ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Building Commissioning Building Commissioning Roles, Responsibilities, and Benefits 2009 ACG ANNUAL MEETING CxA WORKSHOP Wednesday, April 15, 2009 Jim Magee, CxA, LEED-AP Brian Toevs, P.E., CxA, LEED-AP Facility Commissioning Group BETA Engineers

ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

Embed Size (px)

Citation preview

Page 1: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Building Commissioning Building Commissioning

Roles, Responsibilities, and Benefits

2009 ACG ANNUAL MEETING CxA WORKSHOP

Wednesday, April 15, 2009

Jim Magee, CxA, LEED-AP Brian Toevs, P.E., CxA, LEED-AP Facility Commissioning Group BETA Engineers

Page 2: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

OverviewOverview Cx Advocacy, Economics, BenefitsCx Advocacy, Economics, Benefits

Associations, Certifications, GuidelinesAssociations, Certifications, Guidelines

Commissioning TeamCommissioning Team

Commissioning (Cx) ProcessCommissioning (Cx) Process

Cx Team Roles and ResponsibilitiesCx Team Roles and Responsibilities

Commissioning Website ResourcesCommissioning Website Resources

DiscussionDiscussion

Page 3: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

CommissioningCommissioning Advocacy, Advocacy, Economics, BenefitsEconomics, Benefits

Page 4: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Why Commission?Why Commission?

Better Buildings

Building owners are finding that the energy, water, and productivity savings achieved by commissioned buildings can offset the cost of the commissioning process. Studies indicate 8 to 20 percent savings in building operating costs over those in a non-commissioned building.

(Building Commissioning Guide, Version 2.2, GSA/DOE, dated July 30, 1998)

Page 5: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Why Commission?Why Commission?

Better PeopleBetter People

Aside from achieving documented cost savings and cost avoidance, commissioning enhances customer satisfaction by promoting proper training of the owner’s Operations & Maintenance staff, which increases the longevity and efficient operation of building systems.

Page 6: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 7: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 8: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 9: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 10: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 11: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Page 12: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

What is Commissioning?What is Commissioning?

A process of documentation, adjustment, testing, verification, and training, performed specifically to ensure that the finished facility operates in accordance with the owner’s documented project requirements and the construction documents.

It begins in pre-design and continues through design, construction, and the life of the facility.

(BCA draft document, 2004.)

Page 13: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

What is Commissioning?What is Commissioning?

Design Intent Document Details functional requirements and Owner’s

expectations of how a building will be used and operated - OWNER’S PROJECT REQUIREMENTS

Basis for building commissioning

Basis of Design The concepts, calculations, decisions, and

product selections used to meet the OWNER’S PROJECT REQUIREMENTS

Page 14: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

What Commissioning is NOT?What Commissioning is NOT?

Completing Standard Forms

Contractors’ QA/QC Program

Verification of the Contractors’ QA/QC Program

Construction Inspection

Construction Management Substitute

Page 15: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

DesignIntent

Commissioning validates the design!

That the design works and

meets the “design intent”

Commissioning

“retro” ; “re”; or

“ongoing” Cx

Design Construction O & M

“Inspections” validate

constructionThat the construction is installed

correctly per the “design”

Changing Needs

What is Commissioning?(validates the “design”!)

This is not commissioning!

Page 16: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Objections To CommissioningObjections To Commissioning

““Haven’t I already paid for a quality building Haven’t I already paid for a quality building in my design and construction fees?”in my design and construction fees?”

Designer’s (A/E) services typically do not include field verification that their design works as intended.

Construction Manager’s services typically do not include functional verification that the installed systems meet design intent.

Page 17: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Objections To CommissioningObjections To Commissioning

“Isn’t the Commissioning Authority just a ‘bigger hammer’ for the owner to use to pound the designer and contractor?”

No. The CxA must be a team builder by using the commissioning process to the benefit of all.

No. The CxA should respect the traditional construction disciplines. The CxA has a distinct responsibility to owner for system quality and performance.

Page 18: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Objections To CommissioningObjections To Commissioning

“Isn’t commissioning just another layer of inspection?”

The CxA is not a layer, but a catalyst for communication that makes quality solutions possible.

The CxA is not inspector (fault finder, accuser).

The commissioning process provides verification that Owner’s Project Requirements implemented in design and construction.

Page 19: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning(Cx)Commissioning(Cx)(New Construction)

0.5 to 1.5 Percent of Total Construction Cost

Retrocommissioning (RetroCx)(Existing Construction)

3.0 to 5.0 Percent of Total Operating Cost

Source: Building Commissioning Guide, Version 2.2, DOE/GSA, July 30, 1998

W

hat D

oes

Com

mis

sion

ing

Cos

t?

Page 20: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning CostsCommissioning Costs

Commissioning New ConstructionCommissioning New Construction

Approximately 2%-3% of Mechanical System Construction Cost – (BCA Case Studies)

Approximately 1%-2% of Electrical System Construction Cost – (BCA Case Studies)

Page 21: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

The Economics of CommissioningThe Economics of Commissioning

* Based on research findings from University of Wisconsin, ASERTTI Training Module, 1998

If planned correctly and implemented early enough in the design process, commissioning can be included with little or no cost impact*.

Without Commissioning

With CommissioningDesign Phase

Costs

Construction Phase Costs First Year Warranty Period Costs

Design Phase

Costs

Construction Phase CostsFirst Year Warranty Period Costs

Wha

t Doe

s C

omm

issi

onin

g C

ost?

Page 22: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Page 23: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Page 24: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

BenefitsBenefits

Better bid documents More accurate budgets More “control” of project Projects delivered on time Fewer change orders Fewer warranty issues Satisfied Client

Page 25: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Associations, Certifications, Guidelines Associations, Certifications, Guidelines

Page 26: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

AssociationsAssociations

AABC Commissioning Group (ACG) ASHRAE Building Commissioning Association (BCxA) Institute of Electrical & Electronic Engineers (IEEE) International Society For Pharmaceutical Engineering (ISPE) National Environmental Balancing Bureau (NEBB) Sheet Metal and Air Conditioning Contractors' National

Association / Testing Adjusting and Balancing Bureau (SMACNA / TABB)

University of Wisconsin Association of Energy Engineers (AEE)

Page 27: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

CertificationsCertifications

AABC Commissioning Group (ACG) ASHRAE (Process Management Certification) Building Commissioning Association (BCxA) Institute of Electrical & Electronic Engineers (IEEE) International Society For Pharmaceutical Engineering (ISPE) National Environmental Balancing Bureau (NEBB) Sheet Metal and Air Conditioning Contractors' National

Association / Testing Adjusting and Balancing Bureau (SMACNA / TABB)

University of Wisconsin Association of Energy Engineers (AEE)

Page 28: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

The Need for GuidelinesThe Need for Guidelines

Uniform delivery of services Cx adoption as standard practice Owner procurement / selection of providers Continuing education Benchmarking of Cx Benefits Training competent Cx service providers Client education and cooperation Efficient Cx interface with designers, contractors,

vendors, etc

Page 29: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

GuidelinesGuidelines ACG Commissioning Guideline – 2005 ASHRAE Guideline 1 –1996: The HVAC

Commissioning Process ASHRAE Guideline 1.1 – 2007: HVAC&R Technical

Requirements for the Commissioning Process ASHRAE Guideline 0-2005: The Commissioning

Process NECA90-2004: Recommended Practices for

Commissioning Building Electrical Systems ISPE Pharmaceutical Engineering Guide Volume

5: Commissioning and Qualification

Page 30: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

ACG Commissioning Guideline1. Independent 3rd party direct for owner Cx services

2. Cx process intended for provider application

3. Useful for owners, designers and constructors, but intended for training Cx providers

4. Defines 5-Phase process:

a) Pre-Design

b) Design

c) Construction

d) Acceptance

e) Post-Acceptance

Page 31: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

ASHRAE Guideline 11. Cx responsibilities statement in request for A/E design

services.

2. Owner’s Program development and commitment.

3. Assign O&M personnel to the commissioning process.

4. Review and approve the Design Intent Document.

5. Review and approve the construction documents.

6. Provide competent documenting of training sessions (video, etc.)

7. Record construction progress (photo, video, narratives, etc.)

8. Review and comment on CxA verification report.

9. Review and accept the commissioning report

Page 32: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Guideline 0: Cx responsibilities statement in request for A/E design

services. Develop and commit to Owner’s Project Requirements. Assign O&M personnel to the commissioning process. Review and approve changes made in the Owner’s

Project Requirements. Review and approve the Construction Documents. Provide competent documenting of training sessions

(video, etc.) Review and comment on the Cx Process Progress

Reports. Review and comment on the Cx Authority’s verification

reports.

Page 33: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

What is the key difference between Guideline 1 and Guideline 0?

Design Intent Document

Vs.

Owner’s Project Requirements

Page 34: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

ASHRAE Guideline 1.11. Aligns Guideline 1.1 with Guideline 0 terminology

2. Greater emphasis on Owners Project Requirements (OPR)

3. Eliminate DID terminology

4. Suggests challenging design for achieving OPR

5. Promotes sampling over 100% verification and testing

6. Includes more technical process details (specific tasks)

7. Enhanced appendix of sample forms and procedures

8. Advocates extensive training for owner personnel

9. Promotes team building to accomplish commissioning

Page 35: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Owner’s Project Requirements Program requirements Community context Codes and regulations Site and climate Facility context and function Facility technology Sustainability Cost Schedule Client’s needs and capabilities

Page 36: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

CommissioningCommissioning DefinitionsDefinitions

Commissioning Authority (CxA):Commissioning Authority (CxA):

A person (or firm) representing the facility owner

Leader of the Commissioning Team

Authority of Cx Process – not design or means and methods

CxA not in chain of command – preserves objectivity

Page 37: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning DefinitionsCommissioning Definitions

Commissioning Provider (CP):Commissioning Provider (CP):

Independent Third-Party Commissioning Firm

A/E Firm

General Contractor

Construction Manager

Owner's Personnel

Page 38: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning DefinitionsCommissioning Definitions

Retro-Commissioning (RetroCx):Retro-Commissioning (RetroCx): Commissioning an existing building that has never been

commissioned

Re-Commissioning (ReCx):Re-Commissioning (ReCx): Commissioning a building that has been previously

commissioned

Continuous Commissioning (CCx):Continuous Commissioning (CCx): Owner continues to collect and compare baseline data on

selected building systems to ensure that the building functions optimally throughout its operating life

Page 39: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning DefinitionsCommissioning Definitions

Total Building Commissioning (TBCx)Total Building Commissioning (TBCx) Emphasizes that Commissioning is NOT only for the

Mechanical and HVAC system, or any single system

Commissioning TeamCommissioning Team Experts who, through coordinated actions, are responsible

for carrying out the Commissioning Process

Commissioning PlanCommissioning Plan A strategy overseen by the Commissioning Authority and

prepared by the Commissioning Team

Page 40: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Systems Typically CommissionedSystems Typically Commissioned

Mechanical SystemsMechanical Systems Heating, Ventilation and Air Conditioning (HVAC) Building Automation Systems (BAS) Fire Protection

Electrical SystemsElectrical Systems Switchgear and Transformers Grounding/Bonding, Circuitry Generators and UPS Systems Lighting and Lighting Controls

Specialty SystemsSpecialty Systems Security Systems and Fire Alarm Voice/Data Systems

Page 41: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Future Commissioned SystemsFuture Commissioned Systems

The National Institute for Building Sciences (NIBS) is currently developing commissioning requirements for the following systems. Exterior Envelope Roofing Systems Structural Systems Interior Systems Elevator Systems Plumbing Systems Lighting Systems Electrical Systems Fire Protection Systems Telecommunication Systems

Page 42: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

LEED EA Prerequisite 1LEED EA Prerequisite 1

Experienced, independent, CxA to owner Review OPR and DID Incorporate Cx requirements into CD’s Create/execute Cx Plan Verify installation and performance of

Systems to be Commissioned Complete and submit a Cx Report

Page 43: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

EA Credit 3 Enhanced CommissioningEA Credit 3 Enhanced Commissioning Independent 3rd Party CxA

Review OPR, BOD and Design by mid-CD’s

Independent submittal review

Systems Manual

O&M and Occupant Training Verification

10th Month Review of Building Operation

Page 44: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Commissioning TeamCommissioning Team

Page 45: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Team EffortTeam Effort

Commissioning succeeds when…Commissioning succeeds when… Team members understand and carry out

their responsibilities Team members cooperate and coordinate

with each other and third-party agencies

Communication and accountability essential for effective teamwork – and they are the responsibility of the commissioning agent.

Page 46: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team MembersCommissioning Team Members

Owner / OperatorOwner / Operator ArchitectArchitect Design ConsultantsDesign Consultants Commissioning AgentCommissioning Agent Construction Manager (or General Contractor)Construction Manager (or General Contractor) Mechanical ContractorMechanical Contractor Electrical ContractorElectrical Contractor Temperature Controls ContractorTemperature Controls Contractor Test and Balance ContractorTest and Balance Contractor

Page 47: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team MembersCommissioning Team Members

Potential Team Members:Potential Team Members: Equipment Vendors Specialty Trades Specialty Consultants Program Manager Service Contract Providers BAS Specialists IT Support Groups

Page 48: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Commissioning (Cx) ProcessCommissioning (Cx) Process

Page 49: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Elements of CommissioningElements of Commissioning Design Intent Documents (DID or OPR)Design Intent Documents (DID or OPR) Design ReviewsDesign Reviews Submittal ReviewsSubmittal Reviews Site Observations and Site MeetingsSite Observations and Site Meetings Resolution Tracking Forms (RTF’s)Resolution Tracking Forms (RTF’s) System Verification Checklists (SVC’s)System Verification Checklists (SVC’s) Organized Systems Start-UpsOrganized Systems Start-Ups Functional Performance Tests (FPT's)Functional Performance Tests (FPT's) Operation and Maintenance (O&M) trainingOperation and Maintenance (O&M) training O&M DocumentationO&M Documentation Commissioning ReportCommissioning Report Warranty Review of Building OperationWarranty Review of Building Operation

Page 50: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Approaches to CommissioningApproaches to Commissioning

Comprehensive Commissioning

Construction Phase Commissioning

Page 51: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Phases of CommissioningPhases of Commissioning

Pre-Design PhasePre-Design Phase

Design PhaseDesign Phase

Construction PhaseConstruction Phase

Acceptance PhaseAcceptance Phase

Post-Acceptance PhasePost-Acceptance Phase

Page 52: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Pre-Design PhasePre-Design Phase

Establish commissioning Establish commissioning

Select a Commissioning Agency (CxA)Select a Commissioning Agency (CxA)

Develop commissioning scopeDevelop commissioning scope

CxA review of DID or OPRCxA review of DID or OPR

Page 53: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Pre-Design PhasePre-Design Phase

Establish commissioning:Establish commissioning:

Allocate funds in budget

Comprehensive or Construction

Independent 3rd Party , Design Team, or Construction Team

HVAC, Electrical, Etc.

Page 54: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Pre-Design PhasePre-Design Phase

Select a Commissioning Agency (CxA)Select a Commissioning Agency (CxA)

Request for Qualifications

Request for Proposal

Page 55: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Pre-Design PhasePre-Design Phase

Develop commissioning scope:

Match scope to budgetMatch scope to budget

Needs basedNeeds based

Past experiencePast experience

End-user needsEnd-user needs

Maintenance prioritiesMaintenance priorities

Page 56: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Pre-Design PhasePre-Design Phase

CxA review of DID or OPRCxA review of DID or OPR

Defined usage

Defined goals

Short term needs

Long term needs

Page 57: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Design PhaseDesign Phase

Review design for commissioning, testing and O&M access and provisions

Prepare commissioning specification Write the commissioning plan Establish commissioning in the project

schedule

Page 58: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Design PhaseDesign Phase

Review design for commissioning, testing and O&M access and provisions

Adequate testing access Adequate access for valves, dampers, control Quantity and location of service valves Coil pull access Ladders and catwalks Conformity to Owner’s Design Standards

Page 59: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Design PhaseDesign Phase

Prepare commissioning specification / planPrepare commissioning specification / plan

Develop commissioning plan Commissioning team Systems to be commissioned Define approximate extent of testing Contractor roles and responsibilities

Page 60: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Design PhaseDesign Phase

Establish commissioning Establish commissioning in the project schedule:in the project schedule:

General and Supplemental ConditionsGeneral and Supplemental Conditions Define commissioning activities in scheduleDefine commissioning activities in schedule Note blocks of time for FPT’s in schedule – Note blocks of time for FPT’s in schedule –

especially for phased projectsespecially for phased projects Define frequency of Cx meetingsDefine frequency of Cx meetings

Page 61: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

Review submittals

Update commissioning plan

Coordination including site observation, Cx Meetings, Resolution Tracking Forms (RTF’s), and System Verification Checklists (SVC’s)

Equipment and systems start-ups

TAB HVAC systems

Verify Building Automation System (BAS) installation and start-up

Page 62: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

Review submittalsReview submittals

Checklist based on specification and Owner’s Checklist based on specification and Owner’s Design StandardsDesign Standards

Check options – especially accessCheck options – especially access

Check size for spatial applicationCheck size for spatial application

Check valve sizing and applicationCheck valve sizing and application

Check for integration of componentsCheck for integration of components

Page 63: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

Update commissioning planUpdate commissioning plan

Include revised schedule

SVC’s based on current information

Draft FPT’s for review

Discuss O&M Documentation

Provide construction observation procedures

Page 64: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

CoordinationCoordination

Site observationSite observation

Cx MeetingsCx Meetings

Resolution Tracking Forms (RTF’s)Resolution Tracking Forms (RTF’s)

System Verification Checklists (SVC’s)System Verification Checklists (SVC’s)

Functional Performance Tests (FPT’s)Functional Performance Tests (FPT’s)

O&M Training ProvisionsO&M Training Provisions

Page 65: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

Equipment and systems start-upsEquipment and systems start-ups

Contractor start-up

Factory start-up

Documentation chain of submission

Temporary conditions

Maintenance responsibility

Page 66: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

TAB HVAC systemsTAB HVAC systems

Systems properly started

Systems under full control

Appropriate hardware and software interface

Coordination with other trades, especially TCC

Access to space

Page 67: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Construction PhaseConstruction Phase

Verify Building Automation System (BAS)Verify Building Automation System (BAS)

Installation complete per design

Installation complete per submittal / drawings

Start-up performed and documented

Project specific programming

Point-to-point checklists

Safeties tested and documented

Page 68: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Acceptance PhaseAcceptance Phase

Review TAB Report

Functional Performance Tests (FPT’s)

O&M Training and Documentation

Commissioning Report

Page 69: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Acceptance PhaseAcceptance Phase

Review TAB ReportReview TAB Report

Pages are numbered with index

All equipment is accounted for in report

No “extra” equipment shown in report

Performance is per design (± XX %)

Problems sufficiently documented in footnotes

Page 70: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Acceptance PhaseAcceptance Phase

Functional Performance Tests (FPT’s)Functional Performance Tests (FPT’s)

Systems tested as noted in the Cx Plan

“Failure” modes for valves and dampers are not software driven

System is properly networked

Workstation graphics show appropriate response

Occupied / Unoccupied / Optimal Start

Page 71: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Acceptance PhaseAcceptance Phase

O&M Training and DocumentationO&M Training and Documentation

Manuals contain useable maintenance documentsManuals contain useable maintenance documents

Proper indexing and tabsProper indexing and tabs

Training agenda tailored for owner’s needsTraining agenda tailored for owner’s needs

Documentation provided prior to trainingDocumentation provided prior to training

Additional documentation provided at trainingAdditional documentation provided at training

Training for systems and componentsTraining for systems and components

Page 72: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Acceptance PhaseAcceptance Phase

Commissioning ReportCommissioning Report

Proper indexing and tabsProper indexing and tabs

Documentation for all phasesDocumentation for all phases

Executive SummaryExecutive Summary

Provide supporting documentation (Sequence of Provide supporting documentation (Sequence of Operation, Control Drawings, Etc.)Operation, Control Drawings, Etc.)

Page 73: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Correct unresolved deficiencies and conduct required re-tests

Carry out specified off-season testing Perform specified post-occupancy

monitoring Review usage changes Update commissioning documentation

Page 74: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Correct unresolved deficienciesCorrect unresolved deficiencies

Unresolved RTF issuesUnresolved RTF issues

Uncompleted CM/Owner punch listsUncompleted CM/Owner punch lists

Conduct required re-testsConduct required re-tests

Outstanding or additional trainingOutstanding or additional training

Page 75: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Carry out specified off-season testingCarry out specified off-season testing

FPT’s per the Commissioning Plan

Choose near-design day

Build on completed FPT’s

Utilize BAS trending

Page 76: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Post-occupancy monitoringPost-occupancy monitoring

Scheduled site visits Remote (web) monitoring Warranty items Owner conference User conference

Page 77: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Review usage changesReview usage changes

Computers / office machines

Furniture placement

Occupancy change

Closet to office

Energy saving methodology

Page 78: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Post Acceptance PhasePost Acceptance Phase

Update commissioning documentationUpdate commissioning documentation

Resolved issuesResolved issues

Off-Season testsOff-Season tests

Usage ChangesUsage Changes

Provide additional volume for Cx ReportProvide additional volume for Cx Report

Page 79: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Commissioning Team Commissioning Team

Roles and ResponsibilitiesRoles and Responsibilities

Page 80: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Owner / OperatorOwner / Operator

Assign Cx Team Member and attend meetingsAssign Cx Team Member and attend meetings Retain a commissioning agentRetain a commissioning agent Communicate project requirements to the design Communicate project requirements to the design

teamteam Coordinate facilities and staff participationCoordinate facilities and staff participation Conduct regular site observationConduct regular site observation

Page 81: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

ArchitectArchitect

Assign Cx Team Member and attend meetings Coordinate work of design consultants Consider spatial requirements Consider room naming convention Conduct regular site observation Coordinate design and changes with owner and

end-users

Page 82: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Design ConsultantsDesign Consultants Assign Cx Team Members and attend meetings Provide Basis of Design and Design Intent Respond to RFI’s and CO’s Conduct regular site observation Coordinate design and changes with owner and

end-users Review O&M manuals, as-built drawings and

other specified documentation Provide HVAC training on the design intent

Page 83: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Commissioning AgentCommissioning Agent Assign Cx Team Leader and attend meetings Review Design Provide Commissioning Plan and Specification Conduct regular site observation visits Provide System Verification Checklists Monitor system start-ups Conduct Functional Performance Tests Review O&M documentation and training

Page 84: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Construction ManagerConstruction Manager

Assign Cx Team Member and attend meetings Project Scheduling Manage overall completion of work Manage project documentation Coordination of contractors Maintaining specified building conditions

Page 85: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Mechanical ContractorMechanical Contractor Assign Cx Team Member and attend meetings Manage subcontractors and vendors Document Progress (SVC’s) Coordinate equipment start-up Operate systems as required for Functional

Performance Tests Plan and deliver O&M staff training Provide O&M manuals, as-built drawings and

other specified documentation

Page 86: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Electrical ContractorElectrical Contractor Assign Cx Team Member and attend meetingsAssign Cx Team Member and attend meetings Coordinate electrical installation with mechanical Coordinate electrical installation with mechanical

workwork Attend meetingsAttend meetings Document Progress (SVC’s)Document Progress (SVC’s) Operate systems as required for Functional Operate systems as required for Functional

Performance TestsPerformance Tests Plan and deliver O&M staff trainingPlan and deliver O&M staff training Provide O&M manuals, as-built drawings and other Provide O&M manuals, as-built drawings and other

specified documentationspecified documentation

Page 87: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team RolesTemperature Controls ContractorTemperature Controls Contractor

Assign Cx Team member and attend meetings Design and complete controls installation as

required by DID/OPR Document Progress (SVC’s) Coordinate with TAB agency Operate systems as required for Functional

Performance Tests Plan and deliver O&M staff training Provide O&M manuals, as-built drawings and

other specified documentation

Page 88: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Commissioning Team RolesCommissioning Team Roles

Test and Balance ContractorTest and Balance Contractor Assign Cx team member and attend meetingsAssign Cx team member and attend meetings Review design for adequate testing provisionsReview design for adequate testing provisions Submit TAB data sheets for approvalSubmit TAB data sheets for approval Coordinate work with master scheduleCoordinate work with master schedule Review site conditions prior to field workReview site conditions prior to field work Submit complete and accurate TAB ReportSubmit complete and accurate TAB Report Participate in verification of TAB ReportParticipate in verification of TAB Report

Page 89: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

Commissioning Commissioning Website ResourcesWebsite Resources

Page 90: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

ResourcesResources

www.commissioning.org for AABC Commissioning Group www.ashrae.org for American Society of Heating,

Refrigerating, and Air-Conditioning Engineers www.bcxa.org for Building Commissioning Association www.buildingamerica.gov for U. S. Dept. of Energy Building

America Program www.facomgrp.com for Facility Commissioning Group

Page 91: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

ResourcesResources

www.ieee.org for Institute of Electrical & Electronic Engineers

www.ispe.org for International Society For Pharmaceutical Engineering

www.nebb.org for National Environmental Balancing Bureau

www.peci.org for Portland Energy Conservation, Inc. www.smacna.org for Sheet Metal and Air Conditioning

Contractors' National Balancing Bureau www.usgbc.org for United States Green Building Council

Page 92: ACG CxA WORKSHOP WEBINAR ACG Annual Meeting CxA Workshop 8:00 AM 15 April 2009 Intercontinental Chicago O’Hare Building Commissioning Building Commissioning

ACG CxA WORKSHOP WEBINAR

ACG Annual Meeting CxA Workshop 8:00 AM15 April 2009 Intercontinental Chicago O’Hare

Building Commissioning Building Commissioning

Roles, Responsibilities, and Benefits

2009 ACG ANNUAL MEETING CxA WORKSHOP

Wednesday, April 15, 2009

Jim Magee, CxA, LEED-AP Brian Toevs, P.E., CxA, LEED-AP Facility Commissioning Group BETA Engineers