17
ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir Sebagai salah satu syarat untuk memperoleh gelar Sarjana dari Universitas Atma Jaya Yogyakarta Oleh : AJENG AYU ANINDYA NPM : 12 02 14196 PROGRAM STUDI TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS ATMA JAYA YOGYAKARTA YOGYAKARTA 2016

ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

  • Upload
    vunga

  • View
    289

  • Download
    10

Embed Size (px)

Citation preview

Page 1: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC

PADA PROYEK BANGUNAN GEDUNG

Laporan Tugas Akhir Sebagai salah satu syarat untuk memperoleh gelar Sarjana dari

Universitas Atma Jaya Yogyakarta

Oleh :

AJENG AYU ANINDYA

NPM : 12 02 14196

PROGRAM STUDI TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS ATMA JAYA YOGYAKARTA

YOGYAKARTA

2016

Page 2: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir
Page 3: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir
Page 4: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir
Page 5: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

“We keep moving forward, opening new doors and doing new things, because we are curious, and curiousity keeps

leading down new paths.” –Walt Disney

Tugas Akhir ini aku persembahan untuk

Bapak, Ibu, adik Bimo,

Dan Teman-teman tersayang.

Page 6: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

KATA PENGANTAR

Puji syukur kehadirat Tuhan Yang Maha Esa atas limpahan berkat, rahmat

dan karunia-Nya sehingga penulis dapat menyelesaikan Tugas Akhir dengan judul

“Analisis Perbandingan Biaya dan Waktu Penggunaan Bekisting Plywood

Berlapis Polyfilm dan Bekisting PVC pada Proyek Pembangunan Gedung”.

Terkadang, terasa berat menyelesaikan ini, namun semuanya bisa terselesaikan

perlahan atas hikmat-Nya.

Tugas Akhir ini disusun untuk memenuhi persyaratan dalam

menyelesaikan jenjang pendidikan tinggi Program Strata-1 Program Studi Teknik

Sipil, Fakultas Teknik, Universitas Atma Jaya Yogyakarta.

Penyusun menyadari tanpa bimbingan dan petunjuk dari berbagai pihak,

penyusun akan mengalami kesulitan. Oleh karena itu pada kesempatan ini

penyusun ingin menyampaikan ucapan terima kasih kepada pihak-pihak yang

telah membantu dalam penyusunan laporan Tugas Akhir ini, antara lain kepada :

1. Bapak Prof. Ir. Yoyong Arfiadi, M.Eng., Ph.D., selaku Dekan Fakultas

Teknik Universitas Atma Jaya Yogyakarta.

2. Bapak J.Januar Sudjati, S.T., M.T., selaku Ketua Program Studi Teknik Sipil

Universitas Atma Jaya Yogyakarta

3. Bapak Ferianto Raharjo. S.T., M.T., selaku Dosen Pembimbing dan Kepala

Laboratorium Manajemen Rekayasa Konstruksi Universitas Atma Jaya

Yogyakarta yang dengan sabar memberi bimbingan dalam menyelesaikan

Tugas Akhir ini.

Puji syukur kehadirararattt TTuTuhan Yang Mahahhaaa EsEE a atas limpahan berkat, rahmat

dan karunia-Nya sesesehhhingga penulis dapat menyelesaikan TTTugugugas Akhir dengan judul

“Analisis PePePerbandingan Biayaaa dddananan WWWakakaktutut PPPenee ggunaan BeBeekikk sting Plywood

Berlapapapiiis Polyyfififilm dadadan nn BeBeBekisting PVC pada PProrr yeyeyek kk Pembmm angunaan nn Gedung”.

TeTeTerkadang,g,g, terererasa a beeerararatt t menyelesaikaan ini, namun sssememe uanya a a bibibisaasa terselelelesaikan

perlahahahananan aattat s hihihikkmkmat-NNyaya.

Tuggagas Akhir innii disusunn untuk mememenuhi perrsysysyaratatatananan dddalammm

mememennnyeleesesaiikakan n jej njang penddididikikan tinngggi Progograram Strata-1 Prorogrgrammm Studididi TTTeknik

Sipil, FFFakultas Teknknikik, UnU iversiitat ss Attmma JJayayaa Yogyyakakarartata.

Penyusun menyadariri ttannpapa bimbingngan ddan petunjuk dari berbbbagai pipipihakkk,

penyyyusususunuu akkan memengngngalalalamamamiii kekekesulitan. Oleh h h kakakarererenanana iitutu p dada keseseemmmpatan iininini

pepp nyusun ingin menyampaikan ucuccapapapanann tterima kasih kepada pihak-pihak yyyananangg

tetetelaahhh memm mbantu dalam penyusunan laporan Tugas Akhir ini, antara lainnn kkkepeppaadadaa a :

1.1.1 BaBB pak kk PPr ffof. IrIrIr. YoYoYoyong AAArfrfrfiaiaiadididi,,, M.M.M.EEEng., PhPhPh.D.D.D., s lell kkaku Dekan n n FaFaFakkkultas

TeTeTeknkk kik Uniniiveveverrrsitas Atma Jayayaa Yogyakakakarta.

2. Bapak J.Januar Sudjati, S.T.., M.T., selaaaku Ketua Program Studi Teknik Sipil

Universitas Atma Jaya Yogyakaa arta

3. Bapak Ferianto Raharjo. S.T., M.T..,, selaku Dosen Pembimbing dan Kepala

Laboratorium Manajemen Rekayayayasa Konstruksi Universitas Atma Jaya

vi

Page 7: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

4. Para Dosen di Program Studi Teknik Sipil Universitas Atma Jaya Yogyakarta

yang telah bersedia mendidik dan membagikan ilmu kepada penulis.

5. Keluarga tercinta, terutama kedua orang tua dan adik Bimo yang selalu

memberikan doa, perhatian dan semangat kepada penulis.

6. Sahabat-sahabat yang telah membantu serta memberi dukungan dan semangat

dalam proses penyelesaan Tugas Akhir ini : Santo, Berto, Anthony,

Mulyono, Edo, Nanda, Tito, Yudha, Stefo, Via, Advent, Roy, Daniel, Rei,

Harden, Laura, Natas, Rensya, Tania.

7. Teman-teman seperjuangan TS 2012

8. Semua pihak yang tidak bisa penulis sebutkan satu persatu yang telah

membantu penulis menyelesaikan Tugas Akhir ini.

Penulis menyadari bahwa Tugas Akhir ini masih jauh dari sempurna, oleh

karena itu penulis sangat mengharapkan kritik dan saran yang membangun demi

kesempurnaan Tugas Akhir ini.

Yogyakarta, Januari 2016

Ajeng Ayu Anindya

NPM : 12 02 14196

5. Keluarga tercinta, terutammmaaa kkekeddua orrrananang gg tua dan adik Bimo yang selalu

memberikan doaaa, pperhatian dan semangat kepada pepepenun lis.

6. Sahabat-sasasahhhabat yang telahhh membaantn u sertta aa memberi dukukukungnn an dan semangat

dalaaammm proses pppenenenyeyeyellelesaann TTTugugugass AAAkhkhkhiririr iiininini ::: Santo, Bererertot , Anthony,

Mulyonnnooo,, EdEdEdo, Nanddaaa, , TiTiTitoto, Yudhd a, SStetet fofofo,, ViVV a, Adveeentntnt, RoR y, Danananiel, Rei,

HaHH rdrdrdenenen, Laurrra,a,a, NNata as, Rensya, Taannia.

7. TeTeTemamm n--tteteman seperjjuauangan TS 200112

8.8.8. SeS mumumua a pihak yang tididakak bisa peenulis sesebbutkan satu persrsatatatu yayayangngg tttelahhh

meeembm antu penenululisi menyelelesaaikann TTuggaas AAkhir ini.

Penulis menyadari babahwhwaa TuT gas AkAkhihir ininii masih jauh dari semmmpurna,a,, olehhh

kareeenanana iitut pennululisis ssanangagagattt mememengngngharapkan kritik k k dadadannn sasasararann yayangng membababanngngun demememii i

kesempurnaan Tugas Akhir ini.

YoYoYogygygyaka artaaa,,, JaJaJanuari 2016

Ajeng Ayu Anindya

NPM : 12 02 14196

vii

Page 8: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

DAFTAR ISI

HALAMAN JUDUL ............................................................................................. i

HALAMAN PERNYATAAN ............................................................................... ii

HALAMAN PENGESAHAN ............................................................................... iii

HALAMAN PENGESAHAN PENGUJI ............................................................ iv

HALAMAN PERSEMBAHAN ............................................................................ v

KATA PENGANTAR ........................................................................................... vi

DAFTAR ISI .......................................................................................................... viii

DAFTAR TABEL………………………………………………………………..xii

DAFTAR LAMPIRAN………………………………………………………….xvi

INTISARI………………………………………………………………………...xvii

BAB I PENDAHULUAN ...................................................................................... 1

1.1. Latar Belakang ..................................................................................... 1

1.2. Rumusan Masalah ................................................................................ 3

1.3. Batasan Masalah ................................................................................... 3

1.4. Keaslian Tugas Akhir ........................................................................... 4

1.5. Tujuan Penelitian .................................................................................. 4

1.6. Manfaat Penelitian ................................................................................ 5

BAB II TINJAUAN PUSTAKA ........................................................................... 6

2.1. Pengertian Bekisting ............................................................................. 6

2.1.1 Fungsi Bekisting .......................................................................... 7

2.1.2 Syarat Bekisting .......................................................................... 7

2.2. Item Bekisting ....................................................................................... 8

2.3. Tipe Bekisting ...................................................................................... 9

2.3.1 Bekisting Semi Sistem ................................................................ 10

2.3.2 Bekisting Sistem .......................................................................... 10

2.4. Aspek-aspek Pemilihan Bekisting ........................................................ 11

2.5. Waktu ................................................................................................... 12

2.6. Biaya ..................................................................................................... 13

2.7. Upah ..................................................................................................... 14

2.7.1 Macam-macam Upah .................................................................. 14

HALAMAN PERNYATAAN.................................................................................... ii

HALAMAN PENGESAHAHAHAN ...................................... ........................................... iii

HALAMAN PENGNGNGESAHAN PENGUJI .............................................................. iv

HALAMAN N N PPPERSEMBAHANNN................................................................... ........................ v

KATA PPPEEENGANTARARAR .... ....... ................................................. ....................................... ................. vi

DAFTFTFTAR ISIII........................................................... ...................... ............................ ........ ........................... vii

DADADAFTARR TTTABABABEEEL………… …………………………………………………………………………………..xii

DAFTFTFTARARAR LLLAMPMPMPIRANAN………………………………………………………………………………………….xvi

INTITITISASASARI………………………………………………………………………………………………………………...xxxvi

BABABABBB I PEEENDN AHULUANN ..................................................................................................... 111

11.1.1. LaLatatar Belakang ............................................................................. ............ .......... 1

1.2. Rumusaan n MaM salah ........................................................................................... 333

1.3. Batasan Masaalalahh....... .................................................................................. 333

1.4. Keaslilianan TTugugasas AAkhkhiri ....................................................................................... 444

11.5.5. Tuujujujuananan PPPenelitian.................................................................................................. 444

1.6. Manfaat Penelitian.............. .. .... ................................................................... 555

BABABAB BB II TINJAUAN PUSTAKA................................................................................. 6

2.2.2.1. PPPengeg trtrtiaiaian n BeBeBekikikistststinininggg...... ....................................... .................. ........................................ .......... 6

2.1.1 FuFuFungngngsi BBBekekekisisi ting...................................... ............ ...... ................................... 7

2.1..222 SySySyarat Bekistinggg ..................................................................................... 7

2.2. Item Bekisting......................................................................................... 8

2.3. Tipe Bekisting ........................................................................................ 9

2.3.1 Bekisting Semi SSSistem ................................................................ 10

2.3.2 Bekisting Sistem............................................................................ 10

2.4. Aspek-aspek Pemilihan BeBeekkkisting........................................................ 11

vii

Page 9: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

2.8. Produktivitas ......................................................................................... 15

2.8.1 Pengertian Produktivitas ............................................................. 15

2.8.2 Faktor-faktor yang Mempengaruhi Produktivitas ....................... 16

2.8.3 Aspek-aspek dalam Produktivitas ............................................... 16

2.9. Pengukuran Produktivitas Kerja ........................................................... 17

2.10. Time and Motion Study ....................................................................... 18

2.10.1 Pengertian Time and Motion Study ........................................... 18

2.10.2 Prosedur Time and Motion Study .............................................. 19

2.10.3 Teknik Pengukuran dengan Motion Study ................................ 22

2.11. Rating ................................................................................................. 22

2.11.1 Skill ............................................................................................ 23

2.11.2 Effort .......................................................................................... 26

2.11.3 Condition ................................................................................... 28

2.11.9 Consistency ................................................................................ 29

BAB III METODOLOGI PENELITIAN ........................................................... 30

3.1. Jenis Penelitian ..................................................................................... 30

3.1.1 Studi Literatur ............................................................................. 30

3.1.2 Pengamatan Lapangan ................................................................. 30

3.1.3 Wawancara .................................................................................. 31

3.2. Lokasi Penelitian .................................................................................. 31

3.4. Alat yang Digunakan ............................................................................ 31

3.4. Data dan Variabel ................................................................................. 32

3.5. Metode Pengumpulan Data .................................................................. 32

3.6. Bentuk Form Data ................................................................................ 33

3.7. Cara Penggunaan Stopwatch ................................................................ 35

3.8. Pengolahan Data ................................................................................... 36

3.8.1 Total ............................................................................................ 38

3.8.2 Rating .......................................................................................... 39

3.8.3 Waktu Normal ............................................................................. 39

3.8.4 Mean ............................................................................................ 39

3.8.5 Produktivitas Waktu .................................................................... 40

y g p g

2.8.3 Aspek-assspepepekkk dalam Produktiviiitatatasss ............................................... 16

2.9. Pengukkurururaan Produktivitas Kerja............................................................ 17

2.10. TiTiTimme and Motion StStS udy........................................................................... 18

2.10.1 Peeengnggererertititian Tiiimememe aaandndnd MMMotototioioi n nn StStStudududyyy .......... ..................... ................... 18

2.1000.2 Prosososedededur Time and Motion Studddy .................. .................................... 19

222.101010.333 Teknnnikikik PPengukurann dengan Motititiononon Studyyy ............................................ 22

2.2.2.111111. Ratiiingngng ........ ........................................................................... .............................. 22

2.2..1111 .1 Skill............................................................................................... ............ 23

2.11.2 Effort............................................................................................................ 2226

2.2.11.3 Conditionn .................................................................................................. 2888

2.11 9.9 CoConsistencyy......................................................................................... 29292

BAB IIIIII METODOLOGOGII PEP NENELILITIANAN ............................................................... 303030

3.1. Jenis Penelitian ......................................................................................... 303030

3.1.1 11 StStudududiii LiLiLiteteterararatututurrr ................................................... ............................................ 3030

3.1.2 Pengamatan Lapppananangagg n........................................................................ 3330

3.1.3 Wawancara ......................................................................................... 31

333.222. LoLoLokakakasisisi PPPenenenelelititiaiaannn ... .......................................................... ..................................................... ......... 31

3.44. AlAlAl tat yannng g g DiDiDiggunakann............. ....................................... ....... .......................... ................ 31

333.444. DaDaDatatata dananan VVVariabel................................................... ...................................... 32

3.5. Metode Pengumpulannn DDData ......... .......................................................... 32

3.6. Bentuk Form Data .................................................................................... 33

3.7. Cara Penggunaan Stopppwatch ................................................................. 35

3.8. Pengolahan Data..................................................................................... 36

3.8.1 Total ................................................................................................ 38

ix

Page 10: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

3.8.6 Perhitungan Koefisien Tenaga Kerja .......................................... 41

3.8.7 Perhitungan Koefisien Bahan ...................................................... 41

3.8.8 Perhitungan Biaya ....................................................................... 4

BAB IV HASIL DAN PEMBAHASAN ............................................................... 42

4.1. Data Umum .......................................................................................... 42

4.1.1 Proyek Pembangunan Uttara The Icon ........................................ 42

4.1.2 Proyek Pembangunan Tunjungan Plaza 6 ................................... 47

4.1.3 Proyek Pembangunan Srondol Mixed Use Development ............ 52

4.2. Analisis Total Durasi Pekerjaan Pemasangan Bekisting ...................... 52

4.2.1 Analisis Total Durasi Bekisting Plywood Berlapis Polyfilm ...... 52

4.2.2 Analisis Total Durasi Bekisting PVC .......................................... 55

4.3. Analisis Nilai Rerata ............................................................................ 55

4.3.1 Analisis Nilai Rerata Bekisting Plywood Berlapis Polyfilm ....... 56

4.3.2 Analisis Nilai Rerata Bekisting PVC .......................................... 58

4.4. Pemberian Nilai Rating ........................................................................ 59

4.5. Analisis Waktu Normal ........................................................................ 62

4.6. Perhitungan Produktivitas Waktu ......................................................... 62

4.6.1 Pemasangan Bekisting Plywood Berlapis Polyfilm pada Balok .. 63

4.6.2 Pemasangan Bekisting Plywood Berlapis Polyfilm pada Kolom. 63

4.6.3 Pemasangan Bekisting Plywood Berlapis Polyfilm pada Pelat

Lantai ........................................................................................... 64

4.6.4 Pemasangan Bekisting PVC pada Pelat Lantai ........................... 65

4.7. Analisis Koefisien ................................................................................ 65

4.7.1 Analisis Koefisien Tenaga Kerja ................................................. 66

4.7.1 Analisis Koefisien Bahan ............................................................ 73

4.8. Analisis Biaya ....................................................................................... 84

BAB V KESIMPULAN DAN SARAN ................................................................ 90

5.1. Kesimpulan ........................................................................................... 90

5.2. Saran ..................................................................................................... 95

g y

BAB IV HASIL DAN PEEEMBMBMBAHASAN................... ............................................... 42

4.1. Data Umumumum ........................................................................................... 42

4.1.1.1.11 Proyek Pembaaanngn unan Uttara ThT e Icon................. .......................... 42

4.1.2 Proyoyoyekekek PPPeme bangngngunununananan TTTunununjujujungngngananan PPPlaaazazaza 6................. ................... 47

4.1...3 Proyyyekekek PPPembanggunan Srondol MiMiMixeeed d d Use DeDD velopmenenent ............ 52

4.2.2.. AnAnAnalalaliiisis Totototalalal DDurasi Pekeerrjaan Pemasasaangngngan Bekekekisisistititingngng........................ 52

4.44 2.1 AAnAnalalisi is Total Durasi Bekisting Plywwooo ddd BeBB rlapppisisis PoPoPolylylyfiff lm ........ 52

4.4..22.2 2 Analisisis Total Durassi Bekisting PVVCC......................................... ............ 55

4.3.3.3. Analisis Nilai RRere ata ............................................................................................. 5555

4.4.3.1 Analisis NNililaiai Rerataa BBekistining g Plywood Berlapapisis PPPolyfififilmlmlm ....... 5666

4.3.22 AnAnala isis Nilaaii ReReratta BBekisistiinng PVC ............................................. 58585

4.4. Pemberian NiNilalaii RaR tiingn ............................................................................... 595959

4.5. Analisis Waktu NNorormamall ........................................................................... 626262

4.4 6. Perhihitutungngngananan PPPrororodududuktktktivitas Waktuu.............................. ............................................ 62662

4.6.1 Pemasangan BBekekekisisistitt nggg PlPlPlyyywood Berlapis Polyfilm pada Balokokok... 6663

4.6.2 Pemasangan Bekistingn Plywood Berlapis Polyfilm pada KKKoololomomom.63

44.4.6.6.6.333 PePePemamamasasangnggananan Bekisting Plywooooooddd BeBerlrllapapapisisis PoPoPolylylyfififilmlmlm pppadadaa PPPelelelatatat

LaLaLantntntaiaiai........................ .............................................................................................. 64

4.44 666.444 PePeemmmasangan BBBekekekisting PVCVCVC pada Pelalaattt LaLL ntnttaiaiai .............................. 65

4.7. Analisis Koefisien ......................... .......................................................... 65

4.7.1 Analisis Koefisiien Tenaga Kerja................................................. 66

4.7.1 Analisis Koefisiiieene Bahan ............................................................ 73

4.8. Analisis Biaya......................................................................................... 84

BAB V KESIMPULAN DAN SARANANAN ................................................................ 90

x

Page 11: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

DAFTAR PUSTAKA ............................................................................................ 96

LAMPIRAN ........................................................................................................... 97

xi

Page 12: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

DAFTAR TABEL

Tabel 2.1 Berbagai Teknik Pengumpulan Data Produktivitas ............................. 18

Tabel 2.2 Rating Skill ........................................................................................... 23

Tabel 2.3 Rating Effort ......................................................................................... 26

Tabel 2.4 Rating Conditions ................................................................................. 28

Tabel 2.5 Rating Consistency ............................................................................... 29

Tabel 3.1 Contoh Form Pengambilan Data Durasi Pemasangan Bekisting

Balok .................................................................................................... 33

Tabel 3.2 Contoh Form Pengambilan Data Pemasangan Bekisting Pelat

Lantai .................................................................................................... 34

Tabel 3.3 Contoh Form Pengambilan Data Durasi Pemasangan Bekisting

Kolom ................................................................................................... 34

Tabel 3.4 Contoh Form Pengolahan Data Pemasangan Bekisting Balok ............ 36

Tabel 3.5 Contoh Form Pengolahan Data Pemasangan Bekisting Kolom ........... 37

Tabel 3.6 Contoh Form Pengolahan Data Pemasangan Bekisting Pelat

Lantai .................................................................................................... 38

Tabel 4.1 Jadwal Pengamatan Proyek Pembangunan Uttara The Icon ................ 44

Tabel 4.2 Bekisting Balok Plywood Berlapis Polyfilm yang Diamati ................. 45

Tabel 4.3 Bekisting Kolom Plywood Berlapis Polyfilm yang Diamati ................ 46

Tabel 4.4 Bekisting Pelat Lantai Plywood Berlapis Polyfilm yang

Diamati ................................................................................................ 47

Tabel 4.5 Jadwal Pengamatan Proyek Pembangunan Tunjungan Plaza 6,

Surabaya ............................................................................................... 48

Tabel 4.6 Bekisting Pelat Lantai PVC yang Diamati ........................................... 49

Tabel 4.7 Bekisting Balok PVC yang Dilakukan Analisis Biaya ........................ 51

Tabel 4.8 Bekisting Kolom PVC yang Dilakukan Analisis Biaya ....................... 52

Tabel 4.9 Total Durasi Pekerjaan Pemasangan Bekisting Balok pada

Proyek Uttara The Icon ........................................................................ 53

Tabel 4.10 Total Durasi Pekerjaan Pemasangan Bekisting Kolom pada

Proyek Uttara The Icon ........................................................................ 54

g g ppp

Tabel 2.2 Rating Skill ................................................. ............................................... 2

Tabel 2.3 Ratingg EfEfEfffofort .......................................................................................... 2

Tabel 2.4 Raaatititing Conditions........................................................................................ 2

Tabel 2.55 Rating CoCoConsnsnsisisistett ncy ...... ....... .... ................................................. ..................... ................... 2

Tabel l l 333.1 Contnn oh Forororm mm PePP ngambilan Data Durasi PePePemamm sangngngan Bekisisstitt ng

BaBaBaloookkk ................................................................. ...................................................... 3

Tabeel ll 3..222 CoCC nttohohoh Fororm Pengambilaann Data Pemasananggan nn BeBB kisisistititingngg PePP lat

LaLaLantn ai....................................................................................................... ............ 3

Taaabebebel l 3.3 Contoh Form PPeengambilaan Data Durarassi Pemasangan BBBekiistststinining g g

KoK lom.................................................................................................................. 333

TaTaTabbbel 33.3.4 Conttohoh FForo m Penggololaha ann DData PePemmasangann BBekekiisting Balallok ............ 33

Tabel 33.3 5 Contoh Form m PePengngollaha anan Datata PPemamassangngan Bekisting Kollloomo ............ 333

TaTT bel 33.6 Contoh Form Pengngolahan Data PePemasangan Bekisting PPPelat

Lant iai............................................................................ ................................................. 33

Tabel 4.1 Jadwal Pengamatan PrPrProyoyoyek PPPememembbbangunan Uttara The Icon ................... 4

TaTaTabeb l 4.2 Bekisting Balok Plywood BBerlapis Polyfilm yang Diamati ......................... 4

TaTaTabebebel 444 3.33 BeBeBekikikistststinininggg KoKKololomm m PlPlywyy ood Berlapppisis PoPoPolylyfifilmlmlm yayayangngng DDDiaiaiamamamatititi ................. ......... 4

TaTaTabebebel 4.44 BBeB kikikistinininggg PePePelllat LaLaL ntntntaiaiai PlPlPlywywywoood BeBeB rlrlrlapapapisisis PPoP lllyfiffilllm yaaangngng

DiDiDiamamamatttiii ........................................................................................................ 4

Tabel 4.5 Jadwal Pengamatan PrPrProyek Pememembangunan Tunjungan Plaza 6,

Surabaya ...................... ............................................................................. 4

Tabel 4.6 Bekisting Pelat Lantaiii PVC yannng Diamati ........................................... 4

Tabel 4.7 Bekisting Balok PVC yayaang DDiiilakukan Analisis Biaya ........................ 5

Tabel 4.8 Bekisting Kolom PVC yaangngng Dilakukan Analisis Biaya....................... 5

xii

Page 13: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

Tabel 4.11 Total Durasi Pekerjaan Pemasangan Bekisting Pelat Lantai

Proyek Uttara The Icon ........................................................................ 54

Tabel 4.12 Total Durasi Pekerjaan Pemasangan Bekisting Pelat Lantai

Proyek Tunjungan Plaza 6 Surabaya .................................................... 55

Tabel 4.13 Durasi Rerata per m2 Pemasangan Bekisting Balok pada

Proyek Uttara The Icon ........................................................................ 56

Tabel 4.14 Durasi Rerata per m2 Pemasangan Bekisting Kolom pada

Proyek Uttara The Icon ........................................................................ 57

Tabel 4.15 Durasi Rerata per m2 Pemasangan Bekisting Pelat Lantai

Proyek Uttara The Icon ........................................................................ 58

Tabel 4.16 Durasi Rerata per m2 Pemasangan Bekisting Pelat Lantai

Proyek Tunjungan Plaza 6 Surabaya .................................................... 59

Tabel 4.17 Rating Pemasangan Bekisting Plywood Berlapis Polyfilm pada

Pekerjaan Balok .................................................................................... 60

Tabel 4.18 Rating Pemasangan Bekisting Plywood Berlapis Polyfilm pada

Pekerjaan Kolom ................................................................................. 60

Tabel 4.19 Rating Pemasangan Bekisting Plywood Berlapis Polyfilm pada

Pekerjaan Pelat Lantai ......................................................................... 61

Tabel 4.20 Rating Pemasangan Bekisting PVC pada Pekerjaan Pelat

Lantai .................................................................................................... 61

Tabel 4.21 Waktu Normal Pemasangan Bekisting ................................................. 62

Tabel 4.22 Perbandingan Koef. Tenaga Kerja Bekisting Balok Plywood

Berlapis Polyfilm Secara Pengamatan dengan Bekisting Balok

SNI ....................................................................................................... 67

Tabel 4.23 Koefisien Tenaga Kerja 1 m2 Bekisting Balok Plywood

Berlapis Polyfilm .................................................................................. 68

Tabel 4.24 Perbandingan Koef. Tenaga Kerja Bekisting Kolom Plywood

Berlapis Polyfilm Secara Pengamatan dengan Bekisting Kolom

SNI ....................................................................................................... 69

Tabel 4.25 Koefisien Tenaga Kerja 1 m2 Bekisting Kolom Plywood

Berlapis Polyfilm ............................................................................... 70

j g g

Proyek Tunjungngngaaan Plaza 6 Surabaya .......... .............................................. 5

Tabel 4.13 Durasi RRRerata per m2 Pemasangan Bekikikistststing Balok pada

Prrrooyoyek Uttara The IcIcIcon ............................................................................ 5

Tabel 4.14144 Durasi RRRerrratatata a a per mmm222 PPPemememasasasanana gagg n n n BeBeBekikikisting Kolooom mm pada

Proyoyoyek UUttttttararra TTThe Icon ................................................................... ............. 5

Taaabbbel 4.1555 DuDuDurararasssi Rerrratatata a per m2 PPeemasangan BeBeBekik stinggg PePePelalalat Lantaiaiai

PrPP oyyyekekek UUttttara a The Icon ........................................................................................ 5

Tabelll 4.4.4.1116 DuDuDurasi Reratata a per m2 PPeemasangan BeBekisting PePePelat LaLaLantntntaia

Proyek Tunjungngana Plaza 66 SSurabaya .................................................................... 5

TaTaTabebebel 4.11717 RaRating Pemasangganan Bekisstiing Plywywoood Berlapis Poolylyfifilmlmm paaadadada

Pekerjrjaaaan n Balok ............................................................................................... 66

Tabel 44.4 18 Rating Pemamasas ngngan BBekkiistingng PlPlywwooood d BeBerlapis Polyfilm pppada

Pekerjaan Kolom ..................................................................................... 666

Tabeeelll 44.4.19 Ratingg PePeemamamasasasangngngananan Bekisting Pllywywywooooooddd BeBeBerlrlrlapappiis Polyfilmm papapadda

Pekerjaan Pelat Lantatataiii .... ..................................................................................... 6

TaTaTabeb l 4.20 Rating Pemasangan Bekkisi ting PVC pada Pekerjaan Pelaaattt

LaLaLantntntaiaiai.................................. ............................................................................................................................ 6

TaTaTabebebel 4.2121 WWaW kktktu NoNoNormrmrm lalal Pemasssananangagagan n n BeBeBekikikisting ............................................................. 6

Tabebebel l 444.222222 PePePerbrbrbanndididinnngan Koef.f TTenaga KeKeKerja Bekistttininingg g BaBaBalololokk k PlPlPlywywywooooooddd

Berlapis Polyfilm Secacacara Pengagaamatan dengan Bekisting Balok

SNI .......................................................................................................... 6

Tabel 4.23 Koefisien Tenaga KKeK rja 1 mmm2 Bekisting Balok Plywood

Berlapis Polyfilm .................................................................................... 6

Tabel 4.24 Perbandingan Koef. Tenagagagaaa Kerja Bekisting Kolom Plywood

xiii

Page 14: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

Tabel 4.26 Perbandingan Koef. Tenaga Kerja Bekisting Pelat Lantai

Plywood Berlapis Polyfilm Secara Pengamatan dengan

Bekisting Kolom SNI .......................................................................... 71

Tabel 4.27 Koefisien Tenaga Kerja 1 m2 Bekisting Pelat Lantai Plywood

Berlapis Polyfilm ................................................................................. 71

Tabel 4.28 Perbandingan Koef Tenaga Kerja Bekisting Pelat Lantai PVC

Secara Pengamatan dengan Bekisting Kolom SNI .............................. 73

Tabel 4.29 Koefisien Tenaga Kerja 1 m2 Bekisting Pelat Lantai PVC .................. 73

Tabel 4.30 Koefisien Bahan 1m2 Bekisting Balok Plywood Berlapis

Polyfilm ................................................................................................ 75

Tabel 4.31 Koefisien Bahan 1 m2 Bekisting Kolom Plywood Berlapis

Polyfilm ................................................................................................ 77

Tabel 4.32 Koefisien Bahan 1 m2 Bekisting Pelat Lantai Plywood Berlapis

Polyfilm ................................................................................................ 79

Tabel 4.33 Koefisien Bahan 1 m2 Bekisting Balok PVC ....................................... 80

Tabel 4.34 Koefisien Bahan 1 m2 Bekisting Kolom PVC ..................................... 82

Tabel 4.35 Koefisien Bahan 1 m2 Bekisting Pelat Lantai PVC ............................. 84

Tabel 4.36 Analisis Harga Satuan 1 m2 Bekisting Plywood Berlapis

Polyfilm untuk Balok ............................................................................ 85

Tabel 4.37 Analisis Harga Satuan 1 m2 Bekisting Plywood Berlapis

Polyfilm untuk Kolom .......................................................................... 86

Tabel 4.38 Analisis Harga Satuan 1 m2 Bekisting Plywood Berlapis

Polyfilm untuk Pelat Lantai .................................................................. 87

Tabel 4.39 Analisis Harga Satuan 1 m2 Bekisting PVC untuk Balok .................... 88

Tabel 4.40 Analisis Harga Satuan 1 m2 Bekisting PVC untuk Kolom .................. 88

Tabel 4.41 Analisis Harga Satuan 1 m2 Bekisting PVC untuk Pelat Lantai .......... 89

Tabel 5.1 Biaya Pekerjaan 1 m2 Bekisting Plywood Berlapis Polyfilm

pada Balok ............................................................................................ 90

Tabel 5.2 Biaya Pekerjaan 1 m2 Bekisting PVC pada Balok ............................... 90

Tabel 5.3 Biaya Pekerjaan 1 m2 Bekisting Plywood Berlapis Polyfilm

pada Kolom .......................................................................................... 91

g

Tabel 4.27 Koefisien Tenanaaggaga Kerja 1 m2 Bekiiistststinininggg Pelat Lantai Plywood

Berlappisiss PPPolyfilm .................................................................................. 7

Tabel 4.28 Peeerbrbrbandingan Koef f f Tenagag Kerja BBekisting Pelatatat LLantai PVC

Secara PPPeneengagagammam tan deddengngngananan BBekekekisisistitiingngng KKKolololomomom SNI ............................... 7

Tabel l l 444.29 Koooefee isien n TeTeTenaga Kerjaj 1 m2 Bekisting PePePelalalat Lantntntai PVC.................... 7

Taaabbbel 4.3000 KoKoKoefefefisien BaBaBahhah n 1m2 BeB kisting BaBalololok kk Plywwwooood d d Berlapisisis

PoPP lyyfififilmlmlm ........................................................................ ...................................... 7

Tabelll 4.4.4.3331 KoKoKoefisien BaBahan 1 m2 BeB kisting Koololom Plywoooood Beeerlrlrlapapapisi

Polyfilm ................................................................................................................. 7

TaTaTabebebel 4.33232 KoK efisien Bahan n 11 m2 Bekkissting PePelalat Lantai Plywooood d BBeBerlapppisisis

Polyfifilmlm ... ..................................................................................................... 77

Tabel 44.4 33 Koefisien BaBahahann 1 mm2 BeBekiststining g Balolokk PVPVC......................................... 888

TaTT bel 44.34 Koefisien Bahan 11 mm22 BBekisting KoKollom PVC ....................................... 888

Tabeeelll 44.4 35 Ko fefiisieien n n BaBaBahahahannn 111 mmm2 Bekisting g PePePelalalattt LaLaLannntatataiii PVPVCC .................................... . 88

Tabel 4.36 Analisis Harga Sattuauauan n n 1 mmm222 Bekisting Plywood Berlapis

Polyfilm untuk Balok................................................................................... 8

TaTaTabebebel 4.44 373737 AnAnAnalalalisisisisisis HHHarargagaa SSatuan 1 m2 Beeekikikiststiingngg PlPlPlywywywooooooddd BeBeBe lrlapapapisisis

PPoP lllyfiffilmmlm unununtututukkk Kolommm .................................................... ....... .......................... ................ 8

Tabebebel l 444.383838 AnAnAnalalaliisisiss HHHarga Satttuauu n 1 m2 BBekisting PlPlP ywyy oooooodd d BeBeBe lrlapapapiiis

Polyfilm untuk Pelat LaLaLantai ......... .......................................................... 8

Tabel 4.39 Analisis Harga Satuaaan n 1 m2 Bekikiisting PVC untuk Balok.................... 8

Tabel 4.40 Analisis Harga Satuannn 1 m2 Bekkkisting PVC untuk Kolom .................. 8

Tabel 4.41 Analisis Harga Satuan 111 m2 BeBeBekisting PVC untuk Pelat Lantai .......... 8

Tabel 5.1 Biaya Pekerjaan 1 m2 BeBeBekkkisting Plywood Berlapis Polyfilm

xiv

Page 15: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

Tabel 5.4 Biaya Pekerjaan 1 m2 Bekisting PVC pada Kolom .............................. 91

Tabel 5.4 Biaya Pekerjaan 1 m2 Bekisting Plywood Berlapis Polyfilm

pada Pelat Lantai .................................................................................. 92

Tabel 5.5 Biaya Pekerjaan 1 m2 Bekisting PVC pada Pelat Lantai ..................... 92

p

Tabel 5.5 Biaya Pekerjaaaannn 111 m2 Bekisting PVVVCCC papapada Pelat Lantai ..................... 92

xv

Page 16: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

DAFTAR LAMPIRAN

Lampiran 1 Pengambilan Data Durasi Pemasangan Bekisting ............................. 98

Lampiran 2 Produktivitas Waktu ........................................................................... 112

Lampiran 3 Pemberian Rating ................................................................................ 116

Lampiran 4 Koefisien Tenaga Kerja ..................................................................... 138

Lampiran 5 Koefisien Bahan .................................................................................. 142

Lampiran 6 Harga Satuan dan Upah Pekerja ......................................................... 148

Lampiran 7 Biaya ................................................................................................... 149

Lampiran 8 Denah dan Detail Gambar Kerja ....................................................... 157

Lampiran 9 Dokumentasi ....................................................................................... 172

p g g g

Lampiran 2 Produktivitas s WaWaWaktu ................................ ............................................... 1

Lampiran 3 Pemberiririaaan Rating ................................................................................. 1g

Lampiran 4 KoKoKoefisien Tenaga KKKerja ......................................................................... 1

Lampirannn 555 Koefisienenen BBBahahahan .......... ............... ................................................... ....................... ................... 1

Lampppiririran 6 Haaarga Saaatututuaaan dan Upap h Pekerjja .................................................... ............. 1

Laaammpiran 777 BBBiayayaya ................................................................... .............................................. ....... 1

Lampppirananan 888 DDenananahh h adan n Detail Gambaarr Kerja ............................ .......................................... 1

Lampmpmpiriri ananan 9 DDoDokumentasasi i ................................................................... ................................. . 1

xvi

Page 17: ANALISIS PERBANDINGAN BIAYA DAN WAKTU PENGGUNAAN BEKISTING ... · PDF fileBEKISTING PLYWOOD BERLAPIS POLYFILM DAN BEKISTING PVC PADA PROYEK BANGUNAN GEDUNG Laporan Tugas Akhir

INTISARI

ANALISIS PERBANDINGAN BIAYA DAN WAKTUPENGGUNAAN BEKISTING PLYWOOD BERLAPIS POLYFILM PADA PROYEK BANGUNAN GEDUNG, Ajeng Ayu Anindya, 12 02 14196, 2016, Manajemen Konstruksi, Fakultas Teknik, Universitas Atma Jaya Yogyakarta. Bekisting merupakan cetakan sementara yang digunkan untuk menahan beton selama beton dituang dan dibentuk sesuai dengan bentuk yang diinginkan. Teknologi bekisting juga berkembang dengan banyaknya alternatif bahan dan mengurangi penggunaan kayu sebagai bahan utama bekisting konvensional. Penggantian bahan ini diharapkan dapat mempercepat pelaksanaan pekerjaan dan meminimalkan biaya yang dikeluarkan karena penggunaannya yang berulang kali. Oleh sebab itu, penelitian ini membahas mengenai perbandingan biaya dan waktu, produktivitas waktu dan waktu normal penggunaan bekisting plywood berlapis polyfilm dengan bekisting PVC. Penelitian ini dilakukan dengan pengamatan langsung di lapangan, wawancara serta studi literatur. Bagian pekerjaan bekisting yang ditinjau adalah pekerjaan balok, kolom dan pelat lantai. Pengamatan dilakukan guna memperoleh durasi pekerjaan pemasangan bekisting. Serta wawancara dilakukan untuk mengetahui alasan pemilihan bahan tersebut dan biaya yang dibutuhkan pada pekerjaan bekisting. Metode yang digunakan dalam pengolahan data adalah Time and Motion Study. Dari hasil analisis yang dilakukan penulis diperoleh hasil biaya yang dibutuhkan untuk pekerjaan per m2 dengan bekisting plywood berlapis polyfilm pada balok memerlukan biaya Rp Rp 206.725 untuk bahan, Rp 3.874 untuk upah pekerja dengan produktivitas waktu 10,4197 m2/jam. Pada pekerjaan kolom memerlukan biaya Rp 156.798 untuk bahan, Rp 2.268 untuk upah pekerja dengan produktivitas waktu 13,2383 m2/jam. Pada pekerjaan pelat lantai membutuhkan biaya Rp 137.717 untuk bahan, Rp 1.806 untuk upah pekerja dengan produktivitas waktu 21,5127m2/jam. Hasil yang diperoleh dari analisis penulis, biaya yang dibutuhkan untuk pekerjaan per m2 dengan bekisting PVC pada balok adalah Rp 307.984 untuk bahan. Pada pekerjaan kolom memerlukan biaya Rp 255.410 untuk bahan. Pada pekerjaan pelat lantai membutuhkan biaya Rp 305.262 untuk bahan, Rp 2.009 untuk upah pekerja dengan produktivitas waktu 22,3899 m2/jam. Kata Kunci : Bekisting, Biaya dan Waktu, Time Study.

BANGUNAN GEDUNG, AjAjAjeneneng Ayu Aniniindydydya,a,a 12 02 14196, 2016, ManajemenKonstruksi, Fakultas Tekekknininikk, Universitas Atma Jayayaa YYYogyakarta.

Bekistinnnggg merupakan cececetakan sementara yang diguuunknn an untuk menahan beton selamamama bbeton dituang dannn dddibibibenene tututuk kk sesesesuuuaiaa dengan bentukukuk yang diinginkan. Teknologigigi bekistinggg juguguga a a berkkememembababangngng dddennngagagann n bababanynynyakakaknya alternnnataa if bahan dan mengurururangi penggununnaaaan nn kayu sebagai b hahhan uuutatatamamama bekisting kkkonoo vensional. Pengngnggantian bababahhahan iniii diharapkpkpkananan dddapap tatat mmmememempepepercepatt pelakkksasasanann an pekkkeree jaan dan memememinimaaalklklkananan bbbiiiaya yyyananang g ddikeluarkan n karena pennggggggunuu aannnnyayaya yyyananang berulalalangnn kali. OOlO eh sebababab bb itititu, penenenellilittian ini membahhaas mengenai perbbananandidd ngananan bbbiaiaiayayaya dan wwwaktu, produkukuktititivivivitatatas wawawakkktu dadan waktu normmaal penggunaan n bekiistststinini g plplplywywywooooood dd berlrllapaa is polyyyfififilmlmlm dddengggaana bekistingng PVC.

Penenenellitian ini dililaka ukan deenggan penggamamatan langsuunngng dddi ii lalalapap ngannn, wawawawawawancarrra a serta studi literaratut r. Bagiiann pekerjaaanan bekisting yangg ditiiinjnjnjauauau aaaddalahhhpepepekekekerjaaaann n babalolok, kolom dan ppele at lanttaii. Penggamamatan dilakukann ggununnaa a meeempmpmperererolehh dududurrrasi ppekerjaaanan ppemasangaan bekikisttini g. SSeerta wawanancacarra dilakakkukanann uuuntukukuk mengetettaahui alasan pepemim lihan babahah nn teerssebebuut dan bbiaiayaya yang dibuutttuhkan padaddaaa pekerjaaaa n bekisting. MMetetododee yay ngng ddigigunnaakaan ddalalamam ppengolahan data aaadalah TiTiTimee ana d MMoMotion Study.

Daari hhasasilil aananalilisisiss yayangng dilakukan ppenenululisis ddipipererololeheh hasasil biayayayaaa yaanngng dibutututuhhkhkan unt kuk pppekekekerererjajajaananan ppperee m2 dengan bbbekekekisisistititingngng plplplywywy ood berllapapapisisis polyfififilmlmm pada balokk memememerererlululukakakann bibiiayayayaaa RpRpRp RRRp 206.6.6.727272555 unununtuttukk bababahahahannn, RRRp 33.874 untuk upupupahahah pepp kerja dengan produktivitas waktktktuu u 101010,4197 m2/jam. Pada pekerjaan kkkolololomomom memememerlukan biaya Rp 156.798 untuk bab han, Rp 2.268 untuk upah pekerja a a dededengngngaaan prprprodododukukuktititivitas waktu 13,2383 m2/jam. Pada pekerjaan pelat lantai memememmbmbutututuhuhuhkkak nbibibiayayaya a a RpRpRp 11377 7.7.7171717 uuntntntukukuk bbbahahahananan,,, RpRpRp 1.806 uuuntntntukukuk uuupapapah hh pepepekekekerjjrja ddedenggananan ppprororodududuktktktivivivitas wawawaktktktu 2121 5,5121212777m22/j/j/jamamam. HHaHasil yaangngng dddipipiperererololol heh darii i anananalalalisisisiis pen lluliiis, bibiiayayaya a yang didiibububutututuhkhkhkananan uuuntntntukukuk pppekekekerererjajajaan ppererer m2 dededennngan bbbekekekistiiingngng PPPVCVCVC pppadadadaaa bababalololok k k adadadaaalah Rp307.989898444 untuk bababahahahan. Pada pekerjrjrjaaaa n kolooommm memerlukan bbbiaiaiayayaya RRppp 252525555.4410 untuk bahan. Pada pekerjaan pelat lantaiaiai membuuututt hkan biaya Rp 305.262 untuk bahan, Rp 2.009 untuk upah pekerja dennngan produkkktivitas waktu 22,3899 m2/jam.

Kata Kunci : Bekisting, Biaya dannn Waktuuu, Time Study.

xvii