Alpha Borough Alpha Borough Community Recreation Community Recreation Project Project Preliminary Design Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien, Justin Hoffmann, Jon Grabowski, Melissa Stevens

Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Alpha Borough Community Alpha Borough Community Recreation ProjectRecreation Project

Preliminary DesignPreliminary Design

Presented by Group 3

February 28, 2002

From left to right: Pamela Vislocky, Erin O’Brien, Justin Hoffmann, Jon Grabowski, Melissa Stevens

Page 2: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Funding – Grants & LoansFunding – Grants & Loans

Green Acres– $200,000 loan obtained in 1999– Additional grant/loan to cover balance of

outdoor recreational features

Small Cities / Housing & Urban Development (HUD)– Grant of up to $400,000

New Jersey Tree Planting Grant– Up to $25,000

Page 3: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Sources of Revenue Sources of Revenue

Increased pool feesActivities that utilize the rooms in the

recreational facility– Entertainers– Receptions– Dance classes

Page 4: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed Site LayoutProposed Site LayoutAdditions

– Recreation center 2-level access

– Additional baseball field OR tennis courts and soccer field

– Access road and parking lots Total of 89 new parking spaces Crosswalks Fences and guardrail

– Detention facility

Page 5: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed Site LayoutProposed Site LayoutRenovations

– Pool– Basketball courts

w/ lighting– Existing baseball

fields (lighting)

Other– Field house– Playground

Page 6: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed Layout #1Proposed Layout #1

Highlights of layout:

Tennis courts and Soccer field

Building w/ 2-level access

New parking

Sidewalks and jogging path

Page 7: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed Layout #2Proposed Layout #2

Highlights of layout:

New baseball field

Building w/ 2-level access

New parking

Sidewalks and jogging path

Page 8: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed 1Proposed 1stst Floor Plan Floor Plan

– Community room 10,200 s.f. Capacity

100 people Stage Storage space

– Bathrooms– Kitchen– Technology

center– Game room– 2 offices– 1 meeting room

Page 9: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Proposed Basement Floor PlanProposed Basement Floor Plan

– Wrestling room– Weight room– Locker rooms– Mechanical room

Page 10: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

5-Phase Plan5-Phase Plan

Improvements to existing fields & basketball courts

New sports fieldsDetention facilityPool and pool buildingCommunity center & associated

improvements

Page 11: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Preliminary Cost EstimatePreliminary Cost EstimatePhase Description Cost Source of Funding

1 Improvements to existing fields & basketball courts $20,000-$100,000 Borough

Lighting for existing basketball courts $10,000-$20,000

Lighting for existing baseball field $80,000-$100,000

Replacement of basketball goals $3,600

2 New sports fields $60,000-$110,000 Green Acres

Baseball field $60,000-$80,000

Two tennis courts $22,000-$30,000

Soccer field $60,000-$70,000

3 Detention facility $25,000-$50,000 Developer, Borough

4 Pool and pool building $270,000 Green Acres

Pool $260,000

Pool building (bathrooms) $10,000

5 Community center & associated improvements $1,000,000-$1,500,000 Small Cities, NJ Tree-Planting Grant, Borough

Build community center $1,000,000

Timber fence around playground $3,500

Access Road

Parking lot

Resurfacing of existing basketball court $6,000

Sidewalks $2,700

Walking/jogging path $5,100

$111,000

Page 12: Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,

Questions / Comments?Questions / Comments?