ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS IFB # 1691 RRMM Project No. 14148.09 June 18, 2019 This Addendum forms a part of the Construction Documents and modifies the original bidding documents dated June 7, 2019. The information in this Addendum supersedes any contradictory information or omission set forth in the Contract Documents. Where any component of the Contract Documents is modified or deleted by this Addendum, the unaltered components of that Section, Article, or Drawing shall remain in effect. Acknowledge receipt of this Addendum by inserting its number and date in the Proposal Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of two (2) pages, (1) clarification, owner comments at the pre-bid meeting, six (6) pre-bid question responses, and the pre-bid conference sign-in sheet. CLARIFICATIONS 1.1 At entrance locations, existing sidewalks to be demolished may be sawcut 4”-6” from storefront sill in order to prevent possible damage to existing storefront doors. Provide flush condition between new and existing concrete edges. Existing concrete to remain shall be cleaned by scraping any existing exposed sealant and power washing.

ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

ADDENDUM NO. 1

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS

SUFFOLK PUBLIC SCHOOLS IFB # 1691

RRMM Project No. 14148.09

June 18, 2019

This Addendum forms a part of the Construction Documents and modifies the original bidding documents dated June 7, 2019. The information in this Addendum supersedes any contradictory information or omission set forth in the Contract Documents. Where any component of the Contract Documents is modified or deleted by this Addendum, the unaltered components of that Section, Article, or Drawing shall remain in effect. Acknowledge receipt of this Addendum by inserting its number and date in the Proposal Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of two (2) pages, (1) clarification, owner comments at the pre-bid meeting, six (6) pre-bid question responses, and the pre-bid conference sign-in sheet.

CLARIFICATIONS

1.1 At entrance locations, existing sidewalks to be demolished may be sawcut 4”-6” from storefront sill in

order to prevent possible damage to existing storefront doors. Provide flush condition between new and

existing concrete edges. Existing concrete to remain shall be cleaned by scraping any existing exposed

sealant and power washing.

Page 2: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

2

PERTAINING TO THE SPECIFICATIONS

1.2 SECTION 000213- INSTRUCTIONS TO BIDDERS: Page 3, where item 9 states:

“There are two (2) Deductive Bid Alternates scheduled for this contract.”

Revise to:

“There is one (1) Deductive Bid Alternate scheduled for this contract.”

PERTAINING TO THE DRAWINGS for MT. VERNON ELEMENTARY SCHOOL

1.3 SHEET C-501 – “DETAILS”: CONSTRUCTION JOINT detail, DELETE label "21A STONE BASE".

OWNER COMMENTS AT PRE-BID MEETING

1 If a bidder seeks to withdraw a bid, bid withdrawal will need to be substantiated by calculations.

Owner’s attorney will evaluate.

2 Bidder may perform asbestos testing at their own expense. However, the owner will be investigating

for the presence of asbestos in the areas sited on the construction documents. The results of the testing

will be made known after award of bid. Contract price will be adjusted based on alternate pricing

included on Bid Form.

3 Bidders visiting the site before June 17 will need to contact and make arrangements with Anthony

Hinds or Terry Napier prior to the visit.

END OF ADDENDUM NO. 1

Page 3: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL

EXTERIOR RENOVATIONS

SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected]

CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications:

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

Clarification Requested:

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

________________________________________________________________________________________

___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply:

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

_________________________________________________________________________________________

__________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

(Signature)

(Date) (Title)

tcanfield
Typewritten Text
1- Section 000213-3 references 2 deductive bid alternates but only only 1 is shown on the bid form, please advise
tcanfield
Typewritten Text
2- June 24th is mentioned as the bid due date and the award date. Please advise the latest date the project
tcanfield
Typewritten Text
will be awarded.
tcanfield
Typewritten Text
tcanfield
Typewritten Text
tcanfield
Typewritten Text
3- Will there be an office space in the existing school that will be offered to be used for construction personnel
tcanfield
Typewritten Text
and to hold job site meetings?
tcanfield
Typewritten Text
Heartland Construction
tcanfield
Typewritten Text
TJ Canfield
tcanfield
Image
tcanfield
Typewritten Text
6/10/19
jharris
Typewritten Text
jharris
Text Box
1. Only 1 deductive bid alternate (asbestos containing panels) - corrected by addendum #1.
jharris
Text Box
2. Anticipated Notice of Award date is June 24, 2019.
jharris
Text Box
3. The owner has agreed to provide a temporary office space inside the school for the duration of the project prior to school beginning in the fall. A portable trailer is not required to serve as the GC's office.
jharris
Text Box
Jeff Harris Project Mgr - RRMM
jharris
Text Box
6-13-19
Page 4: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected] CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

Clarification Requested: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ________________________________________________________________________________________ ___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ _________________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

(Signature)

(Date) (Title)

6/14/2019

C-501

Please provide a soils report or a quantity of unsuitable material that is to be removed per combination sidewalk /curb detail on C-501. If a quantity cannot be determined, please verify that and unsuitable material will be handled via charge order.

VIRTEXCO

757-466-1115

David Barr

David Barr

There is no unsuitable material anticipated for the project. If any is encountered it will be handled via change order as necessary.

6/18/2019 MSA

Page 5: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected] CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications:

_

___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ________________________________________________________________________________________ ___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ _________________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

(Signature)

(Date) (Title)

6/14/2019

AD101_____________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________

Clarification Requested: Please verify that a temporary partition will not be required on the interior of the building where the doors will be removed and replaced. If a temporary partition is required, please provide a location and detail. _____________________________________________________________________

VIRTEXCO

757-466-1115

David Barr

David Barr

jharris
Text Box
A temporary partition should not be required; however, it is expected that the opening shall be protected if the demo and new work cannot be completed within the same day.
jharris
Text Box
Jeff Harris Project Mgr - RRMM
jharris
Text Box
6-18-19
Page 6: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected] CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

Clarification Requested: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ________________________________________________________________________________________ ___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ _________________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

(Signature)

(Date) (Title)

6/14/2019

AIA-201 - General Conditions of the Contract for Construction

Please verify if the contractor is required for submitting for the building permit, or if the building permit has already been submitted and approved. Also, please verify if the contractor is to include the cost of the building permitin their bid.

VIRTEXCO

757-466-1115

David Barr

David Barr

jharris
Text Box
The GC is required to obtain and pay for the building permit. Due to the quick turn around time for this project, the contract documents were not submitted for review prior to bid. We anticipate having City approval very soon.
jharris
Text Box
Jeff Harris Project Mgr - RRMM
jharris
Text Box
6-18-19
Page 7: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected] CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

Clarification Requested: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ________________________________________________________________________________________ ___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ _________________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

(Signature)

(Date) (Title)

6/14/2019

AIA-201 General Conditions of the Contract for Construction

Please verify that the cost of inspections will be by the owner and the contractor will not be required to includeany testing/inspections for this project. If the contractor is to include testing or inspection, please provide a matrixof testing and inspections that will be required.

VIRTEXCO

757-466-1115

VIRTEXCO

David Barr

jharris
Text Box
Special Inspections is not anticipated for this project. Any hazardous material testing will be conducted by the owner.
jharris
Text Box
Jeff Harris Project Mgr - RRMM
jharris
Text Box
6-18-19
Page 8: ADDENDUM NO. 1 JOHN YEATES MIDDLE SCHOOL …...JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09 PRE-BID QUESTION FORM 1 PRE-BID QUESTION

JOHN YEATES MIDDLE SCHOOL EXTERIOR RENOVATIONS SUFFOLK PUBLIC SCHOOLS RRMM PROJECT NO. 14148-09

PRE-BID QUESTION FORM 1

PRE-BID QUESTION FORM

To: Mr. Anthony Hinds, Purchasing Manager [email protected] CC: Mr. Jeff Harris, Project Manager, RRMM Architects [email protected]

Re: John Yeates Middle School Exterior Renovations Date Submitted:

Relevant Drawings and Specifications: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

Clarification Requested: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ________________________________________________________________________________________ ___________________________________________________________________________________________

(Company Name) (Sender’s Name)

(Fax No.) (Signature)

Reply: ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ _________________________________________________________________________________________ __________________________________________________________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________

(Signature)

(Date) (Title)

CS101

6/14/2019

Please verify that the flag pole shown on drawing CS101is to be note 8 in lieu of note 7 by the plan east entrance.

VIRTEXCO David Barr

757-466-1115 David Barr

Note 7 at flagpole should be labeled note 8.

6/18/2019 MSA