Document Produced Under Loan Project Number: 43906-014 October 2015
Visayas Base Load Power Project (Philippines) KSPC Multipartite Monitoring Team Meeting Presentation and Minutes 1Q2015 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Energizing Energizing Lives, PoweringLives, Powering CommunitiesCommunities
Barangay Colon Naga City CebuBarangay Colon Naga City CebuBarangay Colon, Naga City CebuBarangay Colon, Naga City CebuApril 29, 2015April 29, 2015
1
Meeting AgendaMeeting Agenda
Updates from Previous Meeting Updates from Previous Meeting
1st Quarter Barangay Consultations (IEC)1st Quarter Barangay Consultations (IEC)
Environmental Monitoring Updates
2015 Work and Financial Plan2015 Work and Financial Plan
Overview on MMT Members RolesOverview on MMT Members Roles
Future ActivitiesFuture Activities
44thth Q t MMT M tiQ t MMT M ti44thth Quarter MMT MeetingQuarter MMT Meeting
44thth Quarter MMT Meeting
Date: January 14, 2014 Venue: KSPC 2nd Floor Admin Bldg. Conference Room
44thth Quarter MMT Meeting
A l St k h ld ’ FA l St k h ld ’ FAnnual Stakeholders’ ForumAnnual Stakeholders’ Forum
44thth Quarter MMT Meeting
Date: February 13, 2015 Venue: People’s Hall Naga City Hall
Barangay Public Consultation Barangay Public Consultation U d tU d tUpdatesUpdates
•Barangay Public Consultation Updates
BrgyBrgy. . TangkeTangke (03(03--2020--15)15)gygy gg (( ))
•Barangay Public Consultation Updates
BrgyBrgy Colon (03Colon (03--1515--15)15)BrgyBrgy. Colon (03. Colon (03 1515 15)15)
•Barangay Public Consultation Updates
BrgyBrgy NorthNorth PoblacionPoblacion (03(03 0606 15)15)BrgyBrgy. North . North PoblacionPoblacion (03(03--0606--15)15)
First Quarter Environmental First Quarter Environmental MonitoringMonitoring
Environmental Monitoring
AMBIENT AIR SAMPLING LOCATIONS
SPC COMPLEX
KSPC COMPLEX
Stn 3 ‐ Brgy. TangkeBasketball Court
Stn 4 – Along National Road
Stn 5 – Near Pier Area
Manual Sampling Points
Stn 6 ‐ Mangkikis Chapel
g
Stn 6 – Kading’s Residence – 24 hr test
AAQMS LocationAsh Pond Operation Monitoring Points
Noise and PM 10
Environmental Monitoring– AAQMS
Environmental Monitoring– AAQMS
Environmental Performance Review – AAQMS
Environmental Monitoring– AAQMS
Environmental Monitoring– AAQMS
Environmental Monitoring – Ambient Air
Environmental Monitoring – Ambient Air
Environmental Monitoring – CEMS
Environmental Monitoring – CEMS
Environmental Monitoring
Environmental Monitoring - Effluents
Environmental Performance Review
100‐m radius
Current direction is SW.
M1 (Ambient Temp.) M2 M3
M4
M5
Discharge Point
Environmental Monitoring – Temperature
Environmental Monitoring
Marine Station 4 – Front of Cayam
Marine Station 5 – Front of Tuyan
Groundwater Station 1 – Upper Colon
Leachate Collecting Well (Heavy metals‐ As, Cd, Pb, Cr+6,Hg)
Groundwater Station 3 – Lower Colon
Marine Station 3 Front of Power Plant
Groundwater Station 2 – Tangke
Groundwater Station 4 – North Poblacion
Marine Station 2– Front of North Poblacion
Marine Station 1 – Front of City Hall
Environmental Monitoring – Groundwater
Environmental Performance Review – Marine Water
Environmental Monitoring– River Water
Environmental Monitoring– River Water
Environmental Monitoring
Date: March 11-12, 2015 Ambient Air Water Effluent River Water Marine Water Groundwater Ambient Air, Water Effluent, River Water, Marine Water, Groundwater
ADOPT AN ESTERO ADOPT AN ESTERO ACTIVITYACTIVITYACTIVITYACTIVITY
Adopt an Estero & Tree Planting
Hangyo sa Sapa Activity When: March 27, 2015Participants: represntatives from the 3 b (T k C l d N thbarangays (Tangke, Colon and North Poblacion)
Adopt an Estero
Overview on MMT Members Overview on MMT Members R ibilitiR ibilitiResponsibilitiesResponsibilities
General Function of the MMT
General Function of the MMT
General Function of the MMT
General Function of the MMT
General Function of the MMT
WORK AND FINANCIAL WORK AND FINANCIAL PLANPLANPLANPLAN
End of PresentationEnd of Presentation
Thank You
Date:Locaticr
ConducActivityFacilital
Facilital
KSPC M
meetin5
the mee
Agenda
April29,KSPC Me
ed by: E&C and2015i Fir:
)f: Joanne (
ng Attendees:
Minutes of the 201!
015
ting Room
&PR DepartmentQuarter MMT Meetingrire T. Supnet/E&C
First Quarter MMT Meeting
Time 0930H-n 200H
No KSPC Representatives No. DENR-EMB Representatives
1 Victonio B. {aval t Marcelino Tabuco/ EMB-PCD
z Klayd del C rmen 2 ArielGillera/ EMB-ElA
3 Neil Lawre ce V. Miral 3 Annabeth Roble/EM B-PCD
4 Joanne Cla e T. Supnet
5 Fa rra-Ja ne \. Assaral
/lf held theiir Firs
started at aroun(
:in[J went well. 1
fopics
quarter meeting last April 29,2015 at the KSPC Basemen
1000H and ended 1200H. Majority of the members weree following meeting a$enda were discussed.
: Meeting Roo
present andl g
m. The
enerally
No. Ager da Comments/SuggestionsResponsible
Person/Due Date
I
l.Jpdates frrcm Pr
Minuter;- Adopt an Es
- Members'T- Members'U
vious Meeting
:ro MOAriningriform
Renew Adopt an Estero MOA; changeadopted water body to coastal areafronting the plant site and the NorthPoblacion and Colon Creek.
Training will be done last week of May,together with the monitoring and secondquarter meeting.
Submit quotation and jacket design bynext week (May 4-8); if possible jacketwill be available before the 2no quartermonitoring schedule.
KSPC - E&C
KSPC:- E&C
PTCA-NPC Colon
2
Annual StakeholElarangay PublicMinutes- Barangay Cc
- Barangay Nr
- BaranS;ay Ta
ers'Forumonsultation
cn'th PoblaciongKe
No. Ager da Connments/SuggestionsResponsible
Person/Due Date
3
First Quarter Enr
MonitorinS; Resu
- Ambient Air- Water Efflut- Marine Wat- Ground Wa1
- River Water- Marine Life
ronmental:S
1tr
)r
tudy
a
a
a
o
a
nclude trend for Aliganga St. samplingtation for ambient air (from constructiot
rntil present)
Jse donated pump boat during MarineMater Monitoring; coordinate with Brgy.
'lorth Poblacion.
nclude quarterly monitoring of;ediments quality (3 stations; front ofetty, wharf area and front of coal yard);reavy metal analysis using TCLP methodrnd standard.
nclude monitoring of coal heavy metalrontents; quarterly as fed.
)ENR to check their system on real-time;ransmission of CEMS data from KSPC to)ENR-EMB office.
KSPC _ E&C
4Environmental I- Adopt an Es
:tivitiesero Activity
o Make final report for the existingAdopted Water Body and process newMOA for the proposed water bodies.
KSPC E&C, DENR-
EMB
E Overview on Ml T Members' Rolesc [o be discussed in details during the
training.KSPC E&C, DENR-
EMB
6 2015 Work and inancial Plan
o No changes with the current Work andFinancial Plan
r To be approved by the ExeCom.
7:uture Activitiies/Ot rer Matterr;
o Second quarter monitoring, meetingand members' training will be by last:
week of May 201-5
r Submit 2n' half 2014 GMVR on orbefore May 15.
o Conduct environmental monitoring a
TechCom meeting simultaneously; 2
days (1" day monitoring, 2no daymonitoring and meeting)
id
KSPC E&C andDEI{R-EMB
At A. PtrotosB. AttendrC. Presenl
Sheett Material
Prepared by'; Reviewed by: Noted by:
\furYf;t,-2 r /, e'4, L/'
;H- -f:\J.
SUPNET, J.C. MIRAL, N.L. SUMAOY, J \ /ruavl ,, / KIM, H.J.
Attach ent A:
l__-l
KEPCO !iPC power Corporation
Multipartite Mohitoring Team
Cebu power plant
Colon, City of Naga
Cebr,r, philippines
Tel. No. : (0321 27 2-6290^9I,93Fax. No. (032) 489-7010
ATTENDANCE SHEET
MMT MEETING; April 29, 2015; KSpC
t6trlfiD tr
€.i\ A F^.
ti"A r,4 . Vi l- D ,xl'lflil
eY/7722
lL M lR*L