8/11/2019 Amr Diab Event
1/20
COPYRIGHT 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED.
Amr Diab event - Mousa Coast
29/08/2014
8/11/2019 Amr Diab Event
2/20
1| Introduction
Agenda
2| Event Preparation
3| KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
3/20
The aim of this document is to show all the preparations, actions and KPIs evolution for Amr Diab event which
occurred in Mousa Coast on Friday 29-08-2014 .
The preparations for the event (new mobile shelter , sites upgrades , DT measurements , parameters retune ) will be
illustrated in details .
The main KPIs evolution will be discussed in the next slides .
The recommendations will be presented in the conclusion to be taken into considerations in next events .
The importance of Amr Diab event could be observed from high number of attendances , therefore special
preparations have been done for the sake of this event .
The event was served by the below sites :
1. RS-AMR-DIAB (mobile shelter) .
2. SS-MOUSA-COAST .
3. SZ-HALIJAL-OYN .
The event location is shown in graph
1- Introduction
8/11/2019 Amr Diab Event
4/20
1| Introduction
Agenda
2| 2G Event Preparation
3| 2G KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
5/20
The planned events preparations will be discussed in this section:
Mobile shelter (RS-AMR-DIAB) was planned to rectify the extra TRXs needed on all sectors to
guarantee that the capacity will be sufficient.
Mobile shelter configuration was (8HR 8HR 8HR----8HR 8HR 8HR) to avoid any congestion .
Frequency plan and neighbors definition were done on mobile shelter (RS-AMR-DIAB) .
SDCCHs reconfiguration was done to avoid an suspected SDCCH assign cong .
Parameters tuning were done in our preparation for expected traffic increase .
Upgrades were requested as shown below :
2- Event Preparation (1/2)
Cell Name Old TRX configuration Needed TRX configuration Status
SS-MOUSA-COAST_D_S4_49482_1_S 2 4 Not done
SS-MOUSA-COAST_D_S5_49483_1_S 3 4 Not done
SS-MOUSA-COAST_D_S6_49484_1_S 2 4 Not done
SS-MOUSA-COAST_G_S1_49479_1_S 3 4 Not done
SS-MOUSA-COAST_G_S2_49480_1_S 4 4 Not done
SS-MOUSA-COAST_G_S3_49481_1_S 3 4 Not done
SZ_HALIJAL_OYN_G_S1_14127_1_G 3 12 Not done
8/11/2019 Amr Diab Event
6/20
DT measurements (outdoor) shows good level and quality .
DT measurements (indoor) shows good level and quality .
2- Event Preparation (2/2)
8/11/2019 Amr Diab Event
7/20
1| Introduction
Agenda
2| 2G Event Preparation
3| 2G KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
8/20
The traffic was stepped up on8/29/2014 4:00:00 PM and
reached the highest value (106.9
Er) on 8/29/2014 9:00:00 PM ,
with zero SD and RTCH assign
cong.
The traffic was increased during
hours of event ( 4 PM to 11 PM)
from 381.3 Erl to 692.8 Erl
compared with same hours for the
day before, with percentage of
increase 81.69%.
The CSSR & CDR with normal trend
during event period
3- KPIs Evolution
8/11/2019 Amr Diab Event
9/20
1| Introduction
Agenda
2| Event Preparation
3| KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
10/20
The main KPIs were stable during the event period.
Huge increase in traffic as it was increased by 81.69% from 381 Erl to 692 Erl compared with
same hours for the day before.
There was zero SDCCH and RTCH assign cong during the highest peak of traffic .
The total number of extra TRXs for this event was 48 TRXs .
There were 11 cells (6 GSM and 5 DCS cells) serving this event .
Upgrades were not done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN but did not affect the
congestion during the peak of the highest traffic .
Mobile shelter is highly recommended in such events .
4- Conclusion
8/11/2019 Amr Diab Event
11/20
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
12/20
The planned events preparations will be discussed in this section:
Mobile shelter (RS-AMR-DIAB) & the configuration was planned to guarantee that the capacity will
be sufficient.
CE & PS Needed:
Features Needed
Upgrades which requested on G_SZ-HALIJAL-OYUN_0029SI site.
CE & PS Needed:
Features Needed:
2- Event Preparation (1/2)
Target R99 CE
Target HSDPA PS
Target HSUPA PS
600
4
6
2ndCarrier
HSDPAEnable
HSUPA Enable
HSDPA 64QAM
15 Codes
HSPA 72
proposed no of E1s
NeededNeeded foreach carrier
Needed for eachcarrier
Needed for eachcarrier
15 codes needs to beactivated on each carrier
enable HSPA 72
Users per cell foreach carrier
8E1s
RNC ID
WBTSID WBTS Name Site code Target R99CE Target HSDPAPS Target HSUPAPS
26
64
G_SZ-HALIJAL-OYUN_0029SI
0029SI
400
2
6
RNC IDWBTS ID WBTS Name 2ndCarrier HSDPA Enable HSUPA Enable HSDPA 64QAM 15 Codes
26 64G_SZ-HALIJAL-OYUN_0029SI
NeededNeeded for each
carrier
Needed for eachcarrier
Needed for each carrier15 codes needs to be activated on
each carrier
8/11/2019 Amr Diab Event
13/20
DT measurements (outdoor) shows RSCP level and EcNo .
DT measurements (indoor) shows good RSCP and EcNo .
2- Event Preparation (2/2)
8/11/2019 Amr Diab Event
14/20
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
15/20
Voice traffic was stepped up on
8/29/2014 2:00 PM and reached the
highest value (54 Er) on 8/29/2014 8:00
PM .
Data traffic was stepped up on
8/29/2014 12:00 PM and HSDPA
reached the highest value (3.5 Gbyte) on
8/30/2014 12:00 AM
& HSUPA reached the highest value
(4.2 Gbyte) on 8/29/2014 11:00 PM .
CSSR Voice & HSDPA degraded for due
VCC congestions @ 10PM and solved
next hour due to below actions.
We Increased CPICH power for S_SS-
MOUSA-COAST_0485SI @11PM to
offload traffic from site MS-AMR-DIAB &
we Decreased MaxTotalUplinkSymbolRate
for site MS-AMR-DIAB @11:03 PM.
3- KPIs Evolution
8/11/2019 Amr Diab Event
16/20
3- KPIs Evolution
Voice traffic was stepped up on
8/29/2014 2:00 PM and reached the
highest value (54 Er) on 8/29/2014 8:00
PM .
Data traffic was stepped up on
8/29/2014 12:00 PM and HSDPA
reached the highest value (3.5 Gbyte) on
8/30/2014 12:00 AM
& HSUPA reached the highest value
(4.2 Gbyte) on 8/29/2014 11:00 PM .
CSSR Voice & HSDPA degraded for
2hours due to VCC utilization.
We Increased CPICH power for S_SS-MOUSA-COAST_0485SI to offload
traffic from site MS-AMR-DIAB & we
Decreased MaxTotalUplinkSymbolRate for
site MS-AMR-DIAB .
8/11/2019 Amr Diab Event
17/20
1| Introduction
Agenda
2| 3G Event Preparation
3| 3G KPIs Evolution
4| Conclusion
8/11/2019 Amr Diab Event
18/20
Upgrades were done on sites SS-MOUSA-COAST and SZ-HALIJAL-OYN .
The main KPIs were stable during the event period except 2 hours.
Voice traffic increased by 61% from 21 Erl to 54 Erl compared with same hours for the day
before.
HSDPA Traffic increased by 48.5% from 1.8Gbyte to 3.5Gbyte compared with same hours for the
day before.
HSUPA Traffic increased by 88.8% from 0.47Gbyte to 4.2Gbyte compared with same hours for the
day before.
Mobile shelter is highly recommended in such events .
4- Conclusion