13
How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning Building Commissioning 1

How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

Embed Size (px)

Citation preview

Page 1: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

How to Create a

Craig Hawkins

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

1

Page 2: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Overall Goal □ Purpose □ Contents□ Commissioning Schedule□ Timeline□ Authors and Reviewers□ Pitfalls and Roadblocks□ Summary□ Q & A

Session Overview

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

22

Page 3: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Integrating Commissioning Into the Build Process□ Overview of the Project’s Cx Process□ Sequence of Events□ Roles and Responsibilities□ Requirements and Precursors□ Testing Durations □ Deficiencies Resolution Procedure □ Documentation Requirements

Overall Goal

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

33

Page 4: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Guideline□ Source of Cx Information for Project Team□ Specific for Each Project

□ Scope of Work□ Description of Tasks per Phase□ List of Equipment/Systems to be Commissioned

□ Procedures□ Installation Verification Checklists□ Functional Performance Test Procedures□ Deficiencies Resolution Procedures□ Training Expectations

□ Team Structure□ List of Team Members□ Lines of Communication□ Roles & Responsibilities

Purpose of the Commissioning Plan

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

44

Page 5: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ What Should Be In The Commissioning Plan□ Scope of Work, Specific for Project□ Commissioning Team Members□ List of Equipment/Systems to be Commissioned□ List of Commissioning Meetings□ List of Reference Documents□ Installation Verification Checklists□ Functional Performance Test Procedures□ Acceptance Criteria□ O&M and Facility Staff Training Requirements□ Commissioning Schedule

Contents of the Commissioning Plan

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

55

Page 6: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Identified by Phase/Task□ Integrated into Project Schedule□ Not a Separate Schedule

□ By Systems/Equipment□ Not just One Line Item

□ Pre-Test Requirements (Precursors)□ Durations (Theoretical)

Commissioning Schedule

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

66

Page 7: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Timeline for Creating The Commissioning Plan□ Pre-Design Phase Commissioning Outline□ Design Phase Commissioning Plan□ Construction Phase Commissioning Plan Updates

□ Updates□ Post Submittal□ Post Major Change Order(s)

Timeline

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

77

Page 8: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

Timeline

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

88

Page 9: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Who Should Write The Commissioning Plan□ Project’s Commissioning Authority

□ Who Should Review The Commissioning Plan□ Commissioning Team Members□ Owner□ Engineer/Designer□ GC & Installing Contractors

Authors and Reviewers

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

99

Page 10: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Pitfalls□ Too Early = Generic, Low Value□ Too Late = Reduced Impact, Missed Opportunities

□ Roadblocks□ Slow Review Responses□ Team Member Apathy□ Lack of Support from Cx Authority

Pitfalls and Roadblocks

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

1010

Page 11: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

□ Make it Relevant and Keep it Current□ “The” Source of Cx Info for the Specific Project□ Thorough but Concise□ Created to Audience Level of Cx Understanding□ Addition/Extension of Contract Documents

Summary

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

1111

Page 12: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

Questions

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

12

Page 13: How to Create a Craig Hawkins acg 2008 Annual Meeting-Best Practices for Total Building Commissioning 1

acgacg 2008 Annual Meeting-Best Practices for Total Building 2008 Annual Meeting-Best Practices for Total Building Commissioning Commissioning

For more information:Craig A. [email protected](206) 853-4100