM)

C. FAKTOR KOREKSI1. Angle Of Swing : 120.00 Derajat2. Faktor Swing Dan Depth : 0.883. Eff Kerja Siang : 0.834. Kondisi Kerja : 0.755. Faktor Muat Diambil Rata-rata : 0.956. Faktor Koreksi : 0.88 x 0.83 x 0.75 x 0.95 = 0.52 7. Taksiran Produksi : 0.52 x 96.00 = 49.96 = 50.00 m3 / Jam

D. BIAYA PERALATAN

I. BIAYA - BIAYAI. 1 BIAYA PEMILIKAN

Penyusutan : Rp. 841,650,000.00 / 5 x 2.000 = Rp. 84,165.00 Bunga Bank : 24.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 111,600.00 Pajak PPH : 2.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 11,625.00 Gudang : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00 Asuransi : 0.50% x Rp. 930,000,000.00 / 2,000.00 = Rp. 2,325.00

: JUMLAH = Rp. 209,715.00 :

I. 2 BIAYA OPERASIBahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250.00 = Rp. 86,625.00 Minyak Pelumas : 1.050 x 0.12 Ltr @ Rp. 33,000.00 = Rp. 4,158.00 Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000.00 = Rp. 2,772.00 Gemuk / Grease : 1.100 x 0.07 Kg @ Rp. 13,800.00 = Rp. 1,062.60 Filter Oli : 0.004 x 1.00 Buah @ Rp. 75,000.00 = Rp. 300.00 Filter Solar : 0.002 x 1.00 Buah @ Rp. 120,000.00 = Rp. 240.00 Filter Udara : 0.001 x 1.00 Buah @ Rp. 1,200,000.00 = Rp. 1,200.00 Operator : 1.00 Oh @ Rp. 8,125.00 = Rp. 8,125.00 Co. Operator : 1.00 Oh @ Rp. 5,625.00 = Rp. 5,625.00 Mekanik : 0.20 Oh @ Rp. 7,500.00 = Rp. 1,500.00 Co. Mekanik : 0.40 Oh @ Rp. 5,625.00 = Rp. 2,250.00 Bahan Pelengkap : 1.00 Oh @ Rp. 1,328.13 = Rp. 1,328.13

JUMLAH = Rp. 115,185.73

I. 3 BIAYA PERBAIKAN : 6.00% x Rp. 930,000,000.00 / 2,000.00 = Rp. 27,900.00 JUMLAH = Rp. 27,900.00

REKAPITULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………………= Rp. 209,715.00 BIAYA OPERASI : …………………………………………………………………………………………………………= Rp. 115,185.73 BIAYA PERBAIKAN : …………………………………………………………………………………………………………= Rp. 27,900.00 BIAYA EXCAVATOR : …………………………………………………………………………………………………………= Rp. 352,800.73

HARGA SATUAN PEKERJAANKAPASITAS GALIAN : 50.00 m3 / JamHARGA GALIAN : Rp. 352,800.73 / 50.00 = Rp. 7,056.01 / m3

Dibulatkan ………………… = Rp. 7,056.00 / m3

Page 4: Analisa Dan RAB (BAU.8 - BP.1)

ANALISA PERALATAN DUMP TRUCK( Anl. P. 5. 3 )

A. DATA PERALATAN :1 . Nama Alat : Dump Truck2 . M e r k : FUSO3 . Type / Model : FM. 1904 . Kapasitas : 6 - 8 Ton 4 - 5 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,0007 . Harga Ban Timmer Ring : Rp. 1,969,500 x 6 = Rp. 11,817,0008 . Harga Pokok : Rp. 300,000,0009 . Nilai Sisa : 10.00% x Rp. 300,000,000 = Rp. 30,000,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp. 30,000,000 = Rp. 270,000,000

B. TAKSIRAN PRODUKSI :1 . Kapasitas : 5.00 m32 . Swelling : 30.00 %3 . Kapasitas Nyata : 5.00 / 1.30 = 3.85 m34 . Jarak Angkut

a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 1000.00 m'

1. Kecepatan Dalam Keadaan Isi :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 60.00 Km / Jam = 1,000.00 m' / Menit

2. Kecepatan Dlm Keadaan Kosong :a. Jalan Raya / Aspal :b. Jalan Tanah / Kerja : 80.00 Km / Jam = 1,333.33 m' / Menit

3. Speed Factor : 0.804. Dump Truck : 0.35 Menit5. Manuver : 0.85 Menit6. Waktu Muat : 5 / 84 x 60 = 3.57 Menit7. Travel Time : 1,000 / 1,000 + 1,000 / 1,333.33 = 0.85 Menit8. Total Circle Time : 0.35 + 0.85 + 3.57+ 1.75 = 6.52 Menit9. Produksi Maksimum Teoritis : (60 / 6.52) x 3.85 = 35.39 m310. Produksi Nyata : 0.80 x 35.39 = 28.32 m3 / Jam

C. BIAYA PERALATAN :

I. BIAYA - BIAYAI.1. BIAYA PEMILIKAN

Penyusutan : Rp. 270,000,000 / 5.00 / 2,000 = Rp. 27,000.00Bunga Bank : 24.00% x Rp. 300,000,000 / 2,000 = Rp. 36,000.00Pajak PPH : 2.50% x Rp. 300,000,000 / 2,000 = Rp. 3,750.00Gudang : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00Asuransi : 0.50% x Rp. 300,000,000 / 2,000 = Rp. 750.00

JUMLAH = Rp. 68,250.00I.2. BIAYA OPERASI

Bahan Bakar (solar) : 1.100 x 15.00 Ltr @ Rp. 5,250 = Rp. 86,625.00Minyak Pelumas : 1.050 x 0.37 Ltr @ Rp. 33,000 = Rp. 12,820.50Minyak Hydroulic : 1.050 x 0.08 Ltr @ Rp. 33,000 = Rp. 2,772.00Gemuk / Grease : 1.100 x 0.02 Kg @ Rp. 13,800 = Rp. 303.60Filter Oli : 0.004 x 1.00 Buah @ Rp. 42,000 = Rp. 168.00Filter Solar : 0.002 x 1.00 Buah @ Rp. 36,000 = Rp. 72.00Filter Udara : 0.001 x 1.00 Buah @ Rp. 120,000 = Rp. 120.00Ban : 1.000 / 2,000.00 Buah @ Rp. 1,969,500 = Rp. 984.75Mekanik : 0.20 Mh @ Rp. 7,500 = Rp. 1,500.00Co. Mekanik : 0.40 Mh @ Rp. 5,625 = Rp. 2,250.00D r i v e r : 1.00 Mh @ Rp. 6,875 = Rp. 6,875.00Co. Driver : 1.00 Mh @ Rp. 5,625 = Rp. 5,625.00Bahan Pelengkap : 1.00 Ls @ Rp. 1,000 = Rp. 1,000.00

JUMLAH = Rp. 121,115.85

I.3. BIAYA PERBAIKAN : 6.00% x Rp. 300,000,000 / 2,000 = Rp. 9,000.00JUMLAH = Rp. 9,000.00

REKAPUTULASI BIAYA :BIAYA PEMILIKAN : …………………………………………………………………………………………………= Rp. 68,250.00BIAYA OPERASI : …………………………………………………………………………………………………= Rp. 121,115.85BIAYA PERBAIKAN : …………………………………………………………………………………………………= Rp. 9,000.00

BIAYA DUMP TRUCK : …………………………………………………………………………………………………= Rp. 198,365.85

HARGA SATUAN PEKERJAANKAPASITAS ANGKUT : 28.32 m3 / JamHARGA ANGKUT TANAH DENGANJARAK 1 KM : Rp. 198,365.85 / 28.32 m3 / Jam = Rp. 7,005.62 / m3

Dibulatkan …………………….. = Rp. 7,006.00 / m3

Page 5: Analisa Dan RAB (BAU.8 - BP.1)

ANALISA PERALATAN VIBRATOR ROLLER( Anl. P. 5. 4 )

A. DATA PERALATAN :1 . Nama Alat : VIBRATOR ROLLER2 . M e r k : Dynopac3 . Type / Model : CA. 254 . Kapasitas : 0.70 m35 . Umur Ekonomis : 5 Tahun6 . Jam Kerja / Tahun : 2,000 Jam7 . Harga Pokok : Rp. 300,000,0008 . Harga Roller : Rp. 35,000,0009 . Nilai Sisa : 10.00% x Rp 265,000,000 = Rp. 26,500,000

10 . Harga Penyusutan : Rp. 300,000,000 - Rp 35,000,000 = Rp. 238,500,000

B. TAKSIRAN PRODUKSI :1 . Produksi Maksimum Teoritis: (W x S x L) / P (1.20 x 1.500 x 0.20) / 4 = 90 m3/jam

2 . Faktor Koreksi :a. Efisiensi Kerja : 0.70b. Kondisi Kerja : 0.70Faktor Koreksi : 0.70 x 0.70 = 0.49 m3/jam

3 . Taksiran Produksi : (90 x 0.49) = 44.10 m3/jam

C. BIAYA PERALATAN :

I. BIAYA LANGSUNGI.1. BIAYA PEMILIKAN

a. Penyusutan : Rp. 238,500,000 / 5 / 2,000 = Rp. 23,850.00 /jam

b. Bunga Bank, Gudang : 20% x (6.00/10.00) x 300,000,000 / 2,000 = Rp. 18,000.00 /jamJUMLAH = Rp. 41,850.00 /jam

I.2. BIAYA OPERASI DAN PERAWATANa. Bahan Bakar (Solar) : ……………………………… 15.00 Ltr @ Rp. 5,250 = Rp. 78,750.00 /jamb. Minyak Pelumas : ……………………………… 0.40 Ltr @ Rp. 33,000 = Rp. 13,200.00 /jamc. Minyak Hydroulic : ……………………………… 0.20 Ltr @ Rp. 33,000 = Rp. 6,600.00 /jamd. Oli Transmisi : ……………………………… 0.15 Ltr @ Rp. 71,250 = Rp. 10,687.50 /jame. Gemuk / Grease : ……………………………… 1.00 Kg @ Rp. 13,800 = Rp. 13,800.00 /jamf. Operator : ………………………………………………………………@ Rp. 8,125 = Rp. 8,125.00 /jamg. Co. Operator dan Mekanik : ………………………………………………………………@ Rp. 7,500 = Rp. 7,500.00 /jam

JUMLAH = Rp. 138,662.50 /jam

I.3. BIAYA PERBAIKAN : 10.00% x (Rp. 300,000,000 - Rp. 35,000,000) / 2,000 = Rp. 13,250.00 /jamJUMLAH = Rp. 13,250.00 /jam

Jumlah Biaya Langsung (1.1 + 1.2 + 1.3) …………………………………= Rp. 193,762.50 /jam

II. BIAYA TIDAK LANGSUNG : 15.00% x Rp. 193,762.50 JUMLAH = Rp. 29,064.38 /jam

JUMLAH ( I + II ) = Rp. 222,826.88 /jam

HARGA SATUAN PEKERJAANRp. 222,826.88 / 44.10 m3/jam = Rp. 5,052.76 / m3

Dibulatkan ………… = Rp. 5,053.00 / m3

Page 6: Analisa Dan RAB (BAU.8 - BP.1)

RENCANA ANGGARAN BIAYA

Kegitan : PERENCANAAN TEKNIS JARINGAN IRIGASI WADUK DAN PENANGGULANGAN BANJIR SALURAN SEKUNDER BAU.8 - BP.1Lokasi : Kecamatan Lhoksukon - Kabupaten Aceh Utara

No Uraian Analisa Stn Kuantitas

I. PEKERJAAN PERSIAPAN

1 Pematokan/cek pengukuran Taksir - Ls 550,000.00 550,000.00

2 Sewa Direksi Keet Taksir - Ls 1,500,000.00 1,500,000.00

3 Pengeringan (Dewatering) Taksir - Ls 3,000,000.00 3,000,000.00

4 Mobilisasi dan Demobilisasi alat Taksir - Ls 4,000,000.00 4,000,000.00

Jumlah 9,050,000.00

II. PEKERJAAN SALURAN

Rehabilitasi Saluran Ruas BAU.8 - BP.1 691.80 m

1. Galian Tanah (Alat Berat) Anl. AB.1 7,056.00 0.00

2. Timbunan Tanah Hasil Galian Anl.A.16 9,250.00 0.00

3. Timbunan Tanah Didatangkan Anl. AB.1b 76,621.50 0.00

4. Beton Bertulang K-175 (linning saluran) Supl. V 1,961,700.40 0.00

Jumlah 0.00

III. PEKERJAAN LAIN-LAIN

1 Administrasi Kontrak Taksir - Ls 1,000,000.00 1,000,000.00

2 Adm. Progress dan Pelaporan Taksir - Ls 700,000.00 700,000.00

3 Adm. Foto Dukumentsi Taksir - Ls 500,000.00 500,000.00

4 P3K Taksir - Ls 500,000.00 500,000.00

5 Pembuatan Papan Nama Proyek Taksir unit 1.00 200,000.00 200,000.00

Jumlah 2,900,000.00

Harga Satuan (Rp)

Harga Pekerjaan (Rp)

m3

m3

m3

m3

Page 7: Analisa Dan RAB (BAU.8 - BP.1)

PEKERJAAN PERENCANAAN TEKNISJARINGAN IRIGASI, WADUK DAN PENANGGULANGAN BANJIR

SALURAN SEKUNDER BAU.8 - BP.1KECAMATAN LHOKSUKON - KABUPATEN ACEH UTARA

R E K A P I T U L A S I

I. PEKERJAAN PERSIAPAN Rp. 9,050,000.00

II. PEKERJAAN SALURAN (L = #REF! meter) Rp. 0.00

III. PEKERJAAN LAIN-LAIN Rp. 2,900,000.00

J u m l a h Rp. 2,900,000.00

Dibulatkan Rp. 6,724,345,000.00

TERBILANG:

Enam Milyar Tujuh Ratus Dua Puluh Empat Juta Tiga Ratus Empat Puluh Lima Ribu Rupiah

Lhokseumawe, Desember 2006CV. TOTAL ENGINEERING

CONSULTANT

(IR. M. NASIR)Wakil Direktur

Menyetujui,Ka.Bid. Program dan Hidrologi

Dinas Sumber Daya Air

(IR. HASANUDDIN)Nip. 390 012 616

Mengetahui,Penanggungjawab Kegiatan

Kepala Dinas Sumber Daya AirKabupaten Aceh Utara

(IR. MAWARDI)Pembina/Nip. 390 012 231

Page 8: Analisa Dan RAB (BAU.8 - BP.1)

DAFTAR ANALISACV. TOTAL ENGINEERING CONSULTANT

Jl. Kenari No 9B Tlp. (0645)-41538 - LHOKSEUMAWE

Anl. A.1 : 1 M3 GALIAN TANAH BIASA

0.7500 Org Pekerja @ Rp 35,000.00 Rp 26,250.00

0.0250 Org Mandor @ Rp 50,000.00 Rp 1,250.00

Jumlah Rp 27,500.00

Anl. A.16 : 1 M3 TIMBUNAN TANAH / DIRATAKAN / DITIMBRIS

0.2500 Org Pekerja @ Rp 35,000.00 Rp 8,750.00 0.0100 Org Mandor @ Rp 50,000.00 Rp 500.00

Jumlah Rp 9,250.00

Anl. AB.1 : 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,056.00 Rp 7,056.00

Jumlah Rp 7,056.00

Anl. AB.1a : 1 M3 GALIAN TANAH MENGGUNAKAN ALAT BERAT DAN MENGANGKUT

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,056.00 Rp 7,056.00 1.0000 unit Dump Truck (Anl. P.5.3) @ Rp 7,006.00 Rp 7,006.00

Jumlah Rp 14,062.00

Anl. AB.1b : 1 M3 TIMBUNAN TANAH DIDATANGKAN (MENGGUNAKAN ALAT BERAT)

1.0000 unit Excavator (Anl. P.5.2) @ Rp 7,006.00 Rp 7,006.00

1.0000 unit Vibrator (Anl. P.5.4) @ Rp 5,053.00 Rp 5,053.00

1.2500 m3 Tanah Timbun @ Rp 51,650.00 Rp 64,562.50

Jumlah Rp 76,621.50

Anl. A.B.1 : 1 M2 PASANGAN RUMPUT

0.1500 Org Pekerja @ Rp 35,000.00 Rp 5,250.00

0.0100 Org Mandor @ Rp 50,000.00 Rp 500.00

1.0000 m2 Lempengan Rumput @ Rp 22,200.00 Rp 22,200.00

Jumlah Rp 27,950.00

Diambil 2/3 x Rp 27,950.00 Rp 18,633.33

Anl. G.41 : 1 m3 BETON COR 1 : 2 : 3