REMOVED MATERIAL: CONTRACTOR AND SHALL BE DISPOSED OF IN A MANNER APPROVED BY THE ENGINEER. THE OF PROPERTY THE BECOME SHALL PROJECT THIS DURING REMOVED DEBRIS AND MATERIAL ALL CLEANING BRIDGE SEATS AND PIER CAPS: BRIDGE SEATS AND PIER CAPS SHALL BE PAID FOR IN OTHER ITEMS OF WORK. THE CLEANING OF COSTS ALL DEBRIS. ALL OF CLEAN SWEPT BE SHALL CAPS PIER AND SEATS BRIDGE ALL UTILITIES: REPAIRED AT THE CONTRACTORS EXPENSE. BE WILL UTILITIES THE TO DAMAGE ANY PRESENT. BE MAY THAT LINES UTILITY ANY DAMAGE TO NOT CARE TAKE AND CONSTRUCTION DURING PRECAUTIONS SAFETY NECESSARY ALL TAKE SHALL CONTRACTOR THE SEQUENCE OF CONSTRUCTION: GENERAL NOTES EXCEPT AS MODIFIED BY THE PLANS AND SPECIAL PROVISIONS. CONSTRUCTION, HIGHWAY FOR SPECIFICATIONS STANDARD 2009 THE OF REQUIREMENTS THE WITH COMPLY SPECIFICATIONS: PLANS: BRIDGE "A": AS BUILT PLANS WERE NOT FOUND. SH-131 OVER NORTH BOGGY CREEK IN ATOKA COUNTY ASK FOR: OKLAHOMA CITY, OKLAHOMA 73105 200 NE 21ST STREET OKLAHOMA DEPARTMENT OF TRANSPORTATION OFFICE SERVICES DIVISION DIVISION OF THE OKLAHOMA DEPARTMENT OF TRANSPORTATION. SERVICES OFFICE THE FROM OBTAINED BE MAY STRUCTURES, EXISTING THE FOR PLANS CONSTRUCTION ATOKA VERIFICATION OF EXISTING CONDITIONS: NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, TO THE SATISFACTION OF THE ENGINEER. CONTRACTOR'S THE TO DUE ROADWAY OR STRUCTURE BRIDGE THE TO DAMAGE ANY ROADWAY. OR STRUCTURE BRIDGE EXISTING ANY TO DAMAGE PREVENT TO PRECAUTIONS NECESSARY ALL TAKE SHALL AND PRACTICE CONSTRUCTION GOOD WITH CONSISTENT METHODS ADOPT SHALL CONTRACTOR THE PERFORMED. BE WILL IT WHICH UNDER CONDITIONS AND WORK THE OF NATURE THE OF THEMSELVES INFORM FULLY SHALL BIDDERS BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF. SHALL AND DESCRIBED AS PROJECT THE COMPLETE TO NECESSARY DIMENSIONS ALL VERIFY SHALL CONTRACTOR THE APPROXIMATE. ARE PLANS THE ON SHOWN COMPONENTS BRIDGE EXISTING THE OF DIMENSIONS ALL PAY ITEM NOTES JOB PIECE NO. Design Detail Check SHEET NO. REVISIONS REV. NO. DESCRIPTION DATE Engr.: Squad: BRIDGE COUNTY OKLAHOMA STATE OF DEPARTMENT OF TRANSPORTATION (04) N/A 11/19 11/19 N/A 34094 SH-131 OVER NORTH BOGGY CREEK TEE LAF OF PAY QUANTITIES (BRIDGE) GENERAL NOTES AND SUMMARY "A" HENSLEY DEFRANCO AB01 DECK REPAIR". BRIDGE B "CLASS OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL SHOWN AS WORK THE COMPLETE TO NECESSARY INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, INCLUDING REPAIR THE OF COSTS ALL INHIBITOR (SURFACE APPLIED)". CORROSION "(SP) OF YARD SQUARE FOR BID PRICE UNIT PER SEPARATELY FOR PAID AND PROVISIONS SPECIAL THE TO ACCORDING APPLIED BE SHALL IT INHIBITOR CORROSION USE TO ELECTS DIVISION THE IF INHIBITOR. CORROSION WITH TREATED BE MAY EXPOSED AREAS DECK AND STEEL REINFORCING COATED EPOXY NON- EXISTING PLACE. IN LEFT AND STRAIGHTENED, CLEANED, BE SHALL STEEL REINFORCING DECK EXISTING THE PAYMENT SHALL BE FOR THE ACTUAL REPAIRS MADE. NO PAYMENT SHALL BE MADE FOR WORK NOT PERFORMED. ENGINEER. THE BY FIELD THE IN DETERMINED BE SHALL REPAIR THE OF EXTENT AND LOCATION ACTUAL THE FOR FURTHER ACTION. ENGINEER THE TO THIS REPORT IMMEDIATELY SHALL CONTRACTOR THE REPAIR, OF LEVEL THIS BY REACHED NOT IS CONCRETE SOUND IF SPECIFIED. LEVEL THE BELOW CONCRETE REMOVE NOT SHALL CONTRACTOR THE SECTION 513.04D(2) OF THE STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. WITH ACCORDANCE IN STEEL REINFORCING OF MAT BOTTOM THE TO DOWN DECK BRIDGE THE ON CONCRETE UNSOUND OF PORTIONS REPLACING AND REMOVING OF CONSISTS REPAIR" DECK BRIDGE B "CLASS ITEM PAY (7) CLASS B BRIDGE DECK REPAIR: DECK REPAIR". BRIDGE C "CLASS OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL SHOWN AS WORK THE COMPLETE TO NECESSARY INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, INCLUDING REPAIR THE OF COSTS ALL INHIBITOR (SURFACE APPLIED)". CORROSION "(SP) OF YARD SQUARE FOR BID PRICE UNIT PER SEPARATELY FOR PAID AND PROVISIONS SPECIAL THE TO ACCORDING APPLIED BE SHALL IT INHIBITOR CORROSION USE TO ELECTS DIVISION THE IF INHIBITOR. CORROSION WITH TREATED BE MAY EXPOSED AREAS DECK AND STEEL REINFORCING COATED EPOXY NON- EXISTING PLACE. IN LEFT AND STRAIGHTENED, CLEANED, BE SHALL STEEL REINFORCING DECK EXISTING THE PAYMENT SHALL BE FOR THE ACTUAL REPAIRS MADE. NO PAYMENT SHALL BE MADE FOR WORK NOT PERFORMED. ENGINEER. THE BY FIELD THE IN DETERMINED BE SHALL REPAIR THE OF EXTENT AND LOCATION ACTUAL THE THE DIVISION IN ACCORDANCE WITH SECTION 502 OF THE STANDARD SPECIFICATIONS. BY APPROVED AS REPAIR OF AREA THE FOR WORK FORM APPROPRIATE THE USE SHALL CONTRACTOR THE STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. THE OF D(3) 513.04 SECTION WITH ACCORDANCE IN DECK THE OF DEPTH FULL THE DECK BRIDGE THE ON CONCRETE UNSOUND OF PORTIONS REPLACING AND REMOVING OF CONSISTS REPAIR" DECK BRIDGE C "CLASS ITEM PAY (8) CLASS C BRIDGE DECK REPAIR: (6) CLASS C CONCRETE: (DRAINS AT END OF BRIDGE) THE PRICE BID PER CUBIC YARD OF "CLASS C CONCRETE". IN INCLUDED BE SHALL INCIDENTALS AND EQUIPMENT LABOR, INCLUDING INSTALLATION THIS OF COSTS ALL THE SLOPE OF THE BRIDGE HEADERS OR AS DIRECTED BY THE ENGINEER. BY FIELD THE IN DETERMINED BE SHALL BASINS SPLASH AND SLIDES DRAIN OUT' 'RUN- OF PLACEMENT FINAL AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE ENGINEER. REPAIRED BE SHALL UTILITIES TO DAMAGE ANY PRESENT. BE MAY THAT UTILITIES ANY TO DAMAGE PREVENT AND WAY OF- RIGHTS- OF INTEGRITY THE PRESERVE AND LOCATE TO RESPONSIBILITY CONTRACTORS THE IS IT SHOWN IN THE PLANS AND AS DIRECTED BY THE ENGINEER. AS BRIDGE OF ENDS AT DRAINS NEW OF BUILDING THE OF CONSIST SHALL CONCRETE" C "CLASS ITEM PAY (5) ASPHALT MEMBRANE OVERLAY: WORK SHALL BE INCLUDED IN THE PRICE BID PER SQUARE YARD OF "ASPHALT MEMBRANE OVERLAY". THE COMPLETE TO NECESSARY INCIDENTALS AND MATERIAL EQUIPMENT, LABOR, INCLUDING COSTS ALL SURFACE AND THE 100 FT OF TRANSITION TO NEW BRIDGE DECK GRADE ON EACH END OF THE BRIDGE. DRIVING DECK BRIDGE ENTIRE THE COVER SHALL 'A' BRIDGE FOR OVERLAY MEMBRANE ASPHALT THE WITH SUPERPAVE, TYPE S4 (PG 76-28 OK). REPLACED BE TO ASPHALT SPECIFICATIONS. STANDARD THE OF 505 SECTION WITH ACCORDANCE IN FLASHING AND PRIMER, MEMBRANE, COAT, TACK ASPHALT, INCLUDES OVERLAY" MEMBRANE "ASPHALT ITEM PAY (2) COLD MILLING PAVEMENT: AND INCIDENTALS SHALL BE INCLUDED IN THE PRICE BID PER SQUARE YARD OF "COLD MILLING PAVEMENT". EQUIPMENT LABOR, CUTTING, SAW INCLUDING OPERATIONS MILLING COLD WITH ASSOCIATED COSTS ALL SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER. WORK THE OF RESULT A AS STRUCTURE EXISTING THE TO DONE DAMAGE STRUCTURE. THE ON PLACED MATERIALS NEW OR STRUCTURE EXISTING THE HARM NOT WILL WHICH MANNER A IN PERFORMED BE SHALL MILLING COLD APPROVED BY THE ENGINEER. MANNER A IN OF DISPOSED BE AND CONTRACTOR THE OF PROPERTY BECOME SHALL MATERIAL REMOVED CONSTRUCTION. HIGHWAY FOR SPECIFICATIONS STANDARD 2009 THE OF 412 SECTION WITH ACCORDANCE IN AND PLANS THE IN SHOWN LIMITS THE TO PAVING APPROACH AND DECK BRIDGE THE OVER MEMBRANE AND OVERLAY ASPHALT EXISTING THE OF REMOVAL THE INCLUDES PAVEMENT" MILLING "COLD ITEM PAY (3) DIAMOND GRINDING CONCRETE PAVEMENT: PAVEMENT". CONCRETE GRINDING "DIAMOND OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL INCIDENTALS AND EQUIPMENT LABOR, CUTTING, SAW INCLUDING GRINDING DIAMOND WITH ASSOCIATED COSTS ALL THE WORK SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER. OF RESULT A AS STRUCTURE EXISTING THE TO DONE DAMAGE STRUCTURE. THE ON PLACED MATERIALS NEW OR STRUCTURE EXISTING THE HARM NOT WILL WHICH MANNER A IN PERFORMED BE SHALL GRINDING DIAMOND 425 OF THE 2009 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. SECTION WITH ACCORDANCE IN MEMBRANE NEW THE PUNCTURE MIGHT THAT EDGES SHARP ANY REMOVE TO OFF MILLED BEEN HAS MEMBRANE EXISTING ANY AND OVERLAY CONCRETE ASPHALT EXISTING THE ONCE SLAB DECK BRIDGE THE GRINDING DIAMOND OF CONSIST SHALL PAVEMENT" CONCRETE GRINDING "DIAMOND ITEM PAY PAY ITEM NOTES (11) TEMPORARY RETAINING STRUCTURES: (FORMING WALL CONSTRUCTION) OF "TEMPORARY SHEET PILING". SUM LUMP PER BID PRICE THE IN INCLUDED BE SHALL STRUCTURES RETAINING TEMPORARY BUILD TO NECESSARY INCIDENTALS AND MATERIAL, SERVICES, ENGINEERING EQUIPMENT, LABOR, INCLUDING COSTS ALL APPROVED BY THE ENGINEER BEFORE STARTING WORK ON THE RETAINING STRUCTURES. AND SUBMITTED BE SHALL STRUCTURES RETAINING TEMPORARY THE FOR DRAWINGS AND CALCULATIONS BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF OKLAHOMA. DESIGNED STRUCTURES RETAINING TEMPORARY THE HAVE WILL CONTRACTOR THE NECESSARY, BE STRUCTURES RETAINING TEMPORARY SHOULD SLOPES. FLATTER OR 2:1 MAINTAIN AND WINGS REBUILD TO NECESSARY BE MAY STRUCTURES RETAINING TEMPORARY ALLOWED. BE NOT WILL 2:1 THAN STEEPER SLOPES TEMPORARY (1) UNCLASSIFIED BORROW: LUMP SUM OF CUBIC YARDS OF "UNCLASSIFIED BORROW". PER BID PRICE THE IN INCLUDED BE SHALL INCIDENTALS AND EQUIPMENT LABOR, INCLUDING ABOVE DESCRIBED AS GRADING AND COMPACTION AND EARTHWORK OF PLACEMENT THE FOR NECESSARY COSTS ALL USED TO CORRECT SLOPES AND FILL WASHES AS DIRECTED BY THE ENGINEER. BE MAY MATERIAL THIS ADDITIONALLY, PLANS. THE IN SHOWN AS 'A', BRIDGE ON CONSTRUCTION WING OF AREA THE BACKFILL TO NEEDED EARTH OF AMOUNT AN OF CONSIST SHALL BORROW" "UNCLASSIFIED ITEM PAY EXPANSION MATERIAL: (4) REHABILITATED EXPANSION JOINT WITH ELASTOMERIC MORTAR AND PREFORMED SILICONE LINEAR FOOT OF "EXPANSION DEVICE" AND THE UNIT PRICE BID PER CUBIC FOOT OF "ELASTOMERIC MORTAR". PER BID PRICE UNIT THE IN INCLUDED BE SHALL PLANS THE IN SHOWN AS WORK THE COMPLETE TO NECESSARY INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, ARMOUR, THE OF REMOVAL INCLUDING COSTS ALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER. SHALL NEGLIGENCE CONTRACTOR'S THE TO DUE BRACING STRUCTURAL OR CONNECTORS SHEAR PLATES, COVER BEAMS, EXISTING REINFORCING, THE TO DAMAGE ANY REINFORCING. DECK EXISTING INTO CUT TO NOT CARE TAKE SHALL CONTRACTOR THE ACTION. REMEDIAL FOR ENGINEER THE TO REPORTED BE SHOULD DAMAGE SUCH ANY CONCRETE. DECK OF LOSS OR DECK BRIDGE THE TO DAMAGE IN RESULT NOT SHOULD REMOVAL THE PLANS. THE IN SHOWN AS JOINT THE AT ARMOUR STEEL EXISTING OF PORTION THE REMOVE SHALL CONTRACTOR THE IN ACCORDANCE WITH SUBSECTION 504.04C(2) OF THE STANDARD SPECIFICATIONS. MORTAR ELASTOMERIC WITH PLANS THE IN SHOWN AS REPAIRED BE SHALL CONCRETE SPALLED OR BROKEN MATERIAL IN ACCORDANCE WITH THE SPECIAL PROVISIONS 701-18(A-B)09 AND 504-8(A-C)09. EXPANSION SILICONE PREFORMED WITH PLANS THE IN SHOWN AS JOINT EXPANSION EXISTING SEAL (10) INSTALLATION OF NEW CURBS AT END OF BRIDGE: STEEL". REINFORCING COATED "EPOXY OF LB PER BID PRICE AND CONCRETE" "AA" "CLASS OF YARD CUBIC PER BID PRICE THE IN INCLUDED BE SHALL INCIDENTALS, AND EQUIPMENT LABOR, INCLUDING INSTALL, THIS FOR COSTS ALL JOINTS FORMED AT THE CURBS SHALL BE SEALED AS SHOWN IN THE PLANS. NEW SHOWN. AS CURBS DRAIN NEW THE MEET TO TAPER SHALL EXTENSIONS CURB NEW THE DECK. BRIDGE THE ON CURBS EXISTING THE MATCH TO CONCRETE 'AA' CLASS NEW FORM THEN SHALL CONTRACTOR THE WINGS. THE WITH ALONG DEMOLISHED BE MUST WINGS CURRENT THE TO ATTACHED DIRECTLY BLOCKS CURB THE THAT NOTE ENGINEER. THE BY DIRECTED AS AND PLANS THE IN SHOWN AS DECK BRIDGE THE OF ENDS THE AT EXTENSION CURB CONCRETE THE OF CONSTRUCTION THE OF CONSISTS BRIDGE" OF END AT CURBS NEW OF "INSTALLATION PRICE BID PER LINEAR FEET OF "PILES, DRIVEN (HP 10X42)". UNIT AND 10X42)" (HP FURNISHED "PILES, OF FEET LINEAR PER BID PRICE UNIT THE IN INCLUDED BE SHALL ABOVE DESCRIBED AS WORK THE COMPLETE TO NECESSARY INCIDENTALS AND EQUIPMENT LABOR, OF COSTS ALL TO THE POINT OF REFUSAL OR A MAXIMUM OF 15 FT EACH, AS DIRECTED BY THE ENGINEER. PILES THE DRIVE TO GIVEN IS LENGTH APPROXIMATE AN WINGS. NEW THE OF PART INTEGRAL AN AS PILES THE OF PLACEMENT THE TO CORRESPONDS 10X42)" (HP DRIVEN "PILES, AND 10X42)" (HP FURNISHED "PILES, ITEMS PAY (9) PILES (HP 10X42): ITEM DESCRIPTION UNIT QUANTITY PAY QUANTITIES 0200 BRIDGE 'A' - NBI 16723 - SH-131 OVER NORTH BOGGY CREEK 513(B) 6019 SY CLASS B BRIDGE DECK REPAIR 6130 535 (SP) CORROSION INHIBITOR (SURFACE APPLIED) SY 509(A) 1326 CY CLASS AA CONCRETE 513(C) 6020 CLASS C BRIDGE DECK REPAIR SY 505(D) 6080 SY ASPHALT MEMBRANE OVERLAY 425 5195 SY DIAMOND GRINDING CONCRETE PAVEMENT 412 5267 SY COLD MILLING PAVEMENT (2) (3) (5) (7) (8) 1,028.00 278.00 1,001.00 43.60 30.00 45.00 53.00 ITEM DESCRIPTION UNIT QUANTITY PAY QUANTITIES 1399 0640 CONSTRUCTION 641 MOBILIZATION LSUM 1.00 504(H) 6389 ELASTOMERIC MORTAR (4) CF 22.00 202(D) 1302 CY UNCLASSIFIED BORROW (1) 250.00 504(C) 1450 EXPANSION DEVICE (4) LF 63.00 (BR-1) (7)(8) 514(A) 6010 LF PILES, FURNISHED (HP 10X42) 514(B) 6292 PILES, DRIVEN (HP 10X42) LF 60.00 60.00 (9) 511(B) 6010 EPOXY COATED REINFORCING STEEL LB 6,400.00 509(D) 1331 CLASS C CONCRETE (6) CY 7.70 (10) (10) ABUTMENT SEAT AND WING, RESPECTIVELY. CURB, EACH FOR CONCRETE AA CLASS OF CY 8.80 AND 1.50 0.60, OF QUANTITY ESTIMATED AN IS THERE - STEEL FOR EACH CURB, ABUTMENT SEAT AND WING, RESPECTIVELY. REINFORCING COATED EPOXY OF LB 1030.00 AND 470.00 100.00, OF QUANTITY ESTIMATED AN IS THERE - *** ** SEE SECTION 109.01B OF THE STANDARD SPECIFICATIONS. PAYMENT FOR THIS ITEM WILL BE BASED ON THE PLAN QUANTITY ONLY. (BR-1:) ** *** 514(J) 6390 TEMPORARY SHEET PILING LSUM 1.00 * 31.10 TONS FOR THE DECK AND 81.90 TONS 100 FT OF TRANSITION IN EACH SIDE OF THE BRIDGE. - THERE IS AN ESTIMATED QUANTITY OF 113 TONS OF SUPERPAVE, TYPE S4 (PG 76-28 OK), WHICH INCLUDES * (9) (11) LAY ALL REQUIRED ASPHALT ON ENTIRE BRIDGE DECK AND APPROACHES H. REMOVE ALL BARRIER WALL G. PERFORM REQUIRED CONSTRUCTION ON THE OTHER SIDE F. RESET BARRIER WALL E. PERFORM REQUIRED CONSTRUCTION ON ONE SIDE D. INSTALL BARRIER WALL C. MILL ENTIRE BRIDGE DECK AND BOTH TIE INS B. INSTALL ADVANCE WARNING SIGNAGE A. THIS WORK CONSISTS OF THE FOLLOWING: 1 1 REVISE SEQUENCE 6/5/20

34094(04) GENERAL NOTES AND SUMMARY OF PAY … · 2020. 6. 10. · defranco ab01 deck repair". complete the work as shown shall be included in the price bid per square yard of "class

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

  • REMOVED MATERIAL:

    CONTRACTOR AND SHALL BE DISPOSED OF IN A MANNER APPROVED BY THE ENGINEER.

    THE OF PROPERTY THE BECOME SHALL PROJECT THIS DURING REMOVED DEBRIS AND MATERIAL ALL

    CLEANING BRIDGE SEATS AND PIER CAPS:

    BRIDGE SEATS AND PIER CAPS SHALL BE PAID FOR IN OTHER ITEMS OF WORK.

    THE CLEANING OF COSTS ALL DEBRIS. ALL OF CLEAN SWEPT BE SHALL CAPS PIER AND SEATS BRIDGE ALL

    UTILITIES:

    REPAIRED AT THE CONTRACTORS EXPENSE.

    BE WILL UTILITIES THE TO DAMAGE ANY PRESENT. BE MAY THAT LINES UTILITY ANY DAMAGE TO NOT CARE

    TAKE AND CONSTRUCTION DURING PRECAUTIONS SAFETY NECESSARY ALL TAKE SHALL CONTRACTOR THE

    SEQUENCE OF CONSTRUCTION:

    GENERAL NOTES

    EXCEPT AS MODIFIED BY THE PLANS AND SPECIAL PROVISIONS.

    CONSTRUCTION, HIGHWAY FOR SPECIFICATIONS STANDARD 2009 THE OF REQUIREMENTS THE WITH COMPLY

    SPECIFICATIONS:

    PLANS:

    BRIDGE "A": AS BUILT PLANS WERE NOT FOUND. SH-131 OVER NORTH BOGGY CREEK IN ATOKA COUNTY

    ASK FOR:

    OKLAHOMA CITY, OKLAHOMA 73105

    200 NE 21ST STREET

    OKLAHOMA DEPARTMENT OF TRANSPORTATION

    OFFICE SERVICES DIVISION

    DIVISION OF THE OKLAHOMA DEPARTMENT OF TRANSPORTATION.

    SERVICES OFFICE THE FROM OBTAINED BE MAY STRUCTURES, EXISTING THE FOR PLANS CONSTRUCTION

    ATOKA

    VERIFICATION OF EXISTING CONDITIONS:

    NEGLIGENCE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE, TO THE SATISFACTION OF THE ENGINEER.

    CONTRACTOR'S THE TO DUE ROADWAY OR STRUCTURE BRIDGE THE TO DAMAGE ANY ROADWAY. OR STRUCTURE

    BRIDGE EXISTING ANY TO DAMAGE PREVENT TO PRECAUTIONS NECESSARY ALL TAKE SHALL AND PRACTICE

    CONSTRUCTION GOOD WITH CONSISTENT METHODS ADOPT SHALL CONTRACTOR THE PERFORMED. BE WILL IT

    WHICH UNDER CONDITIONS AND WORK THE OF NATURE THE OF THEMSELVES INFORM FULLY SHALL BIDDERS

    BE SOLELY RESPONSIBLE FOR THE ACCURACY THEREOF.

    SHALL AND DESCRIBED AS PROJECT THE COMPLETE TO NECESSARY DIMENSIONS ALL VERIFY SHALL CONTRACTOR

    THE APPROXIMATE. ARE PLANS THE ON SHOWN COMPONENTS BRIDGE EXISTING THE OF DIMENSIONS ALL

    PAY ITEM NOTES

    JOB PIECE NO.

    Design

    Detail

    Check

    SHEET NO.

    REVISIONSREV. NO. DESCRIPTION DATE

    Engr.:

    Squad:

    BRIDGE COUNTY

    OKLAHOMASTATE OF DEPARTMENT OF TRANSPORTATION

    (04)

    N/A

    11/19

    11/19

    N/A

    34094

    SH-131 OVER NORTH BOGGY CREEK

    TEE

    LAF

    OF PAY QUANTITIES (BRIDGE)

    GENERAL NOTES AND SUMMARY

    "A"

    HENSLEY

    DEFRANCO

    AB01

    DECK REPAIR".

    BRIDGE B "CLASS OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL SHOWN AS WORK THE COMPLETE

    TO NECESSARY INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, INCLUDING REPAIR THE OF COSTS ALL

    INHIBITOR (SURFACE APPLIED)".

    CORROSION "(SP) OF YARD SQUARE FOR BID PRICE UNIT PER SEPARATELY FOR PAID AND PROVISIONS SPECIAL

    THE TO ACCORDING APPLIED BE SHALL IT INHIBITOR CORROSION USE TO ELECTS DIVISION THE IF INHIBITOR.

    CORROSION WITH TREATED BE MAY EXPOSED AREAS DECK AND STEEL REINFORCING COATED EPOXY NON-

    EXISTING PLACE. IN LEFT AND STRAIGHTENED, CLEANED, BE SHALL STEEL REINFORCING DECK EXISTING THE

    PAYMENT SHALL BE FOR THE ACTUAL REPAIRS MADE. NO PAYMENT SHALL BE MADE FOR WORK NOT PERFORMED.

    ENGINEER. THE BY FIELD THE IN DETERMINED BE SHALL REPAIR THE OF EXTENT AND LOCATION ACTUAL THE

    FOR FURTHER ACTION.

    ENGINEER THE TO THIS REPORT IMMEDIATELY SHALL CONTRACTOR THE REPAIR, OF LEVEL THIS BY REACHED NOT

    IS CONCRETE SOUND IF SPECIFIED. LEVEL THE BELOW CONCRETE REMOVE NOT SHALL CONTRACTOR THE

    SECTION 513.04D(2) OF THE STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

    WITH ACCORDANCE IN STEEL REINFORCING OF MAT BOTTOM THE TO DOWN DECK BRIDGE THE ON CONCRETE

    UNSOUND OF PORTIONS REPLACING AND REMOVING OF CONSISTS REPAIR" DECK BRIDGE B "CLASS ITEM PAY

    (7) CLASS B BRIDGE DECK REPAIR:

    DECK REPAIR".

    BRIDGE C "CLASS OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL SHOWN AS WORK THE COMPLETE

    TO NECESSARY INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, INCLUDING REPAIR THE OF COSTS ALL

    INHIBITOR (SURFACE APPLIED)".

    CORROSION "(SP) OF YARD SQUARE FOR BID PRICE UNIT PER SEPARATELY FOR PAID AND PROVISIONS SPECIAL

    THE TO ACCORDING APPLIED BE SHALL IT INHIBITOR CORROSION USE TO ELECTS DIVISION THE IF INHIBITOR.

    CORROSION WITH TREATED BE MAY EXPOSED AREAS DECK AND STEEL REINFORCING COATED EPOXY NON-

    EXISTING PLACE. IN LEFT AND STRAIGHTENED, CLEANED, BE SHALL STEEL REINFORCING DECK EXISTING THE

    PAYMENT SHALL BE FOR THE ACTUAL REPAIRS MADE. NO PAYMENT SHALL BE MADE FOR WORK NOT PERFORMED.

    ENGINEER. THE BY FIELD THE IN DETERMINED BE SHALL REPAIR THE OF EXTENT AND LOCATION ACTUAL THE

    THE DIVISION IN ACCORDANCE WITH SECTION 502 OF THE STANDARD SPECIFICATIONS.

    BY APPROVED AS REPAIR OF AREA THE FOR WORK FORM APPROPRIATE THE USE SHALL CONTRACTOR THE

    STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

    THE OF D(3) 513.04 SECTION WITH ACCORDANCE IN DECK THE OF DEPTH FULL THE DECK BRIDGE THE ON CONCRETE

    UNSOUND OF PORTIONS REPLACING AND REMOVING OF CONSISTS REPAIR" DECK BRIDGE C "CLASS ITEM PAY

    (8) CLASS C BRIDGE DECK REPAIR:

    (6) CLASS C CONCRETE: (DRAINS AT END OF BRIDGE)

    THE PRICE BID PER CUBIC YARD OF "CLASS C CONCRETE".

    IN INCLUDED BE SHALL INCIDENTALS AND EQUIPMENT LABOR, INCLUDING INSTALLATION THIS OF COSTS ALL

    THE SLOPE OF THE BRIDGE HEADERS OR AS DIRECTED BY THE ENGINEER.

    BY FIELD THE IN DETERMINED BE SHALL BASINS SPLASH AND SLIDES DRAIN OUT' 'RUN-OF PLACEMENT FINAL

    AT THE EXPENSE OF THE CONTRACTOR TO THE SATISFACTION OF THE ENGINEER.

    REPAIRED BE SHALL UTILITIES TO DAMAGE ANY PRESENT. BE MAY THAT UTILITIES ANY TO DAMAGE PREVENT AND

    WAY OF-RIGHTS-OF INTEGRITY THE PRESERVE AND LOCATE TO RESPONSIBILITY CONTRACTORS THE IS IT

    SHOWN IN THE PLANS AND AS DIRECTED BY THE ENGINEER.

    AS BRIDGE OF ENDS AT DRAINS NEW OF BUILDING THE OF CONSIST SHALL CONCRETE" C "CLASS ITEM PAY

    (5) ASPHALT MEMBRANE OVERLAY:

    WORK SHALL BE INCLUDED IN THE PRICE BID PER SQUARE YARD OF "ASPHALT MEMBRANE OVERLAY".

    THE COMPLETE TO NECESSARY INCIDENTALS AND MATERIAL EQUIPMENT, LABOR, INCLUDING COSTS ALL

    SURFACE AND THE 100 FT OF TRANSITION TO NEW BRIDGE DECK GRADE ON EACH END OF THE BRIDGE.

    DRIVING DECK BRIDGE ENTIRE THE COVER SHALL 'A' BRIDGE FOR OVERLAY MEMBRANE ASPHALT THE

    WITH SUPERPAVE, TYPE S4 (PG 76-28 OK).

    REPLACED BE TO ASPHALT SPECIFICATIONS. STANDARD THE OF 505 SECTION WITH ACCORDANCE IN FLASHING

    AND PRIMER, MEMBRANE, COAT, TACK ASPHALT, INCLUDES OVERLAY" MEMBRANE "ASPHALT ITEM PAY

    (2) COLD MILLING PAVEMENT:

    AND INCIDENTALS SHALL BE INCLUDED IN THE PRICE BID PER SQUARE YARD OF "COLD MILLING PAVEMENT".

    EQUIPMENT LABOR, CUTTING, SAW INCLUDING OPERATIONS MILLING COLD WITH ASSOCIATED COSTS ALL

    SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER.

    WORK THE OF RESULT A AS STRUCTURE EXISTING THE TO DONE DAMAGE STRUCTURE. THE ON PLACED MATERIALS

    NEW OR STRUCTURE EXISTING THE HARM NOT WILL WHICH MANNER A IN PERFORMED BE SHALL MILLING COLD

    APPROVED BY THE ENGINEER.

    MANNER A IN OF DISPOSED BE AND CONTRACTOR THE OF PROPERTY BECOME SHALL MATERIAL REMOVED

    CONSTRUCTION. HIGHWAY FOR SPECIFICATIONS STANDARD 2009 THE OF 412 SECTION WITH ACCORDANCE

    IN AND PLANS THE IN SHOWN LIMITS THE TO PAVING APPROACH AND DECK BRIDGE THE OVER MEMBRANE

    AND OVERLAY ASPHALT EXISTING THE OF REMOVAL THE INCLUDES PAVEMENT" MILLING "COLD ITEM PAY

    (3) DIAMOND GRINDING CONCRETE PAVEMENT:

    PAVEMENT".

    CONCRETE GRINDING "DIAMOND OF YARD SQUARE PER BID PRICE THE IN INCLUDED BE SHALL INCIDENTALS

    AND EQUIPMENT LABOR, CUTTING, SAW INCLUDING GRINDING DIAMOND WITH ASSOCIATED COSTS ALL

    THE WORK SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER.

    OF RESULT A AS STRUCTURE EXISTING THE TO DONE DAMAGE STRUCTURE. THE ON PLACED MATERIALS NEW OR

    STRUCTURE EXISTING THE HARM NOT WILL WHICH MANNER A IN PERFORMED BE SHALL GRINDING DIAMOND

    425 OF THE 2009 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

    SECTION WITH ACCORDANCE IN MEMBRANE NEW THE PUNCTURE MIGHT THAT EDGES SHARP ANY REMOVE TO OFF

    MILLED BEEN HAS MEMBRANE EXISTING ANY AND OVERLAY CONCRETE ASPHALT EXISTING THE ONCE SLAB DECK

    BRIDGE THE GRINDING DIAMOND OF CONSIST SHALL PAVEMENT" CONCRETE GRINDING "DIAMOND ITEM PAY

    PAY ITEM NOTES

    (11) TEMPORARY RETAINING STRUCTURES: (FORMING WALL CONSTRUCTION)

    OF "TEMPORARY SHEET PILING".

    SUM LUMP PER BID PRICE THE IN INCLUDED BE SHALL STRUCTURES RETAINING TEMPORARY BUILD TO NECESSARY

    INCIDENTALS AND MATERIAL, SERVICES, ENGINEERING EQUIPMENT, LABOR, INCLUDING COSTS ALL

    APPROVED BY THE ENGINEER BEFORE STARTING WORK ON THE RETAINING STRUCTURES.

    AND SUBMITTED BE SHALL STRUCTURES RETAINING TEMPORARY THE FOR DRAWINGS AND CALCULATIONS

    BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF OKLAHOMA.

    DESIGNED STRUCTURES RETAINING TEMPORARY THE HAVE WILL CONTRACTOR THE NECESSARY, BE STRUCTURES

    RETAINING TEMPORARY SHOULD SLOPES. FLATTER OR 2:1 MAINTAIN AND WINGS REBUILD TO NECESSARY BE

    MAY STRUCTURES RETAINING TEMPORARY ALLOWED. BE NOT WILL 2:1 THAN STEEPER SLOPES TEMPORARY

    (1) UNCLASSIFIED BORROW:

    LUMP SUM OF CUBIC YARDS OF "UNCLASSIFIED BORROW".

    PER BID PRICE THE IN INCLUDED BE SHALL INCIDENTALS AND EQUIPMENT LABOR, INCLUDING ABOVE DESCRIBED

    AS GRADING AND COMPACTION AND EARTHWORK OF PLACEMENT THE FOR NECESSARY COSTS ALL

    USED TO CORRECT SLOPES AND FILL WASHES AS DIRECTED BY THE ENGINEER.

    BE MAY MATERIAL THIS ADDITIONALLY, PLANS. THE IN SHOWN AS 'A', BRIDGE ON CONSTRUCTION WING OF AREA

    THE BACKFILL TO NEEDED EARTH OF AMOUNT AN OF CONSIST SHALL BORROW" "UNCLASSIFIED ITEM PAY

    EXPANSION MATERIAL:(4) REHABILITATED EXPANSION JOINT WITH ELASTOMERIC MORTAR AND PREFORMED SILICONE

    LINEAR FOOT OF "EXPANSION DEVICE" AND THE UNIT PRICE BID PER CUBIC FOOT OF "ELASTOMERIC MORTAR".

    PER BID PRICE UNIT THE IN INCLUDED BE SHALL PLANS THE IN SHOWN AS WORK THE COMPLETE TO NECESSARY

    INCIDENTALS AND MATERIAL, EQUIPMENT, LABOR, ARMOUR, THE OF REMOVAL INCLUDING COSTS ALL

    BE REPAIRED AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE ENGINEER.

    SHALL NEGLIGENCE CONTRACTOR'S THE TO DUE BRACING STRUCTURAL OR CONNECTORS SHEAR PLATES, COVER

    BEAMS, EXISTING REINFORCING, THE TO DAMAGE ANY REINFORCING. DECK EXISTING INTO CUT TO NOT CARE TAKE

    SHALL CONTRACTOR THE ACTION. REMEDIAL FOR ENGINEER THE TO REPORTED BE SHOULD DAMAGE SUCH ANY

    CONCRETE. DECK OF LOSS OR DECK BRIDGE THE TO DAMAGE IN RESULT NOT SHOULD REMOVAL THE PLANS. THE

    IN SHOWN AS JOINT THE AT ARMOUR STEEL EXISTING OF PORTION THE REMOVE SHALL CONTRACTOR THE

    IN ACCORDANCE WITH SUBSECTION 504.04C(2) OF THE STANDARD SPECIFICATIONS.

    MORTAR ELASTOMERIC WITH PLANS THE IN SHOWN AS REPAIRED BE SHALL CONCRETE SPALLED OR BROKEN

    MATERIAL IN ACCORDANCE WITH THE SPECIAL PROVISIONS 701-18(A-B)09 AND 504-8(A-C)09.

    EXPANSION SILICONE PREFORMED WITH PLANS THE IN SHOWN AS JOINT EXPANSION EXISTING SEAL

    (10) INSTALLATION OF NEW CURBS AT END OF BRIDGE:

    STEEL".

    REINFORCING COATED "EPOXY OF LB PER BID PRICE AND CONCRETE" "AA" "CLASS OF YARD CUBIC PER BID PRICE

    THE IN INCLUDED BE SHALL INCIDENTALS, AND EQUIPMENT LABOR, INCLUDING INSTALL, THIS FOR COSTS ALL

    JOINTS FORMED AT THE CURBS SHALL BE SEALED AS SHOWN IN THE PLANS.

    NEW SHOWN. AS CURBS DRAIN NEW THE MEET TO TAPER SHALL EXTENSIONS CURB NEW THE DECK. BRIDGE THE

    ON CURBS EXISTING THE MATCH TO CONCRETE 'AA' CLASS NEW FORM THEN SHALL CONTRACTOR THE WINGS. THE

    WITH ALONG DEMOLISHED BE MUST WINGS CURRENT THE TO ATTACHED DIRECTLY BLOCKS CURB THE THAT NOTE

    ENGINEER. THE BY DIRECTED AS AND PLANS THE IN SHOWN AS DECK BRIDGE THE OF ENDS THE AT EXTENSION CURB

    CONCRETE THE OF CONSTRUCTION THE OF CONSISTS BRIDGE" OF END AT CURBS NEW OF "INSTALLATION

    PRICE BID PER LINEAR FEET OF "PILES, DRIVEN (HP 10X42)".

    UNIT AND 10X42)" (HP FURNISHED "PILES, OF FEET LINEAR PER BID PRICE UNIT THE IN INCLUDED BE SHALL ABOVE

    DESCRIBED AS WORK THE COMPLETE TO NECESSARY INCIDENTALS AND EQUIPMENT LABOR, OF COSTS ALL

    TO THE POINT OF REFUSAL OR A MAXIMUM OF 15 FT EACH, AS DIRECTED BY THE ENGINEER.

    PILES THE DRIVE TO GIVEN IS LENGTH APPROXIMATE AN WINGS. NEW THE OF PART INTEGRAL AN AS PILES THE OF

    PLACEMENT THE TO CORRESPONDS 10X42)" (HP DRIVEN "PILES, AND 10X42)" (HP FURNISHED "PILES, ITEMS PAY

    (9) PILES (HP 10X42):

    ITEM DESCRIPTION UNIT QUANTITY

    PAY QUANTITIES

    0200 BRIDGE 'A' - NBI 16723 - SH-131 OVER NORTH BOGGY CREEK

    513(B) 6019 SYCLASS B BRIDGE DECK REPAIR

    6130535 (SP) CORROSION INHIBITOR (SURFACE APPLIED) SY

    509(A) 1326 CYCLASS AA CONCRETE

    513(C) 6020 CLASS C BRIDGE DECK REPAIR SY

    505(D) 6080 SYASPHALT MEMBRANE OVERLAY

    425 5195 SYDIAMOND GRINDING CONCRETE PAVEMENT

    412 5267 SYCOLD MILLING PAVEMENT (2)

    (3)

    (5)

    (7)

    (8)

    1,028.00

    278.00

    1,001.00

    43.60

    30.00

    45.00

    53.00

    ITEM DESCRIPTION UNIT QUANTITY

    PAY QUANTITIES

    1399

    0640 CONSTRUCTION

    641 MOBILIZATION LSUM 1.00

    504(H) 6389 ELASTOMERIC MORTAR (4) CF 22.00

    202(D) 1302 CYUNCLASSIFIED BORROW (1) 250.00

    504(C) 1450 EXPANSION DEVICE (4) LF 63.00(BR-1)

    (7)(8)

    514(A) 6010 LFPILES, FURNISHED (HP 10X42)

    514(B) 6292 PILES, DRIVEN (HP 10X42) LF

    60.00

    60.00(9)

    511(B) 6010 EPOXY COATED REINFORCING STEEL LB 6,400.00

    509(D) 1331 CLASS C CONCRETE (6) CY 7.70

    (10)

    (10)

    ABUTMENT SEAT AND WING, RESPECTIVELY.

    CURB, EACH FOR CONCRETE AA CLASS OF CY 8.80 AND 1.50 0.60, OF QUANTITY ESTIMATED AN IS THERE -

    STEEL FOR EACH CURB, ABUTMENT SEAT AND WING, RESPECTIVELY.

    REINFORCING COATED EPOXY OF LB 1030.00 AND 470.00 100.00, OF QUANTITY ESTIMATED AN IS THERE -

    ***

    **

    SEE SECTION 109.01B OF THE STANDARD SPECIFICATIONS.

    PAYMENT FOR THIS ITEM WILL BE BASED ON THE PLAN QUANTITY ONLY.

    (BR-1:)

    **

    ***

    514(J) 6390 TEMPORARY SHEET PILING LSUM 1.00

    *

    31.10 TONS FOR THE DECK AND 81.90 TONS 100 FT OF TRANSITION IN EACH SIDE OF THE BRIDGE.

    - THERE IS AN ESTIMATED QUANTITY OF 113 TONS OF SUPERPAVE, TYPE S4 (PG 76-28 OK), WHICH INCLUDES *

    (9)

    (11)

    LAY ALL REQUIRED ASPHALT ON ENTIRE BRIDGE DECK AND APPROACHESH.

    REMOVE ALL BARRIER WALLG.

    PERFORM REQUIRED CONSTRUCTION ON THE OTHER SIDEF.

    RESET BARRIER WALLE.

    PERFORM REQUIRED CONSTRUCTION ON ONE SIDED.

    INSTALL BARRIER WALLC.

    MILL ENTIRE BRIDGE DECK AND BOTH TIE INSB.

    INSTALL ADVANCE WARNING SIGNAGEA.

    THIS WORK CONSISTS OF THE FOLLOWING:

    1

    1 REVISE SEQUENCE 6/5/20

    34094(04) GENERAL NOTES AND SUMMARY OF PAY QUANTITIES (BRIDGE)