8877 KM PIPELINE
4.6 METRE FOR EVERY KM SQUARE
1889 KM PIPELINE
3.7 METRE FOR EVERY KM SQUARE
1889KM PIPELINE
14.4 METRE FOR EVERY KM SQUARE
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
1 2 3 4 5 6 7 8 9 10 11 12 13 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
MALAYSIA: GAS IMPORT & EXPORT VOLUME
IMPORT
EXPORT
Source: Department of Statistics, Energy Commission
KTOE
RM 8.3 BILLION
RM 12 BILLION
RM 18 BILLION
RM 6.5 BILLION
RM 45 BILLION
PHILIPPINE MALAYSIA THAILAND INDONESIA SOUTH EAST ASIA
Source: Pike Research (Cleantech management report)
MALAYSIA
RM 2.6 BILLION Installation of anaerobic digesters facility
RM 10.2 BILLION Installation of power generation facility & FiT
RM 4.4 BILLION Installation of compressed biogas facility & sales of CBG
POTENTIAL MARKET SIZE: 2022
METHANOTROPH MICROBE / ENZYME
YIELD AMPLIFICATION 3X MORE BIOGAS
BIOPROCESSING/ BIOREFORMING
PROTEIN FEED
BIOMATERIAL
BIOFUEL BIOGASOLINE
BIOETHYLENE BIOMETHANOL
BIOAMMONIA BIO-DME
RM 20 BILLION INDUSTRY
DIESEL $809B JET FUEL
$309B
PLASTIC ADDITIVES
$37B
INDUSTRIAL LUBRICANT
$24B
SYNTHETIC & NATURAL RUBBER
$13B
BULK POLYMERS
$309B
SURFACTANTS $22B
COSMETICS, FLAVOURS&
FRAGRANCES $32B
AUTOMOTIVE LUBRICANT
$24B
ADDRESSABLE MARKET FOR BIOBASED PRODUCTS
BIOCHEMICALS VALUE
BIOMETHANOL
BIOGASOLINE
BIOETHYLENE
PROTEIN FEED
BIOMATERIAL
USD2,000 / MT
USD1,300 / MT
ANAEROBIC DIGESTERS
UPGRADING TECHNOLOGY
MICROBES / ENZYME
FORTIFICATION
POWER GENERATION
CBG TRANSPORTATION
LIQUEFACTION BIOGAS
OPTIMIZED BIOGAS YIELD (INCREASED EFFICIENCY)
BIO-DME
BIO-METHANOL
BIO-GASOLINE
PROTEIN FEED
BIO-ETHYLENE
BIO-ETHANOL
BIO-AMMONIA
1980’S 1990’S 2000’S 2010 2015 2018 2020
BIOTECHNOLOGY PROCESS CONVENTIONAL PROCESS
Investors set up JV for biogas liquefaction co-located at Philippine sugar mill
“ “
In the Philippines, Aboitiz Equity Ventures has set up a JV with Gazasia called Aseagas Corporation and will invest in a 9,000 ton per year biogas liquefaction plant co-located a sugarcane mill in Batangas Province as its first project. The fuel will be used to power buses and trucks. Cryostar will build the liquefaction machinery.
May 29, 2014
MALAYSIA: ECONOMIC ANALYSIS
POWER GENERATION (within 10km radius from grid)
COMPRESSED BIOGAS (within 250km radius from
nearest offtaker)
INVESTMENT
OPEX
PROFIT
RM18 MILL RM25 MILL
RM720,000 RM2.7 MILL
RM1.20 MILL/YR RM1.8 MILL/YR
*Based on 60 MT/Hr FFB Processing Capacity Palm Oil Mill
MALAYSIA: IMPLEMENTATION STRATEGY
PHASE 1 (2015-2020)
PHASE 2 (2015-2020)
PHASE 3 (2016-2024)
PHASE 4 (2018-2028)
PHASE 5 (2020-2030)
BIOGAS All palm oil
mills equipped
with biogas facility by
2020
POWER 30% of palm
oil mills located
within 10km radius from
grid
CBG 70% off-grid
mills, equipped
with upgrading facility for
CBG
LIQUEFACTION & GRID INJECTION
Reduces logistics cost by 4X compared to CBG transportation
cost
BIOTECH Those located beyond 250km
radius from nearest offtaker
to adopt downstream production
BIOECONOMY RM 150 BILLION
Biogas contribution: RM20.2 B (15%)
BIOGAS CONTRIBUTION BIOECONOMY MALAYSIA
GNI BY 2020: RM2.4 BILLION
EMPLOYMENT: 27,000
THE TARGET:
10% OF DOMESTIC NATURAL GAS REQUIREMENT OR 50MMSCF/D IS SUPPLIED FROM BIOGAS BY 2030
250MW OF OUR NATIONAL ELECTRICITY REQUIREMENT IS SUPPLIED USING BIOGAS BY 2025
ALL 434 PALM OIL MILLS ARE EQUIPPED WITH BIOGAS FACILITY BY 2020, THUS ACHIEVING 50% OF OUR COP-15 COMMITMENT
STRENGTHS CHALLENGES WORLD CLASS COMPANIES & CONGLOMERATES i.e. SIME DARBY, PETRONAS, FELDA, GENTING, IOI
LIMITED AREA FOR PLANTATION EXPANSION, FORCING PALM GROWERS TO VENTURE FURTHER DOWNSTREAM
READY & WELL-ESTABLISHED INFRASTRUCTURE, DEDICATED, CUSTOMIZED INDUSTRIAL PARKS
LIMITED TECHNOLOGY KNOW-HOW, WILL REQUIRE STRATEGIC PARTNERSHIP WITH TECHNOLOGY PROVIDERS
ADVANCED ENGINEERING CAPABILILTIES FROM BOTH PALM OIL & THE PETROCHEMICAL INDUSTRIES
LIMITED EXPERIENCE IN SCALING UP BIO-BASED PROJECTS
PROVIDE OPPORTUNITIES TO COMPLEMENT WITH THE STRATEGIC PROJECTS. i.e. PETRONAS RAPID, JOHOR & PETRONAS GIPC, KUANTAN
VERY COMPETITIVE REGIONAL INVESTMENT LANDSCAPE
To ensure seamless implementation of the biogas applications: • Work closely with industry players to strategize on the grid connection strategy
• Enhance awareness within the palm oil industry players on the economics potential of biogas
• Appropriation of infrastructure grant from the renewable energy fee collected
by SEDA for biogas to electricity grid connection)
• Economic Corridors Agency to provide biogas storage tank facility within their park for downstream consumers
BIOTECHCORP NURTURE AND ACCELERATE GROWTH OF MALAYSIAN BIOTECHNOLOGY INDUSTRY
BIOTECHCORP’S ROLE IN BIOGAS INDUSTRY
• To take the initiative to consolidate with the myriad agencies and
stakeholders in the industry to create a commercial path for the development of biogas in the country.
• To support the national strategy to emphasis on research and
development in biogas industry and to turn biogas into higher value products.
• Using Biotechnology as the game changer of the Bioeconomy of the
country.