8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 1/8
n- oun ry uppor
BangladeshADB TA 7276-REG for “Supporting Investments in Water-related disaster
November 9 2011
Management
Badri Bhakta Shrestha
International Centre for Water Hazards and Risk Management
un er e ausp ces o os e y u c or s esearc ns u eTsukuba, Japan
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 2/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
ere s a ac o e c en ear y warn ng sys em
In Bangladesh, several departments
and institutions are workin in the Review,
field of flood forecasting and earlywarning system. Different
stakeholders have different early
uest onna re survey,
Workshop, fieldcommunications
warning related issues to be faced.
SWOT-AHP
Approach
Multi Criteria
Analysis (MCA)There is also a huge overlap
Questionnaire survey in Key
Institutions and in WorkshopIntervention ranking
-Technical,
an up ca on o s a e o ers
in project planning and
implementation.
Quantitative decision
making method is very National Road Map for
Flood Early Warning
Socio-cultural,
Financial
development of efficient
FEWS
System Development
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 3/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
Review
(a) Technical assessment
(b) Institutional assessment
(c) Impact assessment of EWS
(d) Assessment at grass-root communities
• This step is conducted in close reference with the existing 22
recommendations issues of ADB-TA in 2006.
• The updated issues are long listed for priority ranking and duplication
test. All together the project identified more than 70 existing and new
issues.
• pr or ze ssues were c ass e n s x s eps o e ar y arn ngSystem development cascade cycle (risk knowledge, monitoring and
data acquisition, forecasting and warning, dissemination and
,
(based on UNISDR checklist of EWS).
• Besides 6 cascades of FEWS, the cross cutting issues were also listed.
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 4/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
r or y ran ng an se ec on o n erven ons
In this phase a pair wise comparison for all interventions was performed in TWO
consecutives ste s.
SWOTMulti Criteria Analysis
AHP analysis AHP analysis
Questioner survey in key
Priority ranking
institutions and in workshop
The screening process was done based on
the individual institutional response as
well as group response in the stakeholder’s
workshop.
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 5/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
Example of Questionnaire for SWOT-AHP factors
This methodology is mainly used for
,
used such method for disastermanagement.
The results output from the SWOT-
AHP can be easily displayed and easy
to understand to various stakeholders
in quantitative way.So we a lied these methods in
AHP entry on SWOT factor per
intervention (Make it rationale)
priority ranking.
Cascade 1: Risk Knowledge
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 6/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
Cascade InterventionRank_ Institution
Rank_ Workshop
1. Risk_knowledge development 1-1 National and local level risk assessment 1 2
1-2 Integrated planning for EWS 3 3
1-3 Formal and informal education 2 1
2. Monitoring_and_data acquisition 2-1 Development of base information 4 6
2-2 Manual data collection 7 7
2-3 Automatic data collection 6 5
2-4 Improve data quality 2 4
2. Monitoring_and_data
acquisition 2-1 Development of base information 4 6
Inst WS
2-5 Operation & Maintenance of the monitoring network 1 1
2-6 Expanding the range of data acquisition 3 2
2-7 Regular monitoring of flood events by satellite data 5 33. Forecasting_and_Warning 3-1 Model accuracy aand upgrade software 3 1
2-2 Manual data collection 7 7
2-3 Automatic data collection 6 53-2 Flood forecast Model development 2 2
3-3 Expansion of forcasting capacity and number of institutes 1 3
4. Dissemination and_communication 4-1 Extending the range of dissemination 3 3
4-2 More precise and user friendly warning 2 1
2-4 Improve data quality 2 4
2-5 Operation & Maintenance of the monitoring network 1 1
4-3 Capacity building for dissemination 1 2
5. Information_type and reliability 5-1 More precise and location specific information 1 1
5-2 Update warning information timely manner 2 2
6. Response_capability 6-1 Capacity development of community 1 1
2-6 Expanding the range of data acquisition 3 2
2-7 Re ular monitorin of flood events b satellite data 5 3 _
6-2 Community prepardness 2 2
7. Cross_cutting_issues 7-1 FFWC capacity building 2 1
7-2 Strengthening of organizational status 1 3
7-3 International cooperation 3 2
8/3/2019 WLW Day 3: Presented by Badri Bhakta Shrestha
http://slidepdf.com/reader/full/wlw-day-3-presented-by-badri-bhakta-shrestha 7/8
ADBADB--RETA 7276 Project (Bangladesh component)RETA 7276 Project (Bangladesh component)
Pre-feasibility analysis and recommendation (national road map outline)
CascadeFirst Priorityintervention
Tech-nical
Socio-cultural
Institu-tional
Finan-cial
Second Priorityintervention
Tech-nical
Socio-cultural
Institu-tional
Finan-cial
1. Risk knowledge Mational and local level riskdevelopment assessment 2. Monitoring and data
acquisition
Operation & maintenance of
the monitoring network ++ ++ + +
Expanding the range of data
acquisition ++ ++ +++ ++3. Forecasting andWarning
Model accuracy and upgradesoftware +++ ++ +++ ++
Expansion of forecasting capacityand number of institutes + + + +
4. Dissemination andcommunication
More precise and user friendlywarning +++ +++ ++ ++ Capacity building for
dissemination +++ +++ ++ ++
2. Monitoring
and data
Operation &
Maintenance of++ ++ + +
Expanding the
range of data ++ ++ +++ ++
Finally the project approach and.
reliability specific information +++ ++ ++ ++
manner +++ ++ ++ ++
6. Response capability Capacity development ofcommunity +++ ++ + ++ Community preparedness ++ +++ + ++
7. Cross cutting issues FFWC capacity building +++ +++ +++ ++ Strengthening of organizationalstatus
+++ ++ + ++
acquisition network
acquisition
a National Road Map (NRM) for
FEWS in Ban ladesh• Socio-cultural
• Institutional
• Financial
We will discuss on prepared draft NRM with
various stakeholders in Bangladesh for the
effective use and implementation of NRM