    1) Which of the following components indicate that R3 is a client / server system?

    a. Multiple DBsb. Database server

    c. 3 separate hardware servers (DB, applcn & presentation server)

    d. Db service, app service & presentation service

    2) Which of the following is not contained in R/3 DB?

    a. The R/3 Repository

    b. The R/3 kernel

    c. Customer Data

    d. Transaction datae. Customizing Data

    f. The ABAP dictionary

    3) Which of the following is correct in regard to R/3 clients?

    a. The R/3 client has its own customer data and programs which are notaccessible to other clients within the same R/3 system.

    b. An R/3 client has all R/3 repository objects and client independent

    customizing with all other clients in the R/3 systemc. An R/3 client shares customizing and Applcn data with other clients in the

    same R/3 system

    d. An R/3 client enables you to separate applcn data from customizing data

    4) Which of the following statements is correct in regard to SAP Client Concept

    a. All customizing settings are client independentb. A client has unique set of applcn data

    c. A client has its own repository objects

    d. All customizing settings are client dependant

    5) Which of the following strategies enables R/3 customers to avoid making

    modifications to SAP Std objects?

    a. Using Enhancement techs such as Program exits & menu exits

    b. Modifying SAP delivered programs

    c. Changing SAP std functionality using the IMGd. Performing customizing to provide the required functionality

    6) Which of the following statements are correct in regard to IMG?

    a. The IMG consists of series of customizing activities for defining a

    Companies

    Business process

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    2/23

    TCS Basis Certification week 3

    b. The IMG is a online resource providing the necessary info and steps to

    help you implementing the R/3 applcn Modules

    c. IMG is client independentd. All of the above.

    7) Which of the following strategies enables an Enterprise to meet its business needs by

    changing or enhancing R/3 functionality

    a. Maintaining application data using the Various R3 Business transactions in

    the SAP Stdb. Using the ABAP workbench to create the read R/3 repository objects

    c. Using customizing to modify R/3 programs after obtaining an access key from

    OSSd. Using customer Exits to enhance the functionality of existing SAP Objects

    8) Which of the following statements are correct in regards to modifications

    A a modification is a change to an SAP Std object

    b. A modification must be registered using the SAP OSS (SSCR)

    c. SAP recommends modification only if customers business meets cannot beme by customizing enhancement techs or customer dev

    d. All the above

    9) Which of the following statements is correct in regard to the customizing

    a. Customizing enables R/3 applcn process to be set to reflect a companiesbusiness needsb. Customizing can be performed only from within IMG

    c. Customizing is necessary because R/3 delivered w/o Business process.

    d. None of the above

    10) Which of the following is correct in regard to R/3 repository

    a. Customers can develop new repository objects using tools in the ABAP

    workbench.

    b. Customer developed repository objects reside in the R/3 repository alongside

    std repository objectsc. Customers can create & assign new repository objects to a development class

    d. All of the above.

    11) Which of the following statements is correct in regard to critical client roles as

    recommended by SAP?

    a. Customizing changes can be made in any client

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    3/23

    TCS Basis Certification week 3

    b. All customizing & dev changes should be made in a single R/3 client

    c. Repository object should be created and changed in R/3 Quality assurance

    client (QAS)d. Unit testing should take place in the customizing and dev client.

    12) Which of the following activities should not be performed within a system landscape

    a. Customizing & dev changes are promoted to a QAS client before being

    delivered to PRDb. The R/3 system is upgraded to a new R/3 release

    c. Dev changes are mad directly in the PRD client

    d. Changes are assigned to a specific role

    13) Which of the following benefits does the 3-system landscape recommended by SAP

    have?

    a. Customizing and dev, testing, and prod activities take place in separate DB

    environments and do not affect one anotherb. Changes are tested in the QAS system and imported in the PRD system only

    after verification

    c. Client independent changes can be made in the DEV system w/o immediatelyaffecting the PRD client

    d. All of the above.

    14) Which of the following statements is correct in regard to multiple R/3 clients?

    a. All clients in the same R/3 system share the same R/3 repository and client

    independent customizing settingsb. No more than one client in the same R/3 system should allow changes to

    client independent customizing changes.

    c. If a client allows for changes to client dependent customizing, the clientshould also allow for changes to Client independent customizing objects

    d. All of the above.

    15) Which of the following statements is correct in regard to setup of 3-system landscape

    a. There is only R/3 DB for the system landscape

    b. One client should allow for the automatic recording of client dependentcustomizing and client independent changes.

    c. All R/3 systems have the same System ID (SID)

    d. All clients must have unique client numbers.

    16) Which of the following statements is correct in regard to the CUST client

    a. It should allow changes to client independent customizing, but not repository

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    4/23

    TCS Basis Certification week 3

    objects

    b. It should automatically record all changes to customizing settings

    c. It should not allow changes to client dependent and client independentcustomizing settings

    d. It should allow for all changes, but not require recording of changes to change

    request.

    17) Which of the following statements is correct in regard to the 2-system landscape

    a. It is not optimal because 3 is limited opportunity to test the transport of

    changes from the DEV system to the PRD system

    b. It allows for changes to Customizing in the PRD systemc. It is recommended by SAP because Customizing and DEV do not impact

    QAS testing.

    d. All of the above

    18) Which of the following statements is correct in regard to Phase implementation.

    a. All CUST changes made in PRD support system must also be made in the

    DEV system

    b. The system landscape requires 5 R/3 systemsc. Changes in the PRD support system do not have to be made in the DEV env

    d. The system landscape needs an env that supports a PRD system with any reqd

    changes.

    19) Which of the following statements is not valid in regard to global system landscape

    a. A global template can be used for the roll out of corporate CUST settings andDEV efforts

    b. Management of different repository objects can be managed using name

    spaces, and name ranges for the repository objectsc. Merging and CUST settings delivered by the corporate office with local

    CUST efforts can easily be done using change requests

    d. SAP provides different tools to aid the roll-out of a global template.

    20) Which of the following statements is correct in regard to CUST and DEV changes?

    a. all changes are recorded to task in CUST change requestb. the changes should be recorded to tasks in change requests for transport to

    other clients and systems

    c. the changes must be manually performed in every R/3 systemd. the changes can easily be made simultaneously in multiple clients.

    21) Which of the following statements in regard to change requests is false?

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    5/23

    TCS Basis Certification week 3

    a. The customizing organizer and the workbench organizer are tools used to view,

    create and manager change request

    b. A change request is a collection of tasks where developers and peopleperforming customizing record the changed they make.

    c. All changes made as a result of IMG activities are recorded to customizing

    change requests.d. SAP recommends setting your R/3 system so that customizing changes made in

    the customizing and development client are automatically recorded to

    change requests.

    22) For which of the following activities is the TMS (tcode STMS) not designed?

    a. Releasing change requestsb. Viewing import queues

    c. Viewing log files generated by both the export process and the import process

    d. Initiating the import process

    23) Which of the following statements is correct after you have successfully imported

    change request into the quality assurance system?

    a. The change requests must be released again to be exported to the production

    system.b. The data files containing the changed objects are deleted from the transport

    directory

    c. The change requests need to be manually added to the import queue of the

    production systemd. The change requests are automatically added to the import queue of the

    production system.

    24) Which of the following statements is correct in regard to the change requests in

    an import queue?

    a. They are sequenced according to their change request number.

    b. They are sequenced in the order in which they were exported from the

    development system

    c. They are sequenced according to the name of the user who released the requestsd. They are not sequenced by default, but arranged in a variety of ways using the

    TMS

    25) Which of the following techniques can be used to transfer application data

    between two PRD systems?

    a. Recording transaction data to change requests

    b. Using ALE to transfer application data

    c. Using the client copy tool

    d. All the above

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    6/23

    TCS Basis Certification week 3

    26) Which of the following types of data transfer are possible within appropriate use

    of interface technologies?

    a. Transferring legacy data to an R/3 system

    b. Transferring data between R/3 clientsc. Transferring data to non-SAP systems

    d. Transporting change requests to multiple R/3 systems

    27) Which of the following statements is correct in regard to user master data?

    a. User master data can be transported in a change request

    b. User master data is unique to each R/3 system, but is shared across clients inthe same R/3 system.

    c. A specific client copy option enables you to distribute user master data together

    with authorization profile data

    d. User master data included all user logon information, including the definitionof authorizations and profiles

    28) Which of the following clients should u copy to create new clients and ensure that all

    data from post installation processing is also copied?

    a.Client 000

    b.Client 001

    c.Client 066

    29) Which of the following is not a SAP recommended strategy for setting up a system

    Landscape

    a.Using a client copy from the DEV system to set up your QAS and

    PRD system when the change request strategy is not an optionb. Creating the PRD system as a combination of a client copy from the

    QAS system and change request from the DEV system

    c. Using the same setup strategy to establish both the QAS and PRD

    systemsd. Setting up the QAS and PRD system by importing Change requests

    prompted from the DEV system.

    30) Which of the following are correct in regard to setup of TMS?

    a. The TMS should be setup when the DEV system is installedb. The TMS should include all R/3 systems in the system landscape

    even if the R/3 systems do not physically exist

    c. The TMS is critical in establishing the Transport between the DEV &

    QAS system

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    7/23

    TCS Basis Certification week 3

    d. The TMS should be setup before the Change request is created in the

    CUST and DEV client.

    31) Which of the following is correct in regard to system copy strategy

    a. SAP recommends the system copy strategy because all CUST &DEV objects are transferred

    b. SAP does not recommend the system copy strategy because there is

    no easy to eliminate the unwanted APPLCN datac. A system copy is the easiest set of strategy recommended by SAP

    d. A system copy eliminates the need for change requests for the entire

    R/3 implementation.

    32) Which of the following activities is not necessary for exporting a change request

    a. Documenting every task in the request

    b. Releasing every task in the change requestc. Verification of the contents of the change request by the system

    administratord. Unit testing the change request.

    33) Which of the following is correct in regard to the task used in the change request thatrecord CUST & DEV changes

    a. Task belongs to change request

    b. Task can be used by several R/3 usersc. Task are direct responsibility of the Project leader

    d. Task records only client specific changes

    34) Which of the following indicates that the change request has been signed off after

    QAS testing.

    a. The change request has been released after unit testing.

    b. The change request has been successfully imported into the QAS

    system.

    c. The change request is added into the import queue of all other R/3systems in the system landscape

    d. Theproject leader communicates the approval of the change request.

    35) Which of the following is NOT an SAP recommendation

    a. Imports into the QAS & PRD system should occur in the samesequence.

    b. Even if the import process is automatically scripted a technical

    consultant or system admin should revise the result of the import

    c. The project leader should manually add a change request to import

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    8/23

    TCS Basis Certification week 3

    queue of the QAS system

    d. Change request are imported in the same sequence that they were

    exported from the DEV system.

    36) Which of the following is SAPs recommendation on how to rush an emergency

    correction into the PRD system

    a. Make the changes directly in the PRD system

    b. Transport the changes from the DEV system to QAS system & PRDsystem using preliminary import

    c. Make the change and use a client copy with change request to

    distribute the changes into PRD

    d. Make the change in the QAS system and transport using preliminaryimport

    37) Which of the following transport activities is not typically the responsibility of the

    system admin

    a. Importing change request into all clients within R/3 systemb. Verifying the success of import process

    c. Releasing the change request

    d. Assisting in solving either export or import errors

    38) Which of the following does SAP provide a customer support?

    a. R/3 release upgrade to provide new functionalityb. Support packs to correct identified problems in a specific R/3 release

    c. R/3 notes to announce errors & corrections for reported problems

    d. All of the above

    39) The R/3 system ID (SID)

    a. Must be unique for each system sharing the same transport directory

    b. Must be unique for each system in the system landscape

    c. Can start with a number

    d. Can consist of any 3 char combination

    40) Which of the following statements is correct in regard to the TRANS dir

    a. There can be only one TRANS dir in a system landscape

    b. All R/3 systems within Transport group share a common TRANS dir

    c. In a system landscape using heterogeneous platforms it is notpossible to have a common TRANS dir

    d. Only the PRD system can contain the TRANS dir

    41) The Transport control program TP

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    9/23

    TCS Basis Certification week 3

    a. Is stored in subdirectory bin of TRANS dir

    b. Uses program R3TRANS to access the DB when transporting

    changesc. Cannot be used directly on the OS level

    d. Depends on the settings of the transport profile

    42) The transport profile

    a. Is stored in subdirectory bin of TRANS dirb. Contains comments and parameter settings that configure the transport control

    program TP

    c. Is managed from within TMS as of release 4.5, but is modified with OS text

    editors in earlier released. Contains only settings that are valid for all R/3 systems in the system landscape

    43) The initialization procedure of the CTO

    a. Is especially required after a system copy

    b. Establishes the initial value for change request Idsc. Is not mandatory for the purpose of enabling transports

    d. Is performed automatically during R/3 installation by program R3setup

    44) Which of the following statements is correct in regard to the settings governing

    changes to repository objects

    a. Only the customer name range should be modifiable in production systems.b. Developments are possible in an R/3 system only if you have applied for a

    development namespace from SAP

    c. If the global change option is set to not modifiable, it nevertheless possible tomake changes in certain name spaces or clients that has their change option set to

    modifiable.

    d. The global change option should always be set to not modifiable for the qualityassurance system and the production system.

    45) Which of the following statements is correct in regard to the R/3 systems belonging

    to a transport domain?

    A. They all share the same transport directory

    B. They are managed centrally using TMSC. They belong to the same transport group

    D. They must run on the same operating system and database platform

    46) Which of the following statements is correct in regard to the domain controller?

    A. It must be the production system

    B. It occurs once in a transport domain

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    10/23

    TCS Basis Certification week 3

    C. It occurs in each transport group

    D. It can only be the R/3 system that was originally designated as the transport

    domain controllerE. It should never be the production system due to the high system load that the

    domain controller causes

    47) Which of the following statements are correct in regard to the TMS?

    A. It needs to be initialized only on the transport domain controllerB. It needs to be initialized only on the transport domain controller and the backup

    domain controller

    C. It must be initialized on every R/3 system

    D. It must be set up before you can set up transport routes.

    48) Which of the following statements are correct in regard to the RFC destinations for

    TMS connections?

    A. They are generated automatically when a transport route is created

    B. They are generated between the domain controller and each R/3 system in thetransport domain

    C. They must be established manually before you can use the TMS

    D. They are generated during the TMS initialization processE. They are only needed for importing change requests.

    49) How is the actual system landscape, including R/3 system roles and relationships,

    defined using the TMS?

    A. By including all R/3 system in the transport domain

    B. By configuring transport routesC. By assigning a role to each R/3 system during the TMS initialization process

    D. By designating real, virtual, and external R/3 systems.

    50) Which of the following statements is correct in regard to a consolidation route?

    A. It is defined by an integration system and a consolidation system, and is

    associated with a transport layerB. It is created in the TMS by defining only an integration system and a

    consolidation system

    C. It is not necessarily required in a two-system landscapeD. It can be defined only once in a transport group.

    51) Which of the following statements re correct in regard to client-specific transportroutes?

    A. They are possible as of R/3 Release 4.0

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    11/23

    TCS Basis Certification week 3

    B. They are possible only as of R/3 Release 4.5, and only if extended transport

    control is activated

    C. They are only allowed for target groupsD. They may not be used in conjunction with client-independent transport routes.

    52) After you create a new client entry in table T000, which of the following activitiesenables you to provide the client with data?

    A. A remote client copy to populate the client with data from a client in anotherR/3 system

    B. A client transport to import data from a client in another R/3 system

    C. A local client copy to import data from a client within the same R/3 system

    D. All of the above.

    53) Which of the following cannotbe used to restrict a client from certain activities?

    A. The client roleB. The client-dependent change option

    C. The client ID-numberD. A client restriction

    E. The client-independent change option.

    54) Which of the following tasks can be performed using the client copy tools?

    A. Merging application data from one client into another client

    B. Copying only application data from one client to another clientC. Copying only Customizing data from one client to another client

    D. All of the above .

    55) Which of the following tasks can be performed using the client copy profiles?

    A. Scheduling a client copy to occur at a time when system use is lowB. Selecting the subset of application data that will be copied when a client copy

    is executed

    C. Providing required user authorization for the use of client tools

    D. Determining the data that will be copied when a client copy is executed

    56) Which of the following statements is correct in regard to table logging?

    A. Table logging should be used instead of change requests whenever possible

    B. Table logging provides an audit history of who made what changes and when

    C. Table logging does not negatively impact system resourcesD. All of the above

    57) Which of the following statements isfalse in regard to development classes?

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    12/23

    TCS Basis Certification week 3

    A. Development classes facilitate project management by grouping similar

    Repository objects

    B. All Repository objects are assigned to a development classC. A development class determines the transport route that a changed Repository

    object will follow

    D. A local object does not need a development class

    58) Which of the following kinds of changes are transported using Workbench changerequests?

    A. Client-independent changes

    B. Modifications to SAP-delivered objectsC. Changes made using the ABAP Editor and ABAP Dictionary

    D. Repairs to R/3 Repository objects that originated in another R/3 System

    E. All of the above

    59) Which of the following data is notcontained in the object list of a task?

    A. The actual change made to the objects listed in the taskB. The list of changed objects recorded to the task

    C. Whether the objects recorded to the task are locked

    D. The complete Object Directory entry for the object

    60) Which of the following statements are correct regarding repairs and

    modifications?

    A. Repairs are changes to SAP-delivered objects; modifications are changes to any

    object that originated on an R/3 System other than the current R/3 System

    B. A repair flag protects an R/3 Repository object against being overwritten by animport

    C. All repairs are saved to Workbench change requests

    D. A modification is a change to an SAP-delivered objectE. All of the above

    61) Which of the following requirements must be met before you can change both

    clientdependent and client-independent Customizing settings in a client?

    A. The client settings must allow for changes to client-independent Customizing

    objectsB. The client role must beProduction

    C. The system change option must be set toModifiable

    D. The client settings must allow for changes to client-dependent Customizing

    62) Which of the following statements are correct when project leaders and project team

    members receive only the recommended authorizations?

    A. Only developers can create change requests

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    13/23

    TCS Basis Certification week 3

    B. Only project leaders can create change requests, and are therefore responsible for

    assigning project team members to change requests

    C. Project team members can create and release change requestsD. Project leaders can release change requests

    63) Which of the following statements are correct with regard to Project IMGs?

    A. The Project IMG provides access to the Customizing activities defined for a

    particular projectB) Customizing is performed in the project IMG tree structure

    C. The Project IMG enables you to display project status information and document

    Customizing activities

    D. All of the above

    64) Which of the following activities are performed using the Customizing Organizer?

    A. Viewing all Customizing change requests related to a particular userB. Viewing all Workbench change requests related to a particular user

    C. Viewing all change requests related to a particular userD. Managing change requests you own or reviewing change requests in which you

    have assigned tasks

    65) Which of the following statements is correct in regard to Customizing?

    A. All Customizing activities in the IMG activities can be transported

    B. All changes resulting from IMG activities can be transportedC. All Customizing changes are automatically recorded to a change request if the

    client change option is set toAutomatic recording of changes

    D. A Customizing activity may involve the creation of client-independent objectsand therefore requires Workbench change request

    66) Which of the following activities are performed using client comparison tools?

    A. Comparing the customizing settings of two R/3 clients in the same R/3 System

    or

    in a different R/3 SystemB. Adjusting the Customizing differences between two different R/3 clients

    C. Transporting Customizing settings into the production client

    D. Comparing the objects listed in the object list of a change request with an R/3Client

    67) Which of the following is a prerequisite for copying client-dependent changes to aunit test client using a client copy according to a transport request(Transaction

    SCC1)?

    A. The change request has been released

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    14/23

    TCS Basis Certification week 3

    B. The tasks have been released, but the change request has not

    C. The tasks have been released after successful unit testing by the owner of the

    taskD. The change request has not been released

    68) Which of the following are the results of releasing a task?

    A. A data file is created in the transport directory and contains the objects recorded

    in the change requestB. The object list and documentation for the task are copied to the change request

    C. All objects recorded in the task are locked

    D. You can no longer save changes to that task

    69) Which of the following are result of releasing and exporting a change request?

    A. A data file is created in the transport directory to contain copies of the objects

    recorded in the change requestB. Versions are created in the version database for all R/3 Repository objects in the

    object list of the change requestC. All repairs recorded in the change request are confirmed

    D. You can no longer save changes to that change request

    70) When you release a Customizing change request, you have the option to do which

    of the following?

    A. Release the change request to another Customizing change requestB. Schedule the release of the change request for a late time

    C. Release the change request to a transportable change request

    D. Initiate immediate release and export

    71) Which of the following is a prerequisite for releasing a transportable change request?

    A. There are no syntax errors in the ABAP programs recorded to the change request

    B. You must own the tasks in the change request

    C. All Repository objects in the change request are locked by the change request

    D. The change request has documentation

    72) The export process initiates which of the following activities?

    A. The creation of files in the transport directory

    B. The automatic import of change requests into the target systemfor example,

    thequality assurance system

    C. The addition of the exported change request to the import buffer of the target

    system

    D. The deletion of the change request within the R/3 System

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    15/23

    TCS Basis Certification week 3

    A. Import queues are the TMS representation of the import buffer on the operating

    system level

    B. You have to manipulate import queues to transport change requestsC. Import queues should be closed before starting an import using TMS

    D. You can import only an entire import queue.

    73) Which of the following activities result in a version history for all Repository objects?

    A. A Repository object is recorded to a change requestB. Change requests are imported into an R/3 System, and the transport parameter

    vers_at_imp is activated

    C. A task containing a Repository object is released

    D. A change request containing a Repository object is released

    74) Which of the following statements are correct in regard to import queues?

    A. Import queues are the TMS representation of the import buffer on the operatingsystem level

    B. You have to manipulate import queues to transport change requestsC. Import queues should be closed before starting an import using TMS

    D. You can import only an entire import queue

    75) Which of the following statements is correct in regard to preliminary imports?

    A. SAP recommends using preliminary imports rather than imports of entire

    queues.B. Preliminary imports should be performed only in exceptional cases

    C. Change requests imported as preliminary imports remain in the import queue

    D. Change requests are deleted from the import queue after preliminary imports.This

    prevents them from being imported gain with the next import of the entire import

    queue

    76) Which of the following statements is correct in regard to imports into an R/3 System?

    A. Imports can be performed only by using thestart importfunctionality in theTMS

    B. Imports can be performed only by using tp commands on the operating system

    level to prepare the import queue and then using thestart importfunctionality inthe TMS

    C. Imports can be performed only by using tp commands at the operating system

    levelD. Imports can be performed by using either a tp command on the operating system

    level or the TMS import functionality

    77) Which of the following statements is correct in regard to transports between different

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    16/23

    TCS Basis Certification week 3

    transport groups?

    A. They are not possibleB. They can be performed only by using tp on the operating system level with

    special options

    C. They can be performed using the TMS with special options provided by theexpert mode

    D. They require you to adjust the corresponding import queues.

    78) Which of the following statements are correct in regard to transports between

    different transport domains?

    A. They are not possibleB. They require you to create a virtual system and a virtual transport directory

    C. They require you to configure identical transport groups within the different

    transport domains

    D. They require you to create external systems and an external transport directoryE. They require you to adjust the corresponding import queues.

    79) Which of the following statements re correct in regard to the transport control

    program tp?

    A. To perform imports, tp must always be used directly on the operating system

    level

    B. SAP recommends that you use the TMS instead oftp to perform imports

    C. tp is responsible for exporting and importing objects from and to R/3 SystemsD. tp does not observe the sequence of change requests in the import queue when

    performing imports.

    80) Which of the following statements are correct in regard to import queues and import

    buffers?

    A. Import queues are TMS representations in R/3 of the import buffer files on the

    operating system level

    B. Import queues and import buffers are completely independent of each other

    C. Import buffers have to be manipulated before imports can be performed on theoperating system level

    D. Manipulating import buffers may cause serious inconsistencies and should be

    performed only in exceptional cases.

    81) Which of the following statements are correct in regard to the import options

    formerly known as unconditionalmodes?

    A. Import options cannot be used when imports are performed on the operating

    system level using tp.

    B. Import options are used to cause specific rules of the Change and Transport

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    17/23

    TCS Basis Certification week 3

    System (CTS) to be ignored

    C. Import options must be used when importing into multiple clients using tp.

    D. Import options can be selected in the TMS using the expert mode.

    82) Which of the following statements are correct in regard to the sequence of processing

    steps tp follows when performing imports?

    A. tp collectively processes each import step for all change requests in an import

    queue before proceeding with the next import stepB. tpprocesses all import steps for a single request before proceeding to the next

    change request

    C. The processing sequence followed by tp ensures that when a change request with

    a faulty object is followed in the import queue by a change request with thecorrected object, the faulty object will not affect the runtime environment of the

    target system

    D. tp imports and activates ABAP Dictionary structures prior to the main import

    phase to ensure that the current structures are able to receive new data during themain import phase.

    83) Which of the following statements are correct in regard to troubleshooting imports?

    A. In R/3, you cannot display log files that do not depend on a specific request. Forexample, you cannot display log files related to generic import steps, such as

    structure conversion.

    B. SAP recommends that you check the SLOG file and the ALOG file before

    checking the single step log files.C. By default, all return codes greater than eight cause tp to abort a running import

    D. tp is the only transport tool that uses return codes.

    84) Which of the following statements are correct in regard to buffer synchronization?

    A. Transport activities do not affect buffer synchronizationB. Imports affect buffer synchronization even in central R/3 systems

    C.R3trans can invalidate buffer content

    D. Importing data into a production system can significantly impact performance,

    because some buffer content may be invalidated and reloaded. This causes highsystem load

    E. Importing programs and ABAP Dictionary data cannot cause inconsistencies in

    the target system, even if the programs or data affect running programs and theirenvironment

    85) Which of the following statements are correct in regard to the interaction betweentransport tools?

    A. During exports, tp callsR3trans to access the database of the source system and

    extract the objects to be transported

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    18/23

    TCS Basis Certification week 3

    B. tp triggers the transport daemon RDDIMPDP in R/3 using the operating system

    toolsapevt

    C. Using the tables TRBAT and TRJOB, tp communicates with ABAP programsinvolved in the transport process

    D. tp communicates with only RDDIMPDP

    86) Which of the following statements are correct in regard to the R/3 Release strategy?

    A. Functional Releases are automatically shipped to all customersB. Correction Releases provide only corrections and no new functionality with

    respect to the previous R/3 Functional Release

    C. Functional Releases receive only limited OCS maintenance; that is, only very

    urgent corrections are available as Support PackagesD. R/3 Release upgrades are possible only for Correction Releases

    87) Which of the following statements are correct in regard to Support Packages?

    A. Support Packages change the SAP standard of your R/3 System in advance of

    thenext R/3 Release upgrade

    B. You can apply all types of Support Packages to all R/3 installations, regardless

    ofthe components used in the installation

    C. Support Packages are available only to customers who are participants in the

    First

    Customer Shipment (FCS) programD. Different types of Support Packages may be required for R/3 Installations with

    different components

    88) Which of the following statements are correct in regard to the SAP Patch Manager?

    A. The SAP Patch Manager ensures that Support Packages are applied in thecorrect

    sequence

    B. The SAP Patch Manager does not check whether the type of Support Package

    youwish to apply is appropriate for your R/3 installation. It is up to you to decide

    whether, for example, you require a Conflict Resolution Transport.

    C. The SAP Patch Manager does not offer you the chance to protect SAP objectsthat

    you have modified. These objects are automatically overwritten.

    D. The SAP Patch Manager automatically prompts you to call the modificationadjustment Transactions SPDD or SPAU if necessary

    89) Which of the following statements are correct in regard to R/3 Release upgrades?

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    19/23

    TCS Basis Certification week 3

    A. Objects in the customer namespace are not overwritten

    B. A Repository switch is the replacement of your current R/3 Repository by the

    R/3Repository in the new R/3 Release

    C. All customer modifications to ABAP Dictionary object are lost

    D. Customer modifications to SAP objects that you want to preserve must betransferred to the new Release through the modification adjustment process

    90) Which of the following statements are correct in regard to the modificationadjustment process?

    A. Transaction SPAU is used for most ABAP Dictionary objects

    B. Transaction SPDD is used for most ABAP Dictionary objectsC. Not using Transaction SPDD where applicable may cause data loss

    D. During modification adjustment, you must choose to return to the SAP standard

    91) For importing the transports in the ABAP environment, you have the followingoptions:

    a) import all transports in the queue that are ready for the import

    b) import single transports

    c) select a number of transports for import

    d) schedule the import at a certain time

    e) import the transport after an event

    92) Which of the following are tools offered by the CTS in SAP systems?

    More than one answer is correct. Decide whether each answer is true or false.

    a) Transport Organizerb) Client Organizer

    c) Upgrade Organizer

    d) Transport Management Systeme) CTS Organizer

    93) To perform a modification in an SAP system, the following requirements must be met.

    More than one answer is correct. Decide whether each answer is true or false.

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    20/23

    TCS Basis Certification week 3

    a) Developers must be registered as developers in the SAP Service Marketplace

    b) All modifications must be registered in the SAP Service Marketplace

    c) The developer for whom a modification key is requested must have attended thecourse BC400. This is checked by SAP.

    d) The customer must fax or e-mail an object modification request to SAP.

    e) Transaction SE06 must be set globally to "modifiable" in the SAP systemwhere the modification should be executed

    94) Which of the following statements concerning the Change and Transport System arecorrect?

    More than one answer is correct.

    a) The import in the database of the target system is started automatically

    b) A change requests always has one or more tasks.

    c) The transport directory is given by the parameter DIR_TRANS

    d) All customizing needs a customizing change request.e) Small corrections on ABAP programs can be done safely in the production

    system

    95) Which of the following statement are true

    a) Only languages belonging to the same code page are usable without

    restrictions.. b) SAP supports multiple languages with the introduction of Unicode version of

    the SAP solutions

    c) A code page describes the assignment of each characterto binary value.

    d) You can use a single GUI to access both Unicode and non-Unicode systems.

    96) Which of the following statement are true.

    a) Using the MCOD technology, the installation steps are different and it shouldbe installed with the appropriate MCOD installation CD/DVDs

    b) There is one Physical and n number of logical database instance in MCOD

    installations.c) All systems MUST use the same OS/DB release.

    d) Tables with the same name can not exist independently

    in different schemes, with different contents.

    97) Which of the following statements are true?

    a) You can disconnect from SAPinst using the logoff button and then reconnect

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    21/23

    TCS Basis Certification week 3

    by starting SAPinst GUI again.

    b) Step back is possible with restarting the installation.

    c) There is no abort due to errors.d) There are fewer log files, such as sapinst.log.

    e) The SAPinst GUI allows you to monitor the installation progress and see all

    messages issued by SAPinst.

    98) Which of the following statements are true?

    a) Hardware sizing is carried out by Quick Sizer tool.

    b) The load on the CPU caused by the applications, in this case, the SAP

    Software with Unicode increased by about 60 to 70 %c) Newer SAP releases require less sizing requirement than the older releases as

    the SAP code is very much optimized in newer releases.

    d) The dispatcher listen on 33xx

    e) The message server listen on 36xxf) Gateway process listen on 32xx

    g) Print spool service listen on 34xx

    99) SAP recommends ( answer which of the statements are true)

    a) business data and index data to be stored on Raid 1

    b) current logging data to be stored on Raid 5

    c) Database configuration data to be stored on Raid 1

    d) Historic log files to be stored in offline media such as Tape

    100) Which of the following statements are ture?

    a) Preparation of DVDs involves making sure correct CDs are available and

    adjusting the file structure inside the CD to suit to the particularsolution installation

    b) During installation copy package option allows to take a back up copy if the

    installation CD/DVD Which might be useful in restoring thesoftware just in case .

    c) For windows installation Sap software can run only on NTFS partitionNT patchR3dllins.exe are released in NTPatch CD/DVD

    d) Windows file cache is reduced in size so that application server software, suchas an SAP system, has more resources available.

    e) SAPinst tool require java SDK installation in all OS platform

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    22/23

    TCS Basis Certification week 3

    f) In UNIX operating system as part of the installation we need to create some

    key directories such as /usr/sap , /usr/trans and /usr/sap/sapsid

    g) During installation JDK should be installed and JAVA_HOME to be

    configured before Oracle installation as Oracle OUI also use Java

    for its installation

    101) Which of the following statements are true ?

    a) Patching of SAP GUI is done thro Presentation Cd/DVD and not thro SAP

    GUIb) SAP GUI installation server and distribution server service can be provided on

    the single host machine.

    c) Once SAP GUI updates and patching enabled thro SAP installation server,

    individual SAP gui installed on client can not be updated manuallyd) For SAP GUI for java , config files are to be manually configured before we

    start to usee) SAPinst engine can only be connected thro 21212 and 21213 from the remote

    SAP inst gui engine

    f) SAPinst stops when an error occurred and automatically continue after the errorsituations is rectified.

    102) Which of the following statements are ture?

    a) Oracle intrim patches are applied thro either OUI or OPatch tool

    b) Installation of SAP ECC 5.0 unicode system requires both the Unicode version

    of the kernel and non Unicode version of the Kernel CD/DVDc) In non Unicode system installation SAP recommends that SAP data folder and

    LOG folder to be on the same disk to improve performance

    d) After installation by default ECC installs 3 client which are 000,066 and 100.

    e) In an ABAP + Java installation Java installation always done before ABAPinstances are setup

    f) Java system client numbers should match with the ABAP system client number

    during the installationg) The minimum recommended RAM for the SAP Web AS Java is 1024

    h) While installing the dialog instance, the port number that you specify for the

    message server port can be different from the one specified on the centralinstance host.

    I) You cannot use a database instance ID that is different from the SAP system

    ID.

    J) The SAP Kernel CD is required for the database instance installation.

    Internal Use Only

  • 7/31/2019 Adm200 New Qs

    23/23

    TCS Basis Certification week 3

    103) Which of the following statements are true?

    a) You can install a new SAP license on your SAP system. The license key

    number must be 24 characters.

    b) If you have installed your SAP system from the delivered SAP DVDs(without System Copy or migration), you don.t have to configure CTS

    after installation.

    c) You administer the SAP Web AS Java from within the SAP ECC usingtransaction SU01.

    d) After installation it is impossible to change the Java add-on client to the ABAP

    system

    104 Which of the following are true

    a) If you perform a client copy, you need change SAP ECC client of the

    j2ee_admin user for proper communication between ABAP and JAVA

    b) The installation check checks, among others, whether the release number inthe SAP ABAP programs in the application server the one stored in the

    database system.

    c) SAP router can be used as a replacement for the Firewall for the SAPinstallations as it allows only restricted access to the SAP systems.

    d) It is recommended to run ABAP load using SGEN immediately after

    installation