238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

Embed Size (px)

Citation preview

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    1/11

    ETA

    EMGlNEERlNG PRIVATE LIMITED

    503-504, Prakash Deep Building,

    7

    Tolstoy

    Marg,

    New Delhi - 110001

    Ph.

    :

    0 1

    1-26451115/6/7/8,43743800,

    41520840/43

    Fax : 011-43743866,41520844

    Ernail

    :

    [email protected]

    Ref:

    ETA/ICML/9MW/BC/SClKW035

    Date: July

    26,

    201

    1

    DGM BUSINESS DEVELOPMENT POWER)

    MIS CESC Limited

    CESC House

    Chowringhee Square

    Kolkata - 700 0022

    West Bengal.

    KIND ATTN M R ADRlT PALCHOUDHURY

    SUB: ICML 9MW SOLAR POWER PROJECT AT PRATAPGARH, DlST

    KUTCH,

    GUJARAT

    CLARIFICATION

    TO

    DSLP

    CQACULATIONS

    AND

    SWITCH YARD LIGHTING PROTECTION LAYOUT

    REF: 1) ICML REF: LII GEOE

    11

    055-E-11-12-015 DT 51712011

    Dear Sir,

    Further to your queries vide your mail referred 1) above

    regarding SCADA

    System, we are pleased to attach herewith point-wise clarifications with respect

    to the above system

    for your kind perusal.

    We

    hope the above is in line with your requirements and would request you to

    kindly let us have your approval to enable us to proceed further.

    Thanking you and assuring you of our best services at all times.

    Yours faithfully

    For ETA ENGINEERING PVT

    LTD

    SAURABH CHAUHAN

    GENERAL MANAGER

    Encl: as above

    Regd. Office :

    5,

    Moores Road, Chennai

    -

    600 006 Tamil Nadu, In dia

    Branches Tel.) Bangalore : 41802300, Chennai : 28297626, Hyderabad

    :

    27763529130, Mum bai : 67742700, Pune : 26051310, Kolkata : 24864329

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    2/11

    subject to incorporation of Commentslmodificatlons as noted Resubmit revised drgs ldocs after Incorporating the comments

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    3/11

    DOCUMENT No :

    ETA/ICML/SOLAR/GUJ/ELECT/ERTH/OS9 A

    Lightning Protection Calculation for 66/11

    kV

    S SControl Room

    CONTROL ROOM BUILDING

    For design of lightning protection we have analysed the tallest part of the building.

    i.e. Top terrace level area of the control room.

    Annual thunderstrom days

    =

    30 days

    Estimation of exposure of risk Ref CI.No.8.1.2 of IS 2309)

    Control Room Area :

    Length

    L - 20 m

    W~dth W = 11.6 m

    eight H 4.2 m

    Collection Area Ac

    =

    [

    LXW

    +

    2[U(H] + 2[WXH]

    +

    P

    X

    H

    Ac

    . =

    552.86488 m2

    TOTAL COLLECTION AREA:

    Ac = 552.86488 m2

    ~ i g h t n i n ~lashes per km2 per year 'Ng' for thunderstrom dayslyear as per

    Ref Clause

    no.

    8 1 2

    of

    IS

    2309.

    Ng

    =

    1.9

    Probable number of strikes risk) to the structure per.year is

    P =ACXN~XIO

    P = 1.05E-03

    Weighting factor Ref CI.No.

    8 1 5

    of IS 2309)

    A

    1O from table-IA,for use of structure.

    B 0.4 from table-1 B,for type of construction.

    C 1

    O

    from table-1C,for content or consequential effects.

    D 1

    O

    from table-I D,for degree of isolation.

    E 0.3 from table-I E,for type of company.

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    4/11

    The overall weighting factor A*B*C*D*E

    0.12

    After applying the weighting factor, Probable risk factor

    P 1.05E-03 0.12

    Probable risk factor : P 1.26E-04 per year

    As per cl.no:8.1.3 of IS 2309 suggested acceptable risk figure per year. Protection is not required)

    Now from the above calculation i t has been found that probable risk factor P

    is more than the acceptable risk factor.Hence protection is necessary.

    One down conductor i s required for each 30m of perimeter of the

    structures protected as per 18-2309 CI.No.12.2.3

    B)

    Total Perimeter to be protected

    -

    63.2 m

    Hence, from IS 2309 CI. No. 12.2.3 b) minimum Three down conductors are required.As shown

    in ayout we are providing four down conductors.

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    5/11

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    6/11

    SCHEDULE OF EQUIPMENT

    -66kV

    IS. O. I DESCRIPTION I Qlv. I SYMBOL

    I

    72.5KV.B30 31.WA FOR 3

    SF6

    aRculT

    BREWER.

    01 NO..

    1

    1 72.WV.630AJl.SKA FOR S a c , ENTER BREAK

    ISOU mR THREE PHASE WTH EARTH Sm TM I OZ

    1

    I PHASE 7ZWV WlDM R PT (3 SCONObRY)

    P P PIypu

    03 NO..

    SURGE ARRESTOR INC OXIDE 8CUV.lW A

    8

    N h

    6

    I

    SlRlNG INSULATOR

    IAS

    ER

    BW(

    12.5 MVhll/BBKV. 3Ph. DYnll

    O N A N / ~ S m m m

    or NO..

    2 . 1

    C L E A R A N C E T A B L E

    m A s m PHASE (PP)

    PHASE TD EARTH (PE)

    scncu

    CLE*RANCE SC)

    CROVNO CLEARANCE

    I

    4 2 M

    TO THE NEbREST PART NOT AT EARTH 2440

    P o m n A L w AN

    I N ~ A T W

    A HIMEST SlSTDl WLTADE

    72.5

    kV

    B UMlNINC IMPVLSE WLTAGE

    TIPES OF SISTDl EARTHING

    SWOLY EARTHED

    0. SISrm FRECUENCY

    NOTES:

    1 U DIMENSIONS ARE IN MM. UNLESS D TH W SE SPECIFIED.

    2. CREEPAGE DISTANCE- 25 mm/ kV, MINIMUM CREEPAG: 182 5mm .

    NO.^ DISC INSULATORS:

    BNOS (TENSION)

    5NOS (SUSPENSION)

    3

    CONDUCTOR SIZE/DElAILS.

    - W N BUS : ACSR SINGLE ZEBRA

    - EOUIPMENTS IWER CONNECTION.

    WAF0

    BAY UNE

    BAYS :

    ACSR SINGLE ZEBRk

    4 CONDUCTOR TENSION

    - W N BUS : 1000 ko/CONWCTOR/PHASE.

    - OMER BUS

    :

    1 0 0 0 /PwE.

    -

    SHIELD WIRE

    :

    5 0 0 kg.

    5. PUN TH HEIGHT OF AU EOUIPMENT FOUNOATlON WI U BE +300MM PlU lrm

    MCEPT CB FROM M E FINISHED COUND L M L F.C.L). GRAVEL TOP

    LEML

    WlLL BE +150MM FROM

    TH

    F.G.L

    6.

    DETAILS OF CABLE TRMCH W lU BE

    SHWM

    IN OUTDOOR, INDOOR TRENCH LAYOUT.

    7. DElAILS OF CULVERT TYPE TRENCH AND CABLE ENTRY INSIDE CONTROL RW M

    WlLL BE SHOWN IN TRENCH MYOUT.

    8 REFER PR ESENT DRAWlNC FOR LAYOUT PURPOSE ONLY

    NL

    nnmi

    2 4 . ~ 1 1

    XI

    APPROVU

    F IN

    APPROVAL

    ISIUDBY

    ypBByY

    PRPBY

    N A N

    A m

    Blnn

    Am

    INTEGRATEDCOAL h t M N G m D

    ~P OIIFIACT R ~? -PRIVA~~UMIIPD

    -

    - = =

    -

    '-

    ---- -

    = II . I UYI

    *

    IU M,

    . ..

    I-ul. -n-

    PROECT

    9 ~ ~ S O W W ~ K i O E T A T K l l N l ~ A I

    br nt l t

    SWITCHYARD

    LAYOUTPL N

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    7/11

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    8/11

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    9/11

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    10/11

  • 8/10/2019 238507778 Clarification for DSLP Calculations Switch Yard Lighting Protection 1

    11/11