A. SAADAT & CO. Consulting Engineers Airconditioning, Refrigeration, Mechanical & Electrical Services Specializing in the Design of airconditioning, refrigeration, mechanical, electrical, plumbing water supply & drainage, fire protection services, Process gases piping, Cogeneration systems, Building automation & management systems, Plants operation & maintenance and Project feasibility studies for Commercial, Industrial & Institutional Buildings Head Office Building Cephalosporin Manufacturing Bldg. Sanofi Aventis Pakistan Ltd., Karachi, Administration & Production Facility Complex 3-Absorption Chillers Total 775TR Capacity Library Building Finance & Trade Centre, Karachi LUMS New Campus, DHA, Lahore Replacement of Co Gen Plant 3-Absorption Chillers Total 1180TR Capacity 3x1MW Gen Sets & 4x800TR Chillers Company Profile

A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

Embed Size (px)

Citation preview

Page 1: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

A. SAADAT & CO.

Consulting Engineers Airconditioning, Refrigeration,

Mechanical & Electrical Services

Specializing in the Design of airconditioning, refrigeration, mechanical, electrical, plumbing

water supply & drainage, fire protection services, Process gases piping, Cogeneration systems, Building automation &

management systems, Plants operation & maintenance and Project feasibility studies

for

Commercial, Industrial & Institutional Buildings

Head Office Building Cephalosporin Manufacturing Bldg.

Sanofi Aventis Pakistan Ltd., Karachi, Administration & Production Facility Complex 3-Absorption Chillers Total 775TR Capacity

Library Building Finance & Trade Centre, Karachi LUMS New Campus, DHA, Lahore Replacement of Co Gen Plant 3-Absorption Chillers Total 1180TR Capacity 3x1MW Gen Sets & 4x800TR Chillers

Company Profile

Page 2: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

1

Contents.

1. Contents Page-1 2. Introduction Page-2 3. Principal Fields of Activity Page-3 to 4 4. Prominent Projects Since 1962-1985 Page-5 to 7 5. Senior Technical Staff Page-8 to 19 6. List of Notable Projects 1968-2000 & 2000 to 2010 Page-20 to 39 7. Major Projects Undertaken In Last Five Years Page-40 to 43 8. List of Major Projects In Hand Page-44 to 45

Page 3: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

2

Introduction

A.Saadat & Co., Consulting Engineers, was established in 1962. It is

staffed by qualified and experienced Professional Engineers who have worked in USA,

UK, Europe and Middle East.

The main fields of professional services rendered are listed below.

Projects handled include internal and external services for all types of Buildings and

campuses, industrial and commercial complexes, including multi-storey office

buildings, institutional buildings, University Campuses, computer centres, hospitals &

medical colleges, hotels, cinema auditoriums, Television and Radio Broadcasting

Centres, Laboratories for special research and development, airports, industrial units

including Pharmaceuticals Production units, cotton and synthetic fibre yarn spinning

and weaving units, paints manufacturing, etc.

Mr.Anwar Saadat, Principal of the Company has been associated with

HVACR (Heating, Ventilating, Airconditioning, Refrigeration), Mechanical and Electrical

Services for various types of Buildings since 1950. He completed B.Sc. Honours

(Engineering)from The Punjab College Of Engineering & Technology, Lahore (now

University Of Engineering & Technology, Lahore). He topped the list in 1949 in The

Punjab University and was awarded Gold Medal. He worked with a HVACR Contracting

Firm before leaving for UK on a British Industries Federation 2 years scholarship.

During 1952-58, he completed a post graduate course in HVACR Engineering from The

National College Of Heating, Ventilating, Refrigeration and Fan Engineering, London

(now Institute Of Environmental Engineering, South Bank University), obtained

training and worked in UK, Belgium and USA with HVACR Equipment Manufacturers.

On returning to Pakistan, he worked as Chief Engineer of a HVACR Contracting Firm

till 1962, when he started practicing as a Consulting Engineer.

In consideration of services rendered by him to HVACR Engineering

in the country, he was elected in 1996 as Founder President of Pakistan HVACR

Society. He was elected Vice President of Association of Consulting Engineers Pakistan

in 1990, 1995, 1997 and 2001.

Page 4: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

3

Principal Fields of Activity.

The professional services are rendered in all fields of mechanical and

electrical engineering with special interest in the following systems:

1. Year-round airconditioning or airconditioning (summer cooling) or winter

heating systems.

2. Refrigeration systems for low temperature applications.

3. Mechanical environmental systems including air ventilation/exhaust.

4. Pollution Control.

5. Process piping.

6. Plumbing systems including internal & external cold and hot water supply

and drainage systems.

7. Fire Fighting systems including sprinkler systems.

8. Water conservation, water recycling, grey water systems.

9. Irrigation systems.

10. Electrical systems including internal & external electrification &

illumination.

11. Communications, fire/smoke detection and alarms, building automation,

management & security systems.

12. Self Power Generation, Cogeneration Systems.

Pakistan Engineering Council Registration No.CONSULT/521 as

Consulting Engineers for Mechanical, Electrical & Chemical Engineering

Works.

Scope of Services.

The scope of services rendered cover all aspects of engineering projects

such as:

- Consultation

- Investigations & Survey

- Feasibility & Study Reports

- Engineering Design

- Working Drawings

- Technical Specifications

- Bill of Quantities

- Contract Documents

- Cost Estimates

- Evaluation of Bids

- Procurement of Equipment & Materials

- Construction Supervision

Page 5: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

4

- Supervision of Commissioning & Testing of Plants & Systems and certification of

satisfactory completion of the work

- Inspection and Revalidation of existing Systems & Plants

- Top Supervision of the Operation & Maintenance Work of Plants

Page 6: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

5

PROMINENT PROJECTS SINCE 1962

Since 1962, A.Saadat & Co. has been associated as Consultants for

Year-Round Airconditioning, Heating & Ventilating, Plumbing, Electrical & Mechanical

Systems for a large number of major prestigious Projects in the Country including

multi-storey Buildings, Hospitals, Hotels, Institutional Buildings, Industrial Units and

Special Installations.

To name a few:

- Finance & Trade Centre, Karachi which was the largest single Office

Block in the Country.

- National Assembly Building, Islamabad.

- The Aga Khan University Medical Centre, Karachi (Hospital, Medical

College and School of Nursing). After completion of the main Project in

1985. ASCo were appointed Consultants for the on-going expan-

sions/modifications and new Facilities.

- Multi-Storey Office Buildings:

Pakistan Secretariat, Islamabad, Phase-II Buildings.

Wapda House, Lahore.

The Dawood Centre, Karachi.

Shell House, Karachi.

State Bank Of Pakistan, Dacca Office Building.

National Bank Of Pakistan: Regional Office Building, Islamabad, Principal

Office Building, Lahore, Regional Office Buildings at Hyderabad, Quetta

and Peshawar.

USSR Chancery Buildings, Islamabad.

Chinese Embassy Buildings, Islamabad.

Habib Bank Ltd., Main Building, Quetta.

State Life Building No.2, Karachi.

State Life Building, Dera Ismail Khan.

- SUPARCO Satellite Ground Receiving Stations at Karachi & Chittagong.

Communication Lab Facilities (GRS), Islamabad.

- Pharma Production Units of major Multi-National Companies

requiring special environmental conditions, over 30 Units. Both original

and subsequent expansions of the Production Facilities.

Abbot Laboratories (Pakistan) Ltd. of U.S.A.

Bayer Pakistan (Pvt) Ltd. of Germany

Ciba-Geigy (Pakistan) Ltd. of Switzerland

Clariant (Sandoz) Pakistan Ltd. of Switzerland

Page 7: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

6

Eli Lilly And Company of U.S.A.

GlaxoWellcome Pakistan Ltd. of U.K.

Hoechst Pakistan Ltd. of Germany

Knoll (Boots) Pharmaceuticals Ltd. of U.K.

Merck Sharp & Dhome (Pakistan) Ltd. of U.S.A.

Pharmagen Beximco Ltd. of Korea

Rhone Poulene (Pakistan) Ltd. of France

Searle Pakistan (Pvt) Ltd. of U.S.A.

Smith Kline Beecham (Pakistan) Ltd. of U.K.

Spenser (Fisons) Pharma (Pvt) Ltd. of U.K.

Squibb Pakistan Ltd. of U.S.A.

Wyeth Laboratories (Pakistan) Ltd. of U.S.A.

- Hotels:

Khyber Pearl Continental, Peshawar.

Avari Lahore - Ramada Renaissance, Lahore

Avari Towers - Ramada Renaissance, Karachi.

Hotel Midway House, Karachi Airport, New Block.

Serena Hotel, Faisalabad.

Serena Hotel, Quetta.

Marriott Hotel, Islamabad, New Block.

Pearl Continental Hotel, Bhurbun.

Pearl Continental Hotel, Lahore.

- Industrial Complexes.

PIDC Machine Tool Factory, Landhi, Karachi.

Security Paper Mill, Karachi.

Pakistan Tobacco Co. Ltd. Factories at Akora Khattak & Jhelum.

ICI Pakistan Ltd. Paint Factory, Lahore.

Thal Jute Mills Ltd., Muzaffargarh.

S.G.Fibre Ltd. Polyester Fibre Factory, Karachi.

- Cotton Spinning Mills.

Dawood Cotton Mill Unit Nos.4, 5 & 6, Landhi, Karachi.

Kohinoor Spinning Mill, Chakwal.

Mahmood Textile Mill, Unit No.3, Muzaffargarh.

Margalla Textile Mill, Hasan Abdal.

Page 8: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

7

Monnoo Textile Mill, Distt. Lahore.

Shahpur Textile Mill, Chunian.

- Television Centres and Radio Broadcasting Units.

Television Centres at Karachi, Lahore and Quetta.

Pakistan Broadcasting Corporation Broadcasting Studios at Hyderabad,

Karachi, Multan, Peshawar and Rawalpindi.

High Power Transmitter Stations at Hyderabad, Islamabad, Karachi,

Multan, Peshawar, Quetta and Rewat.

Page 9: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

8

CURRICULUM VITAE

OF

SENIOR TECHNICAL STAFF

Page 10: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

9

Principal: Engr.ANWAR SAADAT

Founder President Pakistan HVACR Society (terms 1996-1999 & 1999-2001) President ASHRAE Pakistan Chapter, 2007-08 Vice President Association of Consulting Engineers, Pakistan (terms 1990-92, 1995-97, 1997-99, 2001-03 & 2005-07)

Life Fellow : The Institution of Engineers, Pakistan.

Life Member : American Society of Heating, Refrigerating & Airconditioning Engineers Inc., (ASHRAE) U.S.A.

Life Fellow : The Institute of Refrigeration, U.K.

Registered Professional Engineer with Pakistan Engineering

Council. Educational Qualifications The Punjab University. 1946 B.Sc., Government College, Lahore (now Government College University). 1949 B.Sc. Honours (Engineering),

The Punjab College of Engineering And Technology, Lahore (now University of Engineering & Technology, Lahore). Topped the list in the University and awarded Gold Medal and Prize.

The South Bank University, London. 1953 The National College of Heating, Ventilating, Refrigeration and Fan

Engineering, London (now Institute of Environmental Engineering).

Awarded Associateship of the College after completing Post Graduate Course and the thesis on `Transfer of Heat and Moisture' was considered as the best.

Professional Experience since 1949

- Engineering Teaching : 1 Year - HVACR Equipment Manufacturing : 5 Years - HVACR & Mechanical Contracting : 7 Years - Consulting Engineering HVACR, Mechanical, Plumbing & Electrical Services : since 1962

1949-50 Assistant Professor, Electrical Engineering Department, The Punjab College of Engineering And Technology, Lahore.

Page 11: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

10

1950-52 Design and installation of 400 TR capacity airconditioning plant for the Pakistan Security Printing Corporation, Malir, Karachi.

1954-55 The Lightfoot Refrigeration Co. Ltd., Wembley, U.K.

Design and installation of cold storage, process refrigeration and airconditioning plants, sizes upto 500 TR (ton refrigeration).

1955-56 Society Gregg D'Europe, Lot, Bruxelles, Belgium. Technical Adviser

(AC&R) supervising cold storage, refrigeration and airconditioning applications for Transport both rail and road.

1957-58 (a) Worthington Corporation, Harrison N.J., U.S.A. HVACR Equipment manufacturer. (b) The Standard Refrigeration Co. Inc. San Juan, Puerto Rico 350 TR

capacity high velocity induction system airconditioning installation of Hotel La Concha, San Juan.

1956-62 Jaleel Brothers Ltd., Karachi.

Chief Engineer, numerous cold storage and airconditioning projects, design and installation. Some of the notable jobs, State Bank of Pakistan, Head Office Building, Karachi (740 TR) Penicillin Factory PIDC, Daudkhel (200 TR), 950 seat Godeon Cinema (110 TR), Montgomery Cold Storage, Montgomery (Storage capacity 1000 tons fresh products).

1962-todate Practicing as a Consulting Engineer Principal of A.Saadat & Co.

Page 12: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

11

Engr.ANWAR SAADAT is a registered Professional Engineer and Principal of A.Saadat

& Co., Consulting Engineers. He has been practicing as a Consulting Engineer for

Airconditioning, Ventilation, Refrigeration, Mechanical, Plumbing and Electrical

Services for Commercial, Industrial and Institutional Buildings since 1962. He has

been associated as a Consulting Engineer with a great majority of notable Projects

executed in the country. These include Pakistan Secretariat Buildings and National

Assembly Building, Islamabad, Wapda House,Lahore, various Buildings of National

Bank of Pakistan, various Buildings of State Life Insurance Corporation, various

Broadcasting Studios and Transmitter Stations of Pakistan Broadcasting Corporation,

Television Centres at Karachi and Lahore, Lahore Hilton Hotel, Avari Towers Hotel,

Karachi, Serena Hotels at Faisalabad and Quetta, Pearl Continental Hotels at

Karachi, Lahore & Rawalpindi, Production Facilities of many Multinational

Pharmaceutical Companies, Khyber Teaching Hospital Peshawar and many Buildings

of The Aga Khan University Campus, Karachi since 1976.

He had previously worked as Chief Engineer of Jaleel Brothers Ltd., Karachi, a

HVACR Contractors.

Earlier he had worked with The Lightfoot Refrigeration Co. Ltd., London, UK, Society

Gregg D'Europe, Bruxelles, Belgium, Worthington Corporation, Harison, NJ, USA and

The Standard Refrigeration Co. Inc, San Juan, Puerto Rico.

He played a key role in the formation of the Pakistan HVACR Society in 1996. In

recognition of services rendered by him to HVACR Engineering in the country since

1950, he was elected as Founder President of Pakistan HVACR Society in 1996 and

reelected in 1999.

Being Principal of one of pioneer Consulting Engineering firm in the Country, he was

elected Vice President of the Association of Consulting Engineers, Pakistan for the

terms 1990-92, 1995-97, 1997-99 & 2001-03.

He is a Fellow of Institution of Engineers, Pakistan, Fellow of The Institute of

Refrigeration, UK, and Life Member of American Society of Heating, Refrigerating &

Airconditioning Engineers, USA.

He is B.Sc. Honours (Engineering) and Gold Medalist from The Punjab College of Engineering & Technology, Lahore (now designated The University of Engineering & Technology), B.Sc. from Government College, Lahore (now designated Government College University), and an Associate of The National College of Heating, Ventilating, Refrigeration and Fan Engineering, London, UK (now designated Institute of Environmental Engineering, South Bank University), for which he had submitted a thesis titled "Transfer of Heat and Moisture".

Page 13: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

12

Engr. FAROOQ AHMAD Technical Director of the Company. He has a wide ranging professional career of over 32 years, having obtained his Engineering Degree in 1977 from The Punjab University, Lahore. He is a registered Professional Engineer with Pakistan Engineering Council. He joined A.Saadat & Co. in 1988 and has been responsible for designing of HVACR, Mechanical & Plumbing Systems, preparation of working drawings, specifications, BOQ and tender documents, and top supervision of the work of the Contractors. He has been associated with a number of notable Projects including 300 Room Extension of Pearl Continental Hotel, Lahore, new Campus of Lahore University of Management Sciences, Lahore, Production and other facilities of multi national Pharmaceutical Companies such as GlaxoSmithKline Pakistan Ltd., Aventis Pakistan Ltd. & Barrett Hodgson Pakistan Ltd., multi storey office buildings and industrial units. His responsibilities include coordination with Owners, Architects and other Consultants for the Project and supervision of the work of Engineers & Draughtsmen of his Group. 1. Educational Qualifications: 1971 B.Sc. from Government College Lahore. 1975 B.Sc. (Engineering) in Chemical Engineering from The Institute Of

Chemical Engineering & Technology,University Of Punjab, Lahore. Secured Second Position in the University.

Merit Scholarships 1967-69 High School Performance Scholarship. 1969-72 Pakistan Railway Sponsorship. 1972-75 Punjab University Talent Scholarship. 2. Professional Affiliations:

Registered as a Professional Engineer with Pakistan Engineering Council.

3. Professional Experience since 1976: 1976 Interim Assignment as a Lecturer for six months with The

University Of The Punjab, Lahore. 1977-78 Post-Graduate Practical Training with Dawood Hercules Chemicals

Ltd., Lahore, for fifteen months. Plant Capacity was 1100 Tons of Urea per Day.

Page 14: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

13

1978-80 Worked as Efficiency Engineer with The Electricity Corporation,

Tripoli, Libya for their West Tripoli Power Station. This is one of the major Power Stations in North Africa with a Generating Capacity of 5x65 MW electric power and included a Captive Seawater Desa-lination Plant of 2x11250 Cu.m per Day Capacity.

1980-88 Was employed by Saline Water Conversion Corporation,

Jeddah,Saudi Arabia as Efficiency Engineer for Desalination Plant and Power House, Jeddah, Phase-III. This Plant had a Generating Capacity of 4x62 MW electric power and 4x22000 Cu.m per Day Of Sweet Water production from Red Sea.

1988-todate A.Saadat & Co., Consulting Engineers.

Page 15: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

14

Engr. MUHAMMAD ZUBAIR He rejoined A.Saadat & Co. as the Manager Projects on November 1,2007. He had previously served with the Company as Senior Projects & Design Engineer from July 1997 to September, 2001. He graduated from NED University of Engineering & Technology, Karachi in 1981. He is a registered Professional Engineer with Pakistan Engineering Council. He has rich experience of over 25 years in HVACR, Plumbing & Mechanical Engineering both as a Design Engineer and in the field supervising the work of the Contractors. He has been responsible for designing HVACR, Mechanical & Plumbing Systems, preparation of working drawings, specifications and BOQ and tender documents. 1. Educational Qualifications: 1981 B.E. in Mechanical Engineering from NED University of Engineering

& Technology, Karachi in 1st Division. 2. Professional Affiliations:

Registered as a Professional Engineer with Pakistan Engineering Council, Registration No. MECH-3058.

Life Member, Pakistan HVACR Society. 3. Professional Experience since 1982: 1982-1997 Junaid Engineering (Pvt) Ltd., Karachi. A leading Airconditioning, Refrigeration and Mechanical Engineers

and Contractors. Worked as a Projects Engineer and completed following notable

Projects: (1) Airconditioning and Mechanical Works of 10-storied L.D.A. Plaza,

Lahore, comprising 800TR Absorption Water Chilling System. (2) Airconditioning of Grindlays Bank plc. Building, Islamabad,

comprising 200TR Air Cooled Water Chilling System. (3) H.V.A.C. & Steam Plant installation at Hotel Holiday Inn (Ext.)

Islamabad, comprising 550TR Water Cooled Reciprocating Water Chilling System.

(4) Airconditioning of Printing Department, Pakistan Tobacco Company

Ltd., Akora Khatak Complex, comprising 80TR Air Cooled Water Chilling System.

(5) Heating, Ventilation and Airconditioning of Pearl Continantal Hotel,

Bhurban, comprising Steam Boilers and Packaged Airconditioning Systems.

Page 16: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

15

(6) Augmentation of Airconditioning System at State Bank of Pakistan, H.O. Building, Karachi, comprising 750TR Absorption Water Chilling System.

1997-2001 A.Saadat & Co., Karachi. A leading Consulting Engineers firm in the field of HVAC,

Mechanical and Plumbing Systems. Assigned as the Project Engineer for Airconditioning, Mechanical

and Plumbing Systems of following Major Projects: (1) The Aga Khan University, Karachi. a) Ibne Ridwan (CHS) and Juma Research Building. b) Sports Centre. (2) New Pellets Manufacturing Area at Smith Kline & Beecham

Pharmaceutical Factory, S.I.T.E., Karachi. (3) GlaxoWellcome Pakistan Ltd. West Wharf Factory Renovation

Project, Production Building and Aerosol Area. (4) Aventis Pharma (Pakistan) Ltd., Korangi Industrial Area, Karachi Airconditioning and Mechanical works for Production Areas. 2001-2007 The Aga Khan University Hospital, Karachi. Senior Mechanical Engineer in the Construction Department. Major Responsibilities. The major responsibilities included scrutinizing the drawings and

specifications received from the Consultants; coordination amongst the Architects, Consultants and the Contractors for smooth execution of the work; technical inspection of the mechanical equipment and materials, to monitor the Contractor’s work during execution; etc.

The responsibilities included Monitoring and Supervision of

Airconditioning and Plumbing works of following Major Projects: (1) Cardiac Services Programme. (2) Women’s Residences. (3) Soparivala Building (Pathological, BSL-2 & BSL-3 Laboratory) (4) Ibne Zuhar Enocology Building. (5) Various projects related to Utility Master Plan Project. Nov.2007-todate A.Saadat & Co., Consulting Engineers. Manager Projects.

Page 17: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

16

Engr. IDREES AHMED He joined A.Saadat & Co. in 1995 after 36 years experience in installation, operation & maintenance of various types of airconditioning-refrigeration plants. He is responsible for top supervision of the work of the Contractors for different works. 1. Educational Qualifications:

Diploma in Refrigeration & Airconditioning from Technical Institute, Karachi.

2. Professional Experience since 1959:

Airconditioning and Mechanical Services Plants, Installation and Operation & Maintenance:

1959-69 Jaleel Brothers Ltd., Karachi. Maintenance/Installation Supervisor,

Projects assigned, Peek Freen English Biscuit Factory, Karachi reciprocating compressor type chillers of 225TR capacity, Central and Cantt Telephone Exchanges, Karachi with 230 & 110TR capacity absorption chillers, State Bank Of Pakistan with centrifugal compressor chillers of 750TR capacity.

1969-74 Greaves Cotton & Co. Pakistan Ltd., Karachi. Maintenance/Installation Engineer.

Main Projects assigned, Security Paper Mills Airconditioning System with 250TR centrifugal type chiller, Pakistan Machine Tool Factory A/C Plant with reci-procating compressor type chiller,Humidification and winter heating plants for Thal Jute Mills, Muzaffargarh.

1974-75 Shahnawaz Ltd., Karachi. Site Engineer.

Project assigned, PIA Ground Training School, Karachi, Absorption type

system capacity 310TR.

1975-76 Embassy Airconditioning Ltd., Karachi. Project Engineer,

Various Airconditioning Projects, Tourist Complex Casino, Clifton Karachi (300TR), Peoples Foundation Building, Karachi (600TR),Pakistan Steel

Page 18: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

17

Mills,Karachi Metallurgical Training Centre (150TR) and Office Building & Canteen (200TR).

1976-79 Zenat Brother (Overseas) Ltd., Dhahran, Saudi Arabia. Site Agent.

Assigned to Peace Hawk V Project, 34 facilities in Dharan & Taif. Work comprised complete Airconditioning Systems (total 4300TR capacity)and Plumbing Systems (internal & external).

1979-91 Zenat Brother (P) Ltd., Karachi. Mechanical Engineer,

Main Airconditioning Projects handled were Central Plant at FTC Complex, Karachi with 4X760TR capacity absorption chillers, Hotel Inn,Karachi Airport Central chilled water type plant, Pakistan Security Printing Press with 2000TR screw compressor type chilled water system, Port Qasim Berth Nos 1 to 7 complete Plumbing Systems (internal and external) comprising water supply, drainage and sewerage systems and Fire Fighting System.

1991-95 Cyanamid Pakistan Ltd. Plant Engineer,

Incharge of Operation, Servicing and Maintenance of all Plants and Equipment of new Pharma Factory, SITE, Karachi including Central Chilled Water type Airconditioning Plant, Air Compressors, Dehumidifiers, Steam Boilers & Production Machinery.

1995-todate A.Saadat & Co., Consulting Engineers.

Page 19: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

18

Engr. HAFIZ YASIR KHAN 1. Educational Qualifications: 2012 B.E. in Mechanical Engineering from NED University of

Engineering & Technology, Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS Power Point.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-27869.

3. Professional Experience: 2012(1 Year) National Technologies Inc, as Project Engineer. 2013, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 20: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

19

Engr. MUHAMMAD ASIF IQBAL 1. Educational Qualifications: 2012 B.E. in Mechanical Engineering from NED University of

Engineering & Technology, Karachi. Computer Skill: Professional Courses: Two months professional training on AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS Power Point.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-25680.

3. Professional Experience: Apr-12-Aug-13 Trainee Engineer at Tapal Energy (Pvt.) Ltd. Nov-13-July-14 Project Engineer at M.G Engineering Associates. 2014, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 21: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

20

Engr. SYED AHSAN BUKHARI 1. Educational Qualifications: 2012 B.E. in Mechanical Engineering from Mehran University of

Engineering & Technology, Jamshoro. Computer Skill: Professional Courses: Two months professional training on AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS Power Point.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-24613

3. Professional Experience: 2012-13 Trainee Engineer at Prime Engineering Method. 2013-14 Project Engineer at Shahnawaz Engineering (Pvt.) Ltd. 2015, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 22: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

21

Engr. TAHIR YOUSUF KHAN 1. Educational Qualifications: 2012 B.E. in Mechanical Engineering from Quaid-e-Awam University of

Engineering, Science & Technology, Nawabshah. Computer Skill: Professional Courses: Two months professional training on AutoCAD.

Other Courses: MS Office including MSWord, MS Excel, MS Power Point.

2. Professional Affiliations:

Registered as a Registered Engineer with Pakistan Engineering Council, Registration No. MECH-29392.

3. Professional Experience: May,14-Feb-15 International Consultants, as Design Engineer. 2015, todate A.Saadat & Co., Consulting Engineers, as Design Engineer.

Page 23: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

22

LIST OF NOTABLE PROJECTS

executed by

A.SAADAT & CO.

Consulting Engineers

- Pharmaceutical Production Units

- Multi-Storey Office & Other Purposes Buildings

- Government Buildings And Embassies

- Banks And Insurance Companies

- Hotels

- Television, Radio, Auditoriums And Cinemas

- Hospitals, Laboratories And Special Applications

- Computer Centres

- Industrial Complexes

- Cotton & Synthetic Fibre Spinning & Weaving Units

Page 24: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

23

PHARMACEUTICAL PRODUCTION UNITS PROJECTS FROM 1968 to 2000 1. Sandoz Pakistan Ltd.:

(a) New Pharmaceutical Factory, Jamshoro. 230TR absorption type central plant with different systems for individual production areas and laboratories.

(b) Jamshoro Factory Pharma Production Extension - Airconditioning.

(c) Syrup Production Building, Jamshoro - Process Piping.

(d) Laboratory, Bahria Complex, Karachi - Plumbing.

(e) Warehouse Expansion,Jamshoro Factory - Airconditioning.

(f) Scientific Centre, Korangi, Karachi - Airconditioning.

2. Ciba-Geigy Pakistan Ltd.: (now Noavrtis Pharma Pakistan Ltd.)

(a) Pharmaceutical Factory, Karachi. 110 TR central plant with different systems for individual production areas and Laboratory.

(b) Multi Divisional Warehouse,Ciba House, Karachi Electrical & Airconditioning.

(c) New Pharma Liquid & Ointment Section, Ciba House, Karachi - Airconditioning & Electrical. (d) Administration Block, Ciba House, Karachi - Airconditioning & Electrical Works.

(e) Emergency Generator installation for Pharma Production, Ciba House, Karachi.

(f) Pharma Production Facility Renovation Project - Airconditioning, Mechanical & Electrical.

3. Abbott Laboratory (Pak) Ltd.:

(a) Pharmaceutical Factory, New Production Areas, Karachi. Airconditioning, mechanical and plumbing systems.

Extension-I, 230TR capacity reciprocating compressor type central

plant.

Extension-II, 400 TR capacity absorption type central plant with different systems for individual production areas and Laboratory.

(b) New Tablet Department, Pharma Production, Airconditioning & Ventilation Systems.

Page 25: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

24

(c) New Liquid Manufacturing Deptt. - Airconditioning.

(d) Factory Canteen - Ventilation & Exhaust Air System.

(e) New Personnel Facilities Building - Plumbing.

(f) New Injectable Department - Airconditioning And Mechanical.

(g) Administration Block - Airconditioning.

(h) Renovation & Upgrading Of Pharma Production Facility - Aircondi-tioning & Mechanical Systems.

(i) Upgrading Of Airconditioning Systems of Pharma Low RH Areas. Karachi.

4. Wyeth Laboratories (Pak) Ltd.: (Now Pfizer Pakistan Ltd.)

(a) New Pharma Production Building, Lahore Factory. Airconditioning and mechanical systems. 420TR capacity centrifugal compressor type central plant with different systems for individual production areas and Laboratory.

(b) Old Pharma Production Block, Airconditioning Systems - Modifications and Upgrading.

5. Wellcome Pakistan Ltd./GlaxoWellcome Pakistan Ltd/GSK:

(a) New Pharmaceutical Factory, F/268, SITE, Karachi. Airconditioning and mechanical systems. 370TR capacity absorption type central plant with different systems for individual production areas.

(b) New Office Block, F/268, SITE, Karachi - Airconditioning.

(c) TMP Expansion Project, F/268, SITE, Karachi - Airconditioning & Fire Fighting System.

(d) Extension Of Warehouse And Offices, F/268, SITE - Airconditioning.

(e) Installation of 2nd 370TR absorption type chiller for enhancement of central plant capacity, F/268, SITE, Karachi.

(f) Aleem House (New Warehouse & Offices), Islamabad - Airconditioning.

(g) New Warehouse & Offices, Lahore - Airconditioning.

(h) Refurbishment of Pharma Production Facility, D/43,SITE, Karachi - Airconditioning & Mechanical Systems.

(i) New Warehouse & Offices, Sukkur - Airconditioning.

Page 26: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

25

(j) Proposed Sterile Production Facility at F/268, SITE, Karachi. The design, working drawings, specifications & BOQ for airconditioning, ventilation and mechanical systems and process piping were completed. (k) (i) New Tablet Building, SITE. (ii) West Wharf Renovation Project.

6. Squibb Pakistan Ltd.: (Now GSK Pakistan Ltd.)

(a) New Pharmaceutical Factory,Karachi. Airconditioning, mechanical and plumbing systems. 350 TR capacity reciprocating compressor type central plant with different systems for individual production areas and warehouse.

(b) Pharma Factory, Karachi, Extension, Sterile Testing Area - Airconditioning.

(c) Sterile Production Area - Airconditioning System Upgrading.

7. Hoechst Pakistan Ltd.: (Now Sanofi- Aventis Pakistan Ltd.)

(a) Pharmaceutical Factory, Korangi, Karachi Expansion of Production Areas. Airconditioning and mechanical systems. 450 TR capacity absorption type central plant with different systems for individual production areas.

(b) Administration Building,Korangi Factory - Airconditioning & Electrical Works.

(c) Pesticide Formulation Plant, Korangi Factory - Electrical Work.

(d) ATA Laboratory, Korangi Factory - Electrical Work.

(e) Central Store Extension, Korangi Factory, - Electrical Works.

(f) TH Plant Korangi Factory - Electrical/Evaporative Water Cooling Systems.

(g) Korangi Factory Ampule Filling Room Renovation - Airconditioning.

(h) Korangi Factory Substation Expansion-Electrical Works.

(i) Korangi Factory - Cooling Tower For Industrial Plant Cooling Water System.

(j) Haemaccel Plant,Korangi Factory - Airconditioning, Mechanical & Electrical.

(k) Administration Building Extension, Korangi Factory - Airconditioning.

(l) Central Store Units 1, 2 & 3 - Electrical.

(m) AgrEvo Projects, Korangi Factory - Airconditioning.

Page 27: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

26

8. Knoll Pharmaceuticals Ltd.formerly Boots Co.(Now Abbott Laboratory (Pak) Ltd )

(a) Pharmaceutical Factory,New Production Buildings,Korangi Karachi. Airconditioning, mechanical and plumbing systems. 370 TR capacity reciprocating compressor type central plant with different systems for individual production areas. (b) Korangi Factory Pharma Production Facility Extension Phases 1 & 2 - Airconditioning, Mechanical & Plumbing.

(c) New Q.C.Facilities, Korangi Factory - Airconditioning.

(d) Korangi Factory, Farley Manufacturing Facility - Airconditioning & Plumbing.

9. Searle Pakistan (Pvt) Ltd.:

(a) New Pharmaceutical Factory,SITE, Karachi. Airconditioning,mechanical and plumbing systems. 200TR capacity reciprocating compressors type central plant with different systems for individual production areas.

(b) Karachi Factory Warehouse & Liquid Manufacturing Expansion - Airconditioning & Plumbing.

(c) Karachi Factory Production Facility Expansion and Upgrading - Airconditioning & Mechanical.

10. Gelcap (Pakistan) Ltd., Capsule Manufacturing Plant, HITE - Airconditioning. 11. S.J.&G.Fazal Ellahie Ltd., Pharmaceutical Factory,Extention, Karachi -

Airconditioning. 12. May & Baker (Rhone Poulenc Rorer Pakistan (Pvt) Ltd.) (Now Sanofi- Aventis Pakistan Ltd.)

New Pharma Production Block,Wah Cantt Factory - Airconditioning, Mech-anical And Plumbing Works.

13. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi - Airconditioning,

Mechanical, Plumbing & Electrical. 14. Bayer Pakistan (Pvt) Ltd.:

(a) Q.C.Laboratory, Karachi - Airconditioning.

(b) New Pharma Production Facility, SITE, Karachi - Airconditioning, Mechanical, Plumbing & Electrical.

(c) New Solid Dose/Cream Production Facility - Airconditioning, Mechanical, Plumbing & Electrical.

15. Ali Gohar Pharmaceuticals (Pvt) Ltd., Pharma Production Factory, SITE,

Page 28: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

27

Karachi - Airconditioning, Mechanical & Plumbing. 16. Merck Sharp & Dohme Of Pakistan Ltd., Pharma Factory, SITE, Karachi -

Airconditioning & Mechanical Systems for:

(a) Production Facility Expansion Phases 1 & 2.

(b) New Liquid Deptt. 17. Leonine Pharmaceutical Products Factory, Lahore - Airconditioning. 18. Saitex Pharmaceutical Factory, Karachi - Airconditioning 19. Parke Davis Pharmaceutical Factory(Now Pfizer Pakistan Ltd.), Karachi Renovation Of Airconditioning & Ventilation Systems. 20. Brooks Pharmaceutical Laboratories, Karachi Factory - Airconditioning System Renovation. 21. Century Pharmaceutical Factory, Karachi - Airconditioning, Mechanical & Plumbing Systems. 22. Atco Laboratories Sterile Production And Packaging Area, Karachi Factory - Airconditioning. 23. Pacific Pharma Factory, Lahore - Airconditioning. 24. Efroze Chemical Industries (Pvt) Ltd. ORS Area, Karachi Factory- Airconditioning. 25. Pharmagen Beximco Ltd, New Pharma Factory, Lahore - Airconditioning. 26. Bosch Pharmaceuticals (Pvt) Ltd., Pharma Production Factory, Karachi - Airconditioning. 27. Organon Karachi Factory Sterile Area & Microbiological Laboratory -

Airconditioning. 28. Spencer Pharma (formerly Fisons), Karachi Factory:

(a) Main Production Facility-Airconditioning & Mechanical.

(b) New Injectable Deptt. - Airconditioning. 29. Pharmatec Pakistan (Pvt) Ltd., (formerly Sterling Products), Pharma Factory, Karachi - Upgrading of Airconditioning System. 30. Smith Kline-Beecham Of Pakistan Ltd. (Now GSK Pakistan Ltd.):

(a) Landhi Factory, Augmentin Facility and New Tablet manufacturing unit - Airconditioning.

Page 29: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

28

(b) SITE Factory, Upgrading of Airconditioning System. 31. Ferozsons Laboratories Ltd., Nowshera Factory - New Tablet Manufacturing Block - Airconditioning. 32. Barrett Hodgson Pakistan (Pvt) Ltd, Airconditioning and Mechanical Services. Phase-I: (a) New Production Facility (b) Penicillin Production Facility (c) Veterinary Protection Facility. Phase-II: Cephalosporine Production Facility. 33. Remington Pharmaceutical Industries (Pvt Ltd. Airconditioning and Mechanical Services for New factory at Multan Road Lahore. PROJECTS FROM 2000 to 2010 34. Abbott Laboratory (Pak) Ltd.:

(a) HVAC, Mechanical and Plumbing systems for Effervesce Tablet and Ointment Production Areas. At Landhi Factory Area.

(b) HVAC, Mechanical and Plumbing systems Dispensing Areas at Landhi &

Korangi Factories, including Airconditioning of existing warehouses.

(c) HVAC, Mechanical and Plumbing systems for extension & up-grading

of Liquids Area Production Area. At Korangi Factory. Including extension of Central Plant Equipment.(cGMP Project).

35. Ali Gohar Pharmaceuticals (Pvt) Ltd.:

(a) HVAC, Mechanical and Plumbing systems for New Sterile Facility. (b) HVAC & Mechanical Systems for Renovation of Solids and Liquid

production Areas. Including Extension of Central Plant by 250 TR Direct Fired water chiller.

(c) Replacement of exiting HVAC equipment for Pharma Production Areas.

Page 30: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

29

36. Bayer Pakistan Ltd.:

HVAC Systems for Micro Laboratory.

37. Bayer Crop Sciences Pakistan Ltd.:

Extension of Central Plant & HVAC System for office Areas.

38. Bf- Bio Sciences Pakistan Ltd. (Ferozsons) Near Riawind (a) HVAC, Mechanical & Plumbing Systems for New factory at Sunder Road, Lahore.

(b) Airconditioning, Mechanical & Plumbing Systems for New Head office Building at Sunder Road, Lahore.

39. Barrett Hodgson Pakistan (Pvt) Ltd, (a) Extension of Central Plant, addition of 200TR Direct Fired Absorption water chiller and ancillary works. (b) HVAC for New Pharma Packing at Second Floor. 40. Consolidated Chemical Laboratories (Pvt) Ltd. (CCL) Lahore HVAC Systems for New Product Manufacturing Area. 41. CCL Pharmaceutical (Pvt.) Ltd., Lahore. HVAC Systems for New Dry Power Area at Kot-lakh-pat Factory. 42. CSH Pharmaceutical (Pvt.) Ltd., Lahore. HVAC, Mechanical & Plumbing Systems for New Factory at Ferozpur Road. 43. Eli Lilly Gohar Pharma Products Factory, SITE, Karachi .

(a) Up-grading of Central Plant and Up-grading of HVAC system for Production facility.

(b) Replacement of Existing AHUs and Dehmidifiers for HVAC system of Production Facility.

44. GSK Pakistan Ltd.

SITE, F-268 Factory.(formerly Wellcome) (a) Up-grading & Renovation of HVAC & Mechanical Systems for Liquids Production Areas. (b) HVAC & Mechanical Systems for Blister Packing Areas.

Page 31: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

30

(c) Airconditioning systems for Raw Material storage area. (d) HVAC & Mechanical Systems for New Penicillin Block. (e) Up-grading and Extension of Central Plant for Liquids Block.

(addition of 450 TR direct Fired Dual fuel water chiller and ancillary work)

(f) HVAC & Mechanical Systems for Bottle Packing area. (g) HVAC & Mechanical Systems for Additional Primary and

secondary Packing Areas in tablet Block. West Wharf Factory. (a) Up-grading & Renovation of HVAC & Mechanical Systems for

Sterile Areas. (b) Relocation and Extension of Central Plant for West Wharf

Production facility. (350 TR x 2 DGF water chillers and ancillary equipment)

(c) Extension of Central Plant for West Wharf Production facility. (addition of 350 TR, DGF water chillers and ancillary equipment)

Korangi Factory.(formerly Bristol Mayer Squibb) (a) HVAC, Mechanical & Plumbing Systems for Extension of Lactam

Production facility. (b) Extension and Relacation of Central Plant for Production facility.

(450x 2 TR, DF dual fuel water chillers and ancillary equipment) 45. Herbion Pakistan Ltd. A. Karachi Factory.

(a) Phase-I, Up-grading of HVAC and Mechanical systems for production facility at ground floor.

(b) Phase-II, Up-grading of HVAC and Mechanical systems for production

facility at First & Second floors. B. Lahore Factory.

HVAC, Mechanical and Plumbing systems for new production facility at Sunder Industrial Area Lahore.

46. Hilton Pharma (Pvt) Ltd. Korangi , Karachi HVAC, Mechanical and Plumbing systems for new production facility.

Page 32: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

31

47. Hodgson Pharma (Pvt) Ltd. Port Qasim , Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi. 48. Kaizen Pharma (Pvt) Ltd. Port Qasim , Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi 49. Nexter Pharma (Pvt) Ltd. Port Qasim, Karachi HVAC, Mechanical and Plumbing systems for new production facility at Port Qasim Industrial Area Karachi. 50. Novartis Pharma Pakisan Ltd. A. Karachi Factory.

(a) Air-conditioning of existing raw material and finished goods warehouses.

B. Jamshoro Factory.

(a) Up-Grading of HVAC & Mechanical systems for Dispensing Areas and production facility.

(b) Air-conditioning of New finished goods warehouse.

(c) HVAC, Mechanical and Plumbing systems for New Solids Block.

51. Platinum Pharma Pakisan Ltd. Port Qasim, Karachi:

(a) HVAC, Mechanical and Plumbing systems for New Cephalosporin Block.

(b) Up-grading HVAC, Mechanical and Plumbing systems for

Liquids and Solids systems and Extension of Central Plant Equipment by addition of 320RT Gas Fired Water chiller and ancillary equipment.

52. Pharmatec Pakistan (Pvt) Ltd.:

Extension of Central Plant Equipment by additional Direct fired Water chiller and ancillary equipment and Airconditiong of New Warehouse.

53. Sami Pharma Pakistan Ltd. SITE Karachi:

(a) HVAC, Mechanical and Plumbing systems for New Bio Pharma Block.

Page 33: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

32

(b) HVAC, Mechanical and Plumbing systems for New Pharma

Production Block.

(c) New Central Plant for New Bio and Parma Production Blocks. 54. Sanofi-Aventis Pakistan Ltd.:

(a) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Sterile Production Area. (b) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Solids Production Area. (c) HVAC, Plumbing and Mechanical Services for New Building of Clafron (Cephalosporin) Production facility.

(d) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Haemaccel Production Area. (e) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Haemaccel Production Area. (f) Up-Grading and Extension-1 of Central Plant. (Addition of 400 TR Water Steam operated water Chiller. (g) Up-Grading and Extension-2 of Central Plant. (Addition of 450 TR Water Direct Gas operated water Chiller. (h) HVAC, Plumbing and Mechanical Services for Extension of Haemaccel Plant. (i) Fire Fighting Sprinkler system for Existing Raw Materials and Finished Goods warehouse. (j) HVAC, Plumbing and Mechanical Services for Renovation & Up grading of Solids Primary & Secondary Packing Production Area. (Job in hand)

55. Wyeth Laboratories (Pak) Ltd (Now Pfizer Pakistan Ltd.) Up-grading of Central Plant and HVAC Systems for Liquids Area.

Page 34: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

33

INDUSTRIAL COMPLEXES 1. Pakistan (PIDC) Machine Tool Factory, Landhi, Karachi. Airconditioning of

Special Production Shops and Administration Block, reciprocating compressor type central chilled water plant with fan-coil units and airhandling units.

2. Security Paper Mill, Karachi, Airconditioning, Ventilation and Humidification

of special bank note paper manufacturing factory, 250 TR centrifugal compressor type water chilling plant with airhandling units for airconditioning and air washers for humidification system.

3. Pakistan Tobacco Company Ltd.:

(i) Akora Khattak Factory Complex.

(a) Evaporative cooling systems for PMD extension,CPD, CST, CMD extensions Phases 1 & 2,Tobacco Store and Administration Block.

(b) Airconditioning Systems for CMD, Printing Department & Filter Rod Section.

(c) Dust Extraction System for GLT-87.

(ii) Jhelum Factory Complex.

(a) Evaporative cooling systems for CMD and Printing Department.

(b) Airconditioning Systems for CMD & CPD Sections, Loga Max Enclosures Phase-1 & 2.

(iii) Airconditioning of Offices at Karachi & Islamabad.

(iv) Tobacco Storage Warehouse, EPZ, Karachi - Ventilation System.

4. Pakistan Cables Ltd. Factory, SITE, Karachi:

(a) Laboratory and Office Block - Airconditioning.

(b) New Upcast Plant, Evaporative cooling and mechanical refrigeration water cooling systems for process cooling.

(c) Aluminium Anodising Plant, upgrading of chilled water system for process cooling.

5. Allawala Brothers Ltd., Dry Battery Cell Manufacturing Factory, Karachi,

Airconditioning of production area and laboratory. 6. National Beverages Ltd., Karachi. Water chilling system for bottled soft drink

Page 35: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

34

(7 up, etc,) manufacturing. 7. Pakistan Oxygen Ltd., West Wharf Complex, Karachi, Office Block - Airconditioning. 8. Continental Biscuits Ltd., Biscuits Factory at Sukkur-Airconditioning of Production

Areas & Offices and subsequent Production Areas Extension Nos.1 & 2. 9. Berger Paints Ltd., Karachi Factory.

(a) Laboratory - Airconditioning.

(b) Paint Manufacturing Facility - Ventilation & Exhaust Air Systems. 10. Adamjee Polycrafts Ltd. Factory, HITE-Chilled Water Systems for Process

cooling. 11. ICI Pakistan Ltd.:

(i) Lahore Paints Factory.

(a) Kansai Paint Plant, Airconditioning, Cold Storage & Dust Extraction Systems.

(b) Paint Manufacturing Area. Upgrading of Dust Extraction & Collection and ventilation systems.

(ii) Karachi Factory, Vapour Extract Systems.

(iii) Soda Ash Manufacturing Complex, Khewra.

(a) Turbo Generator Hall upgrading of evaporative cooling system.

(b) Kiln Area Dust Extraction & Recovery Systems Phase 1&2.

12. Crescent Greenwood Ltd.,Garment Stitching Unit, Sheikhupura, Air-conditioning.

Page 36: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

35

COTTON & SYNTHETIC FIBRE SPINNING & WEAVING UNITS (Note: Mostly Humidification Cum Evaporative Cooling Systems are installed. Airconditioning System where installed is identified) 1. Thal Jute Mill, Muzaffargarh.

2. Island Textile Mill, Kotri.

3. Apollo Textile Mill, Muzaffargarh.

4. Monnoo Group.

(a) Margalla Textile Mill, Hasan Abdal.

(b) Rawal Textile Mill, Distt. Sheikhupura.

(c) Olympia Blanded Fibre Mill Nos.1&2, Distt. Sheikhupura.

(d) Qureshi Textile Mill, Mian Channu.

(e) Monnoo Textile Mill, Distt. Lahore.

(f) Lahore Spinning Mills, Chunian.

5. Kohinoor Group.

(a) Kohinoor Spinning Mill, Chak Bazaid.

(b) Chakwal Textile Mill, Chakwal.

6. Nagina Cotton Mill, Kotri.

7. Consolidated Textile Mill, Larkana.

8. Sapphire Fibre Mill, Distt. Sheikhupura.

9. Gulshan Spinning Mill, Distt. Multan.

10. Ibrahim Textile Mill, Shahkot.

11. Sohail Textile Mill, Distt. Sheikhupura.

12. Jamia Textile Mill, Karachi.

13. Dost Mohammad Cotton Mill, Karachi.

14. Dawood Group, Dawood Cotton Mills, Landhi, Karachi.

(a) Spinning Unit IV.

Page 37: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

36

(b) Spinning Unit V.

(c) Spinning Unit VI.

15. Indus Textile Mill Nos.1, 2 & 3, Hyderabad.

16. Modern Textile Mill, Hyderabad.

17. Norrie Textile Mill, Norriabad.

18. Shahdadkot Textile Mill Spinning Section, Shahdadkot.

19. Mahmood Textile Mills, Muzaffargarh.

(a) New Unit 2.

(b) Renovation of Unit 1.

20. Shahpur Textile Mill, Chunian.

21. Deewan Group.

(a) Dewan Textile Mill, Kotri.

(b) Khalid Textile Mill, Kotri.

22. Premium Textile Mill, Nooriabad, New Finishing Deptt.

23. Premier Tobacco Industries Ltd., Mandra Factory.

24. Ajax Industries Ltd. Korangi Mills, Open End Spinning

Department - Airconditioning.

25. S.G.Fibres Ltd., Synthetic Fibres, Mill Expansion Unit

Nos. 2, 3 & 4 - Airconditioning.

Page 38: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

37

HOSPITALS, LABORATORIES AND SPECIAL APPLICATIONS

1. Central Telegraph House, Islamabad. Year-round airconditioning, absorption

type central water chilling plant with low velocity air distribution system.

2. Pakistan Space & Upper Atmosphere Research Commission.

(a) Research & Instrumentation Laboratory, SUPARCO Plant, Karachi

including Extensions 1 & 2 - Airconditioning.

(b) Geomagnetic Hut, Sparcent, Karachi - Airconditioning.

(c) Communication Lab. Facilities (GRS), Islamabad - Airconditioning.

(d) Aerospace Institute Building, Islamabad - Airconditioning.

3. Pakistan Telegraph & Telephone Department.

(a) Airconditioning Systems for four telephone exchanges.

(b) Satellite Earth Station, Deh Mandro,Karachi.Year-round

airconditioning, 100 TR plant.

4. Khyber Teaching Hospital, Peshawar Phase 1 & 2. Year-round

airconditioning, winter heating and ventilation systems, 350 & 1050 TR

absorption type central plants.

5. Businessman Trust Hospital, Lahore. Airconditioning, Ventilation &

Evaporative

cooling systems.

6. The Aga Khan University Medical Centre, Karachi - Airconditioning,

Mechanical & Plumbing Systems.

(a) Main Buildings Construction, 4x870TR capacity airconditioning plant

commissioned in 1985.

(b) Since 1986, have been associated with different extension

programmes including School of Nursing Expansion and New Block for

Magnetic Resource Images (MRI) and Radiology.

7. Lady Dufferin Hospital, Karachi.

Airconditioning Of 1st Floor Operation Rooms, New Block.

8. Children's Hospital Quetta - Year round Aiconditioning.

9. Sindh Institute of Urology and Transplantation, New Dewan Farooq Medical

Complex - Airconditioning.

Page 39: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

38

COMPUTER CENTRES

1. WAPDA, Main Computer Centre, Wapda House, Lahore - Airconditioning.

2. National Bank of Pakistan.

(a) Computer Centre, Head Office Building, Karachi - Airconditioning.

(b) Computer Centre, Main Branch Building, Lahore - Airconditioning.

(c) Zonal Office Building,Islamabad, Computer Centre - Airconditioning.

3. State Life Insurance Corporation Computer Centre, S.L. Building No.2,

Karachi – Airconditioning.

4. Muslim Commercial Bank Ltd., MCB Computer Centre, S.L. Building No.2,

Karachi - Airconditioning.

5. Computer Centre, Shell House, Karachi - Airconditioning.

6. Karachi Port Trust, Computer Centre, Head Office Building,

Karachi – Airconditioning & Electrical.

7. IBM Computer Centre, Avari Plaza, Karachi - Airconditioning.

8. Lever Brothers (Pakistan) Ltd., Computer Centre,Avari Plaza,

Karachi - Airconditioning.

9. Allied Bank of Pakistan Ltd., Computer Centre, Jubilee Insurance House,

Karachi - Airconditioning.

Page 40: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

39

TELEVISION, RADIO, AUDITORIUMS AND CINEMAS

1. Television Centre,Karachi. Year-round airconditioning, 440TR absorption type

central water chilling plant with low velocity air distribution system and

special noise proof systems for the Studios.

2. Television Centre, Lahore. Year-round airconditioning, 330 TR absorption

type central plant with low velocity air distribution system and special noise

proof systems for the Studios.

3. TV Transmitter Station, Murree. Winter heating system.

4. TV Rebroadcasting Stations at Thano Bula Khan, Sukesar, and Cherat.

Packaged type air cooled airconditioning systems.

5. Central Film Laboratory, Television Centre, Karachi. Aircooled airconditioning

system.

6. Melody Cinema, Islamabad. Year-round airconditioning system, 120 TR

electric operated chilled water plant.

7. Auditorium, Cultural Centre, Municipal Corporation, Lyallpur. Electric

operated packaged type units.

8. Shabistan Cinema, Rawalpindi. Electric operated packaged airconditioners.

9. Auditorium, PIA Head Office Building, Karachi. Air cooled packaged

airconditioners.

10. Pakistan Broadcasting Corporation. Broadcasting Studios, Electric operated

special noise proof airconditioning systems for New Studios at Karachi,

Multan,Rawalpindi,Peshawar, Khyber, Khairpur, Faisalabad, Bahawalpur, Loralai,

Zhob and Muzaffarabad.

11. Pakistan Broadcasting Corporation. High Power Transmitter Stations,

Airconditioning systems for new Stations at Hyderabad, Multan, Quetta,

Rawalpindi, Muzaffarabad, Lawrencepur, Khuzdar, Lahore, Islamabad,

Rewat, Karachi, Peshawar and Skardu.

12. Pakistan Broadcasting Corporation. Airconditioning Systems for Staff Training

and Technical Training Schools, Islamabad.

13. PBC Village Broadcasting Station, Gilgit - Airconditioning.

Page 41: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

40

HOTELS

1. Pakistan House, Islamabad. 250 Room Hotel, Capital Development

Authority. Year-Round airconditioning 360 TR absorption system with

fan-coil units in the guest rooms.

2. PIA Motels at Twelve different locations in East & West Pakistan.

Year round airconditioning, winter heating and ventilation systems.

3. Khyber Intercontinental Hotel, Peshawar. Year round airconditioning

system, 400 TR absorption type plant with air distribution systems

and fan-coil units.

4. New PIA Flight Kitchen,Karachi. Year-round airconditioning and

ventilation systems and cold storage room.

5. Motel Complex, Naran, Kaghan Valley,Pakistan Tourism Develop-l

ment Corporation. Winter heating system.

6. Avari Lahore Hotel (formerly Lahore Hilton). Airconditioning, mec-

hanical, plumbing and electrical systems. 900TR capacity central

airconditioning plant, 3000KVA capacity substation and 2000 KVA

full back up generator units.

7. Avari Towers Ramada Renaissance Hotel, Karachi. Airconditioning,

mechanical, plumbing and electrical systems. 750TR capacity

absorption type central airconditioning plant, 3500KVA capacity

substation and 2500KVA full back up generator units.

8. Hotel Midway House, Karachi Airport New Block. Airconditioning,

mechanical and plumbing systems. 405TR capacity reciprocating

compressor type central plant.

9. Serena Hotel, Quetta - Airconditioning, mechanical,plumbing and

electrical systems. 200 TR capacity reciprocating compressor type

central plant.

10. Serena Hotel, Faisalabad - Airconditioning, mechanical, plumbing

and electrical systems. 200TR capacity reciprocating compressor

type central plant.

11. Pearl Continental Hotel - Karachi.

Airconditioning and Mechanical Systems as part of Renovation works

of Main Lobby, Shopping Area, Meeting Rooms and Chandni Lounge.

Page 42: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

41

12. Pearl Continental Hotel - Lahore .

New 289 Guest room block with 1000 person capacity Convention

Hall Meeting Rooms, four restaurants, BOH areas including Kitchens,

Laundry, etc. Airconditioning, mechanical, plumbing and electrical

systems. 1800TR capacity direct gas fired absorption type central

plant, 3800KW full back up generating sets.

13. Pearl Continental Hotel - Bhoorbun .

Airconditioning, mechanical, plumbing and electrical systems.

Packaged airconditioners, incremental type guest room

airconditioners, 1500KVA substation, 600KVA emergency supply

generator sets.

Page 43: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

42

MAJOR PROJECTS UNDERTAKEN IN LAST 5 YEARS

S.No. Brief Description Remarks

1.

Air-conditioning, Mechanical & Plumbing Works Barrett Hodgson International School, Korangi Karachi.

Completed in September 2011

2.

HVAC, Mechanical & Plumbing Works School of Science & Engineering At LUMS, Lahore.

Completed in April 2011

3. Airconditioning, Plumbing & Fire Fighting Suleman Dawood School of Business, LUMS, Lahore.

In Progress

4. Utility Master Plan-III – Replacement/Enhancement of Main Fire Water Distribution Network at AKUH, Detailed Designing. Aga Khan University, Karachi.

Completed March 2011

5. Mechanical & Plumbing Works Benazir Bhutto Shaheed Institute of Management Science, Dadu

In Progress

6.

HVAC and Mechanical Works for Haemaccel Plant Extension at Sanofi Aventis Pakistan Ltd., Korangi Industrial Area, Karachi.

Completed in June 2009

7.

Replacement of Existing Central Chilled Water Plant & Heat Recovery Systems At Finance & Trade Centre, (FTC) Building, Shahrae Faisal, Karachi.

Completed in May 2008

8.

Replacement of Airhandling Units, Audit of Plumbing Systems and Improvement in A/C System/Upgrading etc. At Finance & Trade Centre, (FTC) Building, Shahrae Faisal, Karachi.

Completed in April 2011

9.

Year Round HVAC and Co-Gen Power System at National Institute of Cardiovascular Diseases(NICVD), Karachi

Completed 2012

10.

Airconditioning & Plumbing Works for Ibrahim Fibers Ltd., Head Office Building, Faisalabad.

Completed in December 2010

11.

HVAC Systems and Mechanical Works for Spansules Area, at West Wharf factory, GlaxoSmithKline Pakistan Ltd., Karachi.

Completed in February 2008

12.

HVAC, Plumbing and Mechanical Works for Effervescent & Cream Relocation & Upgrading Project at Landhi Factory, Abbott Laboratories (Pakistan) Ltd. Karachi

Completed in February 2009

Page 44: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

43

13.

HVAC, Plumbing, Mechanical & Electrical Works for Northstar Holdings Commercial Building Clifton, Karachi.

In Progress

14.

Rationalization Projects a. HVAC Systems and Mechanical Works for Penicillin Block, SITE Factory GlaxoSmithKline Pakistan Ltd., Karachi. b. HVAC Systems and Mechanical Works for Consumer Health Care, West Wharf Factory GlaxoSmithKline Pakistan Ltd., Karachi.

Completed in October 2008

15.

(a) Renovation of Avari Plaza/Avari Towers, Airconditioning, Mechanical & Plumbing Systems, Karachi (b) Renovation Avari Hotel Lahore, Airconditioning, Mechanical & Plumbing Systems, at Lahore

a) & b) In Progress

16.

Centaur Pvt. Ltd. Centaur Mixed Use Commercial Development Projects, Lahore – MEP Services

Preliminary Design Stage Completed in September 2008

17.

HVAC Systems and Mechanical Works for Tablet Block Extension, SITE Factory GlaxoSmithKline Pakistan Ltd., Karachi.

Completed in October 2009

18.

HVAC & Mechanical Services For New Pharma Factory at Port Qasim Nextar Pharma (Pvt.) Ltd. Karachi

Completed in April 2012

19.

Air-conditioning of Liquids Manufacturing Area, SITE Factory, Wyeth Pakistan Ltd. Karachi.

Completed in January 2008

20.

Project of Trade Development Authority. HVAC, Mechanical & Plumbing Works School of Fashion Design, Johar Town, Lahore

Completed in 2011

21. Renovation of Air-conditioning Systems Kot Lakhpat Factory CCL Pharmaceuticals (Pvt) Ltd., Lahore

Completed in December 2011

22. HVAC & Mechanical Systems New Factory, Sunder Road, Raiwind. Ferozsons Laboratories Ltd., Lahore

Completed in May 2009

23. Upgrading of Central Plant For Liquid Block at SITE Factory, GlaxoSmithKline Pakistan Ltd Karachi.

Completed in January 2008

24. Power Generation Project of SPL/PSPC Security Papers Ltd. Malir Karachi

Completed in November 2009

Page 45: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

44

25. Upgrading of HVAC, Electrical and Mechanical Systems for Production Areas. Jamshoro Pharma Factory Novartis Pharma (Pakistan) Ltd.,

Completed in 2008

26. HVAC & Mechanical Systems Platinum Pharmaceutical (Pvt.) Ltd. Port Qasim Karachi.

Completed in 2008

27. Upgrading Central Plant Room Absorption Chiller & Ancillary Works, Korangi Industrial Area ,Sanofi Aventis Pakistan Ltd. Karachi.

Completed in 2010

28. Expansion of Airconditioning System NBP H.O. Building, Karachi. National Bank of Pakistan Limited. Karachi.

Completed March 2011

29. Sami Pharmaceutical (Pvt.) Ltd. HVAC & Mechanical System, New Factory At SITE, Karachi.

In Progress

30. HVAC & Mechanical Systems, Korangi Factory, Karachi. Herbion Pakistan (Pvt.) Ltd.

Completed in 2012

31. HVAC & Mechanical Systems, Extension Facility At New Factory, Lahore Herbion Pakistan (Pvt.) Ltd.

In Progress

32. HVAC & Mechanical Systems for Production Factory at Ferozpur Road, Lahore. CSH Pharmaceuticals (Pvt.) Ltd. Lahore

Completed in 2012

33. HVAC Works For Upgrading of Raw Material Dispensing Area Landhi and Korangi Plants and Upgrading of Korangi Raw Material Warehouse Abbott Laboratories (Pakistan) Ltd. Karachi

Completed in 2012

34. (a) HVAC, Plumbing & Mechanical Works New Solids Block, Jamshoro Factory Novartis Pharma (Pakistan) Ltd. (b) HVAC & Ancillary Works for FG Warehouse at West Wharf factory Novartis Pharma (Pakistan) Ltd.

Completed in December 2012

35. Mechanical & Plumbing Works for Lactam Bldg. Extension, Korangi Factory, Karachi GlaxoSmithKline Pakistan Ltd.

Completed in September 2012

36. HVAC, Mechanical & Plumbing Systems at Port Qasim Factory, Karachi. Kaizen Pharmaceuticals (Pvt.) Ltd.

In Progress

Page 46: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

45

37. Upgrading of Tablet Coating Area For Zantac Aqueous Coating Project at SITE Factory, GlaxoSmithKline Pakistan Ltd

Completed in 2011

38. HVAC Systems & Mechanical Works Korangi Industrial Area, Karachi Hilton Pharma (Pvt) Ltd.

In Progress

39. Airconditioning, Mechanical and Ancillary Works for cGMP Upgrade Project, Korangi Factory, Karachi. Abbott Laboratories (Pakistan) Ltd.

Completed in 2012

40. HVAC & Mechanical Work for New Warehouse & Upgrading of Central HVAC Plant. SITE Factory. Pharmatec Pakistan (Pvt.) Ltd.

In Progress

41. Airconditioning, Mechanical Systems & Ancillary Works for Remolding of Packaging Hall Area, Korangi Factory, Karachi. Sanofi Aventis Pakistan Ltd.

Completed in 2012

42. Airconditioning System & Ancillary Works for Effervescent Area Expansion, Landhi Factory Abbott Laboratories (Pakistan) Ltd.

Completed in 2012

43. OPAL 225 Tower Project – MEP Systems Bahria Town (Pvt.) Ltd.

In Progress

44. New Sterile Area at Korangi Factory, Karachi. GlaxoSmithKline Pakistan Ltd

In Progress

45. Pharma Facilities & Warehouse, SITE, Karachi. ATCO Laboratories (Pvt.) Ltd.

In Progress

Page 47: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

46

LIST OF MAJOR PROJECTS IN HAND

S.No. Brief Description

1. Airconditioning, Plumbing & Fire Fighting Suleman Dawood School of Business, LUMS, Lahore.

2. Mechanical & Plumbing Works Benazir Bhutto Shaheed Institute of Management Science, Dadu

3.

HVAC, Plumbing, Mechanical & Electrical Works for Northstar Holdings Commercial Building Clifton, Karachi.

4.

(a) Renovation of Avari Plaza/Avari Towers, Airconditioning, Mechanical & Plumbing Systems, Karachi (b) Renovation Avari Hotel Lahore, Airconditioning, Mechanical & Plumbing Systems, at Lahore

5. Sami Pharmaceutical (Pvt.) Ltd. HVAC & Mechanical System, New Factory At SITE, Karachi.

6. HVAC & Mechanical Systems, Extension Facility At New Factory, Lahore. Herbion Pakistan (Pvt.) Ltd.

7. HVAC, Mechanical & Plumbing Systems at Port Qasim Factory, Karachi. Kaizen Pharmaceuticals (Pvt.) Ltd.

8. HVAC Systems & Mechanical Works Korangi Industrial Area, Karachi Hilton Pharma (Pvt) Ltd.

9. HVAC & Mechanical Work for Astola Project, Getz Pharma (Pvt.) Ltd. Korangi Industrial Area, Karachi.

10. OPAL 225 Tower Project – MEP Systems Bahria Town (Pvt.) Ltd.

11. New Sterile Area at Korangi Factory, Karachi. GlaxoSmithKline Pakistan Ltd.

12. Pharma Facilities & Warehouse, SITE, Karachi. ATCO Laboratories (Pvt.) Ltd.

Page 48: A. SAADAT & CO. · Avari Lahore - Ramada Renaissance, Lahore Avari Towers - Ramada Renaissance, Karachi. Hotel Midway House, Karachi Airport, New Block. Serena Hotel, Faisalabad

47

13. GlaxoSmithKline Pakistan Ltd. Misc. Projects, SITE Area Factory, Karachi.

14. GlaxoSmithKline Pakistan Ltd. Misc. Projects, Korangi Factory, Karachi.

15. Sanofi Aventis Pakistan Ltd., Korangi Area, Wet Granulation Suite Upgradation.

16. Pharmacia–Herbion Pakistan Ltd., Islamabad, HVAC & Mechanical Works.

17. Barrett Hodgson Pakistan (Pvt) Ltd. DGF & CT – SITE Factory, Karachi.

18. HVAC & Mechanical Works for Non Lactam Building, Korangi Factory, Karachi. GlaxoSmithKline Pakistan Ltd.

19. HVAC & Mechanical Works, Jamshoro Factory, Novartis Pharma (Pakistan) Ltd.

20. Airconditioning Systems and Ancillary Works For Penicillin & Liquid Block at SITE Factory, Karachi. GlaxoSmithKline Pakistan Ltd.

21. Direct Fired Dual Fuel Absorption Water Chiller, Cooling Tower and Ancillary Works For Central Plant Extension, SITE, Karachi. GlaxoSmithKline Pakistan Ltd.

22. HVAC, Fire Fighting and Plumbing Works for Extension Haemaccel Manufacturing Area, Korangi Factory, Karachi. Sanofi Aventis Pakistan Ltd.

23. Airconditioning Systems and Ancillary Works for Liquids Extension at Korangi Factory, Karachi. Abbott Laboratories (Pakistan) Ltd.