29
低压电机 低压电机使用手册 安装、操作及 维护手册 ZH 3 Installation, operation and maintenance manual EN 15

ABB LOWVOLTAGE sc - 西门子中国

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ABB LOWVOLTAGE sc - 西门子中国

低压电机

低压电机使用手册

安装、操作及维护手册 ZH 3

Installation, operation and maintenance manual EN 15

Page 2: ABB LOWVOLTAGE sc - 西门子中国

ZH 2 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

其它语种译本可向 ABB 索取。

符合性声明样本由 ABB 提供。

欧盟符合性声明

制造商: (制造商的名称和地址) 特此声明:

以下产品: (产品标识)

符合以下协会指令条例:

低电压指令 73/23/EEC(由 93/68/EEC 修订)

此外,作为零部件,这些产品符合以下基本要求:

电磁兼容 (EMC) 指令 89/336/EEC(由 92/31/EEC 和 93/68/EEC 修订),该指令涉及辐射和 抗干扰水平的内在特性,

且符合:

EN 60 034-1

附加信息:

作为零部件,这些机器在设计上符合以下基本要求:

机器指令 98/37/EEC,该指令规定机器应由机器制造商正确安装(例如:符合本公司的安装说明和 EN 60 204“工业机器电气设备”)

公司注册证书(指令 98/37/EEC 第 4.2 条和附录 II 子条款 B):

上述机器只有在声明已组装成符合机器指令的机器后才能投入使用。

CE 标示年份:CE00

签名 ..................................................

标题 ...........................................................

日期 ..........................................................

Page 3: ABB LOWVOLTAGE sc - 西门子中国

3 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

低压电机

安装、操作及维护手册

目录 页

1. 一般说明 ......................................................................................................................................................... 41.1 符合性声明 .......................................................................................................................................... 41.2 有效范围 .............................................................................................................................................. 4

2. 安装 .................................................................................................................................................................. 42.1 投入使用(启动) ............................................................................................................................. 4

2.1.1 收货检查 ............................................................................................................................... 42.1.2 绝缘电阻检查 ...................................................................................................................... 42.1.3 直接启动或三角形/星形接线启动 ................................................................................. 52.1.4 接线端子和旋转方向 ......................................................................................................... 5

2.2 搬运 ..................................................................................................................................................... 52.2.1 存放 ........................................................................................................................................ 52.2.2 运输 ........................................................................................................................................ 52.2.3 抬升 ........................................................................................................................................ 52.2.4 机器重量 ............................................................................................................................... 6

2.3 安装 ....................................................................................................................................................... 62.3.1 散热 ........................................................................................................................................ 62.3.2 底座 ........................................................................................................................................ 62.3.3 校正 ........................................................................................................................................ 62.3.4 滑轨和皮带传动 .................................................................................................................. 6

2.4 连接 ....................................................................................................................................................... 72.4.1 变速驱动连接 ...................................................................................................................... 7

2.5 平衡 ....................................................................................................................................................... 7

3. 操作 .................................................................................................................................................................. 83.1 使用 ....................................................................................................................................................... 8

3.1.1 操作条件 ............................................................................................................................... 83.2 安全事项 .............................................................................................................................................. 8

3.2.1 注意事项 ............................................................................................................................... 83.3 组装和拆卸 .......................................................................................................................................... 8

3.3.1 一般说明 ............................................................................................................................... 83.3.2 轴承 ........................................................................................................................................ 83.3.3 安装半联轴节和皮带轮 ..................................................................................................... 8

4. 维护 .................................................................................................................................................................. 94.1 维护和润滑 .......................................................................................................................................... 9

4.1.1 常规检查 ............................................................................................................................... 94.1.2 润滑 ........................................................................................................................................ 94.1.3 装有永久润滑轴承的机器................................................................................................. 94.1.4 配备油嘴的电机 .................................................................................................................. 94.1.5 润滑间隔时间和润滑量 ................................................................................................... 104.1.6 润滑剂 .................................................................................................................................. 104.1.7 变频器驱动 ......................................................................................................................... 114.1.8 零部件 .................................................................................................................................. 114.1.9 重新绕组 ............................................................................................................................. 11

5. 环境要求 ....................................................................................................................................................... 115.1 噪音等级 ............................................................................................................................................ 11

6. 故障排除 ....................................................................................................................................................... 12

Page 4: ABB LOWVOLTAGE sc - 西门子中国

ZH 4 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

1. 一般说明注意!为了确保安全、正确地安装、操作和维护电机,请务必遵守以下各项说明。安装、操作或维护本设备的人员应仔细阅读这些说明。忽视这些说明可能会导致保证失效。

1.1 符合性声明根据指令 93/68 EEC 修改的低电压指令 73/23/EEC 的相关符合性声明随单机分别发行。

符合性声明还符合公司注册声明中有关机器指令 98/37/EEC 第 4.2 条附录 II 子条款 B 的要求。

1.2 有效范围本说明书有关电机和发电机操作方面适用以下 ABB 电机型号。

MT*, MBT*, MXMA系列产品,M2A*/M3A*, M2B*/M3B*, M2C*/M3C*, M2F*/M3F*, M2L*/M3L*, M2M*/M3M*, M2Q*, M2R*/M3R*, M2V*/M3V*系列产品

机座号 56 - 450.

有些电机,如用于危险区域的防爆电机有单独的使用手册:安装、操作和维护手册(防爆电机使用手册)

某些机型出于特殊应用和/或设计考虑需提供附加信息。附加信息可应用于下列电机:

滚道电机 水冷电机 开启式电机 烟道电机 制动电机 永磁电机

2. 安装

2.1 投入使用(启动)

2.1.1 收货检查

收到货后立即对机器进行检查,看机器外部是否存在损坏,如果发现损坏,请马上通知转运代理商。

检查所有铭牌数据,特别是电压和绕组接线(星形或三角形)。除最小机座号的电机外,所有电机的铭牌上都说明了轴承的型号。

打开装运锁。用手转动电机轴,检查其是否能自由旋转。

不要超过产品目录中规定的轴承允许负载值。

装有滚动轴承的电机:在无径向力作用于电机轴的情况下运转电机可能会损坏滚动轴承。

装有角接触轴承的电机:在无正确方向轴向力作用于电机轴的情况下运行电机可能会损坏角接触轴承。

装有油嘴的电机:第一次启动电机或长期存放后启动电机时,请打入指定量的润滑油,以润滑油挤出油嘴为准。

详细情况请参阅第 8 页的“手动润滑”一节。

2.1.2 绝缘电阻检查

投入使用前或怀疑绕组受潮时应对绝缘电阻进行测量。

在 25°C 下测量的电阻应超过参考值,即 10 兆欧(用 500V dc 高阻表测量)

警告测量后应立即对绕组进行放电,以免触电。

环境温度每升高 20°C,绝缘电阻参考值即减小一半。

如果未达到参考电阻值,那说明绕组已经受潮,这时,必须在烘箱内烘干绕组。在 90°C 下烘 12-16 小时,然后在 105°C 下烘 6-8 小时。

如果安装了排水孔塞,必须拔除并关闭阀门,但在加热时必须是打开的。

被海水打湿的绕组必须重新进行绕线。

Page 5: ABB LOWVOLTAGE sc - 西门子中国

5 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

2.1.3 直接启动或三角形/星形接线启动

标准单速机器上的接线端子盒通常包含 6 个绕组端子以及至少 1 个接地端子。

将机器连接到电源之前必须根据当地规定进行接地。

铭牌上印有电压和接线参数。

直接启动 (DOL):可能需要采用 Y 或 D 绕组连接。

例如,660VY 和 380VD 分别表示 660V 电压的 Y 接线和 380V 的 D 接线。

星形/三角形接线启动 (Y/D):电源电压必须与三角形接线时电机的额定电压相等。

拆除接线板上的所有接线片。

对于双速电机、单相电机和特殊电机,电源接线必须按照接线盒内的说明进行。

如果直接启动持续时间超过 10 秒,或者 Y/D 启动超过 30 秒,请咨询 ABB 营业部或查阅期刊《The Motor Guide》(也可通过 Internet 访问 www.abb.com/ motors&generators)

2.1.4 接线端子和旋转方向

当线相位顺序 L1、L2、L3 如图 1 所示连接到接线端子上后,面向电机驱动端查看轴的旋转方向,为顺时钟方向。

要改变旋转方向,可交换任何两根线缆的接线位置。

如果机器装有单向风扇,请确保旋转方向与机器上标示的箭头方向一致。

2.2 搬运

2.2.1 存放

本机应始终在干燥、无振动、无尘的室内环境中存放。

应对未加防护的机器加工面(轴端和凸缘)进行防锈处理。

建议定期用手转动电机轴,以防润滑油渗出。

如装有抗冷凝加热器,最好为其接通电源。

存放时间超过 1 至 2 年后,必须对安装在单相电机上的电解电容器的特性进行“改造”。请联系 ABB 营业部了解详细情况。

2.2.2 运输

在运输过程中,必须为装有圆柱滚子轴承和/或角接触轴承的机器安装锁定装置。

2.2.3 抬升

本电机只能用吊环抬升,除非在单独的抬升说明中另行规定。

由于输出功率、安装方式和辅助设备的不同,相同机座号的电机重心可能会有所变化。

抬升电机时,请检查与电机机座集成的吊环螺栓或吊环是否完好无损。不得使用受损的吊环。

起重前必须对吊环螺栓进行紧固。如有必要还必须用合适垫圈调整吊环螺栓的位置。

确保使用正确的起重设备,而且吊钩的尺寸也必须与吊环匹配。

注意不要损坏连接电机的辅助设备和电缆。

Page 6: ABB LOWVOLTAGE sc - 西门子中国

ZH 6 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

2.2.4 机器重量

对于机座号(中心高度)相同的电机,其总重量可能会存在差异,具体取决于输出功率、安装方式和附加特性的不同。

下表列出了作为机座材料的电机基本结构的最大估计重量。

除机座号最小的电机外,所有电机的铭牌上都注明了电机的实际重量。

铝 铸铁 钢

机架 重量 制动器的 重量 重量

尺寸 kg 额外重量 kg kg56 4.5 - - -63 6 - - -71 8 5 13 -80 12 8 20 -90 17 10 30 -

100 25 16 40 -112 36 20 50 -132 63 30 90 -160 110 30 175 -180 160 45 250 -200 220 55 310 -225 295 75 400 -250 370 75 550 -280 405 - 800 600315 - - 1700 1000355 - - 2700 2200400 - - 3500 3000450 - - 5000 4500

表一

2.3 安装

2.3.1 散热

要达到标准性能,正常环境温度不应超过 40°C(海上标准为 +45°C 或 +50°C)。检查电机内空气流通是否充分。确保电机不受附近设备及表面热辐射或阳光直射的影响。有关更高环境温度及散热的信息请参阅《电机指南》或联系 ABB 营业部。

2.3.2 底座

所有底座准备工作由买方承担。

金属底座应该涂漆,以免生锈。

底座必须平整、坚固,足以抵抗短路产生的冲击力。还应固定它们的尺寸,以免因共振而产生振动。

在安装电机前,必须检查、清理底座表面上用于安装薄垫圈或底脚的多余漆和泥土。并且必须仔细检查是否有高度差和表面不平整的部位。如下图所示。

底座螺栓将底座螺栓固定在电机底脚上,并在螺栓和底脚之间放置一个 1 到 2 毫米的垫片。

用合适的工具直接对齐电机。用水泥填塞螺栓,检查对齐情况,然后钻孔固定销子。

排水孔经常检查打开的排水孔是否朝下。

在灰尘过多的环境中应关闭所有排水孔。

2.3.3 校正

校正准确与否是避免轴承故障、振动和轴外伸部位破裂的关键所在。

2.3.4 滑轨和皮带传动

如图 2 所示,将机器固定在滑轨上。 水平放置滑轨,使其处于同一平面。

注意!任何电机底脚高度不能大于 μ 0.1 mm 公差范围。

规尺

底脚位置

Page 7: ABB LOWVOLTAGE sc - 西门子中国

7 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

检查机器轴是否与从动轴或主动轴平行。 必须按照供应商的说明张紧所有皮带。

警告皮带过紧会损坏轴承并有可能造成电机轴破损。

因此,不要超过相关产品目录中规定的最大皮带张力(如径向轴承负载)。

2.4 连接标准电机的顶部装有接线盒,其两侧均可接入电缆。

有些电机顶部安装的接线盒可旋转 4 x 90 ,而有些的接线盒则安装在电机侧面。

产品目录对是否采用了这些方案作了说明。

必须密封未使用的电缆入口。

接线盒不仅装有主绕组引接线端子和接地端子,还能容纳热敏电阻、加热元件、双金属部件、开关或 PT100 电阻元件的接线端子。

警告加热元件或直接绕组加热元件的电源可在停机状态下接入接线端子盒。

辅助元件接线图见接线盒盖里或在机座的附加标签上。

警告单相电机的电容器能保留一定的电流,该电流可流过电机接线端子,即使电机已停止运转。

2.4.1 变速驱动连接

与正弦电源相比,变速驱动会在电机绕组上产生更高的电压应力,并有可能形成高频轴电压和轴承电流。因此,必须依照“VSD 应用范围 /绝缘材料选择规范” (3GZF500930-2) 标明电机绕组和轴承绝缘材料以及转换器输出元件上的滤波器的尺寸,该文件可向 ABB 索取。

在变速传动中,电机 (Pn > 30 kW) 必须用屏蔽好的对称电缆和能提供 360 的电缆密封管(即 EMC 电缆密封管)进行连接。详细情况请参阅 ABB 的使用手册《传动装置的接地和布线》(3AFY61201998)。

在应用变频器时,为了平衡电机机座和驱动机器之间的电势,电机机座必须采用外部接地。除非这两者都安装在相同的金属材料基准面上。

机座在 IEC280 以上的电机应采用 0.75 x 70 mm 的带状导线或至少两根 50 mm2 的圆导线。圆导线互相之间的距离至少为 150mm。

这种布置方法不属于电气安全范畴,其目的在于平衡电势。如果电机和变速箱安装在普通的钢基座上,则无需进行电势均衡。

为了符合 EMC 要求,请务必使用专用电缆和接线器。(请参阅变频器说明。)

用于变速驱动 (M2BA/M3BP) 的铸铁电机的最高允许转速不得超过下表所示的最高允许速度或铭牌上标明的速度。请联系 ABB 了解其它电机尺寸和型号的最高允许转速。轴承润滑应按后文中的说明进行。

机座号尺寸

速度转/分钟2 极 4 极

280 3600 2600

315 3600 2300

355 3600 2000

400 3600 1800

450 3600 1800

表二

如果对本电机变速传动的适用性存在疑问,请联系 ABB。

警告不得超过润滑油和轴承的最高允许温度。

2.5 平衡电机转子可保持动态平衡。

依照标准,本机采用半键取得平衡,而且轴上贴有红色胶带,并注明“用半键平衡”。假如电机在运输过程中没有贴有任何注明 „Balanced with half key‰ 的胶带,电机仍认为是使用半键平衡。

为了避免振动,半联轴器或滑轮必须用带半键的加工后的键槽来进行校平衡。

用全键校平衡时,轴上贴有黄色胶带,并注明 „Balanced with full key‰。

进行无键平衡时,轴上贴有蓝色胶带,并注明 „Balanced without key‰。

Page 8: ABB LOWVOLTAGE sc - 西门子中国

ZH 8 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

3. 操作

3.1 使用

3.1.1 操作条件

本机专用于工业驱动。

工作环境温度的正常范围是 -20°C 到 +40°C

最高高度为海拔 1000 m。

3.2 安全事项本机应由熟悉相关安全要求的专业人员安装和使用。

必须依照地方条例提供必要的安全设备,以防安装和操作现场发生事故。

警告供电电流直接由热敏开关控制的小电机可自动启动。

3.2.1 注意事项

1. 不要踏在机器上。2. 在正常操作过程中,本机外壳温度可能会达到烫手的程度。

3. 在某些特殊场合应用本机时需参照特别说明(如使用变频器供电等)。

4. 吊环只能用于抬升本电机。 本电机与其他设备连接后,请不要用它们抬升本电机。

3.3 组装和拆卸

3.3.1 一般说明

机器的拆卸和组装必须由专业人员用适当的工具和工作方法完成。所有维修工作必须依照 IEC-60079-19 标准进行。

3.3.2 轴承

拆装轴承时必须特别小心。轴承必须用拔具拆卸,安装时必须加热或使用专用工具。

轴承的安装方法在单独的说明书中有详细说明,该说明书可向 ABB 营业部索取。

3.3.3 安装半联轴节和皮带轮

必须用合适的设备和工具安装半联轴节和皮带轮,以免损坏轴承。

安装半联轴节或皮带轮时不要将它们敲打入位,也不要用杠杆抵住机体拆下它们。

半联轴节的安装精度:

检查间隙 b,确保其小于 0.05mm,a1 和 a2 之间的间隙也应小于 0.05mm。请参阅图 3。

Page 9: ABB LOWVOLTAGE sc - 西门子中国

9 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

4. 维护

4.1 维护和润滑

4.1.1 常规检查

定期对机器进行检查。 保持电机清洁并确保空气自然流通。 检查轴密封件(如 V 形圈)的情况,必要时更换密封件。

检查连接件及安装和组装螺栓的情况。 检查轴承情况,即观察是否存在不正常的噪音、振动量和轴承温度,检查润滑油的消耗情况,或对 SPM 振动测量仪进行监测。

* 如情况异常,请拆卸机器并检查部件, 必要时请更换部件。

4.1.2 润滑

警告 请留意所有转动部件!

警告润滑油可能会引发皮炎和眼炎。请遵守制造商规定的所有安全措施。

4.1.3 装有永久润滑轴承的机器

轴承通常采用 Z 或 2Z 型永久润滑轴承。轴承型号说明见相关产品目录和本公司所有电机(小尺寸电机除外)铭牌。

在 25°C 环境温度下,按照 L1(即 99% 的电机运行必须保证间隔一段时间)进行操作,给以足够润滑,机座200以上电机可以达到以下负载时间。对于环境温度超过 25°C 时的负载时间,请参阅各自产品目录。

机座号 极数 负载时间

56-80 2-8 与电机寿命相同90-112 2-8 40 000132 2-8 40 000160 2-8 40 000180 2-8 40 000200 2 27 000200 4 40 000

表三

当取决于应用和负载情况,请参阅适用的产品目录。

立式电机的操作时间为以上数值的一半。

装有滚柱轴承的电机的油脂使用时间更短。为了能持续性工作,应考虑使用注油嘴。

4.1.4 配备油嘴的电机

润滑信息铭牌和润滑注意事项

如果机器装有润滑信息铭牌,请以规定数值为准。

在润滑信息铭牌上可了解润滑间隔时间与安装、环境温度和旋转速度之间的关系。

第一次使用或在注油后,可能会导致温度升高持续10-20小时。

ABB 的政策规定,可靠性是轴承润滑间隔时间的关键性问题。这就是我们应当遵守 L1 原则的原因所在。

A. 手动润滑

不停机润滑 拔除放油口塞或打开隔离阀。 确保润滑通道已打开。 将适量的润滑油注入轴承。 让电机运行 1 到 2 个小时,以便将所有多余的润滑油甩出轴承。关闭放油口塞或隔离阀。

停机润滑请在电机运转时上润滑油。如不行,也可在停机时进行润滑。 在这种情况下,请使用半量润滑油,然后让电机全速运转数分钟。

电机停止后,将剩下的润滑油注入轴承室。 运转 1 到 2 小时后,关闭放油口塞或隔离阀。

B. 自动润滑如采用自动润滑,则必须永久性地卸下放油口塞或打开隔离阀。

有些电机可能装有陈油收集器。请参阅设备特别说明。

本公司建议仅将本电机用于机电系统。请联系当地 ABB 营业部。

如果使用自动润滑系统,表中说明的每次润滑间隔的润滑油量应加倍。

如果对 2 极电机进行自动润滑,应遵守“润滑剂”一章中关于 2 极电机润滑剂建议的注意事项(即“注意!”项)。

Page 10: ABB LOWVOLTAGE sc - 西门子中国

ZH 10 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH影响润滑间隔时间的因素立式电机的润滑间隔时间为上述数值的一半。

润滑间隔时间基于轴承操作温度 80°C(环境温度约为 +25°C)。注意!环境温度升高会相应提高轴承温度。轴承温度升高 15°C 时应将上述数值减半,而当轴承温度降低 15° C 时,则可能需要将上述数值增加一倍。

警告不得超过润滑油和轴承的最高操作温度。

4.1.6 润滑剂

警告不要混合不同类型的润滑剂。混合不相容的润滑剂可能会损坏轴承。

上润滑油时,务必使用具有以下特性的球轴承专用润滑油: 含有锂复合基以及矿物油或 PAO 油的优质润滑油 40°C 下的基油粘度为 100-160 cST 稠度为 NLGI 级 1.5 - 3 * 温度范围保持在 -30°C - +120°C 之间。

*) 对垂直安装的电机,或在高温环境下,建议以较高值为准。

具有适当特性的润滑油各大润滑油制造商均有出售。

建议使用混合剂,但必须向润滑剂制造商索取书面保证,即在操作温度范围内混合剂不会损坏轴承或降低润滑剂的性能,这一点对 EP 混合剂来说尤其重要。

警告轴承温度较高,机座号为 280 到 450 时,建议不要采用含 EP 附加剂的润滑剂。

如果环境温度低于 -25°C 或高于 +55°C,或者轴承温度高于 110°C,请向 ABB 营业部咨询应采用何种润滑油。

可使用以下高温润滑油。

Esso Unirex N2, N3 或 S2(锂复合基) Mobil Mobilith SHC 100(锂复合基) Shell Albida EMS 2(锂复合基) SKF LGHQ 3(锂复合基) Klüber Klüberplex BEM 41-132(专用锂基) FAG Arcanol TEMP110(锂复合基)

请联系当地 ABB 营业部了解能达到所需特性的其他润滑油的润滑间隔时间。

4.1.5 润滑间隔时间和润滑量

机座 润滑 3600 3000 1800 1500 1000 500-900号 油量 转/分 转/分 转/分 转/分 转/分 转/分

克/轴承 钟 钟 钟 钟 钟 钟

球轴承工作期内的润滑间隔时间

112 10 10000 13000 18000 21000 25000 28000132 15 9000 11000 17000 19000 23000 26500160 25 7000 9500 14000 17000 21000 24000180 30 6000 8000 13500 16000 20000 23000200 40 4000 6000 11000 13000 17000 21000225 50 3000 5000 10000 12500 16500 20000250 60 2500 4000 9000 11500 15000 18000280 70 20001) 35001) 8000 10500 14000 17000315 90 1) 1) 6500 8500 12500 16000355 120 1) 1) 4200 6000 10000 13000400 120 1) 1) 4200 6000 10000 13000400 M3BP 130 1) 1) 2800 4600 8400 12000450 140 2400 4000 8000 8800

表四

圆柱滚子轴承工作期内的润滑间隔时间

160 25 3500 4500 7000 8500 10500 12000180 30 3000 4000 7000 8000 10000 11500200 40 2000 3000 5500 6500 8500 10500225 50 1500 2500 5000 6000 8000 10000250 60 1300 2200 4500 5700 7500 9000280 70 10001) 20001) 4000 5300 7000 8500315 90 1) 1) 3300 4300 6000 8000355 120 1) 1) 2000 3000 5000 6500400 120 1) 1) 2000 3000 5000 6500400 M3BP 130 1) 1) 1400 2300 4200 6000450 140 1200 2000 4000 4400

表五1) 有关某些电机型号(3600 和 3000转/分钟)的 IEC(国际电工委员会)尺寸 280 和 450 的对应值,请参阅。

润滑间隔时间和润滑量,2 极,IEC机座号 280 和 450机座 润滑 3600 3000号 油量 转/分 转/分

克/轴承 钟 钟

球轴承工作期内的润滑间隔时间

280 M2B*, M2C*, M3B* 35 2000 3500315 M2B*, M2C*, M3B* 35 2000 3500355 M2B*, M2C* 45 1200 2000355 M3B* 35 1200 2000400 M2B*, M2C* 45 1200 2000400 M3B* 40 1000 1600450 M3B* 40 1000 1600

表六

圆柱滚子轴承工作期内的润滑间隔时间

280 M2B*, M2C*, M3B* 35 1000 1800315 M2B*, M2C*, M3B* 35 1000 1800355 M2B*, M2C* 45 600 1000355 M3B* 35 600 1000400 M2B*, M2C* 45 600 1000400 M3B* 40 500 800450 M3B* 40 500 800

表七

Page 11: ABB LOWVOLTAGE sc - 西门子中国

11 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

注意!对高速电机和其它一些型号,如 M2 BA 355和 M2 BA 400 2 极电机,应始终使用高速润滑油,因它们的速度因数高于 400000(以Dm x n 计算,其中 Dm = 承轴平均直径,mm; n = 转速,转/每分钟)

可使用以下润滑油。 FAG L69(聚脲基) Klüber Klüber quiet BH 72-102(聚脲基) Lubcon Turmogrease PU703(聚脲基)

如果使用其他润滑剂,请咨询制造商,了解其质量是否达到上述润滑剂的水平;如果对润滑剂的相容性存在疑问,请联系当地的 ABB 营业部。

警告对于高转速(速度因数 > 400000 )注油过多可能会导致损坏.

4.1.7 变频器驱动

高速操作时,如在应用变频器或低速高负荷的情况下,需要缩短润滑间隔时间。请向当地 ABB 营业部咨询这类情况。

将速度提高一倍后,润滑间隔时间通常需减至上述数值的约 40%。

警告不得超过电机的最高允许转速。

必须检查轴承在高速操作中的稳定性。

4.1.8 零部件

订购零部件时,必须指明完整的型号规格和产品代码,如铭牌所示。如果电机上印有制造序号,还应提供这一信息。

更多信息,请查询网站:www.abb.com/partsonline

4.1.9 重新绕组

应请合格的修理厂进行重新绕组。

如需对排烟电机和其他专用电机进行重新绕组,请事先联系 ABB 公司。

5. 环境要求

5.1 噪音等级在 50 Hz 的正弦电源下,本公司大多数电机的噪音等级均低于 82 dB(A),允许误差为 μ3 dB(A)。

特定电机的对应值见相关产品目录。

关于 60 Hz 正弦电源和非正弦电源下的噪音等级,请联系 ABB 营业部。

所有具备独立冷却系统的电机以及 M2F*/M3F*、M2L*/M3L*、M2R*/M3R* 、M2BJ/M3BJ*、M2LJ/M3LJ* 系列电机的噪音等级均在单独的手册中分别给予了说明。

Page 12: ABB LOWVOLTAGE sc - 西门子中国

ZH 12 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

6. 故障排除此说明并没有涵盖在安装、使用和维护时设备的所有细节和可能遇到的情况。需要提供所需信息,请联系 ABB 当地营业部。

电机故障排除必须请专业人员用合适的工具和设备进行电机维修和故障排除。

故障 原因 处理方法

电机无法启动 保险丝熔断 更换保险丝,保险丝的型号和额定值应正确无误

过载跳闸 检查和重置起动器的过载设置。

电源不正确 查看电源是否符合电机铭牌上的说明和负荷因素。

接线错误 参照电机线路图检查接线情况。

绕组电路或控制开关断路 出现这种情况时,合上开关会发出嗡嗡声。检查接线头是否松动。同时确保合闭所有控制接触器。

机械故障 查看电机和传动装置是否能自由转动。检查轴承和润滑情况。

定子短路 发生这种情况时保险丝会熔断,必须对电机进行重新绕组。

定子线圈连接不良 打开终端盒,用测试灯确定连接不良的部位。

转子存在缺陷 查找断裂的铜条或端环。

电机可能处于过载状态 减小负载。

电机停转 可能发生断相 检查断相线路。

应用错误 更换型号或尺寸。向制造商咨询。

过载 减小负载。

电压过低 确保电压保持铭牌上的电压水平。检查接线情况

断路 保险丝熔断,检查过载继电器、定子和按钮。

电机运转一段时间后逐渐停止运转。

电源故障 检查电线、保险丝和控制器的接头是否松动。

电机达不到理想速度 应用不当 请向供应商咨询正确的电机型号。

因线路电压降低而导致电机接线端子电压过低。

使用电压更高的电源或变压器终端,也可以减小负载。检查接线情况。检查导线尺寸是否正确。

启动负载过高 检查电机启动时的负载情况。

转子铜条断裂或转子松动 检查线圈附近是否存在裂痕。可能需要更换转子,因为维修通常只能暂时解决问题。

主电路断路 用测试装置确定断路位置并进行维修。

电机加速时间过长且消耗过多电流

负载过高 减小负载。

启动时电压过低 检查电阻是否过大。检查电线尺寸是否合适。

鼠笼式转子存在缺陷 更换新转子。

外加电压过低 要求电力公司增加电源分接头。

转动方向错误 相序错误 对调电机或配电盘上的接线头。

电机轻负载运转时出现过热现象

过载 减小负载。

机架或支架通风孔可能被脏物堵塞,因而电机无法正常通风。

疏通通风孔并检查是否有气流从电机内持续送出。

电机可能断相 检查所有导线,确保其连接良好。

线圈触地 找到触地位置并进行维修。

终端电压失衡 检查是否有引线、接头和变压器损坏。

Page 13: ABB LOWVOLTAGE sc - 西门子中国

13 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

故障 原因 处理方法

电机振动 电机未校正 重新校正电机。

支座不稳 加固底座。

联轴器失衡 平衡联轴器。

从动设备失衡 重新平衡从动设备。

轴承缺陷 更换轴承。

轴承未对齐 对齐轴承。

平衡块移位 重新平衡电机。

转子和联轴器平衡错位(半键-全键)

重新平衡联轴器或电机。

多相电机以单相运转 检查是否存在断路。

轴端余隙过大 调整轴承或添加垫片。

刮擦音 风扇与风扇罩发生磨擦 消除障碍。

风扇打在绝缘材料上 清洗风扇。

电机在底座上松动 拧紧紧固螺栓。

嗓音过大 空隙不均匀 检查并校正支架连接件或轴承。

转子失衡 重新平衡转子。

主轴承过热 轴弯曲或扭曲 矫直或更换电机轴。

皮带过紧 减小皮带张力。

皮带轮发生偏离 使皮带轮靠近电机轴承。

皮带轮直径过小 使用更大的皮带轮。

校正不良 通过重新校正传动装置进行纠正。

润滑油不足 给轴承添加适量的润滑油。

润滑油变质或润滑剂受到污染 清除原有润滑油,用煤油彻底清洗轴承,然后更换新的润滑油。

润滑剂过多 减少润滑剂量,使其不超过轴承空间的一半。

轴承过载 检查对准情况以及侧推力和端推力。

滚珠破损或座圈粗糙 更换轴承,更换前彻底清扫机壳。

Page 14: ABB LOWVOLTAGE sc - 西门子中国
Page 15: ABB LOWVOLTAGE sc - 西门子中国

15 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

Translations into other languages are available from ABB.

Example of the Declaration of Conformity given by ABB.

EC Declaration of Conformity

The Manufacturer :- (Name and address of the manufacturer) hereby declares that

The Products :- (Product identifi cation)

are in conformity with provisions of the following Council Directives :

Low Voltage Directive 73/23/EEC (amended by 93/68/EEC),

and, as components, with the essential requirements of the following :

EMC Directive 89/336/EEC (amended by 92/31/EEC and 93/68/EEC), regarding the intrinsic characteristics to emission and immunity levels,

and are in conformity with :

EN 60 034-1

Additional Information :-

By design, the machines, considered as components, comply with the essential requirements of

Machinery Directive 98/37/EEC provided that the installation be correctly realised by the manufacturer of the machinery (for example : in compliance with our Installation Instructions and EN 60 204 „Electri- cal Equipment of Industrial Machines‰).

Certificate of Incorporation (Directive 98/37/EEC, Art 4.2 and Annex II, Sub B) :

The machines above must not be put into service until the machinery into which they have been incorporated have been declared in conformity with the Machinery Directive.

Year of CE marking : CE00.

Signed by ..................................................

Title ...........................................................

Date ..........................................................

Page 16: ABB LOWVOLTAGE sc - 西门子中国

EN 16 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

Low Voltage Motors

Installation, operation and maintenance manual

1. General ........................................................................................................................................................... 171.1 Declaration of Conformity ..................................................................................................................... 171.2 Validity .................................................................................................................................................. 17

2. Installation ...................................................................................................................................................... 172.1 Putting into service (starting) ................................................................................................................ 17

2.1.1 Reception check .................................................................................................................... 172.1.2 Insulation resistance check .................................................................................................... 172.1.3 Direct-on-line or star/delta starting ........................................................................................ 182.1.4 Terminals and direction of rotation ......................................................................................... 18

2.2 Handling ............................................................................................................................................... 182.2.1 Storage .................................................................................................................................. 182.2.2 Transportation ........................................................................................................................ 182.2.3 Lifting ..................................................................................................................................... 182.2.4 Machine weights .................................................................................................................... 19

2.3 Installation............................................................................................................................................. 192.3.1 Cooling ................................................................................................................................... 192.3.2 Foundation ............................................................................................................................. 192.3.3 Alignment ............................................................................................................................... 192.3.4 Slide rails and belt drives ....................................................................................................... 19

2.4 Connection............................................................................................................................................ 202.4.1 Connection for variable speed drive ...................................................................................... 20

2.5 Balancing .............................................................................................................................................. 20

3. Operating ........................................................................................................................................................ 213.1 Use ....................................................................................................................................................... 21

3.1.1 Operating conditions .............................................................................................................. 213.2 Safety considerations ........................................................................................................................... 21

3.2.1 Points to observe ................................................................................................................... 213.3 Assembly and dismantling .................................................................................................................... 21

3.3.1 General .................................................................................................................................. 213.3.2 Bearings................................................................................................................................. 213.3.3 Fitting coupling halves and pulleys ........................................................................................ 21

4. Maintenance ................................................................................................................................................... 224.1 Maintenance and lubrication ................................................................................................................. 22

4.1.1 General inspection ................................................................................................................. 224.1.2 Lubrication ............................................................................................................................. 224.1.3 Machines with permanently greased bearings ...................................................................... 224.1.4 Motors with regreasing nipples .............................................................................................. 224.1.5 Lubrication intervals and amounts ......................................................................................... 234.1.6 Lubricants .............................................................................................................................. 234.1.7 Frequency converter drives ................................................................................................... 244.1.8 Spare parts ............................................................................................................................ 244.1.9 Rewinding .............................................................................................................................. 24

5. Environmental requirements ........................................................................................................................ 245.1 Noise levels........................................................................................................................................... 24

6. Troubleshooting ............................................................................................................................................. 25

Contents Page

Page 17: ABB LOWVOLTAGE sc - 西门子中国

17 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

1. General

NOTE!These instructions must be followed to ensure safe and proper installation, operation and maintenance of the motor. They should be brought to the attention of anyone who installs, operates or maintains this equipment. Ignoring the instruction may invalidate the warranty.

1.1 Declaration of Conformity

Declarations of Conformity with respect to the Low voltage Directive 73/23/EEC amended by Directive 93/68 EEC are issued separately with individual machines. The Declaration of Conformity also satisfies the requirements of a Declaration of Incorporation with respect to the Machinery Directive 98/37/EEC, Art 4.2Annex II, sub B

1.2 Validity

The instructions are valid for the following ABB electrical machine types, in both motor and generator operation.

series MT*, MBT*, MXMA,series M2A*/M3A*, M2B*/M3B*, M2C*/M3C*, M2F*/M3F*, M2L*/M3L*, M2M*/M3M*, M2Q*, M2R*/M3R*, M2V*/M3V*

in frame sizes 56 - 450.

There is a separate manual for e.g. Ex motors ÂLow voltage motors for hazardous areas: Installation, operation and maintenance ManualÊ (Low Voltage Motors/Manual for Ex-motors).

Additional information is required for some machine types due to special application and/or design considerations. Additional information is available for the following motors:

roller table motors water-cooled motors open drip proof motors smoke venting motors brake motors permanent magnet motors

2. Installation

2.1 Putting into service (starting)

2.1.1 Reception check

Immediately upon receipt check the machine for external damage and if found, inform the forwarding agent without delay.

Check all rating plate data, especially voltage and winding connection (star or delta). The type of bearing is specified on the rating plate of all motors except the smallest frame sizes.

Remove transport locking if employed.Turn shaft by hand to check free rotation.

Do not exceed permissible loading values of bearings stated in the product catalogue.

Motors equipped with roller bearings: Running the motor with no radial force applied to the shaft may damage the roller bearing.

Motors equipped with angular contact bearing: Running the motor with no axial force applied in the right direction to the shaft may damage the angular contact bearing.

Motors equipped with regreasing nipples: When starting the motor for the first time, or after long storage of the motor, apply the specified quantity of grease until grease is forced out of the grease outlet.

For details see section „Manual lubrication" on page 9.

2.1.2 Insulation resistance check

Measure insulation resistance before commissioning and when winding dampness is suspected.

Resistance, measured at 25°C, shall exceed the reference value, i.e. 10 M ohm (measured with 500 V dc Megger)

WARNINGWindings should be discharged immediately after measurement to avoid risk of electric shock.

Insulation resistance reference value is halved for each 20°C rise in ambient temperature.

If the reference resistance value is not attained, the winding is too damp and must be oven dried. Oven temperature should be 90°C for 12-16 hours followed by 105°C for 6-8 hours.

Drain hole plugs, if fitted, must be removed and closing valve, if fitted, must be opened during heating.

Windings drenched in seawater normally need to be rewound.

Page 18: ABB LOWVOLTAGE sc - 西门子中国

EN 18 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

2.1.3 Direct-on-line or star/delta starting

The terminal box on standard single speed machines normally contains 6 winding terminals and at least one earth terminal.

Earthing must be carried out according to local regulations before the machine is connected to the supply voltage.

The voltage and connection are stamped on the rating plate.

Direct-on-line starting (DOL):Y or D winding connections may be used.

e.g. 660 VY, 380 VD indicates Y-connection for 660 V and D-connection for 380 V.

Star/Delta starting (Y/D):The supply voltage must be equal to the rated voltage of the machine in D-connection.

Remove all connection links from the terminal block.

For two-speed, single phase and special machines, supply connection must follow the instructions inside the terminal box.

If direct-on-line starting lasts for more than 10 seconds or Y/D starting more than 30 seconds, consult ABB Sales Office or see the publication ÂThe Motor Guide' (also available on the internet on www.abb.com/motors&generators).

2.1.4 Terminals and direction of rotation

Direction of rotation is clockwise when viewing the shaft face at the machine drive end, when the line phase sequence L1, L2, L3 is connected to the terminals as shown in the figure 1.

To alter the direction of rotation, interchange the connection of any two line cables.

If the machine has a uni-directional fan, ensure that the direction of rotation is according to the arrow marked on the machine.

2.2 Handling

2.2.1 Storage

The machine should always be stored indoors, in dry, vibration free and dust free conditions.

Unprotected machined surfaces (shaft-ends and flanges) should be protected with anti-corrosive treatment.

It is recommended that shafts be rotated periodically by hand to prevent grease migration.

Anti condensation heaters, if fitted, should preferably be energised.

The characteristics of electrolytic capacitors, if fitted to single-phase motors, will require „reforming‰ following periods of storage exceeding 1-2 years.

Contact ABB Sales Office for details.

2.2.2 Transportation

Machines fitted with cylindrical-roller and/or angular contact bearings must be fitted with locking devices during transport.

2.2.3 Lifting

Lift the motor using the lifting lugs only, if not otherwise stated in the separate lifting instruction.

The center of gravity of motors with the same frame may vary due to different outputs, mounting arrangements and auxiliary equipment.

Check that eyebolts or the lifting lugs integrated with the motor frame are undamaged before lifting. Damaged lifting lugs must not be used.

Lifting eyebolts must be tightened before lifting. If needed the position of the eyebolt must be adjusted with suitable washers.

Ensure that proper lifting equipment is used and that the sizes of the hooks are suitable for the lifting lugs.

Care must be taken not to damage auxiliary equipment and cables attached to the motor.

Page 19: ABB LOWVOLTAGE sc - 西门子中国

19 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

Before mounting the motor, the foundation surface for the shims or for the feet must be clean from thick paint, paint drops and dirt. Then it should be checked in order to discover any height differences between the individual foot locations. Also, the smoothness within each footprint area has to be checked. The requirements are noted in the figure below.

Foundation studsBolt the foundation studs to the feet of the motor and place a 1-to-2 mm shim between the stud and the feet.

Align the motor directly using appropriate means. Grout the studs with concrete, check alignment and drill holes for locating pins.

Drain holesAlways check that open drain holes face downward.

In extremely dusty environments, all drain holes should be closed.

2.3.3 Alignment

Correct alignment is essential to avoid bearing failures, vibrations and possible fractured shaft extensions.

2.3.4 Slide rails and belt drives

Fasten the machine to the slide rails as shown in figure 2. Place the slide rails horizontally on the same level. Check that the machine shaft is parallel with driven, or driving,

shaft. Any belt must be tensioned according to the supplier 's

instructions.

WARNINGExcessive belt tension will damage bearings and can cause shaft breakage.

Do not exceed the maximum belt forces (i.e. radial bearing loading) stated in the relevant product catalogues.

Note! Height difference shall n o t ex c e e d μ 0 , 1 m m referred to any other motor foot location

Ruler

Foot location

2.2.4 Machine weights

Total machine weight can vary within the same frame size (center height) depending on different output, mounting arrangements and added features.

The following table shows estimated maximum weights for machines in their basic versions as a function of frame material.

The actual weight of all our motors is stated on the rating plate except the smallest frame sizes.

Aluminum Cast iron Steel

Frame Weight Add. Weight Weightsize kg for brake kg kg

56 4.5 - - -63 6 - - -71 8 5 13 -80 12 8 20 -90 17 10 30 -

100 25 16 40 -112 36 20 50 -132 63 30 90 -160 110 30 175 -180 160 45 250 -200 220 55 310 -225 295 75 400 -250 370 75 550 -280 405 - 800 600315 - - 1700 1000355 - - 2700 2200400 - - 3500 3000450 - - 5000 4500

Table 1

2.3 Installation

2.3.1 Cooling

Normal ambient temperatures should not exceed 40°C (marine standard +45 or +50°C) if standard performance is to be achieved. Check that the motor has sufficient airflow. Ensure that no nearby equipment, surfaces or direct sunshine, radiate additional heat to the motor. For more information about higher ambient temperatures and cooling, see „the Motor Guide‰ or contact ABB Sales Office.

2.3.2 Foundation

The purchaser bears full responsibility for preparation of the foundation.

Metal foundations should be painted to avoid corrosion.

Foundations must be even, and sufficiently rigid to withstand possible short circuit forces. They shall be dimensioned as to avoid the occurrence of vibration due to resonance.

Page 20: ABB LOWVOLTAGE sc - 西门子中国

EN 20 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

2.4 Connection

Normal machine design has the terminal box on top with cable entry possible from both sides.

Some machines are available with top mounted terminal boxes rotatable 4 x 90 , and some with side mounted terminal boxes.

Availability of these solutions is described in the product catalogues.

Unused cable entries must be closed.

As well as main winding and earthing terminals, the terminal box can also contain connections for thermistors, standstill heating elements, bimetallic, switches, or PT 100 resistance elements.

WARNINGVoltage may be connected at standstill inside the terminal box for heating elements or direct winding heating.

Connection diagrams for auxiliary elements are found inside the terminal box cover or in additional labels on the frame of the machine.

WARNINGThe capacitor in single-phase motors can retain a charge that appears across the motor terminals, even when the motor has reached standstill.

2.4.1 Connection for variable speed drive

Variable speed drives cause higher voltage stresses than the sinusoidal supply on the winding of the motor and may cause high frequency shaft voltages and bearing currents. Therefore the winding and the bearing insulation of the motor as well as the filter at the converter output must be dimensioned according to "Selection rules for VSD applications/Insulation" (3GZF500930-2), available on request from ABB.

In variable speed drives the motor (Pn > 30 kW) must be cabled by using shielded symmetrical cables and cable glands providing 360 bonding (also called EMC glands). More information can be found in ABBÊs manual „Grounding and cabling of the drive system‰ (3AFY61201998).

In frequency converter applications motor frame external earthing must be used for equalising the potential between the motor frame and the driven machine, unless the two machines are mounted on the same metallic base.

For motor frame sizes above IEC 280, use 0.75 x 70 mm flat conductor or at least two 50 mm2 round conductors. The distance of the round conductors must be at least 150 mm from each other.

This arrangement has no electrical safety function; the purpose is to equalise the potentials. When the motor and the gearbox are mounted on a common steel fundament, no potential equalisation is required.

To comply with EMC-requirements, use only cables and connectors approved for this purpose. (See instruction for frequency converters.)

The highest permissible rotational speed of a cast iron motor used in variable speed drive (M2BA/M3BP) must not exceed maximum permissible speeds as stated in the table 2 below or the speed stamped on the rating plate. For information on the highest permissible rotational speed for other motor sizes and types, please contact ABB. Bearing lubrication should follow the directions mentioned later.

Frame size

Speed r/min2 pole 4 pole

280 3600 2600

315 3600 2300

355 3600 2000

400 3600 1800

450 3600 1800

Table 2

If there is uncertainty concerning the suitability of the motor for the variable speed drive, please contact ABB.

WARNINGThe maximum operating temperature of the grease and bearings must not be exceeded.

2.5 Balancing

The rotor of the machine is dynamically balanced.

As standard, balancing has been carried out using half key, and the shaft is marked with a RED tape, with the text „Balanced with half key‰. In case of motors delivered without any tape defining the type of balancing, these motors are also balanced with half key.

To avoid vibration the coupling-half or pulley must be balanced with half key after the keyway has been machined.

In the event of balancing with full key the shaft is marked with a YELLOW tape, with the text „Balanced with full key‰.

In case balancing without key, the shaft is marked with a BLUE tape, with the text „Balanced without key".

Plate/strip

Potential equalisation

Cables/wires

Driven machinery

Page 21: ABB LOWVOLTAGE sc - 西门子中国

21 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

3. Operating

3.1 Use

3.1.1 Operating conditions

The machines are intended for use in industrial drive applications.Normal ambient temperature limits are -20° to +40°C.Maximum altitude 1000 m above sea level.

3.2 Safety considerations

The machine is intended for installation and use by qualified personnel, familiar with relevant safety requirements.

Safety equipment necessary for the prevention of accidents at the installation and operating site must be provided in accordance with the local regulations.

WARNINGSmall motors with supply current directly switched by thermally sensitive switches can start automatically.

3.2.1 Points to observe

1. Do not use the machine to step on.2. The temperature of the outer casing of the machine may be hot to

the touch during normal operation.3. Some special machine applications require special instructions (e.g.

using frequency converter supplies).4. Lifting lugs must only be used for lifting the motor. They must not be used to lift the motor when it is attached to other equipment.

3.3 Assembly and dismantling

3.3.1 General

Dismantling and assembly of machines must be carried out by qualified personnel using only suitable tools and working methods. All repairs must be carried out according to the standard IEC-60079-19.

3.3.2 Bearings

Special care should be taken with the bearings.These must be removed using pullers and fitted by heating or using special tools for the purpose.

How to replace bearings is described in detail in a separate instruction leaflet available from ABB Sales Office.

3.3.3 Fitting coupling halves and pulleys

Coupling halves and pulleys must be fitted using suitable equipment and tools that do not damage the bearings.

Never fit a coupling half or pulley by hammering into place or remove it using a lever pressed against the body of the machine.

Mounting accuracy of coupling half:

check that the clearance b is less than 0.05 mm and that the difference a1 to a2 is also less than 0.05 mm. See figure 3.

Page 22: ABB LOWVOLTAGE sc - 西门子中国

EN 22 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

4. Maintenance

4.1 Maintenance and lubrication

4.1.1 General inspection

Inspect the machine at regular intervals. Keep the machine clean and ensure free ventilation airflow. Check the condition of shaft seals (e.g. V-ring) and replace if

necessary. Check the condition of connections and mounting and assembly

bolts. Check the bearing condition by listening for unusual noise, vibration

measurement, bearing temperature, inspection of spent grease or SPM bearing monitoring.

* When changes of condition occur, dismantle the machine, check the parts and replace if necessary.

4.1.2 Lubrication

WARNING Beware of all rotating parts!

WARNINGGrease can cause skin irritation and eye inflammation. Follow all safety precautions specified by the manufacturer.

4.1.3 Machines with permanently greased bearings

Bearings are usually permanently greased bearings of either Z or 2Z types.

Bearing types are specified in the respective product catalogues and on the rating plate of all our motors except smaller frame sizes.

As a guide, adequate lubrication for sizes up to 200 can be achieved for the following duration, according to L1 (i.e. that 99 % of the motors are sure to make the interval time) at ambient temperature of 25°C. For duties with ambient temperatures higher than 25°C, see the respective product catalogue.

Frame size Poles Duty hours56-80 2-8 for life90-112 2-8 40 000132 2-8 40 000160 2-8 40 000180 2-8 40 000200 2 27 000200 4 40 000

Table 3

Depending on application and load conditions, seeapplicable product catalogue.

Hours of operation for vertical motors are half of the above values.

Motors with roller bearings have considerably shorter grease life. For continuous operation regreasing nipples should be considered.

4.1.4 Motors with regreasing nipples

Lubrication information plate and general lubrication advice

If the machine is fitted with a lubrication information plate, follow the given values.

On the lubrication information plate, regreasing intervals with regard to mounting, ambient temperature and speed of rotation can be defined.

During the first start or after a bearing lubrication it may appear a temporary temperature rise, appr. 10-20 hours. ABB policy is to have reliability as a vital issue in bearing lubrication intervals. That is why we follow the L1-principle.

A. Manual lubrication

Regreasing while motor is running Remove grease outlet plug or open closing valve if fitted. Be sure that the lubrication channel is open Press the specified amount of grease into the bearing. Let the motor run 1-2 hours to ensure that all excess grease is forced

out of the bearing. Close the grease outlet plug or closing valve if fitted.

Regreasing while motor is at a standstillRegrease motors while running. If this is not possible, lubrication can be carried out while the machine is at a standstill. In this case, use only half the quantity of grease, then run the motor

for a few minutes at full speed. When the motor has stopped, press the rest of the specified amount

of grease into the bearing. After 1-2 running hours close the grease outlet plug or closing valve

if fitted.

B. Automatic lubricationThe grease outlet plug must be removed permanently with automatic lubrication or open closing valve if fitted.

Some motors may be equipped with a collector for old grease. Follow the special instructions given for the equipment.

We recommend only the use of electromechanical systems. Contact your local ABB Sales Office.

The amount of grease per each lubrication interval stated in the tables 4-5 should be doubled if an automatic regreasing system is used.

If 2-pole motors are being automatically regreased, the note (NOTE!) concerning lubricant recommendations given for 2-pole motors in the chapter Lubricants shall be followed.

Page 23: ABB LOWVOLTAGE sc - 西门子中国

23 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

Factors influencing the lubrication intervalsLubrication intervals for vertical machines are half of the above values.

The lubrication intervals are based on bearing operating temperature 80 C (ambient temperature of about + 25 ). Note! An increase in the ambient temperature raises the temperature of the bearings correspondingly. The values should be halved for 15 C increase in bearing temperature and may be doubled for 15 C decrease in bearing temperature.

WARNINGThe maximum operating temperature of the grease and bearings must not be exceeded.

4.1.6 Lubricants

WARNINGDo not mix different types of grease. Incompatible lubricants may cause bearing damage.

When regreasing, use only special ball bearing grease with the following properties: good quality grease with lithium complex soap and with mineral- or

PAO-oil base oil viscosity 100-160 cST at 40°C consistency NLGI grade 1.5 - 3 *) temperature range -30°C - +120°C, continuously.

*) For vertical mounted motors or in hot conditions a stiffer end of scale is recommended.

Grease with the correct properties is available from all major lubricant manufacturers.

Admixtures are recommended, but a written guarantee must be obtained from the lubricant manufacturer especially concerning EP admixtures, that admixtures do not damage bearings or the properties of lubricants at the operating temperature range.

WARNINGLubricants containing EP admixtures are not recommended in high bearing temperatures in frame sizes 280 to 450.

If the ambient temperature is below -25°C or above +55°C, or bearing temperature is above 110°C, consult ABB Sales Office regarding suitable grease.

The following high performance grease can be used

Esso Unirex N2, N3 or S2 (lithium complex base) Mobil Mobilith SHC 100 (lithium complex base) Shell Albida EMS 2 (lithium complex base) SKF LGHQ 3 (lithium complex base) Klüber Klüberplex BEM 41-132 (special lithium base) FAG Arcanol TEMP110 (lithium complex base)

Lubrication intervals for other grease fullfilling the required properties, contact your local ABB Sales Office.

4.1.5 Lubrication intervals and amountsFrame Amount 3600 3000 1800 1500 1000 500-900size of grease r/min r/min r/min r/min r/min r/min

g/bearingBall bearingsLubrication intervals in duty hours

112 10 10000 13000 18000 21000 25000 28000132 15 9000 11000 17000 19000 23000 26500160 25 7000 9500 14000 17000 21000 24000180 30 6000 8000 13500 16000 20000 23000200 40 4000 6000 11000 13000 17000 21000225 50 3000 5000 10000 12500 16500 20000250 60 2500 4000 9000 11500 15000 18000280 70 20001) 35001) 8000 10500 14000 17000315 90 1) 1) 6500 8500 12500 16000355 120 1) 1) 4200 6000 10000 13000400 120 1) 1) 4200 6000 10000 13000400 M3BP 130 1) 1) 2800 4600 8400 12000450 140 2400 4000 8000 8800

Table 4

Roller bearingsLubrication intervals in duty hours

160 25 3500 4500 7000 8500 10500 12000180 30 3000 4000 7000 8000 10000 11500200 40 2000 3000 5500 6500 8500 10500225 50 1500 2500 5000 6000 8000 10000250 60 1300 2200 4500 5700 7500 9000280 70 10001) 20001) 4000 5300 7000 8500315 90 1) 1) 3300 4300 6000 8000355 120 1) 1) 2000 3000 5000 6500400 120 1) 1) 2000 3000 5000 6500400 M3BP 130 1) 1) 1400 2300 4200 6000450 140 1200 2000 4000 4400

Table 51) Values for IEC sizes 280 to 450 (cast iron and steel motors) in certain motor types (3600 and 3000 r/min), see tables 6-7.

Lubrication intervals and amounts, 2-pole, IEC frame sizes 280 to 450Frame Amount 3600 3000size of grease r/min r/min

g/bearingBall bearingsLubrication intervals in duty hours

280 M2B*, M2C*, M3B* 35 2000 3500315 M2B*, M2C*, M3B* 35 2000 3500355 M2B*, M2C* 45 1200 2000355 M3B* 35 1200 2000400 M2B*, M2C* 45 1200 2000400 M3B* 40 1000 1600450 M3B* 40 1000 1600

Table 6Roller bearingsLubrication intervals in duty hours

280 M2B*, M2C*, M3B* 35 1000 1800315 M2B*, M2C*, M3B* 35 1000 1800355 M2B*, M2C* 45 600 1000355 M3B* 35 600 1000400 M2B*, M2C* 45 600 1000400 M3B* 40 500 800450 M3B* 40 500 800

Table 7

Page 24: ABB LOWVOLTAGE sc - 西门子中国

EN 24 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

NOTE! Always use high speed grease for high speed machines and some other models, e.g. M2 BA 355 and 400 2-pole machines, where the speed factor is higher than 400 000 (calculated as Dm x n where Dm = average bearing diameter, mm; n = rotational speed, r/min).

The following grease can be used: FAG L69 (polyurea base) Klüber Klüber quiet BH 72-102 (polyurea base) Lubcon Turmogrease PU703 (polyurea base)

If other lubricants are used, check with the manufacturer that the qualities correspond to those of the above mentioned lubricants, or if the compatibility of the lubricant is uncertain, contact your local ABB Sales Office.

WARNINGEspecially in high rotational speed (the speed factor > 400000) over greasing may cause damage.

4.1.7 Frequency converter drives

Higher speed operation, e.g. in frequency converter applications, or lower speed with heavy load will require shorter lubrication intervals. Consult your local ABB Sales Office in such cases.

Typically a doubling of speed will require a reduction of lubrication intervals to approx. 40 % of values tabulated above.

WARNINGThe constructional maximum speed of the motor must not be exceeded (see table 2).

Suitability of bearings for high speed operation must be checked.

4.1.8 Spare parts

When ordering spare parts, the full type designation and product code, as stated on the rating plate, must be specified.

If the machine is stamped with a serial manufacturing number, this should also be given.

For more information, please visit our web site www.abb.com/partsonline.

4.1.9 Rewinding

Rewinding should always be carried out by qualified repair shops.

Smoke venting and other special motors should not be rewound without first contacting ABB.

5. Environmental requirements

5.1 Noise levels

Most of our motors have a sound pressure level not exceeding 82 dB(A) refer to 50 Hz sinusoidal supply conditions, tolerance μ 3 dB(A).

Values for specific machines can be found in the relevant product catalogues.

For sound pressure levels for 60 Hz sinusoidal supply and with non-sinusoidal supplies, contact ABB Sales Office.

Sound pressure levels for all machines having separate cooling systems and for series M2F*/M3F*, M2L*/M3L*, M2R*/M3R*, M2BJ/M3BJ and M2LJ/M3LJ are indicated in separate Manuals.

Page 25: ABB LOWVOLTAGE sc - 西门子中国

25 ENABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

6. TroubleshootingThese instructions do not cover all details or variations in equipment nor provide for every possible condition to be met in connection with installation, operation or maintenance. Should additional information required, please contact the nearest ABB Sales Office.

Motor troubleshooting chartYour motor service and any troubleshooting must be handled by qualified persons with proper tools and equipment.

TROUBLE CAUSE WHAT TO DOMotor fails to start Blown fuses Replace fuses with proper type and rating.

Overload trips Check and reset overload in starter.

Improper power supply Check to see that power supplied agrees with motor rating plate and load factor.

Improper line connections Check connections with diagram supplied with motor.

Open circuit in winding or control switch Indicated by humming sound when switch is closed. Check for loose wiring connections. Also, ensure that all control contacts are closed.

Mechanical failure Check to see if motor and drive turn freely. Check bearings and lubrication.

Short circuited stator Poor stator coil connection

Indicated by blown fuses. Motor must be rewound. Remove end bells, locate with test lamp.

Rotor defective Look for broken bars or end rings.

Motor may be overloaded Reduce load.

Motor stalls One phase may be open Check lines for open phase.

Wrong application Change type or size. Consult manufacturer.

Overload Reduce load.

Low voltage Ensure the rating plate voltage is maintained. Check connection.

Open circuit Fuses blown, check overload relay, stator and push buttons.

Motor runs and then dies down

Power failure Check for loose connections to line, to fuses and to control.

Motor does not come up to speed

Not applied properly Consult supplier for proper type.

Voltage too low at motor terminals because of line drop

Use higher voltage or transformer terminals or reduce load. Check connections. Check conductors for proper size.

Starting load too high Check load motor is supposed to carry at start.

Broken rotor bars or loose rotor Look for cracks near the rings. A new rotor may be required, as repairs are usually temporary.

Open primary circuit Locate fault with testing device and repair.

Motor takes too long to accelerate and/or draws high amp

Excessive load Reduce load.

Low voltage during start Check for high resistance. Adequate wire size.

Defective squirrel cage rotor Replace with new rotor.

Applied voltage too low Get power company to increase power tap.

Wrong rotation Wrong sequence of phases Reverse connections at motor or at switchboard.

Page 26: ABB LOWVOLTAGE sc - 西门子中国

EN 26 ABB / Low Voltage Motors / Manual ZH-EN 12-2004

EN

TROUBLE CAUSE WHAT TO DOMotor overheats while running underloaded

Overload Reduce load.

Frame or bracket vents may be clogged with dirt and prevent proper ventilation of motor

Open vent holes and check for a continuous stream of air from the motor.

Motor may have one phase open Check to make sure that all leads are well connected.

Grounded coil Locate and repair.

Unbalanced terminal voltage Check for faulty leads, connections and transformers.

Motor vibrates Motor misaligned Realign.

Weak support Strengthen base.

Coupling out of balance Balance coupling.

Driven equipment unbalanced Rebalance driven equipment.

Defective bearings Replace bearings.

Bearings not in line Line up properly.

Balancing weights shifted Rebalance motor.

Contradiction between balancing of rotor and coupling (half key - full key)

Rebalance coupling or motor.

Polyphase motor running single phase Check for open circuit.

Excessive end play Adjust bearing or add shim.

Scraping noise Fan rubbing fan cover Remove interference.

Fan striking insulation Clear fan.

Motor loose on bedplate Tighten holding bolts.

Noisy operation Airgap not uniform Check and correct bracket fits or bearing.

Rotor unbalance Rebalance.

Hot bearings ball Bent or sprung shaft Straighten or replace shaft.

Excessive belt pull Decrease belt tension.

Pulleys too far away Move pulley closer to motor bearing.

Pulley diameter too small Use larger pulleys.

Misalignment Correct by realignment of drive.

Insufficient grease Maintain proper quality of grease in bearing.

Deterioration of grease or lubricant contaminated

Remove old grease, wash bearings thoroughly in kerosene and replace with new grease.

Excess lubricant Reduce quantity of grease, bearing should not be more than 1/2 filled.

Overloaded bearing Check alignment, side and end thrust.

Broken ball or rough races Replace bearing, first clean housing thoroughly.

Page 27: ABB LOWVOLTAGE sc - 西门子中国

27 ZHABB/低压电机/使用手册 ZH-EN 12-2004

ZH

图 1. 接线图Figure 1. Connection diagram

图 2. 皮带传动Figure 2. Belt drive

Page 28: ABB LOWVOLTAGE sc - 西门子中国

ZH 28 ABB/低压电机/使用手册 ZH-EN 12-2004

ZH

图 3. 半联轴节或皮带轮的安装Figure 3. Mounting of half-coupling or pulley

Page 29: ABB LOWVOLTAGE sc - 西门子中国

澳大利亚ABB Industry Pty Ltd2 Douglas StreetPort Melbourne,Victoria, 3207电话:+61 (0) 3 9644 4100传真:+61 (0) 3 9646 9362

奥地利ABB AGWienerbergstrasse 11 BA-1810 Wien电话:+43 (0) 1 601 090传真:+43 (0) 1 601 09 8305

比利时Asea Brown Boveri S.A.-N.V.Hoge Wei 27B-1930 Zaventem电话:+32 (0) 2 718 6311传真:+32 (0) 2 718 6657

加拿大ABB Inc., BA Electrical Machines10300 Henri-Bourassa Blvd,West, Saint-Laurent, QuebecCanada H4S 1N6电话:+1 514 832-6583传真:+1 514 332-0609

中国*ABB Shanghai Motors Company Limited8 Guang Xing Rd.,Rong BeiTown, Songjiang County,Shanghai 201613电话:+86 21 5778 0988传真:+86 21 5778 1364

智利Asea Brown Boveri S.A.P.O.Box 581-3Santiago电话:+56 (0) 2 5447 100传真:+56 (0) 2 5447 405

丹麦ABB A/SAutomation Technology Electrical MachinesPetersmindevej 1DK-5000 Odense C电话:+45 65 477 070传真:+45 65 477 713

芬兰*ABB OyLV MotorsP.O.Box 633FIN-65101 Vaasa电话:+358 (0) 10 22 11传真:+358 (0) 10 22 47372

法国ABB AutomationRue du General de GaulleChampagne-sur-SeineF-77811 Moret-sur-Loing Cedex电话:+33 (0) 1 60 746 500传真:+33 (0) 1 60 746 565

德国ABB Automation Products GmbHEdisonstrasse 1568623 Lampertheim电话:+49 (0) 6206 503 503传真:+49 (0) 6206 503 600

香港ABB (Hong Kong) Ltd.Tai Po Industrial Estate,3 Dai Hei Street,Tai Po, New Territories,

香港电话:+852 2929 3838传真:+852 2929 3505

印度*ABB Ltd.32, Industrial Area, N.I.TFaridabad 121 001电话:+91 (0) 129 502 3001传真:+91 (0) 129 502 3006

印度尼西亚PT. ABB Sakti IndustriJL. Gajah Tunggal Km.1Jatiuwung, Tangerang 15136Banten, Indonesia电话:+ 62 21 590 9955传真:+ 62 21 590 0115 - 6

爱尔兰Asea Brown Boveri LtdComponents DivisionBelgard RoadTallaght, Dublin 24电话:+353 (0) 1 405 7300传真:+353 (0) 1 405 7327

意大利*ABB SACE SpALV MotorsVia Della Meccanica, 22I-20040 Caponago - MI电话:+39 02 959 6671传真:+39 02 959 667216

日本ABB K.K.26-1 Cerulean TowerSakuragaoka-cho, Shibuya-kuTokyo 150-8512电话:+81 (0) 3 578 46251传真:+81 (0) 3 578 46260

韩国ABB Korea Ltd.7-9fl, Oksan Bldg., 157-33Sungsung-dong, Kangnam-kuSeoul电话:+82 2 528 2329传真:+82 2 528 2338

马来西亚ABB Malaysia Sdn. Bhd.Lot 608, Jalan SS 13/1K47500 Subang Jaya, Selangor电话:+60 3 5628 4888传真:+60 3 5631 2926

墨西哥ABB Mexico, S.A. de C.V.Apartado Postal 111CP 54000 TlalnepantlaEdo. de Mexico, Mexico电话:+52 5 328 1400传真:+52 5 390 3720

荷兰ABB B.V.Dept. LV motors (APP2R)P.O.Box 301NL-3000 AH Rotterdam电话:+31 (0) 10 4078 879传真:+31 (0) 10 4078 345

挪威ABB ASP.O.Box 154 VollebekkNO-0520 Oslo电话:+47 22 872 000传真:+47 22 872 541

新加坡ABB Industry Pte Ltd2 Ayer Rajah CrescentSingapore 139935电话:+65 6776 5711传真:+65 6778 0222

西班牙*ABB Automation Products S.A.Division MotoresP.O.Box 81E-08200 Sabadell电话:+34 93 728 8500传真:+34 93 728 8741

瑞典*ABB Automation Technologies ABLV MotorsSE-721 70 Västerås电话:+46 (0) 21 329 000传真:+46 (0) 21 329 140

瑞士ABB Schweiz AGNormelec/CMC ComponentsMotors&DrivesBadenerstrasse 790PostfachCH-8048 Zurich电话:+41 (0) 58 586 0000传真:+41 (0) 58 586 0603

台湾ABB Ltd.6F, No. 126, Nanking EastRoad, Section 4iTaipei, 105 Taiwan, R.O.C.电话:+886 (0) 2 2577 6090传真:+886 (0) 2 2577 9467

泰国ABB Limited (Thailand)161/1 SG Tower,Soi Mahadlekluang 3,Rajdamri, Bangkok 10330电话:+66 2 665 1000传真:+66 2 6042

英国ABB Automation Ltd9 The Towers, Wilmslow RoadDidsburyManchester, M20 2AB电话:+44 (0) 161 445 5555传真:+44 (0) 161 448 1016

美国ABB Inc.Low Voltage Motors16250 W. Glendale DriveNew Berlin, WI 53151电话:+1 262 785 3200传真:+1 262 785 8628

委内瑞拉Asea Brown Boveri S.A.P.O.Box 6649Carmelitas,Caracas 1010A电话:+58 (0) 2 238 2422传真:+58 (0) 2 239 6383

低压电机生产地址 (*) 及部分大型销售公司列表。

www.abb.com/motors&generators http://online.abb.com/motors&drives

ABB

/ Low

Vol

tage

Mot

ors

/ Man

ual Z

H-EN

12-

2004

芬兰印制