Ikatan Ahli Pracetak dan Prategang Indonesia
PENGENALAN KOMPONEN PRACETAK
Oleh :
Gambiro
Pelatihan Pengawas Pekerjaan Pembangunan Rumah Susun Dengan Sistem Pracetak
Jakarta, 21 – 25 April 2008
PENGENALAN KOMPONEN PRACETAK
(Koncz, 1978, Vol. 3)
Column Spliced at each floor Two storey columns with rigid joints
(Koncz, 1978, Vol. 3)Sambungan cor setempat pada tiap-tiap kumpul
Sendi
Jepit monolit
H-shaped unit (Koncz, 1978, Vol. 3)
Two pin portal frames Frame units with pin joints at beam
T-shaped units with pin joints
HALF SLAB (SEGI EMPAT)
HALF SLAB (SEGI TIGA)
DOUBLE TEE
HOLLOW CORE SLAB
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
HALF BEAM
SOLID BEAM
U SHELL
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
KOMPONEN PRACETAK PADA GEDUNG
GEDUNG BANK JATIM SURABAYA
MENARA BDN JAKARTA
GEDUNG ITC MANGGA DUA
GEDUNG BANK BUKOPIN JAKARTA
COOLING TOWER
COOLING TOWER
COOLING TOWER
COOLING TOWER
COOLING TOWER
PENGENALAN KOMPONEN PRACETAK
Konstruksi Jembatan dengan BalokPost-tension / Pretension
Konstruksi Jembatan dengan Voided SlabKonstruksi Jembatan Balok dengan Balok Post-Tension/Pretension
Konstruksi Jembatan dengan Voided Slab
B i P d
Balok beton pratekanPostension/PretensionDiafragma
Plat deck Lantai kendaraanRailing Aspal
Bangunan Pier
Bearing Pads
Muka tanah asli
Tiang Pancang beton
SISTEM KONSTRUKSI JEMBATAN WIKA BETONSISTEM KONSTRUKSI JEMBATAN WIKA BETON
DENGAN BALOK PRETENSION/POST-TENSION
Railing Aspal
Kabel stressing
Balok beton pratekan V id d Sl b
Beton Pengisi
B i P d
Bangunan Pier
Voided Slab Bearing Pads
Muka tanah asli
Tiang Pancang beton
SISTEM KONSTRUKSI JEMBATAN WIKA BETONSISTEM KONSTRUKSI JEMBATAN WIKA BETON
DENGAN VOIDED SLAB
Capping
Balok Beton Pratekan
Railingpp g
Bearing
Muka tanah asliAbutment Sheet Pile (CCSP)
gPads
Tiang Pancang Beton
MENGGUNAKAN SHEET PILE SEBAGAI DINDING PENAHANMENGGUNAKAN SHEET PILE SEBAGAI DINDING PENAHAN
Concrete = 500 – 800 kg/cm2 (cubes)
H = 90, 125, 160, 170, 210 cm
STRESSING SYSTEMSTRESSING SYSTEMPretensionPostTension(VSL, Freyssinet, Dywidag, etc.)
PRODUCTION SYSTEM• Segmental
SPAN• 10 – 26 m (pretension) Segmental
• Non segmental10 26 m (pretension)
• 15 – 52 m (posttension)
Dimensi B : 65 & 70 cmDimensi B : 65 & 70 cm
Beton : K 500 – K 800
H : 90, 125 & 140 cmPanjang (L) : 15 m - 26 m
H
Beton : K 500 – K 800Penulangan : BjTP24 & BjTD40Bajaprategang
: PC Strand Ø 12.7 mmatau Ø 15 2 mmprategang atau Ø 15.2 mm(ASTM A416 LowRelaxation atauJIS G 3536)
BSistem produksi : Non segmentalSistemprategang
: Pretension
Dimensi B : 65 & 70H : 90 125 140 160
Beton : K 500 - K 800
90, 125, 140,160,170, 210
Panjang (L) : 16 m - 52 m
Penulangan : BjTP24 & BjTD40Baja : PC Strand Ø 12 7
sampai 5 buah:SelongsongH
Bajaprategang
: PC Strand Ø 12.7mm(ASTM A416 LowRelaxation atauJIS G 3536)
Sistem produksi : SegmentalSistem
t: Post-tension
B
prategang
Dimensi : 97, 120 cmBH : 57, 62, 66 cm
Lubang : 2 atau 3 buah
Beton : K 500 K 800
Panjang (L) : 5 m - 16 m, ,
Beton : K 500 – K 800Penulangan : BjTP24 & BjTD40Bajaprategang
: PC Strand Ø 12.7 mmatau Ø 15 2 mm
H
prategang atau Ø 15.,2 mm(ASTM A416 LowRelaxation atauJIS G 3536)
B
Sistem Produksi : Non segmentalSistemprategang
: Pretension
I GIRDER UNTUK JEMBATAN LAYANG
I GIRDER UNTUK JEMBATAN LAYANG
PENGENALAN KOMPONEN PRACETAK
PC Hollow Spun Pile (JIS A 5335 – 1985)
OD t Cl W i htConcrete : 600 kgf/cm2
( b )ODmm
tmm
Class Weightkg/m
300 60 A2, A3, B, C 110
(cubes)
PC Wire : JIS G 3536
350 65 A1, A3, B, C 140
400 75 A1 A2 A3 B C 200
Spiral : JIS G 3532
400 75 A1, A2, A3, B, C 200
450 80 A1, A2, A3, B, C 240
500 90 A1, A2, A3, B, C 300
600 100 A1 A2 A3 B C 400600 100 A1, A2, A3, B, C 400
N Di i Cl U it C All bl L thB di M t
PC Hollow Spun Pile (JIS A 5335 – 1985)No. Dimension Class Unit Cross Allowable Length
Weight Section Area Cracking Nominal Axial Load(cm) (kg/m) (cm2) (Ton-m) (Ton-m) (Ton) (m)
1 25 x 25 A 2.24 3.84 81.40 6 - 12B 2.50 4.81 79.62 6 - 14C 2 76 5 77 77 92 6 16
625
Bending Moment
156C 2.76 5.77 77.92 6 - 16
2 30 x 30 A 3.62 5.77 118.59 6 - 12B 3.95 6.92 116.76 6 - 14C 4.33 8.30 114.66 6 - 16D 4.88 10.38 111.60 6 - 18
225 900
3 35 x 35 A 5.22 7.30 163.98 6 - 12B 5.91 9.69 160.68 6 - 14C 6.58 12.11 157.45 6 - 16D 7.24 14.53 154.32 6 - 18
306 1225
4 40 x 40 A 7.84 11.07 213.96 6 - 14B 8.64 13.83 210.60 6 - 16C 9.43 16.61 207.32 6 - 18D 11.65 24.91 198.01 6 - 20
5 45 x 45 A 11 11 15 57 270 98 6 14
400 1600
5 45 x 45 A 11.11 15.57 270.98 6 - 14B 12.02 18.68 267.61 6 - 16C 12.90 21.80 264.30 6 - 18D 14.63 28.02 257.88 6 - 20
6 50 x 50 A 15.07 20.76 335.12 6 - 14B 16 08 24 21 331 72 6 16
506 2025
B 16.08 24.21 331.72 6 - 16C 17.08 27.68 328.38 6 - 18D 18.06 31.13 325.09 6 - 20
625 2500
TIANG PANCANG SENTRIFUGAL
TIANG PANCANG SENTRIFUGAL
Concrete Concrete AllowableThickness Area Crack Ultimate Axial Load
(mm) (cm2) (kg/m') (Ton-m) (Ton-m) (Ton)
A2 6 50 10 00 182
Bending MomentDimension Class
Weight
A2 6.50 10.00 182A3 8.50 12.50 180B 10.00 18.00 173C 11.00 22.00 169
27711097540 x 40
A1 8.50 12.50 227A2 11.00 17.00 222A3 13.00 20.90 219B 13 50 24 00 215
45 x 45 80 1364 341B 13.50 24.00 215C 15.50 31.00 208
KLASIFIKASI TIANG PANCANG SENTRIFUGAL
TYPE Heightmm
Thicknessmm
Widthmm
CrackingMoment
tf.mW 325 A 1000 325 110 996 11 4W -325 A 1000W -325 B 1000
325 110 996 11.413.3
W -350 A 1000W -350 B 1000
350 120 996 15.617.0
W -400 A 1000 400 120 996 20 1W -400 A 1000W -400 B 1000
400 120 996 20.123.4
W -450 A 1000W -450 B 1000
450 120 996 26.930.7
W -500 A 1000 500 120 996 35.2W -500 B 1000 40.4
W -600 A 1000W -600 B 1000
600 120 996 50.659.6
CORRUGATEDCONCRETE
Concrete compressive strength at 28 days
700 kgf/cm2
Prestress steel (f ) 18 600 kgf/cm2 JIS G3536 CONCRETE SHEET PILE
Prestress steel (fu) 18,600 kgf/cm JIS G3536
Mild steel (fy) 4,000 kgf/cm2 JIS G3112
REINFORCED Type
Dimension(mm)
Concreteclass
Mcr
(tf.m)220 × 500 K 350 1 45220 × 500 K 350 1,45
K 500 1,70320 × 500 K 350 3,22,
K 500 3,61
Dimension Concrete McrPRESTRESSED Type
(mm) classcr
(tf.m)220 × 500 K 500 3,32 – 5,97FLAT CONCRETE
SHEET PILE 320 × 500 K 500 6,05 – 13,88SHEET PILE
PC PIPES VIBRO PRESS CENTRIFUGAL
Track gauge : 1067, 1435, 1520 mm
Fastening : DE Clip, Pandrol, KA Clip
Design speed : 120 – 200 km/hrs
Axle load : 18 – 25 ton
CONCRETE SLEEPER
POLES for :• Electrical• Transmission lines
Lighting• Lighting• Communication• Etc.
PENGENALAN KOMPONEN PRACETAK
BANGUNAN DARMAGA
BANGUNAN DARMAGA
BANGUNAN DARMAGA
BANGUNAN DARMAGA
BANGUNAN DARMAGA
BANGUNAN DARMAGA (SLAB)
BANGUNAN DARMAGA (PILE CAP)
BANGUNAN DARMAGA (CAPPING)
BANGUNAN DARMAGA (PILE CAP)
BANGUNAN DARMAGA
BANGUNAN DARMAGA
SHEET PILE UNTUK STADION
SHEET PILE UNTUK STADION
PLAT DOUBLE TEE UNTUK JEMBATAN
PLAT DOUBLE TEE UNTUK JEMBATAN
PLAT DOUBLE TEE UNTUK JEMBATAN
BOX GIRDER UNTUK JEMBATAN LAYANG
BOX GIRDER UNTUK JEMBATAN LAYANG