19
Addendum 1 Page 1 of 3 ADDENDUM NO. 1 To: All Plan Holders of Record and Interested Parties Project: ARC Transfer Center Canopy Phase I – 2012 Project IIW Project No. 11095-01 Issue Date: Thursday, August 16, 2012 Bids Due: 2:00 PM, Tuesday, August 28, 2012 The following additions, revisions, corrections, and clarifications contained herein shall become part of the Construction Contract Documents for the Project, and shall be included in the Scope of Work and Bid Proposals to be submitted. References made below to Specifications and Construction Drawings shall be used as a general guide only. Bidders shall determine for themselves the full scope of work affected by the Addendum items. The following Addendum is part of the Construction Contract Documents dated July 18, 2012. This Addendum consists of the following: Addendum No. 1, 3 Pages Predetermined Wage Rate for State of Iowa – 6 Pages 2012 Predetermined Wage Rate for State of Iowa – 1 Page Addendum Drawings (7 Total): C/AD1-1 – 3 SHEETS S/AD1-1 thru S/AD1-4 – 4 SHEETS Plan Holders List, 2 Pages CHANGES TO SPECIFICATIONS: 1. SECTION 00200: Delete item 106 in its entirety. 2. SECTION 005200: Further Conditions: Third paragraph- Change “five (5)” to “two (2)”. 3. SECTION 005600, Item 9. General Comment related to this section. Contractors to utilize 2012 Predetermined Wage Rate for the State of Iowa, Zone 2. 4. SECTION 011000, 1.4.A.1. Add the following: “The intent is to complete this project 100% by this date, however, if weather does not make this possible, the contractor may be allowed to complete painting of the project (if alternate is accepted) when weather allows in the spring. Contractors do not need to provide for temporary heating of the structure to complete the painting by this date.”

Addendum No 1 - City of Dubuque

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Addendum No 1 - City of Dubuque

Addendum 1 Page 1 of 3

ADDENDUM NO. 1

To: All Plan Holders of Record and Interested Parties

Project: ARC Transfer Center Canopy Phase I – 2012 Project IIW Project No. 11095-01 Issue Date: Thursday, August 16, 2012

Bids Due: 2:00 PM, Tuesday, August 28, 2012 The following additions, revisions, corrections, and clarifications contained herein shall become part of the Construction Contract Documents for the Project, and shall be included in the Scope of Work and Bid Proposals to be submitted. References made below to Specifications and Construction Drawings shall be used as a general guide only. Bidders shall determine for themselves the full scope of work affected by the Addendum items.

The following Addendum is part of the Construction Contract Documents dated July 18, 2012.

This Addendum consists of the following:

Addendum No. 1, 3 Pages Predetermined Wage Rate for State of Iowa – 6 Pages 2012 Predetermined Wage Rate for State of Iowa – 1 Page Addendum Drawings (7 Total):

� C/AD1-1 – 3 SHEETS � S/AD1-1 thru S/AD1-4 – 4 SHEETS

Plan Holders List, 2 Pages

CHANGES TO SPECIFICATIONS: 1. SECTION 00200: Delete item 106 in its entirety.

2. SECTION 005200: Further Conditions: Third paragraph- Change “five (5)” to “two

(2)”.

3. SECTION 005600, Item 9. General Comment related to this section. Contractors to utilize 2012 Predetermined Wage Rate for the State of Iowa, Zone 2.

4. SECTION 011000, 1.4.A.1. Add the following: “The intent is to complete this project

100% by this date, however, if weather does not make this possible, the contractor may be allowed to complete painting of the project (if alternate is accepted) when weather allows in the spring. Contractors do not need to provide for temporary heating of the structure to complete the painting by this date.”

Page 2: Addendum No 1 - City of Dubuque

Addendum 1 Page 2 of 3

5. SECTION 012300.3.1.C Alternate: Add “, as well as all exposed electrical conduit, boxes and light supports”.

6. SECTION 015000:

a. 1.4.A – Change to read – “Contractors will be allowed to utilize existing water

and power on site, for construction purposes only, at no cost to the contractors.

b. 3.3.E - Delete item in its entirety.

7. SECTION 055000.2.4,B.1: Add note ”Products by manufacturers other than those listed will be acceptable as long as the product meets the requirements 2-5 below.”

8. SECTION 061053:

a. 2.2.A – Delete: “and AWPA C9 (plywood),” b. 2.2.D – Change to read: “Application: Treat blocking and dimensional lumber.” c. 2.4.B – Change “C-C Plugged Exterior” to “CDX”.

9. SECTION 033053.3.8.A: Change “Contractor” to “Owner”.

CHANGES TO DRAWINGS:

1. SHEET A3.0:

a. Detail 16:

i. Add note for bent plates to read: “Continuous 4x6x1/8 bent plate on east top edge of precast beam and continuous 4x10x1/8 bent plate on west top edge of precast beam”.

ii. Change weld of bent plates from “2@12” to “3”. b. Detail 19:

i. Add note for bent plates to read: “Continuous 4x6x1/8 bent plate on east and west top edges of precast beam”.

ii. Change weld of bent plates from “2@12” to “3”.

2. SHEET S5.1: a. Detail 11: Replace with Addendum Drawing S/AD1-1. b. Detail 12: Replace with Addendum Drawing S/AD1-2. c. Detail 13: Replace with Addendum Drawing S/AD1-3. d. Detail 14: Replace with Addendum Drawing S/AD1-4.

3. SHEET C3.10:

a. Refer to Addendum Drawing C/AD1-1, 1 of 3 thru 3 of 3, for modifications to this

sheet. b. Clarification: Extent of work on the site is limited to area within “Detail A” as well

as reworking parking island striping. No work is required north of the canopy.

Page 3: Addendum No 1 - City of Dubuque
Page 4: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 1

General Decision Number: IA100001 05/14/2010 IA1

Superseded General Decision Number: IA20080001

State: Iowa

Construction Types: Heavy and Highway

Counties: Adair, Adams, Allamakee, Appanoose, Audubon, Benton, Black Hawk, Boone,

Bremer, Buchanan, Buena Vista, Butler, Calhoun, Carroll, Cass, Cedar, Cerro Gordo, Cherokee,

Chickasaw, Clarke, Clay, Clayton, Clinton, Crawford, Dallas, Davis, Decatur, Delaware, Des

Moines, Dickinson, Dubuque, Emmet, Fayette, Floyd, Franklin, Fremont, Greene, Grundy,

Guthrie, Hamilton, Hancock, Hardin, Harrison, Henry, Howard, Humboldt, Ida, Iowa, Jackson,

Jasper, Jefferson, Johnson, Jones, Keokuk, Kossuth, Lee, Linn, Louisa, Lucas, Lyon, Madison,

Mahaska, Marion, Marshall, Mills, Mitchell, Monona, Monroe, Montgomery, Muscatine,

O'Brien, Osceola, Page, Palo Alto, Plymouth, Pocahontas, Polk, Pottawattamie, Poweshiek,

Ringgold, Sac, Shelby, Sioux, Story, Tama, Taylor, Union, Van Buren, Wapello, Warren,

Washington, Wayne, Webster, Winnebago, Winneshiek, Woodbury, Worth and Wright Counties

in Iowa.

STATEWIDE EXCEPT SCOTT COUNTY HEAVY CONSTRUCTION PROJECTS

(Does not include work on or pertaining to the Mississippi or Missouri Rivers or on Water and

Sewage Treatment Plants), AND HIGHWAY PROJECTS (does not include building structures

in rest areas)

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 05/14/2010

SUIA2002-003 12/01/2008

CARPENTERS AND PILEDRIVERMEN: Rates Fringes

ZONE 1 23.92 7.83

ZONE 2 21.83 7.83

ZONE 3 21.83 7.83

ZONE 4 20.80 5.70

ZONE 5 20.25 4.30

CONCRETE FINISHER:

ZONE 1 21.77 6.00

ZONE 2 21.77 6.00

ZONE 3 21.77 6.00

ZONE 4 19.55 4.20

ZONE 5 17.95 4.20

Page 5: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 2

ELECTRICIANS: (STREET AND HIGHWAY LIGHTING

AND TRAFFIC SIGNALS)

ZONE 1, ZONE 2, AND ZONE 3 20.55 4.20

ZONE 4 19.25 4.20

ZONE 5 17.00 4.20

IRONWORKERS: (SETTING OF STRUCTURAL STEEL)

ZONES 1 AND 2 25.05 7.13

ZONE 3 24.75 7.43

ZONE 4 20.65 5.85

LABORERS: Rates Fringes

ZONE 1 AND ZONE 2

GROUP AA 20.06 7.75

GROUP A 19.26 7.75

GROUP B 17.38 7.75

GROUP C 14.13 7.75

ZONE 3

GROUP AA 20.06 7.75

GROUP A 19.26 7.75

GROUP B 17.38 7.75

GROUP C 14.13 7.75

ZONE 4

GROUP A 18.60 4.85

GROUP B 17.28 4.85

GROUP C 14.80 3.80

ZONE 5

GROUP A 17.55 4.40

GROUP B 14.55 4.40

GROUP C 13.95 4.40

POWER EQUIPMENT OPERATORS:

ZONE 1

GROUP A 26.30 12.10

GROUP B 24.70 12.10

GROUP C 22.20 12.10

GROUP D 22.20 12.10

ZONE 2

GROUP A 25.55 12.10

GROUP B 23.95 12.10

GROUP C 21.20 12.10

GROUP D 21.20 12.10

Page 6: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 3

ZONE 3

GROUP A 26.70 12.40

GROUP B 24.90 12.40

GROUP C 23.90 12.40

GROUP D 23.90 12.40

ZONE 4

GROUP A 25.50 6.40

GROUP B 24.36 6.40

GROUP C 22.28 6.17

GROUP D 22.28 6.17

ZONE 5

GROUP A 22.07 4.40

GROUP B 21.03 4.40

GROUP C 19.70 4.40

GROUP D 18.70 4.40

TRUCK DRIVER (AND PAVEMENT MARKING DRIVER/SWITCHPERSON)

ZONE 1 20.10 7.85

ZONE 2 20.10 7.85

ZONE 3 20.10 7.85

ZONE 4 19.30 4.40

ZONE 5 17.35 4.40

ZONE DEFINITIONS

ZONE 1 The Counties of Polk, Warren and Dallas for all Crafts, and Linn County

Carpenters only.

ZONE 2 The Counties of Dubuque for all Crafts and Linn County for all Crafts except

Carpenters.

ZONE 3 The Cities of Burlington, Clinton, Fort Madison, Keokuk, and Muscatine (and

abutting municipalities of any such cities).

ZONE 4 Story, Black Hawk, Cedar, Jasper, Jones, Jackson, Louisa, Madison, and Marion

Counties; Clinton County (except the City of Clinton), Johnson County,

Muscatine County (except the City of Muscatine), the City of Council Bluffs, Lee

County and Des Moines County.

ZONE 5 All areas of the state not listed above.

Page 7: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 4

LABORER CLASSIFICATIONS - ALL ZONES

GROUP AA - Skilled pipelayer (sewer, water and conduits) and tunnel laborers (zones 1, 2 and

3).

GROUP A - Carpenter tender on bridges and box culverts; curb machine (without a seat); deck

hand; diamond & core drills; drill operator on air tracs, wagon drills and similar drills; form

setter/stringman on paving work; gunnite nozzleman; joint sealer kettleman; laser operator;

pipelayer (sewer, water, and conduits) Zone 4 & 5; powderman tender; powderman/blaster; saw

operator; tunnel laborer (zones 4 and 5).

GROUP B - Air, gas, electric tool operator; barco hammer; carpenter tender; caulker; chain

sawman; compressor (under 400 cfm); concrete finisher tender; concrete processing materials

and monitors; cutting torch on demolition; drill tender; dumpmen; electric drills; fence erectors;

form line expansion joint assembler; form tamper; general laborer; grade checker; handling and

placing metal mesh, dowel bars, reinforcing bars and chairs; hot asphalt laborer; installing

temporary traffic control devices; jackhammerman; mechanical grouter; painter (all except

stripers); paving breaker; planting trees, shrubs and flowers; power broom (not self-propelled);

power buggyman; rakers; rodman (tying reinforcing steel); sandblaster; seeding and mulching;

sewer utility topman/bottom man; spaders; stressor or stretcherman on pre or post tensioned

concrete; stringman on re/surfacing/no grade control; swinging stage, tagline, or block and

tackle; tampers; timberman; tool room men and checkers; tree climber; tree groundman;

underpinning and shoring caissons over twelve feet deep; vibrators; walk behind trencher; walk

behind paint stripers; walk behind vibrating compactor; water pumps (under three inch); work

from bosun chair.

GROUP C - Scale weigh person; traffic control/flagger, surveillance or monitor; water carrier.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS - ALL ZONES

GROUP A - Asphalt breakdown roller (vibratory); Asphalt laydown machine; asphalt plant;

Asphalt screed; bulldozer (finish); central mix plant; concrete pump; crane; crawler tractor

pulling scraper; directional drill (60,000 (lbs) pullback and above); dragline and power shovel;

dredge engineer; excavator (over ½ cu. yd.); front end loader (4 cy and over); horizontal boring

machine; master mechanic; milling machine (over 350 hp); motor grader (finish); push cat;

rubber tired backhoe (over ½ cu. yd.); scraper (12 cu. yd. and over or finish); Self-propelled

rotary mixer/road reclaimer; sidebroom tractor; slipform portland concrete paver; tow or push

boat; trenching machine (Cleveland 80 or similar).

GROUP B - Articulated off road hauler, asphalt heater/planer; asphalt material transfer vehicle;

Asphalt roller; belt loader or similar loader; bulldozer (rough); churn or rotary drill; concrete

curb machine; crawler tractor pulling ripper, disk or roller; deck hand/oiler; directional drill (less

than 60,000 (lbs) pullback); distributor; excavator (1/2 cu. yd. and under); form riding concrete

paver; front end loader (2 to less than 4 cu. yd.); group equipment greaser; mechanic; milling

machine (350 hp. and less); paving breaker; portland concrete dry batch plant; rubber tired

Page 8: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 5

backhoe (1/2 cu. yd. and under); scraper (under 12 cu. yd.); screening, washing and crushing

plant (mobile, portable or stationary); shoulder machine; skid loader (l cu. yd. and over);

subgrader or trimmer; trenching machine; water wagon on compaction.

GROUP C - Boom & winch truck; concrete spreader/belt placer; deep wells for dewatering; farm

type tractor (over 75 hp.) pulling disc or roller; forklift; front end loader (under 2 cu. yd.); motor

grader (rough); pile hammer power unit; pump (greater than three inch diameter); pumps on well

points; safety boat; self-propelled roller (other than asphalt); self-propelled sand blaster or shot

blaster, water blaster or striping grinder/remover; skid loader (under 1 cu. yd.); truck mounted

post driver.

GROUP D - Boiler; compressor; cure and texture machine; dow box; farm type or utility tractor

(under 75 hp.) pulling disk, roller or other attachments; group greaser tender; light plants;

mechanic tender; mechanical broom; mechanical heaters; oiler; pumps (under three inch

diameter); tree chipping machine; truck crane driver/oiler.

CARPENTERS AND PILEDRIVERMEN (ZONE 5)

Setting of structural steel; any welding incidental to bridge or culvert construction; setting

concrete beams.

---------------------------------------------------------------------------------------------------------------------

WELDERS: Receive rate prescribed for craft performing operation to which welding is

incidental.

Unlisted classifications needed for work not included within the scope of the classifications

listed may be added after award only as provided in the labor standards contract clauses (29 CFR

5.5 (a) (1) (ii)).

---------------------------------------------------------------------------------------------------------------------

In the listing above, the "SU" designation means that rates listed under that identifier do not

reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions

whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination

matter

* a conformance (additional classification and rate) ruling

Page 9: Addendum No 1 - City of Dubuque

PREDETERMINED WAGE RATE IA10-1.2

IA100001 - 6

On survey related matters, initial contact, including requests for summaries of surveys, should be

with the Wage and Hour Regional Office for the area in which the survey was conducted because

those Regional Offices have responsibility for the Davis-Bacon survey program. If the response

from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be

followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact

should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U. S. Department of Labor

200 Constitution Avenue, N. W.

Washington, D. C. 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the

action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N. W.

Washington, D. C. 20210

The request should be accompanied by a full statement of the interested party's position and by

any information (wage payment data, project description, area practice material, etc.) that the

requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly

to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U. S. Department of Labor

200 Constitution Avenue, N. W.

Washington, D. C. 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Page 10: Addendum No 1 - City of Dubuque

2012 PREDETERMINED WAGE RATEFOR STATE OF IOWA

ZONE DEFINITIONS with LEGEND

ZONE 1Dallas CountyPolk CountyWarren CountyLinn County• Carpenters Only

ZONE 2Dubuque CountyLinn County• All Crafts

Except Carpenters

ZONE 3BurlingtonClintonFort MadisonKeokukMuscatine• Abutting Municipalities

For All of the Above

ZONE 4Black Hawk CountyCedar CountyClinton County• Except City of ClintonCity of Council BluffsDes Moines County• Except City of BurlingtonJackson CountyJasper CountyJohnson CountyJones CountyLee County• Except Cities of

Louisa CountyMadison CountyMarion CountyMuscatine County• Except the City of MuscatineStory County

LYON OSCEOLA DICKINSON EMMET KOSSUTH WINNEBAGO WORTH MITCHELL HOWARD WINNESHIEK ALLAMAKEE

SIOUX O'BRIEN CLAY PALO ALTO HANCOCK CERRO GORDOFLOYD CHICKASAW

FAYETTE CLAYTON

PLYMOUTH CHEROKEE BUENA VISTA POCAHONTAS HUMBOLDT WRIGHT FRANKLIN BUTLER BREMER

WOODBURY IDA SAC CALHOUN

WEBSTER

HAMILTON HARDIN GRUNDYBLACK HAWK BUCHANAN DELAWARE

MONONA CRAWFORD CARROLL GREENE BOONE STORY MARSHALL

TAMA BENTON J ONES JACKSON

HARRISON SHELBY AUDUBON GUTHRIE JASPER POWESHIEK IOWA JOHNSON

CEDAR

CLINTON

POTTAWATTAMIE CASS ADAIR MADISON MARION MAHASKA KEOKUK WASHINGTON

MUSCATINE

MILLS MONTGOMERY ADAMS UNION CLARKE LUCAS MONROE WAPELLO JEFFERSON HENRY

LOUISA

DES MOINES

FREMONT PAGE TAYLOR RINGGOLD DECATUR WAYNE APPANOOSE DAVIS VAN BURENLEE

Scott County is NOTcovered under theIowa Wage Decision

ZONE 5All Areas of the StateNot Noted Above or Below

LINN

DUBUQUE

SCOTT

DALLAS POLK

WARREN

Ft. Madison and Keokuk

Page 11: Addendum No 1 - City of Dubuque

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVE BEENPREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED ORDISTRIBUTED IN ANY FORM

WITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

Project Description:

Date:Sheet:Drawing No:

Project No:

IIW, P.C.

CITY OF DUBUQUEARC TRANSFER CENTER PHASE 1 CANOPY - 2012 PROJECT

3355 JOHN F. KENNEDY CIRCLE, DUBUQUE, IOWA

ADDENDUM 1SITE PLAN

Page 12: Addendum No 1 - City of Dubuque

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVE BEENPREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED ORDISTRIBUTED IN ANY FORM

WITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

Project Description:

Date:Sheet:Drawing No:

Project No:

IIW, P.C.

CITY OF DUBUQUEARC TRANSFER CENTER PHASE 1 CANOPY - 2012 PROJECT

3355 JOHN F. KENNEDY CIRCLE, DUBUQUE, IOWA

ADDENDUM 1SITE PLAN

Page 13: Addendum No 1 - City of Dubuque

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVE BEENPREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED ORDISTRIBUTED IN ANY FORM

WITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

Project Description:

Date:Sheet:Drawing No:

Project No:

IIW, P.C.

CITY OF DUBUQUEARC TRANSFER CENTER PHASE 1 CANOPY - 2012 PROJECT

3355 JOHN F. KENNEDY CIRCLE, DUBUQUE, IOWA

ADDENDUM 1SITE PLAN

Page 14: Addendum No 1 - City of Dubuque

2

6' - 9 5/8"

9' - 10"

T.O.B.

T/COLUMN

(2) L 5x3x1/4x0'-6" LLV

WT 5x34x0'-8"

(2) 3/4" DIATHREADED STUDS

BY P.C. MFR

LONG SLOTTED HOLES

PTFE SLIDEBEARINGS

1'-2"x10" EMBED PLATEBY P.C. MFR

3-SIDES

X-BRACING BYJOIST MFR

ARCHED CHORD JOIST

5" 5"

10"

SERVICE LOADS TOPRECAST BEAM(@ EA JOIST):D: 1180#S: 3040#W: 1000# LONG 1490# UP 2080# DOWN

3/8" BEARING PAD

P.C. BEAMS SHALL BEDESIGNED FOR TORSIONDUE TO LATERAL LOADSAPPLIED @ T.O.B.

6' - 10"

BOT/BM

TYP

P.C. BM

C-I-P COL

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVEBEEN

PREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED OR

DISTRIBUTED IN ANY FORMWITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

INTEGRITY.EXPERTISE.SOLUTIONS.

www.iiwengr.com 800.556.4491

Project Description:

Date:Sheet:

Drawing No:

Project No:

IIW, P.C. C

8/16/2012 10:02:19 AM

REVISED DETAIL 11/S5.1

ARC TRANSFER CENTER PHASE I

11095-01

LWR

S/AD1-1

08/16/121 OF 1

1" = 1'-0"11 JOIST BEARING AT GRID 2

Page 15: Addendum No 1 - City of Dubuque

1

16' - 0"

12' - 11 5/8"

T.O.B.

T/COLUMN

(2) L 5x3x1/4x0'-6" LLV

WT 5x34x0'-8"

(2) 3/4" DIATHREADED STUDS

BY P.C. MFR

STD HOLES

1'-2"x10" EMBED PLATEBY P.C. MFR

3-SIDES

X-BRACING BYJOIST MFR

ARCHED CHORD JOIST

SERVICE LOADS TOPRECAST BEAM(@ EA JOIST):D: 1320#S: 7440#W: 650# TRANS 1000# LONG 1740# UP 2180# DOWN

5" 5"

10"

3/8" BEARING PAD

P.C. BEAMS SHALL BEDESIGNED FOR TORSIONDUE TO LATERAL LOADSAPPLIED @ T.O.B.

13' - 0"

BOT/BM

C-I-P COL

P.C. BM

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVEBEEN

PREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED OR

DISTRIBUTED IN ANY FORMWITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

INTEGRITY.EXPERTISE.SOLUTIONS.

www.iiwengr.com 800.556.4491

Project Description:

Date:Sheet:

Drawing No:

Project No:

IIW, P.C. C

8/16/2012 10:02:20 AM

REVISED DETAIL 12/S5.1

ARC TRANSFER CENTER PHASE I

11095-01

LWR

S/AD1-2

08/16/121 OF 1

1" = 1'-0"12 JOIST BEARING AT GRID 1

Page 16: Addendum No 1 - City of Dubuque

(2) L 5x3x1/4x0'-6"

WT 5x34x0'-8"

1'-2"x10" EMBED PLATEBY P.C. MFR

ARCHED CHORD JOIST

X-BRACING BYJOIST MFR

(2) 3/4" DIATHREADED STUDS

BY P.C. MFR

7" 7"

1' - 2"

16' - 0"

12' - 11 5/8"

T.O.B.

T/COLUMN

TYP1" CLEARANCE

TYP3"

EM

BE

D6"

MIN

3/8" BEARING PAD

3/4" COIL ROD -DRILL & EPOXY INTO COLUMN

2" DIA GROUT TUBE, TYP

PRECAST CONC BEAM, TYP

CAST IN PLACECONCRETE COLUMN

NOTE:BEAM CONNECTION TO COLUMNSHALL BE DESIGNED TO TRANSFERTORSION INTO COLUMN.

13' - 0"BOT/BM

5 1/2"

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVEBEEN

PREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED OR

DISTRIBUTED IN ANY FORMWITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

INTEGRITY.EXPERTISE.SOLUTIONS.

www.iiwengr.com 800.556.4491

Project Description:

Date:Sheet:

Drawing No:

Project No:

IIW, P.C. C

8/16/2012 10:02:20 AM

REVISED DETAIL 13/S5.1

ARC TRANSFER CENTER PHASE I

11095-01

LWR

S/AD1-3

08/16/121 OF 1

1" = 1'-0"13 LONGITUDINAL FRAMING SECTION

Page 17: Addendum No 1 - City of Dubuque

16' - 0"T.O.B.

(2) L 5x3x1/4x0'-6"

WT 5x34x0'-8"

1'-2"x10" EMBED PLATEBY P.C. MFR

ARCHED CHORD JOIST, TYP

X-BRACING BYJOIST MFR

TYP

7" 7"

1' - 2"

13' - 0"

BOT/BM

7"

P/C BEAM

5 1/2"

(2) 3/4" DIA THREADEDSTUDS BY P.C. MFR

Addendum Drawing Issue Information:

Drawn By:

COPYRIGHT 2012 ALL RIGHTSRESERVED

THESE DOCUMENTS HAVEBEEN

PREPARED SPECIFICALLYFOR THIS PROJECT ONLY.

NO PART OF THIS DOCUMENTMAY BE REPRODUCED OR

DISTRIBUTED IN ANY FORMWITHOUT THE PERMISSION OFIIW, P.C. ALL INFORMATION IN

THIS DOCUMENT ISCONSIDERED PROPERTY OF

IIW, P.C.

INTEGRITY.EXPERTISE.SOLUTIONS.

www.iiwengr.com 800.556.4491

Project Description:

Date:Sheet:

Drawing No:

Project No:

IIW, P.C. C

8/16/2012 10:02:21 AM

REVISED DETAIL 14/S5.1

ARC TRANSFER CENTER PHASE I

11095-01

LWR

S/AD1-4

08/16/121 OF 1

1" = 1'-0"14

LONGITUDINAL FRAMING SECTION @RAKE

Page 18: Addendum No 1 - City of Dubuque

IIW Planholders List

Bid Date: 8/28/2012

Bid Time: 2:00 p.m.

Addenda: 1Engineer's Estimate:

ARC Transfer Center Canopy Phase I – 2012 Project

Project Team: Mark Fassbinder, Lauren Ray, Jim Kaune

Alternate A:

Alternate B:

Alternate C:

Mailing Address PhoneCompany Fax

Project No: 11095 01 -

IIW Testing Dept.

IIW Survey Dept.

A & G Electric (563) 588-4253 (563) 588-8043490 E. 14th Street Dubuque IA 52001

Advantage Sheet Metal (563) 556-4822 (563) 556-484818 East 18th St. Dubuque IA 52001

City of Dubuque Planning Services (563) 589-4210 (563) 589-422150 West 13th Street Dubuque IA 52001

Conlon Construction Co. (563) 583-1724 (563) 583-2890P.O. Box 3400 Dubuque IA 52004-3400

Construction Update Plan Room (319) 369-4848 (319) 369-4809645 32nd Ave. SW, Ste C Cedar Rapids IA 52404-3907

Drew Cook & Sons Excavating, Inc.

(563) 582-9292 (563) 582-96565200 Wolff Rd. Dubuque IA 52002

Dubuque Builders Exchange (563) 583-8459 (563) 582-6113801 Cedar Cross Road Dubuque IA 52003

DW Power Industrial Coatings (563) 557-1723 (563) 557-17232055 Rockdale Rd. Dubuque IA 52003

Geisler Bros. Co. (563) 583-7363 (563) 583-7365340 East 12th St. Dubuque IA 52001

Klauer Construction Company (563) 588-0247 (563) 588-03701015 Century Circle Dubuque IA 52002

La Crosse Builders Exchange (608) 781-1819 (608) 781-1718427 Gillette St. La Crosse WI 54603

Mark Fondell Excavating Inc. (563) 590-0314 (563) 583-90652270 Crown Point Rd. Dubuque IA 52002-2107

Master Builders of Iowa (515) 288-8904 (515) 288-8718P.O. Box 695 Des Moines IA 50309

McDermott Excavating (563) 583-4633 (563) 583-585814407 Hwy 20 West Dubuque IA 52003-9709

McGraw-Hill Construction Dodge 563-355-1250 563-355-12833875 Elmore Avenue, Suite C

Davenport IA 52807

Midwest Architectural 3275 Central Dubuque IA 52001

Morse Electric, Inc. (563) 556-0828 (563) 556-7431395 South Main Dubuque IA 52003-7427

Murphy Construction Group, LLC (563) 581-61754970 Northrange Ct. Dubuque IA 52002

Portzen Construction (563) 557-7642 (563) 557-9048205 Stone Valley Dr. Dubuque IA 52003-9746

Reed Construction Data (800) 699-8640 (800) 303-862930 Technology Parkway South, STE 500

Norcross GA 30092-2912

Stumpf Construction (563) 583-5969 (563) 583-59952613 University Ave., Ste 3

Dubuque IA 52001-5560

Taylor Construction (563) 921-2315 (563) 921-3845P.O. Box 110 New Vienna IA 52065-0110

The Jule (563) 589-4196 (563) 589-43402401 Central Ave.Dubuque, IA 52001

Dubuque IA 52001

Page 1 of 2Thursday, August 16, 2012 10:12 AM

IIW Planholders List is also available on line at: iiwengr.com

Page 19: Addendum No 1 - City of Dubuque

Mailing Address PhoneCompany Fax

Project No: 11095 01 -

IIW Testing Dept.

IIW Survey Dept.

Tricon Construction Group (563) 588-9516 (563) 588-95192245 Kerper Blvd., STE 2 Dubuque IA 52001

Westphal & Company, Inc. (563) 583-5749 (563) 588-3202P.O. Box 1023 Dubuque IA 52003

Page 2 of 2Thursday, August 16, 2012 10:12 AM

IIW Planholders List is also available on line at: iiwengr.com