ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG DIBANDINGKAN DENGAN METODE KONVENSIONAL PADA PROYEK THE AYOMA APARTMENT TANGERANG SELATAN ANALYSIS OPTIMAL COST USING KUMKANG FORMWORK COMPARED TO CONVENTIONAL METHODS IN THE AYOMA APARTMENT PROJECT SOUTH TANGERANG Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan Diploma Empat Program Studi Perawatan dan Perbaikan Gedung di Jurusan Teknik Sipil Oleh: DITA YUNIAR LAKSANA GARAS RIZKY PRAMEDIKA NIM: 151144012 NIM: 151144015 POLITEKNIK NEGERI BANDUNG 2019

ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

  • Upload
    others

  • View
    32

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING

KUMKANG DIBANDINGKAN DENGAN METODE

KONVENSIONAL PADA PROYEK THE AYOMA

APARTMENT TANGERANG SELATAN

ANALYSIS OPTIMAL COST USING KUMKANG FORMWORK

COMPARED TO CONVENTIONAL METHODS IN THE AYOMA

APARTMENT PROJECT SOUTH TANGERANG

Laporan ini disusun untuk memenuhi salah satu syarat menyelesaikan pendidikan

Diploma Empat Program Studi Perawatan dan Perbaikan Gedung di Jurusan

Teknik Sipil

Oleh:

DITA YUNIAR LAKSANA GARAS RIZKY PRAMEDIKA

NIM: 151144012 NIM: 151144015

POLITEKNIK NEGERI BANDUNG

2019

 

 

 

 

 

 

 

 

 

 

 

 

Page 2: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

Scanned with CamScanner

 

 

 

 

 

 

 

 

 

 

 

 

Page 3: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

 

 

 

 

 

 

 

 

 

 

 

 

Page 4: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

 

 

 

 

 

 

 

 

 

 

 

 

Page 5: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

iv

LEMBAR PERSEMBAHAN

Alhamdulillah saya ucapkan kepada Allah SWT, akhirnya saya dan dita bisa

menyelesaikan Tugas Akhir ini. Tentunya ini tidak lepas dari bantuan orang

disekitar kami yang membuat kami pantang menyerah sampai titik darah

penghabisan. Pada kesempatan ini saya mengucapkan terima kasih sebesar-

besarnya kepada:

1. Pembimbing kami bapak Mei Sutrisno, Ir,.MSc.,Ph.D. yang senantiasa

membimbing, memberikan arahan serta menjadi tauladan dan menjadi

motivasi saya, dan Wali dosen bu Ruth Esther Ambat sebagai wali dosen

terbaik sepanjang saya mengenal dosen di polban.

2. Orang tua saya Pa Budi Suprianto, Bu Nur indriyani, Nenek Tuti Maryati,

Tante Susi, Tante Yayu, Tante Wiji, Om Boy, Tante Dona, Pakde

Syafrudin Bob, yang selalu memberi motivasi agar saya bisa selalu

menjadi orang yang berguna dan bisa lulus tepat waktu sehingga tidak

menyusahkan mereka, dan terutama Kedai 88 serta rumah tante Yayu yang

selama kurang lebih 4 tahun saya tinggal di rumah nya.

3. Pacar jarak jauh Eliesha Dilla Fricilia yang mungkin ingin cepat di

halalkan insyaallah, terimakasih atas segala semangat dan hinaan sehingga

menjadikan motivasi yang lebih agar bisa bertahan kuliah di polban.

4. Partner terbaik Dita Yuniar Laksana yang tidak disangka mau berpartner

dengan saya, terimakasih ya semoga kamu sukses.

5. Teman teman kelas PGTV, adik kelas PG 2017,2016,2018 dan Himas,

yang selalu bisa di andalkan sebagai kawan.

6. Bapak Sandiaga Salahudin Uno, yang telah menjadikan saya dikenal di

polban, saya bangga pernah berada di barisan pendukung bapak saat

pilpres tahun 2019,dan menjadi semangat saat saya mengerjakan laporan.

7. Bapak Abdhy Ghazali. ST ,bu Ester, pak Tony selaku pembimbing

lapangan.

8. Brader jhonny cs Sma yang selalu menjadi tempat diskusi dan bertukar

pikiran Aswin, Chandra, Bimo, Cikko, Imam, Dirja.

9. Dan seluruhnya yang tidak bisa disebut satu per satu nya saya mohon maaf

 

 

 

 

 

 

 

 

 

 

 

 

Page 6: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

v

LEMBAR PERSEMBAHAN

Alhamdulillahirabbil ‘alamin puji syujur saya panjatkan kepada Allah SWT

karena atas karunia-Nya saya dan garas dapat menyelesaikan Tugas Akhir ini

tepat waktu. Saya mengucapkan terimakasih yang sebesar sebarnya kepada:

1. Orang tua saya Bapak Agus Budi Laksana dan Ibu Yeti Multiati atas

semua dukungan, arahan, cinta dan kasih sayang yang telah diberikan

kepada saya.

2. Adik saya Deva Desfira Laksana yang selalu menjadi pelipur hati, teman

berantem, dan temen ketawa saya.

3. Bubu, Bu Tuti, Wawa, Omdi,dan Ateu atas semua dukungan baik secara

moril maupun secara materil. Atas doa doa yang tulus buat saya, dan telah

menjadi orangtua kedua buat saya.

4. Pembimbing saya bapak Mei Sutrisno, Ir,.MSc.,Ph.D. yang senantiasa

membimbing, memberikan arahan serta menjadi tauladan bagi saya.

5. Wali dosen Ibu Ruth Esther Ambat atas segala motivasi, dorongan, serta

ilmu yang telah diberikan kepada saya. Ibu merupakan dosen yang paling

baik hati, dan sayang sama seluruh anak kelas TPPG 15.

6. Partner hidup yang sekarang masih jadi pacar, Nurhalim Wildan Nugraha

atas semua perhatian, semangat, motivasi, doa, cinta dan kasih sayang

yang tulus diberikan kepada saya.

7. Partner PKL, SK, dan TA Garas Rizky Pramedika yang selalu membackup

semua kekurangan saya dalam menyelesaikan semua tugas ini sampai

selesai, jadi partner yang sabar, dan jadi teman yang baik.

8. Aulia Listya Agarthy, Danya Cahaya Ramadhani,dan Annisa Mutiara

Pratiwi yang telah jadi sahabat saya, memberi saya banyak kegembiraan di

kampus dan jadi warna warni hari hari saya. “Aku sayang kalian geng”.

9. Teman teman TPPG 2015 atas semua semangat, bantuan, motivasi, dan

canda tawa yang kalian berikan pada saya. Serta SIPIL 2015 telah menjadi

temen yang baik untuk saya.

10. Bapak Abdhy Ghazali, Ibu Esther,Pak Tony selaku pembimbing lapangan.

11. Dan seluruhnya yang tidak bisa disebut satu per satu saya mohon maaf.

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

vi

ABSTRAK

Bekisting kumkang aluminium merupakan metode yang baru diterapkan di

Indonesia, yang salah satu kelebihannya adalah waktu siklus penggunaannya

dapat mencapai 150 kali. Kekurangan bekisting kumkang yaitu harganya yang

relatif lebih mahal untuk investasi awalnya bila dibandingkan dengan metode

konvensional. Untuk itu diperlukan analisa biaya penggunaan bekisting kumkang

yang optimal dibandingkan dengan bekisting konvensional. Pada tugas akhir ini

disusun rencana estimasi biaya untuk bekisting kumkang serta konvensional,

untuk beberapa proyek sehingga didapatkan break even point bekisting kumkang

terhadap bekisting konvensional.

Penyusunan tugas akhir ini dimulai dengan melakukan survei dan

observasi. Data yang diperoleh diantaranya adalah shop drawing Proyek The

Ayoma Apartment, daftar harga satuan 2018, proses pelaksanaan, zona

pengecoran, serta harga sewa gudang untuk bekisting kumkang. Analisa yang

dilakukan mencakup biaya material bekisting , biaya tenaga kerja, biaya gudang,

nilai depresiasi serta nilai sisa.

Hasil dari kajian ini menghasilkan pengeluaran investasi awal bekisting

kumkang sebesar Rp 3.691.273.688. Biaya bekisting kumkang untuk proyek

proyek berikutnya akan berkurang karena hanya memerlukan biaya pekerja dan

gudang saja berbeda dengan bekisting konvensional yang mana di proyek proyek

selanjurnya biayanya relatif sama. Untuk setiap proyek bekisting konvensional

memerlukan biaya sebesar Rp 1.509.480.352. Hasil perbandingan penggunaan

bekisting kumkang maupun konvensional untuk beberapa kali proyek menunjukan

bahwa break even point biaya penggunaan bekisting kumkang dibandingkan

dengan biaya bekisting konvensional yaitu adalah lima kali proyek. Setelah lima

kali proyek penggunaan bekisting kumkang akan lebih murah daripada

menggunakan bekisting konvensional yang bila dihitung nilai sisa kelebihannya

sebesar Rp 451.177.700.

Kata kunci : Bekisting kumkang, bekisting konvensional, biaya, break event point,

optimalisasi

 

 

 

 

 

 

 

 

 

 

 

 

Page 8: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

vii

ABSTRACT

The Kumkang Aluminum Formwork is a new method applied in Indonesia,

which has advantages formwork its cycle time can reach 150 times used. Its

disadvantages, namely due to the investation is relatively more expensive than

conventional methods. The analysis of the optimal cost of the formwork kumkang

is carried out to compare with the conventional formwork. This final project

estimate the project cost of Kumkang formwork as well as the conventional

method for the utilitation in some project to find out the break even point of the

kumkang formwork.

The final project is started by doing survey, observation, and collacting

data.Data needed including the shop drawing of The Ayoma Apartment Project,

price list at 2018, casting zone, and warehouse rental prices for Kumkang

formwork. The cost analysis includes formwork material, labor, warehouse and

depreciation as well as residual values.

The result of study shows the investment price for the Kumkang formwork

is IDR 3.691.273.688. The cost of next projects will decrease because it only

requires labor and warehouse costs. While the cost of conventional formworks for

each project is relatively the same, namely up to Rp 1.509.480.352. Break even

point the kumkang formwork compared to the cost of conventional formwork is in

five times. The next projects of the Kumkang formwork project will be cheaper

than using conventional formwork of IDR 451.177.700 calculated from the

residual value.

Keywords: Kumkang formwork, conventional method, cost, break even point,

optimization

 

 

 

 

 

 

 

 

 

 

 

 

Page 9: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

viii

KATA PENGANTAR

Puji syukur penulis panjatkan ke hadirat Tuhan Yang Maha Esa. Yang

telah melimpahkan rahmat dan karunia-Nya memberi penulis kesempatan dalam

menyelesaikan Tugas Akhir dengan judul “ANALISA BIAYA OPTIMAL

PENGGUNAAN BEKISTING KUMKANG DIBANDINGKAN DENGAN

METODE KONVENSIONAL PADA PROYEK THE AYOMA

APARTMENT TANGERANG SELATAN”

Penyusunan tugas akhir ini dapat diselesaikan tidak lepas dari bimbingan,

arahan, dan dukungan dari berbagai pihak. Oleh karena itu, dalam kesempatan

kali ini, penulis mengucapkan terima kasih dan penghargaan kepada semua pihak

yang terkait dalam penyusunan tugas akhir ini, yaitu kepada:

1. Orang tua dan keluarga yang selalu memotivasi penulis dari mulai

pelaksanaan tugas akhir hingga selesai.

2. Bapak Hendry, Dipl.Ing., HTL., MT selaku Ketua Jurusan Teknik Sipil

Politeknik Negeri Bandung.

3. Ibu Ery Radya Juarti, ST, MT. selaku Ketua Program Studi Teknik

Perawatan dan Perbaikan Gedung.

4. Bapak Mei Sutrisno, Ir, M.Sc. Ph.D. selaku Pembimbing Tugas Akhir

kami.

5. Bapak Udi Raharjo, Drs, MST dan Bapak Muchtar, SST, MT. selaku

dosen penguji tugas akhir atas saran, arahan, dan masukannya.

6. PT. PP Tbk., pada proyek The Ayoma Apartment khususnya kepada Bapak

Abdhy selaku pembimbing lapangan dan rekan-rekan lainnya yang

berkenan membantu penulis dalam memberikan data dan arahan.

7. Rekan-rekan kelas D4-Teknik Perawatan dan Perbaikan Gedung angkatan

2015 atas dukungan dan motivasinya.

 

 

 

 

 

 

 

 

 

 

 

 

Page 10: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

ix

8. Pihak-pihak lain yang telah banyak membantu, yang tidak dapat penulis

sebutkan satu persatu, atas segala kebaikan dan bantuannya selama ini.

Akhir kata penulis berharap agar tugas akhir ini dapat bermanfaat bagi

pembaca maupun penulis sendiri. Penulis mengharapkan kritik dan saran demi

perbaikan dimasa yang akan datang. Atas segala perhatiannya, penulis

mengucapkan terima kasih.

Bandung, Juli 2019

 

 

 

 

 

 

 

 

 

 

 

 

Page 11: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

x

DAFTAR ISI

LEMBAR HALAMAN IDENTITAS .................................................................... i

LEMBAR PENGESAHAN ................................................................................... ii

LEMBAR PERNYATAAN .................................................................................. iii

LEMBAR PERSEMBAHAN ............................................................................... iv

ABSTRAK ............................................................................................................ vi

ABSTRACT ............................................................................................................ vii

KATA PENGANTAR ......................................................................................... viii

DAFTAR ISI .......................................................................................................... x

DAFTAR LAMPIRAN ........................................................................................ xiii

DAFTAR GAMBAR ........................................................................................... xiv

DAFTAR TABEL ................................................................................................. xv

DAFTAR ISTILAH ............................................................................................ xvii

BAB I PENDAHULUAN ..................................................................................... 1

1.1 Latar Belakang ................................................................................................. 1

1.2 Tujuan .............................................................................................................. 3

1.3 Ruang Lingkup ................................................................................................. 3

I.4 Sistematika Penulisan ...................................................................................... 4

BAB II TINJAUAN PUSTAKA ........................................................................... 5

2.1 Bekisting/Formwork ........................................................................................ 5

2.1.1 Bekisting Tradisional (Sederhana) ............................................................. 5

2.1.2 Bekisting Setengah Sistem (Semi Sistem) ................................................. 6

2.1.3 Bekisting Sistem ........................................................................................ 6

2.2 Bekisting Konvensional ................................................................................... 6

2.2.1 Material Penyusun ..................................................................................... 7

 

 

 

 

 

 

 

 

 

 

 

 

Page 12: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xi

2.2.2 Material Penopang (Perancah) dan Pemikul .............................................. 8

2.3 Bekisting Kumkang Alumunium ..................................................................... 9

2.3.1 Kelebihan Bekisting Kumkang .................................................................. 9

2.3.2 Kekurangan Bekisting Kumkang .............................................................. 10

2.3.3 Peralatan dan Material Pekerjaan Bekisting Metode Alform ................... 10

2.4 Siklus Pekerjaan Bekisting.............................................................................. 14

2.4.1 Pemilihan Metode Bekisting ..................................................................... 15

2.4.2 Fabrikasi Bekisting ................................................................................... 15

2.4.3 Pemasangan Bekisting dan Pengecoran .................................................... 16

2.4.4. Penambahan Perkuatan Bekisting ............................................................ 17

2.4.4.1 Reshoring ..................................................................................... 17

2.4.5 Perbaikan dan Penggunaan Kembali Bekisting ........................................ 17

2.5 Siklus Konstruksi Tipikal ............................................................................... 18

2.6 Depresiasi ........................................................................................................ 20

2.7 Produktivitas ................................................................................................... 20

2.7.1 Faktor Produktivitas .................................................................................. 20

2.7.2 Pengukuran Produktivitas Tenaga Kerja .................................................. 21

2.7.3 Produktivitas Tenaga Kerja Bekisting Konvensional ............................... 22

2.8 Analisa Harga Satuan ...................................................................................... 22

2.9 Jenis Rencana Anggaran Biaya ....................................................................... 23

2.10 Inflasi ............................................................................................................ 26

BAB III METODOLOGI ...................................................................................... 27

3.1 Pengertian Metode Penelitian ......................................................................... 27

3.2 Pengumpulan Data .......................................................................................... 27

3.2.1 Data Primer ............................................................................................ 27

3.2.2 Data Sekunder ........................................................................................ 28

 

 

 

 

 

 

 

 

 

 

 

 

Page 13: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xii

BAB IV PEMBAHASAN DAN PERHITUNGAN ............................................. 31

4.1 Data Umum Proyek ......................................................................................... 31

4.2 Data Teknis ..................................................................................................... 32

4.3 Bekisting Kumkang ........................................................................................ 37

4.3.1 Analisa Kebutuhan Material Bekisting Kumkang ................................. 37

4.3.2 Daftar Harga Satuan Pekerjaan Bekisting Kumkang ............................. 60

4.3.3 Biaya Material Bekisting Kumkang ....................................................... 61

4.3.4 Analisa Produktifitas Tenaga Kerja Bekisting Kumkang ...................... 90

4.3.5 Biaya Tenaga Kerja Pekerjaan Bekisting Kumkang .............................. 92

4.3.5.1 Harga Satuan Tenaga Kerja Pekerjaan Bekisting Kumkang ..... 92

4.3.5.2 RAB Tenaga Kerja Pekerjaan Bekisting Kumkang ................... 93

4.3.6 Biaya Gudang Bekisting Kumkang ....................................................... 94

4.3.7 Biaya Total Bekisting Kumkang ............................................................ 94

4.4 Bekisting Konvensional .................................................................................. 95

4.4.1 Analisa Kebutuhan Material Bekisting Konvensional ........................... 95

4.4.2 Daftar Harga Satuan Bekisting Konvensional ...................................... 100

4.4.3 Analisa Harga Satuan Pekerjaan Bekisting Konvensional ................... 100

4.4.4 Rencana Anggaran Biaya ...................................................................... 103

4.4.5 Biaya Total Bekisting Konvensional .................................................... 106

4.5 Perbandingan Biaya ....................................................................................... 106

BAB V PENUTUP ............................................................................................. 109

5.1 Kesimpulan .................................................................................................... 109

5.2 Saran .............................................................................................................. 110

DAFTAR PUSTAKA .......................................................................................... xix

DAFTAR RIWAYAT HIDUP.............................................................................. xx

 

 

 

 

 

 

 

 

 

 

 

 

Page 14: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xiii

DAFTAR LAMPIRAN

Lampiran 1 Administrasi

Lampiran 2 Perhitungan Panel Kolom

Lampiran 3 Urutan Pekerjaan Bekisting

Lampiran 4 Denah Bangunan

Lampiran 5 Detail Tipe Bekisting Kolom, Balok, Pelat Lantai

 

 

 

 

 

 

 

 

 

 

 

 

Page 15: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xiv

DAFTAR GAMBAR

Gambar 1.1 Proyek The Ayoma Apartment ........................................................... 2

Gambar 2.1 Integrasi Siklus Pekerjaan Bekisting dengan Pekerjaan ................... 14

Gambar 2.2 Proses fabrikasi kumkang aluminium formwork .............................. 16

Gambar 2.3 Shoring/reshoring of concerete multistory building ......................... 19

Gambar 2.4 Struktur Analisa Harga Satuan Pekerjaan ......................................... 23

Gambar 3.1 Flowchart pengerjaan tugas akhir ..................................................... 30

Gambar 4.1 Peta Lokasi The Ayoma Apartment .................................................. 31

Gambar 4.2 Kolom tipe 1 ..................................................................................... 38

Gambar 4.3 Kolom tipe 2 ...................................................................................... 38

Gambar 4.4 Kolom tipe 3 ...................................................................................... 39

Gambar 4.5 Kolom tipe 4 ...................................................................................... 39

Gambar 4.6 Kolom tipe 5 ...................................................................................... 40

Gambar 4.7 Bekisting kolom tampak depan ......................................................... 40

Gambar 4.8 Bekisting balok tampak dan potongan .............................................. 45

Gambar 4.9 Contoh tipe komponen balok ........................................................ 46

Gambar 4.10 Contoh tipe 1 komponen Pelat ........................................................ 52

Gambar 4.11 Contoh tipe 2 komponen pelat ........................................................ 52

Gambar 4.12 Detail Komponen pelat ................................................................... 53

Gambar 4.13 Pembagian Zona .............................................................................. 90

Gambar 4.14 Tampak depan bekisting konvensional untuk kolom ...................... 95

Gambar 4.15 Bekisting konvensional untuk balok ............................................... 96

Gambar 4.16 Bekisting konvensional untuk pelat ................................................ 98

Gambar 4.17 Grafik perbandingan biaya bekisting ............................................ 107

 

 

 

 

 

 

 

 

 

 

 

 

Page 16: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xv

DAFTAR TABEL

Tabel 2.1 Klasifikasi Kayu di Indonesia (PKKI, 1961) ......................................... 8

Tabel 2.2 Peralatan dan Bahan Pekerjaan Acuan dan Perancah Kumkang ......... 10

Tabel 4.1 Elevasi Tiap Lantai The Ayoma Apartement ....................................... 31

Tabel 4.2 Fungsi Bangunan Tiap Lantai ............................................................... 34

Tabel 4.3 Dimensi balok ....................................................................................... 35

Tabel 4.4 Tebal Selimut Beton ............................................................................. 37

Tabel 4.5 Tipe kolom tiap lantai ........................................................................... 38

Tabel 4.6 Material Bekisting Kumkang untuk Kolom .......................................... 41

Tabel 4.7 Jumlah material bekisting kumkang untuk kolom ................................ 43

Tabel 4.8 Material Bekisting Kumkang untuk Balok ........................................... 47

Tabel 4.9 Jumlah material bekisting kumkang untuk balok ................................. 49

Tabel 4.10 Material Bekisting Kumkang untuk Pelat .......................................... 54

Tabel 4.11 Jumlah material bekisting kumkang untuk pelat ................................ 56

Tabel 4.12 Daftar harga satuan bahan bekisting kumkang ................................... 60

Tabel 4.13 Daftar harga satuan pekerja bekisting kumkang ................................. 61

Tabel 4.14 Harga Bekisting Kumkang untuk kolom ............................................ 63

Tabel 4.15 Harga Bekisting Kumkang untuk balok .............................................. 69

Tabel 4.16 Harga bekisting Kumkang untuk pelat ............................................... 78

Tabel 4.17 Schedule pekerjaan bekisting kumkang .............................................. 90

Tabel 4.18 Volume bekisting ................................................................................ 91

Tabel 4.19 Jumlah tenaga kerja............................................................................. 91

Tabel 4.20 Harga satuan tenaga kerja bekisting kumkang.................................... 92

Tabel 4.21 Biaya tenaga kerja bekisting kumkang ............................................... 93

Tabel 4.22 Sewa Gudang ...................................................................................... 94

Tabel 4.23 Biaya total bekisting kumkang............................................................ 94

Tabel 4.24 Volume bekisting konvensional untuk kolom .................................... 96

Tabel 4.25 Volume bekisting konvensional untuk balok ...................................... 97

Tabel 4.26 Volume bekisting konvensional untuk pelat ....................................... 99

Tabel 4.27 Daftar harga satuan bekisting konvensional ..................................... 100

Tabel 4.28 AHS pekerjaan bekisting konvensional ............................................ 101

Tabel 4.29 RAB kolom ....................................................................................... 104

 

 

 

 

 

 

 

 

 

 

 

 

Page 17: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xvi

Tabel 4.30 RAB balok ........................................................................................ 105

Tabel 4.31 RAB pelat ......................................................................................... 106

Tabel 4.32 Biaya total bekisting konvensional ................................................... 106

Tabel 4.33 Perbandingan biaya bekisting konvensional dan kumkang .............. 106

Tabel 4.34 Nilai depresiasi dan nilai sisa satu kali proyek ................................. 108

Tabel 4.35 Nilai sisa bekisting kumkang ............................................................ 108

 

 

 

 

 

 

 

 

 

 

 

 

Page 18: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xvii

DAFTAR ISTILAH

Fabrikasi : Suatu rangkaian pekerjaan dari beberapa komponen material baik

berupa plat, pipa ataupun baja profil dirangkai dan dibentuk setahap

demi setahap berdasarkan item-item tertentu sampai menjadi suatu

bentuk yang dapat dipasang menjadi sebuah rangkaian alat produksi

maupun konstruksi.

Bekisting : Cetakan sementara yang digunakan untuk menahan beton selama

beton dituang dan dibentuk sesuai dengan bentuk yang diinginkan.

Dikarenakan berfungsi sebagai cetakan sementara, bekisting akan

dilepas atau dibongkar apabila beton yang dituang telah mencapai

kekuatan yang cukup.

Monolitik : Pengecoran kolom,corewall/shearwall, fasad serta balok, pelat lantai,

dan tangga yang dilakukan secara bersamaan agar menjadi satu

kesatuan struktur.

Reshoring : Proses penyediaan temporary penyangga vertikal untuk penambahan

elemen struktur yang belum mencapai kekuatan penuh

rancangannya.

Kumkang : Merupakan nama jadi jenis bekisting aluminium yang di produksi

oleh PT KUMKANG KIND Korea Selatan. Memiliki kelebihan

yaitu ramah lingkungan serta penggunaanya yang dapat mencapai

150 kali.

Siklus : Putaran waktu yang di dalamnya terdapat daur/rangkaian kejadian

yang berulang-ulang secara tetap dan teratur. (sumber Kbbi)

Depresiasi : Alokasi harga perolehan aktiva tetap berwujud yang di bebankan

pada suatu periode tertentu, pembebanan biaya penyusutan ini

biasanya dilakukan pada akhir periode.

 

 

 

 

 

 

 

 

 

 

 

 

Page 19: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xviii

Optimalisai : Berasal dari kata dasar optimal yang berarti terbaik sehingga

optimalisasi adalah suatu tindakan, proses, atau metodologi untuk

membuat sesuatu (sebagai sebuah desain, sistem) menjadi

lebih/sepenuhnya sempurna, fungsional, atau lebih efektif

Nilai Investasi : Istilah tersebut berkaitan dengan akumulasi suatu bentuk aktiva

dengan suatu harapan mendapatkan keuntungan pada masa depan

Nilai Sisa : nilai sisa suatu barang yang sudah habis umur ekonomisnya dalam

akuntansi nilai tersebut diperhitungkan sebagai pengurang biaya

overhead

 

 

 

 

 

 

 

 

 

 

 

 

Page 20: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xix

DAFTAR PUSTAKA

AS 3610. 1995. Formwork for Concrete. SAI Global.

Badan Standarisasi Nasional. 2013. Persyaratan Beton Struktural untuk bangunan

gedung. SNI 2847-2013. Jakarta

Brosur KUMKANG. 2018, Kumkang Alumunium Formwork, Korea.

Husein, Abrar. 2011, Manajemen Proyek, Yogyakarta : Andi Offset.

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat No 28/PRT/M . 2016,

Analisa Harga Satuan Pekerjaan (AHSP) Bidang Umum, JDIH

Kementrian PUPR.

Rodney D. Adama dkk. Guide for Shoring/Reshoring of Concrete Multistory

Buildings, ACI 347.2R-05.

Rodney D. Adama dkk. Guide to formwork for concrete ACI 347R-14.

Ruslan, Ujang. 2011, Tesis Analisa Bekisting Terhadap Waktu Siklus Pengecoran

Lantai Pada Gedung Bertingkat, Semarang : Program Pascasarjana

Magister Teknik Sipil Universitas Diponegoro.

Soeharto, Iman. 1997. Manajemen Proyek, Yogyakarta: BPFE.

Tim, Ayoma. 2018. Alform Effect. Tanggerang: The Ayoma Apartment.

 

 

 

 

 

 

 

 

 

 

 

 

Page 21: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xx

DAFTAR RIWAYAT HIDUP

DATA PRIBADI

Nama Lengkap : Dita Yuniar Laksana

Nama Panggilan : Dita

Tempat, Tanggal & Lahir : Bandung, 25 Juni 1997

Alamat : Jalan Babakan Tarogong

Gang Sindang Asuh 2 no

92a, RT 06 RW 04 Kel.

Suka Asih Kec. Bojongloa

Kaler, Kota Bandung

No. Telepon/HP : 085624987438

E-mail : [email protected]

Moto : Keep Moving Forward

Hobi : Makeup

PENDIDIKAN FORMAL

No. Sekolah Tahun

1 SD Negeri Babakan Tarogong 5 Bandung 2003-2009

2 SMP Negeri 3 Bandung 2009-2012

3 SMA Negeri 4 Bandung 2012-2015

4 Politeknik Negeri Bandung 2015-2019

PENGALAMAN ORGANISASI

No. Organisasi Jabatan Tahun

1 Komili Pemilihan PEMIRA Anggota 2015

2 Bandan Eksekutif Mahasiswa Anggota Departemen PSDM 2015-2016

3 Basic Training Organization Ketua Angkatan 2015-2016

4 Himpunan Mahasiswa Jurusan

Teknik Sipil POLBAN

Anggota Departemen Dalam

Himpunan

2015-2018

PENGALAMAN MENGIKUTI KURSUS/ PELATIHAN/ SEMINAR

No. Kursus / Pelatihan / Seminar Institusi Tahun

1 Pelatihan Bela Negara PUSDIKHUB Cimahi 2015

2 ESQ Leadership Training Butterfly 2015

Pas foto berwarna

4x6

 

 

 

 

 

 

 

 

 

 

 

 

Page 22: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xxi

3 Pelatihan PPKK POLBAN Politeknik Negeri Bandung 2015

4 Training Motivasi POLBAN Politeknik Negeri Bandung 2015

5 English Course LBPP LIA 2015

6 Pelatihan SIBIMA PUPR 2019

INFORMASI TAMBAHAN

Keterampilan:

1. Tekla Structure Foundation (BIM)

2. SKA Muda Ahli Teknik Bangunan Gedung

3. SKA Muda Ahli Manajemen Konstruksi

Bahasa:

1. TOEIC Score 535 Tahun 2019

2. English Proficiency Test (EPT) Score 457 Tahun 2019

Dengan ini saya menyatakan bahwa semua informasi yang ada dalam Daftar Riwayat Hidup ini adalah benar dan akurat sesuai dengan keadaan yang sebenarnya.

Hormat saya,

Dita Yuniar Lasksana

 

 

 

 

 

 

 

 

 

 

 

 

Page 23: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xxii

DAFTAR RIWAYAT HIDUP

DATA PRIBADI

Nama Lengkap : Garas Rizky Pramedika

Nama Panggilan : Garas

Tempat, Tanggal & Lahir : Sukabumi, 14 Mei 1997

Alamat : Jl. Cicadas No.37 RT 001

RW 001 Kota Sukabumi

No. Telepon/HP : 085720692011

E-mail : [email protected]

Jenis Kelamin : Laki-laki

Agama : Islam

PENDIDIKAN FORMAL

No. Sekolah Tahun

1 SDN Kebonjati Kota sukabumi 2003-2009

2 SMPN 3 Kota Sukabumi 2009-2012

3 SMAN 1 Kota Sukabumi 2012-2015

4 D4 Perawatan dan Perbaikan Gedung (jurusan

Teknik Sipil) Politeknik Negeri Bandung

2015-2019

PENGALAMAN ORGANISASI

No. Organisasi Jabatan Tahun

1 Teater Epigonen SMANSA Ketua 2 2012-2014

2 Koordinator Supporter Himas Koordinator 2016-2018

3 Himpunan Mahasiswa Jurusan

Teknik Sipil POLBAN

Anggota Departemen

Dalam Himpunan

2015-2019

PENGALAMAN MENGIKUTI KURSUS/ PELATIHAN/ SEMINAR

No. Kursus / Pelatihan / Seminar Institusi Tahun

1 Pelatihan Bela Negara PUSDIKHUB Cimahi 2015

2 ESQ Leadership Training Butterfly 2015

3 Pelatihan PPKK POLBAN Politeknik Negeri Bandung 2015

4 Training Motivasi POLBAN Politeknik Negeri Bandung 2015

5 Occupational and Safety K3 Qscert 2018

Pas foto berwarna

4x6

 

 

 

 

 

 

 

 

 

 

 

 

Page 24: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

xxiii

ISO 45001

6 Pelatihan SIBIMA PUPR 2019

INFORMASI TAMBAHAN

Keterampilan:

1. Tekla Structure Foundation (BIM)

2. SKA Muda Ahli Teknik Bangunan Gedung

Bahasa:

1. TOEIC Score 420 Tahun 2019

2. English Proficiency Test (EPT) Score 423 Tahun 2019

Dengan ini saya menyatakan bahwa semua informasi yang ada dalam Daftar Riwayat Hidup ini adalah benar dan akurat sesuai dengan keadaan yang sebenarnya.

Hormat saya,

Garas Rizky Pramedika

 

 

 

 

 

 

 

 

 

 

 

 

Page 25: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

 

 

 

 

 

 

 

 

 

 

 

 

Page 26: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG

 

 

 

 

 

 

 

 

 

 

 

 

Page 27: ANALISA BIAYA OPTIMAL PENGGUNAAN BEKISTING KUMKANG