5e Method Statement Demand Assessment & Master Planning for Proposed Industrial Estates Submitted to Submitted by 5e Consulting www.5econsulting.in

5e consulting demand assessment & master planning for proposed industrial estates

Embed Size (px)

DESCRIPTION

Demand Assessment, Master Planning, Feasibility Study, Feasibility studies, Industrial Estate, GIDC, MIDC, 5e Consulting, Ahmedabad, India, Gujarat, IE, Truck Terminal

Citation preview

Page 1: 5e consulting demand assessment & master planning for proposed industrial estates

5e

Method StatementDemand Assessment & Master Planning

for Proposed Industrial Estates

Submitted to

Submitted by

5e Consulting

www.5econsulting.in

Page 2: 5e consulting demand assessment & master planning for proposed industrial estates

5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area super builtup mckinsey plants reuse recycling resource reduction Rajkot solid waste management ocean villa resort cottage tourism tourists survey opinion survey cvc classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process ModelingTransportation

HO & Registered Office

Mumbai

E-8, Suman Apartments, Opp Aggarwal Residency, Shankar Lane, Kandiwali West, Mumbai-64

Contact Mr. Parthiv SoniLandline Mobile +91-9930316916Email [email protected]

6 Mangal, 3A Vishrut Bunglows, Opposite A SchoolSubhash chowk, MemnagarAhmedabad 380052

Contact Mr. Sourabh AgarwalLandline +91-79-40055790Mobile +91-9662124866Email [email protected]

Ahmedabad

Tagore ApartmentTagore RoadRajkot

Contact Mr. Tushar VadodariaLandline Mobile +91-98987 06178Email [email protected]

Rajkot

Associated Companies

Wise Financial Solution Pvt. Ltd., Hyderabad

Varishta Consultants Pvt. Ltd., Hyderabad

Hyderabad

Contact Mr. Raghuram AVGLandline +91-04-27627607Mobile +91-9701010000Email [email protected]

Mr. Raghuram AVG102 A, Sri Dattasai Commercial Complex, Opp. Saptagiri Theatre, RTC ‘X’ Roads, Hyd - 500020

www.5econsulting.in

Page 3: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Secondary Data Collection

Stake Holder’s Consultation

Data Collection Stage 2 -Primary Survey – Willingness/Plot

size/Rqmt. etc

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Physical SurveyData Analysis (Stage 1) – Demand Supply gap & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1

www.5econsulting.in

Page 4: 5e consulting demand assessment & master planning for proposed industrial estates

5e

1. Data Collection

www.5econsulting.in

Page 5: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 11. Data Collection – Stage 1

Secondary Data Collection Stakeholder’s Consultation Physical Survey

•To collect basic profile of the proposed sites•To assess demand for Industry at state level & cluster level•To assess the basic supply of the spaces available•Collect of available onsite information

Collect Basic data•Site Profile•Design Guidelines•IE profile•GIDC data•Industry census•GIDC info on inflow outflow•Connectivity and linkages•Existing Industries•Existing Onsite Infrastructure•Current Logistics Trends•Identification of stake holders•Case Studies•Etc

a

Data on Demand for Industries•Historical Trends on GIDC performance – Macro, Micro, others•Future Projects planned through Vision Documents, Budgets, five year plans, Vibrant Gujarat, other studies, etc•Industries policies•Cluster wise trends of new upcoming industries•Sector wise study of trends•Impact of DMIC•Others

b

Data on Supply of Industrial Spaces•Historical Trends on absorption of spaces in the existing IEs•Expansion trends of vacant space •Inventory of planned spaces•Inventory of SEZs•Impact of DMIC on supply•Supply forecast available•Others

c

Data on site infrastructure, Connectivity, policies , etc•Design Year•Population Projections•Connectivity – Road, rails, Ports, airports•Manpower availability•Power availability•Subsidies and incentives available from GOI/GOG•Cluster specific Needs•Restrictions•Env. Issues

d

www.5econsulting.in

Page 6: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 11. Data Collection – Stage 1

Secondary Data Collection Stakeholder’s Consultation Physical Survey

Indicative

Indicative

www.5econsulting.in

Page 7: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 11. Data Collection – Stage 1

Secondary Data Collection Stakeholder’s Consultation Physical Survey

Two main objectives can be derived by willingness survey/stake holder consultation out put will be in terms of industrial sector identification, area of the unit and envisaged production for upcoming IE development.

Demand generators• Willingness to move to

another industrial estate• Intention to expand the

production unit in another industrial estate

• Ancillary demand generating from established industries to support the production

Out put of the consultation- Industry sector i.e

Engineering, textile, Automobile, Pharmaceutical etc

- Area (in terms of block requirement for expansion/relocation)

- Target production ( expected production from subject development

- Infrastructure requirement at macro level

- Amenities required for industrial estate

www.5econsulting.in

Page 8: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 11. Data Collection – Stage 1

Secondary Data Collection Stakeholder’s Consultation Physical Survey

Indicative

Indicative Indicative

www.5econsulting.in

Page 9: 5e consulting demand assessment & master planning for proposed industrial estates

5e

2. Data Analysis (Stage 1) &

Benchmarking

www.5econsulting.in

Page 10: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1i. Demand Forecast

Indicative• Infrastructure agenda

vision 2020• CMIE time series data on

investment in Gujarat• Investment information

for INDEXT-B• Vibrant Gujarat MoU lists• Policy documents by

GoG• Growth statistics of

industrial areas from GIDB

www.5econsulting.in

Page 11: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1ii. Supply trends and forecast

Indicative

www.5econsulting.in

Page 12: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1i. Identifying Demand Supply Gaps

Indicative

• Infrastructure agenda vision 2020• CMIE time series data on investment in Gujarat• Investment information for INDEXT-B• Vibrant Gujarat MoU lists• Policy documents by GoG• Growth statistics of industrial areas from GIDB

www.5econsulting.in

Page 13: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1iv. Plotting Sector wise/cluster wise demand supply gap

Sector 1

Sector 2

Sector 3

Sector 4

Sector 5

Sector 6

Sector 7

Cluster 1

Cluster 2

Cluster 3

Cluster 4

Cluster 5

Cluster 6

Cluster 7

Page 14: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1v. Benchmarking of key parameters

Proposed site 1

Proposed site 2

Proposed site 3

SEZs Sample 1

Other GIDCs

National Benchm

ark

Int. Benchm

ark

Connectivity

Power

Human Resource

s

Land availabili

ty

Readiness

Others

Others

www.5econsulting.in

Page 15: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1v. Benchmarking of key parameters

www.5econsulting.in

Page 16: 5e consulting demand assessment & master planning for proposed industrial estates

5e

3. Product Mix Derivation & Survey

Design

www.5econsulting.in

Page 17: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1i. Product Mix

www.5econsulting.in

Page 18: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1ii. Selection of TG for willingness survey

www.5econsulting.in

Page 19: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1iii. Questionnaire Design

a b cOptions – Land Parcel

Options

Connectivity

Power

Human Res.

Land availability

Readiness

Readiness

Willingness

Investment

Requirements

Otherswww.5econsulting.in

Page 20: 5e consulting demand assessment & master planning for proposed industrial estates

5e

4 to 6. Data Collection, Analysis, &

Finalization of Standards

www.5econsulting.in

Page 21: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1

Data Collection Stage – 2

•Identification of 500 nos of industries as target segment•Short listing of 150 as sample size considering 50 to drop out/no response•Field survey – questionnaire base interview of the industry representation

4

Data Analysis & Inferences•Analysis on willingness•Analysis on typical plot requirement•Analysis on supporting infra requirement•Analysis on Preference for site options•Indicative of power requirements•Indicative of proposed investments•Etc.

5

Finalization of design standards•Plot Sizes•Required Infra•Power Requirement•Env. Clearances•Sizing•Amenities •Etc

6

Page 22: 5e consulting demand assessment & master planning for proposed industrial estates

5e

7. Conceptual Layout

www.5econsulting.in

Page 23: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1Project Milestones

Sub areas Deliverables/Output Remarks

Conceptual Layout

Finalizing Basis of design as per relevant standards

Identification of project components & Sizing

Preparation of conceptual layout & associated services

A Note on Basis of design

Associated details and calculations

CAD based layout

Physical Survey not to be part of the assignment

Cad format for to plot to be provided by the client

Conceptual layout not to include architectural detailing, structural layout, and services planning

Scope – Design Layouts

www.5econsulting.in

Page 24: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1Proposed Land Use Distribution

  UDPFI

USE

Percentage Area

actual area %

Transport Operators - Office, godown, loading/unloading 30Service Industry - Petrol pump, service area, weigh bridge, etc. 6Public/ Semi-public - Police, post office, telephone, first aid, etc. 3

Commercial 3Parking - idle, transit, other vehicles 18

Open Spaces 10

Circulation 28Others (Dormitories etc) 2

TOTAL 100

Sr.No

Infrastructure Component

1 Internal roads

2 Drainage

3 Compound wall

4 Land scapping

5 Waste Treatment system

6 Effluent treatment plant

7 Sewerage system

8 Waste collection system

9 Telecom

10 Medical center

11 Transport terminal & goods loading/unloading

12 Fire station

13 Bus terminal, stop etc.

14 Community center

15 Police station

16 Post telecommunication

17 Sewerage treatment plant

Page 25: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1Alternative Layouts

a1

a2

Indicative

www.5econsulting.in

Page 26: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1Conceptual Layouts

Indicative

www.5econsulting.in

Page 27: 5e consulting demand assessment & master planning for proposed industrial estates

www.5econsulting.in

Page 28: 5e consulting demand assessment & master planning for proposed industrial estates

5e

8. Cost Estimates

Page 29: 5e consulting demand assessment & master planning for proposed industrial estates

Approach & Methodology

Data Collection Stage 2 -

Data Analysis (Stage 2) & Inferences

Finalization of Design Standards

Conceptual Layout

Cost Estimates

Data Analysis (Stage 1) & Benchmarking

Product Mix Derivation & Survey Design

4

5

6

7

8

2

3

1 Data Collection – Stage 1Block Estimates

Indicative

www.5econsulting.in

Page 30: 5e consulting demand assessment & master planning for proposed industrial estates

helping execute your

projects

5e Consulting

Sample Property Information Memorandum

www.5econsulting.in5E Consulting, india, ahmedabad, sourabh agarwal, readesign, architecture, project management, sustainabilityl estate, Project Feasibility, Research, Technology and system, Economic commercial, Legal, green building, leed, griha, sustainability, Swapnil anil, real estate demand assessment, Ahmedabad, ranchi, cept, nicmar, energy star rating, interior design, earned value management, pert, cpm, Microsoft project, primavera, material management, multiplex, truck terminal, amusement park, bridge, building, park, garden, bus stop, viability study, planning, infrastructure, environment, usgbc, igbc, teri, leed ap, housing, construction, contractor, sbst, school of building science and technology, flyover, industrial shead, shed, water harvesting, heat island effect, third party inspection, telecom towers, eoi, rfp, storm water management, energy modeling, renewable energy, carbon credits, 5e, five elements, five e, 5, e, consultants, consultancy, consulting, rainwater harvesting, solar energy, wind energy, green power, green e, construction activity pollution prevention, fsi, saleable area, gicea, carpet area, builtup built-up, area super builtup mckinsey plants reuse recycling resource reduction Rajkot solid waste management ocean villa resort cottage tourism tourists survey opinion survey cvc classified volume count mdf agrifibre board rfp eoi tender estimation quantity survey hvac air conditioning power albedo aquifer architectural architect performance index performance monitoring dashboard basis of design commissioning report agent biofuel vermin-composting vermin composting waste to energy blackwater brownfield vc pe funding venture capital private equity bankable feasibility reports document power point excel ms project leed rating platinum certified 1so 9000 14001 automation density carbon dioxide climate change rainfall flood commissioning authority Inddor environmental quality air quality controls factor End-to-End Integrated Solution Provider linking the entire value chains from Planning & Architecture to Engineering/Design to Project Management across various sectors: Core Infrastructure, Urban Services, Public Health Eng, Transportation and Value Added/ Themed based/ Integrated Development. premier design engineering and consultancy organization Budget Business Process ModelingTransportation