Method StatementDemand Assessment & Master Planning
for Proposed Industrial Estates
Submitted to
Submitted by
5e Consulting
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 2/30
5E Consulting, india, ahmedabad, sourabhagarwal, readesign, architecture, projectmanagement, sustainabilityl estate, Project Feasibility, Research, Technology andsystem, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnilanil, real estate demandass essment, Ahmedabad, ranchi, cept, nicmar, energy starrating, interiordesign,
earnedvalue management, pert, cpm, Microsoftproject, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leedap, housing, construction, contractor, sbst, school ofbuilding sc ience andtechnology, flyover, industrial
shead, shed, waterharvesting, heatislandeffect, thirdparty inspection, telecom towers, eoi, rfp, stormwatermanagement, energy modeling, renewable energy, carboncredits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwaterharvesting, solarenergy, wind energy, greenpower, greene, constructionactivity pollution prevention,
fsi, saleable area, gicea, carpetarea, builtupbuilt-up, area superbuiltupmckinsey plants reuse recycling resource reductionRajkotsolidwaste management oceanvilla resortcottage tourismtourists survey opinion survey cvc classifiedvolume countmdfagrifibre boardrfpeoi tenderestimationquantity survey hvac airconditioning poweralbedo aquifer
architectural architectperformance index performance monitoring dashboardbasis ofdesignc ommissioning reportagentbiofuel vermin-composting vermincomposting waste toenergy blackwaterbrownfieldvc pe funding venture capital private equity bankable feasibility reports documentpowerpoint excel ms projectleedrating platinumcertified1s o9000
14001automationdensity carbondioxide climate change rainfall floodcommissioning authority Inddorenvironmental quality airquality controls factorEnd-to-EndIntegratedSolution Providerlinking the entire value chains fromPlanning & Architecture toEngineering/DesigntoProject Managementacross various sectors:Core Infrastructure, UrbanServices,
Public HealthEng, Transportationand Value Added/ Themedbased/ IntegratedDevelopment. premierdesignengineering andconsultancy organizationBudget Business Process ModelingTransportation
HO & Registered Off ice
Mumbai
E-8, Suman Apartments,
Opp Aggarwal Residency, Shankar Lane,
Kandiwali West, Mumbai-64
Contact Mr. Parthiv Soni
Landline
Mobile +91-9930316916
Email [email protected]
6 Mangal, 3A Vishrut Bunglows,
Opposite A School
Subhash chowk, Memnagar
Ahmedabad 380052
Contact Mr. Sourabh Agarwal
Landline +91-79-40055790
Mobile +91-9662124866Email [email protected]
Ahmedabad
Tagore Apartment
Tagore Road
Rajkot
Contact Mr. Tushar Vadodaria
Landline
Mobile +91-98987 06178Email [email protected]
Rajkot
Associated Companies
Wise Financial
Solution Pvt. Ltd.,Hyderabad
Varishta Consultants
Pvt. Ltd., Hyderabad
Hyderabad
Contact Mr. Raghuram AVG
Landline +91-04-27627607
Mobile +91-9701010000
Email [email protected]
Mr. Raghuram AVG
102 A, Sri Dattasai Commercial
Complex, Opp. Saptagiri Theatre, RTC
X Roads, Hyd - 500020
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 3/30
Approach & Methodology
Secondary Data Collection
Stake Holders
Consultation
Data Collection Stage 2 -Primary
Survey Willingness/Plot
size/Rqmt. etc
Data Analysis (Stage 2) &
Inferences
Finalization of Design Standards
Conceptual Layout
Cost Estimates
Physical SurveyData Analysis (Stage 1) Demand
Supply gap & Benchmarking
Product Mix Derivation & Survey
Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 4/30
1. Data Collection
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 5/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
1. Data Collection Stage 1
Secondary Data Collection Stakeholders Consultation Physical Survey
To collect basic profile of the proposed sites
To assess demand for Industry at state level & cluster level
To assess the basic supply of the spaces available
Collect of available onsite information
Collect Basic data
Site Profile
Design Guidelines
IE profile
GIDC data
Industry census
GIDC info on inflow
outflow
Connectivity andlinkages
Existing Industries
Existing Onsite
Infrastructure
Current Logistics
Trends
Identification of stake
holders
Case StudiesEtc
a
Data on Demand f or
Industries
Historical Trends on
GIDC performance
Macro, Micro, others
Future Projects
planned through
Vision Documents,
Budgets, five yearplans, Vibrant Gujarat,
other studies, etc
Industries policies
Cluster wise trends of
new upcoming
industries
Sector wise study of
trends
Impact of DMICOthers
b
Data on Supply of
Industrial Spaces
Historical Trends on
absorption of spaces
in the existing IEs
Expansion trends of
vacant space
Inventory of planned
spacesInventory of SEZs
Impact of DMIC on
supply
Supply forecast
available
Others
c
Data on site
inf rastructure,
Connectivity, policies
, etc
Design Year
Population
Projections
Connectivity Road,
rails, Ports, airportsManpower
availability
Power availability
Subsidies and
incentives available
from GOI/GOG
Cluster specific
Needs
RestrictionsEnv. Issues
d
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 6/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
1. Data Collection Stage 1
Secondary Data Collection Stakeholders Consultation Physical Survey
Indicative
Indicative
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 7/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
1. Data Collection Stage 1
Secondary Data Collection Stakeholders Consultation Physical Survey
Two main objectives can be derived by willingness survey/stake holder consultation
out put will be in terms of industrial sector identification, area of the unit and
envisaged production for upcoming IE development.
Demand generators
Willingness to move to
another industrial estate Intention to expand the
production unit in another
industrial estate
Ancillary demand generating
from established industries to
support the production
Out put of the consultation
- Industry sector i.e
Engineering, textile,Automobile, Pharmaceutical
etc
- Area (in terms of block
requirement for
expansion/relocation)
- Target production ( expected
production from subject
development
- Infrastructure requirement at
macro level
- Amenities required for
industrial estate
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 8/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
1. Data Collection Stage 1
Secondary Data Collection Stakeholders Consultation Physical Survey
Indicative
Indicative Indicative
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 9/30
2. Data Analysis
(Stage 1) &
Benchmarking
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 10/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
i. Demand Forecast
Indicative Infrastructure agenda
vision 2020
CMIE time series data on
investment in Gujarat
Investment information
for INDEXT-B
Vibrant Gujarat MoU lists
Policy documents by
GoG
Growth statistics of
industrial areas from
GIDB
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 11/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
ii. Supply trends and f orecast
Indicative
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 12/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
i. Identif ying Demand Supply Gaps
Indicative
Infrastructure agenda vision 2020
CMIE time series data on investment in Gujarat
Investment information for INDEXT-B
Vibrant Gujarat MoU lists
Policy documents by GoG
Growth statistics of industrial areas from GIDBwww.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 13/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
iv. Plotting Sector wise/cluster wise demand supply gap
Sector
1
Sector
2
Sector
3
Sector
4
Sector
5
Sector
6
Sector
7
Cluster
1
Cluster
2
Cluster
3
Cluster
4
Cluster5
Cluster
6
Cluster
7
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 14/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
v. Benchmarking of key parameters
Propose
d site 1
Propose
d site 2
Propose
d site 3
SEZs
Sample 1
Other
GIDCs
National
Benchma
rk
Int.
Benchma
rk
Connecti
vity
Power
Human
Resource
s
Land
availabili
ty
Readiness
Others
Others
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 15/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
v. Benchmarking of key parameters
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 16/30
3. Product Mix
Derivation & Survey
Design
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 17/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
i. Product Mix
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 18/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
ii. Selection of TG f or willingness survey
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 19/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
iii. Questionnaire Design
a b cOptions Land
Parcel
Options
Connectivity
Power
Human Res.
Land availability
Readiness
Readiness
Willingness
Investment
Requirements
Otherswww.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 20/30
4 to 6. Data
Collection, Analysis, &
Finalization of Standards
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 21/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
Data Collection Stage 2
Identification of 500 nos of
industries as target
segment
Short listing of 150 as
sample size considering 50
to drop out/no responseField survey
questionnaire base
interview of the industry
representation
4
Data Analysis & Inf erences
Analysis on willingness
Analysis on typical plot
requirement
Analysis on supporting
infra requirement
Analysis on Preference for
site optionsIndicative of power
requirements
Indicative of proposed
investments
Etc.
5
Finalization of design
standards
Plot Sizes
Required Infra
Power Requirement
Env. Clearances
Sizing
AmenitiesEtc
6
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 22/30
7. Conceptual
Layout
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 23/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
Project
Milestones
Sub areas Deliverables/Output Remarks
Conceptual
Layout
y Finalizing Basis
of design as
per relevant
standards
y Identification
of project
components &
Sizing
y Preparation of
conceptual
layout &
associated
services
y A Note on
Basis of design
y Associated
details and
calculations
y CAD based
layout
y Physical Survey not
to be part of the
assignment
y Cad format for to
plot to be provided
by the client
y Conceptual layout
not to include
architectural
detailing, structural
layout, and services
planning
Scope Design Layouts
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 24/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
Proposed Land Use Distribution
UDPFI
USE
Percent
age
Area
actualarea %
Transport Operators
- Office, godown,loading/unloading 30
Service Industry- Petrol pump,service area, weighbridge, etc. 6Public/ Semi-public
- Police, postoffice, telephone, firstaid, etc. 3
Commercial 3
Parking- idle, transit, other
vehicles 18
Open Spaces 10
Circulation 28Others (Dormitoriesetc) 2
TOTAL 100
Sr.
No
Infrastructure Component
1 Internal roads
2 Drainage
3 Compound wall
4 Land scapping
5 Waste Treatment system
6 Effluent treatment plant
7 Sewerage system
8 Waste col lect ion system
9 Telecom
10 Medical center
11 Transport terminal & goods loading/unloading
12 Fire station
13 Bus terminal, stop etc.
14 Community center
15 Police station
16 Post telecommunication
17 Sewerage treatment plant
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 25/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
Alternative Layouts
a1
a2
Indicative
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 26/30
Approach & Methodology
Data Collection Stage 2 -
Data Analysis (Stage 2) &
Inferences
Finalization of Design
Standards
Conceptual Layout
Cost Estimates
Data Analysis (Stage 1) &
Benchmarking
Product Mix Derivation
& Survey Design
4
5
6
7
8
2
3
1 Data Collection Stage 1
Conceptual Layouts
Indicative
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 27/30
www.5econsulting.in
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 28/30
8. Cost Estimates
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 29/30
8/8/2019 5e Consulting Demand Assessment & Master Planning for Proposed Industrial Estates
http://slidepdf.com/reader/full/5e-consulting-demand-assessment-master-planning-for-proposed-industrial 30/30
helping execute your
projects
helping execute your
projects
5e Consulting
Sample Property Inf ormation
Memorandum
Sample Property Inf ormation
Memorandum
www.5econsulting.in5E Consulting, india, ahmedabad, sourabhagarwal, readesign, architecture, projectmanagement, sustainabilityl estate, Project Feasibility, Research, Technology andsystem, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnilanil, real estate demandass essment, Ahmedabad, ranchi, cept, nicmar, energy starrating, interiordesign,
earnedvalue management, pert, cpm, Microsoftproject, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leedap, housing, construction, contractor, sbst, school ofbuilding sc ience andtechnology, flyover, industrial
shead, shed, waterharvesting, heatislandeffect, thirdparty inspection, telecom towers, eoi, rfp, stormwatermanagement, energy modeling, renewable energy, carboncredits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwaterharvesting, solarenergy, wind energy, greenpower, greene, constructionactivity pollution prevention,
fsi, saleable area, gicea, carpetarea, builtupbuilt-up, area superbuiltupmckinsey plants reuse recycling resource reductionRajkotsolidwaste management oceanvilla resortcottage tourismtourists survey opinion survey cvc classifiedvolume countmdfagrifibre boardrfpeoi tenderestimationquantity survey hvac airconditioning poweralbedo aquifer
architectural architectperformance index performance monitoring dashboardbasis ofdesignc ommissioning reportagentbiofuel vermin-composting vermincomposting waste toenergy blackwaterbrownfieldvc pe funding venture capital private equity bankable feasibility reports documentpowerpoint excel ms projectleedrating platinumcertified1s o9000
14001automationdensity carbondioxide climate change rainfall floodcommissioning authority Inddorenvironmental quality airquality controls factorEnd-to-EndIntegratedSolution Providerlinking the entire value chains fromPlanning & Architecture toEngineering/DesigntoProject Managementacross various sectors:Core Infrastructure, UrbanServices,
Public HealthEng, Transportationand Value Added/ Themedbased/ IntegratedDevelopment. premierdesignengineering andconsultancy organizationBudget Business Process ModelingTransportation