Page 1: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

18th National Award

for

Excellence in

Energy Management -2017

ESSAR POWER GUJARAT LTD (EPGL), Dist : Dev Bhumi Dwarka, Gujarat

1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1

Page 2: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

2

INDEX

Sr. No.

1 Company profile --- A Walk Through.

2 Process flow of EPGL Plant.

3 SEC Trend in last 5 yrs.

4 a) Energy Savings Projects : 2014-16

b) Energy Savings Projects : 2016-17

5 Details of ENCON Projects of 2016-17

6 Future ENCON Projects -- Next 3 Years

7 EPGL Road Map Towards Excellence in EnMS

8 Efficient Utilization of Renewable Energy

9 Environmental Projects

10 Replication of ENCON BEST Practices

11 Awards & Accolades

Page 3: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

1. COMPANY PROFILE

Location Salaya, Dev Bhumi Dwarka District, Gujarat

Capacity 1200 MW (2 x 600 MW)

Fuel Imported Thermal Coal

Technology / Equipment

• Sub-Critical Technology

• BTG Package- HEI , China • BOP- Reputed Vendors ( ABB/Areva/SPIG )

Power Off-take • 1000 MW - Long term PPA with GUVNL

• Balance 118 MW - Merchant Power

Water Requirement

• Presently 64 MLD River water

• Future-Sea Water - 9375 m3/hr

Power Evacuation

• Evacuation at 400 KV – STU Network

3

Page 4: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

4

UNIT-1 COD : 01st April 2012

UNIT-2 COD : 15th June 2012

1. COMPANY PROFILE

Boiler Area

PLANT OVERVIEW

Page 5: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

5

Supply ~ 9% of Gujarat demand

High Reliability (consistent PAF)

Generation Cost highly competitive amongst IPP

Recognition geographically for our environmental clean efforts

Recognized as leaders in Energy Efficiency by CII & OSHAI

Mharo EPGL

Page 6: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

6

2. PROCESS FLOW DIAGRAM

Page 7: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

7

DM Water Make up ( % )

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17

3.33 % 1.48 % 1.04 % 1.18 % 0.72 %

Aux Power (%)

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17

7.1%

(293 MU)

6.6%

(356 MU)

5.8%

(386 MU)

6.1%

(317 MU)

6.2%

(327 MU)

Heat Rate ( Kcal / kwh )

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17

2451

(LF -70.9 %)

2421

(LF 68.7 %)

2339

(LF 80.35 %)

2333

(LF 73.40 %)

2368

(LF 72.95 %)

Specific Oil Consumption ( ml / kwh )

FY 2012-13 FY 2013-14 FY 2014-15 FY 2015-16 FY 2016-17

1.8 0.32 0.23 0.28 0.29

CERC NORM

5.75 %

CERC NORM

2375 Kcal/kwh

CERC NORM

0.5 ml/kwh

CERC NORM

1.5 %

3. SPECIFIC ENERGY CONSUMPTION

Page 8: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

8

71% 69%

80% 73% 73%

7.15% 6.60% 5.83% 6.06% 6.23%

[VALUE] MU

[VALUE] MU

[VALUE] MU

[VALUE] MU [VALUE] MU

0

1000

2000

3000

4000

5000

6000

7000

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

2012-13 2013-14 2014-15 2015-16 2016-17

Plant Loading Factor % Auxiliary Consumption % Gross Generation MU

GHR

2451 GHR

2333

GHR

2339

GHR

2421 GHR

2368

GHR - 2416 GHR - 2332

GHR - 2304 GHR - 2332

GHR - 2372

6.6% 5.78% 5.66% 5.64% 5.95%

YOY Improvement

• Good and Consistent O&M practices

AT

Normative

Loading

3. SPECIFIC ENERGY CONSUMPTION

Page 9: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

S. No Energy Conservation Projects Cost

Incurred

(INR Lacs)

Energy Saving

M Kcal/Annum

1 Pre-Ponement of Turbine Capital Overhaul 340 115500

2 Turbine Operation Philosophy – Sequential v/v None 99135

3 Boiler DM make up reduction. Nil 72160

4 HP Exhaust Valve modification None 52872

5 Condenser Vacuum Improvement – Up

gradation of Cooling tower

200 24000

6 Start Up Oil reduction None 23710

A TOTAL SAVINGS ( MKCAL )

MU/Annum

1 Coal Mill Utilization optimization None 3.50

2 Plant Air compressor Pressure reduction None 2.41

3 Other Projects 11.5 3.315

B TOTAL SAVINGS (MU)

Total Savings in two years is 1740 (INR Lacs)

9

4. SUMMARY – ENERGY SAVINGS FY 2014-16

9.23 MU

3,87,377 MKCAL

Page 10: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Sr.

No

ENCON Projects

Cost

Incurred

(INR Lacs)

Energy Saving

/Annum

Total savings

/Annum

(INR Lacs)

1 SH Spray reduction in Boiler Nil 17400 MKcal 185.3

2 DM Make up Reduction Nil 14701 Mkcal 210.6

3 Startup Oil Reduction- 229 MT Oil Nil 2290 Mkcal 79.5

A TOTAL SAVINGS ( MKCAL )

1 Energy conservation in CEP Operation Nil 1.40 MU 33.1

2 OCCW pump -90 KW replaced with 37

KW CCCW pump.

37 0.6 MU 15

3 Energy conservation in HVAC system Nil 0.31 MU 7.5

4 Energy conservation in AHP system Nil 0.16 MU 3.8

5 Energy conservation in CHP system Nil 0.21 MU 5.1

6 LED Lighting installation 14 0.47 MU 11.8

7 LDO Forwarding Pump Optimization Nil 0.55 MU 13.0

8 CCCW pump Optimization Nil 0.37 MU 8.9

B TOTAL SAVINGS ( MU )

Total Savings is 573 ( INR Lacs ) 10

4. SUMMARY – ENERGY SAVINGS FY 2016-17

34390 MKcal

4.01 MU

Page 11: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

11

Page 12: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

12

Page 13: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

13

Overview- Energy Saving by modifying OCCW

system by installing a closed cycle cooling

system for BFP’s oil system.

Details- OCCW system modified for TD BFP and M BFP oil

coolers and working oil coolers.

For these coolers system converted from OCCW

system to CCCW system.

A 37 KW pump installed for supply CCCW for BFP

cooler thus enabling stoppage of 90 KW OCCW

pump.

Hence a saving of 50 KW is achieved.

Energy savings- Total Energy savings/annum

Annual Commercial Savings- INR 15 Lacs

5. INNOVATION : OCCW SYSTEM MODIFICATION

= 0.60 MU

Page 14: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Lube oil cooler for T-BFP

Working oil cooler M-BFP

Lube oil cooler M-BFP

To Circulating water O/L pipe

PHE-A

PHE-B

From circulating water pipe

Filter OCCWA

OCCWB

CCCW-HE

To CW pipe

s

OCCW system (Original Scheme)

CCCWP DISCHARGE

OCCW-M 1 OCCW-M 2

OCCW-M 3

OCCW-M - 9

OCCW-M -4

OCCW-M -5 OCCW-M -7

OCCW-M -6

OCCW-M -8

Return to circulating water pipe

90 KW

Page 15: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Lube oil cooler for T-BFP

Working oil cooler M-BFP

Lube oil cooler M-BFP

PHE-A

PHE-B

From circulating water pipe

OCCWA

OCCWB

CCCW-HE

To CW pipe

CCCWP DISCHARGE

OCCW-M -4

OCCW-M -5 OCCW-M -7

OCCW-M -6

Service water Tank

PHE-A

PHE-B

Return to circulating water pipe

Filter

s OCCW-M 1

OCCW-M 3

OCCW-M - 9

Savings of 50 KW

37 KW

OCCW system (Modified Scheme)

Page 16: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

16

Overview- Spray reduction at low load from 80 TPH (as per

OEM manual) to 22 TPH by implementing

innovative solutions.

Details-

• Boiler combustion optimization through

- Balanced coal mill velocity

- Higher fineness.

- Burner tilt operation

- Soot blowing fine tuned.

• SADC damper adjustment

• Lower elevation mill operation.

• Bottom elevation firing with high FC coal during

mixed coal firing

Total low load operation hours = 2334 Hours

INNOVATION : REDUCTION OF SH SPRAY

Annual Thermal savings/annum

= 3928 Tons of coal

Annual Commercial Savings- INR 185 Lacs

Page 17: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

17

Overview-

Change in operational philosophy of CEP

Details-

Saving of power consumption of condensate

extraction pump at technical minimum loading.

Design philosophy of CEP operation is 2

Working and 1 stand by.

Stopping one CEP running of unit on only one

CEP at low load (Technical minimum-330 MW)

in case of SLDC back down condition.

Energy savings/annum

= 1.404 MU

Annual Commercial Savings- INR 33.1 Lacs

INNOVATION : CONDENSATE EXTRACTION

__PUMP OPERATION OPTIMIZATION

CONDENSATE WATER SYSTEM

M

M

CEPA

CEP

B

Con

den

sate

Pum

p C

M M

M

CPU

M

M

M

M

M

M

M

M

M

M M

M

M M

M

M

M M M

Ho

t

We

ll

M

M

M

Total Running

Hours (FY 16-17) Technical minimum

hours @ 330 MW

Unit 1 6458 934

Unit 2 5453 1069

Page 18: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

18

Overview-

Energy conservation in coal handling system

Details-

Optimizing utilization factor of coal handling system

The main parameter on which continuous efforts

are being made are :

1. Highest capacity Utilization of Conveyors

2. Effective synchronization of coal feeding with coal

stacking and reclaiming

3. Innovative monitoring of Sp. Power consumption in

terms of Kwh/Ton/Km

Annual Energy saving

= 0.22 MU

Total Commercial Savings = INR 5.1 Lacs

INNOVATION : ENERGY CONSERVATION

COAL HANDLING SYSTEM

Page 19: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

ENERGY CONSERVATION COAL HANDLING

SYSTEM

19

1.79

1.14 1.05

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

2014-15 2015-16 2016-17

Sp. Consumption Kwh/Ton of coal

Specific consumption (2015-16) - 1.14 Kwh/MT of coal

Specific consumption (2016-17) - 1.05 Kwh/MT of coal

Total reduction in Sp. Power - 0.09 Kwh/MT of coal

Total coal conveyed (MT) - 2384575 MT

Total Energy savings (Mkwh) - 0.22 MU

While Road logistic is being monitored in Rs/MT/KM

Why not coal conveying in Kwh/MT/KM ?

Page 20: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

20

Overview-

Optimizing operation processes in AHP, Fly ash

conveying and in bottom ash conveying

Details- Maintaining ash conveying by full accumulation of

ash in transporter vessel by operating on level

mode instead of on timer mode.

Conveying compressor maximum capacity

utilization by clubbing of system.

Increasing ash conveying pressure for reduction in

conveying time

Reduction in Sp. Consumption from

10.19 to 9.34 Kwh/Ton

Annual Energy saving = 0.16 MU

Annual Commercial Savings = INR 3.8 Lacs

INNOVATION : ENERGY CONSERVATION IN

ASH HANDLING SYSTEM

Page 21: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

ENERGY CONSERVATION IN ASH HANDLING

SYSTEM

21

13.6

10.19 9.34

0

2

4

6

8

10

12

14

16

2014-15 2015-16 2016-17

SP. Consumption Kwh/Ton of Fly Ash

Specific consumption (2015-16) - 10.19 Kwh/MT of Ash

Specific consumption (2016-17) - 9.34 Kwh/MT of Ash

Total reduction in Sp. Power - 0.85 Kwh/MT of Ash

Total Fly ash conveyed (MT) - 190000 MT

Total Energy savings (Mkwh) - 0.16 MU

Page 22: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

22

Overview-

Energy conservation in HVAC system

Details-

Continuous monitoring of temperature

profile, zone wise being monitored every 2

hours.

Heat Load profile, season wise and across

the day prepared based on monitored and

recorded data.

Based on temperature profile we are

proactively optimizing operation of AHU,

chiller and connected accessories over and

above automation system.

Zone wise losses identified and arrested for

reduction in power consumption of HVAC.

Sp. Consumption/Day 2015-16 = 7.95 MW/Day

Sp. Consumption/Day 2016-17 = 7.08 MW/Day

Annual Energy savings

= 0.32 MU

Annual Commercial Savings = INR 7.5 Lacs

INNOVATION : ENERGY CONSERVATION IN

HVAC SYSTEM

Page 23: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Sr.

No.

Future Projects

Conservative Estimate

Energy Savings

Annual

Savings

MKCAL

OR MU OR

MT

Saving

s

Per

Annum

(INR in

Lacs)

Approx.

Investment

(INR in

Lacs)

1 Turbine retrofit for Unit-1 50 kCal/kWh 1600 10000

2 VFD installation in CEP 780-900 KW according to

load 5.9 MU / Annum 5.9 MU 117 325

3 VFD in Seal Air Fans 78 KW

0.55 MU/Annum 0.55 MU 10.9 24

4 Installation of LED in Plant 1.1 MW/Day 0.4 MU 10 14

5 HFO forwarding pumps

modification 200 KW/Day 0.07MU 1.9 4.1

TOTAL SAVINGS ( MU)

23

6. FUTURE ENCON PROJECTS – NEXT 3 YEARS

1,50,000

MKCAL

6.92 MU

Page 24: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

24

Designated

Consumer

(PAT-2)

Baseline

Net Heat Rate

Consumption

2014-15

Target

Net Heat rate for

PAT-2

2018-19

Actual

Net Heat Rate

FY 2016-17

STATION (Kcal/Kwh) (Kcal/Kwh) (Kcal/Kwh)

ESSAR POWER

GUJARAT LIMITED 2512 2506 2451

- ENCON OBJECTIVE ARE ALIGNED TO _TECHNOLOGICAL DEVELOPMENT

- BENCHMARKING WITH BEST IN INDUSTRY

- ZERO TOLERANCE TO INEFFICIENT EQUIPMENTS

7. EPGL ROAD MAP TOWARDS EXCELLENCE IN

__ENERGY MANAGEMENT

CHALLENGING SELF

Page 25: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

25

ISO 50001:2011 CERTIFICATE & ENERGY POLICY

Page 26: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

26

Efficiency Monitoring

Parameters

Heat Rate

APC

Vacuum

Make Up

Temp/Pressure

Testing

Online & offline testing

of Boiler, Turbine,

Condenser & APH etc.

Audit

Energy Audit

Insulation Audit

Valve leak/passing

Assessment

Pre & Post Overhaul/

Maintenance jobs

assessment

MIS

Daily, Monthly & Yearly MIS

Statutory Reporting

EFFICIENCY MONITORING APPROACH

Page 27: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

27

ENERGY MANAGEMENT SYSTEM

Page 28: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

28

ENERGY MANAGEMENT SYSTEM

Page 29: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

29

ENERGY MANAGEMENT SYSTEM

20-Apr-16

Load 1151 MW

Aux 5.17 %

DATE 23-Apr-16 Avg Aux 113 MW

GCV 5967 Kcal/kg

Parameters Performance Units MWh% Share of

Total APC% of APC Plants Equipments MWh

% Share

of Total

APC

% of APC MWh% Share of

Total APC% of APC

Generation 27204 MWh ID (VFD) 169.4 11.7% 0.62% 175.0 12.3% 0.63%

Avg Load 1134 MW 596 41.2% 2.2% ID (BY PASS) 0.0 0.0% 0.00% 0.0 0.0% 0.00%

Avg Aux 64 MW PA 139.6 9.7% 0.51% 141.6 9.9% 0.51%

Aux 5.32 % COAL MILL 120.1 8.3% 0.44% 121.7 8.5% 0.44%

GCV 6085 kCal/kg 601 41.5% 2.2% FD 92.9 6.4% 0.34% 93.5 6.6% 0.34%

Moisture 13.3 % ESPST 16.6 1.1% 0.06% 16.6 1.2% 0.06%

BCP 35.9 2.5% 0.13% 35.6 2.5% 0.13%

89 6.2% 0.3% BST 21.7 1.5% 0.08% 21.8 1.5% 0.08%

MDBFP 0.0 0.0% 0.00% 0.0 0.0% 0.00%

Projected Aux 5.95 % 596.1 41.2% 2.19% 605.7 42.5% 2.19%

Deviation 0.63 % 160 11.1% 0.6%

CWP 300.8 20.8% 1.11% 300.4 21.1% 1.09%

CTST 107.8 7.5% 0.40% 103.3 7.2% 0.37%

CEP 94.8 6.6% 0.35% 94.3 6.6% 0.34%

BFPT BOOSTER 52.9 3.7% 0.19% 52.7 3.7% 0.19%

TGST 26.1 1.8% 0.10% 25.9 1.8% 0.09%

CCCW 14.5 1.0% 0.05% 14.1 1.0% 0.05%

Excitation Trafo Consumption 3.8 0.3% 0.01% 3.9 0.3% 0.01%

600.6 41.5% 2.21% 594.5 41.7% 2.15%

ER-4 O\G BKR 33.7 2.3% 0.12% 24.4 1.7% 0.09%

AHPS 7.9 0.5% 0.03% 9.4 0.7% 0.03%

CICO 8.0 0.6% 0.03% 13.0 0.9% 0.05%

AIR COMPRESSOR 11.4 0.8% 0.04% 11.5 0.8% 0.04%

AC&Vent.ST 9.4 0.7% 0.03% 9.2 0.6% 0.03%

SST 8.7 0.6% 0.03% 10.3 0.7% 0.04%

WCST 5.0 0.3% 0.02% 5.1 0.4% 0.02%

Putzmeister Pump-(UAT) 0.0 0.0% 0.00% 0.0 0.0% 0.00%

Return Water Pump 5.2 0.4% 0.02% 0.0 0.0% 0.00%

89.3 6.2% 0.33% 82.9 5.8% 0.30%

160.0 11.1% 0.59% 143.6 10.1% 0.52%

160.0 11.1% 0.59% 143.6 10.1% 0.52%

Others & Transformer Losses

Total

OTHERS & TRANSFORMER LOSSES Total

T

U

R

B

I

N

E

Total

M

I

S

C

E

L

L

A

N

E

O

U

S

Total

ENERGY MANAGEMENT SYSTEMPrevious Date

BOILER AUXILIARIES

B

O

I

L

E

R

TURBINE AUXILIARIES

MISCELLANEOUS AUXILIARIES

41%

42%

6%

11%

% Share of Total APC

BOILER AUXILIARIES

TURBINE AUXILIARIES

MISCELLANEOUSAUXILIARIES

OTHERS &TRANSFORMER LOSSES

Page 30: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

OUR BELIEF … ENERGY CONSERVATION.

A TEAM EFFORT …….

30

Target

Evaluate Options

Analyze and Apply

Monitor and Maintain

E

N

E

R

G

Y

C

O

N

E

T

A

M

ENCON --- Driven across Levels

Page 31: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

31

GLIMPSE OF ISO 50001 AWARENESS TRAININGS

ISO 50001 Audit

Rating 4 from 3

by DNV in just 1

year

Page 32: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

32

• Forecasting of Demand based on Weather Condition & Renewable Gen.

• Preference for Low Moisture coal.

• Maintaining High COC of 9 to 10 in Cooling tower

Periodical Practice Followed at EPGL :

1) Annual Cleaning of Condenser and Heaters

2) On line cleaning of Cooling Tower fills

3) Helium leak detection for Air ingress in Condenser

4) Checking and Resetting of Air – Preheater seals.

5) Insulation healthiness audit

6) Coal mill velocity online monitoring. Clean and dirty air test annually

7) Condition Monitoring of all Mechanical & Electrical equipment.

• Modulating the plant operation to achieve best performance on actual running

condition

• Automated Daily Station Energy Monitoring Report .

• Alarm analysis through dedicated software developed In-house

• Equipment Performance report.

• Daily Aux Power Consumption report.

• Boiler & Turbine start up report.

KEY BEST PRACTICES AT EPGL

Page 33: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

• ESSAR POWER OWNS

1 MW Solar based Power plant

• Installed Turbo –driven Fans in the O&M Building and Power House in place of Ventilation fans.

Total Savings : 70 kwh

• Replacing 900 units of sodium lamps by 500 units of LED lights

• Annual Energy savings/annum = 365*900 units* 2Kwh- 365*500 units * 1 Kwh = 0.47 MU

33

8. EFFICIENT UTILIZATION OF RENEWABLE

ENERGY

Page 34: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

34

2967 MT / Year

CO2 (MT) sequestered in Green Belt at EPGL

84 Hectare

Green Belt

9. ENVIRONMENTAL PROJECTS FOR CARBON

EMISSION REDUCTION

Page 35: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

35

EPGL has started experimenting plantation

of sturdy species of Date Palm around it’s

cooling tower which will withstand impact

of sea water.

Acoustic covering for TG Deck

Rain Water Harvesting Green Belt Development

Organic waste converter at site

Injection - Ammonia in Flue Gas

EFFORTS TOWARDS ENVIRONMENT PROTECTION

Page 36: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

100% Reuse of treated

wastewater Celebrating World

Environment Day

in Horticulture

Use of Waste Water in CHP Dust Free Ash loading to

reduce Fugitive emissions

Received continuously Five Year Water Cess Rebate from GPCB

BEST ENVIRONMENTAL PRACTICES IMPLEMENTED

Page 37: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

*100% Fly Ash Disposal :

(Only five large power plants)

a) 87% disposal to Cement manufacturing.

b) 12% for back filling of low lying area.

c) 1% for Fly ash brick& blocks manufacturers.

* 84 ha Greenbelt developed

*100% reuse of STP / ETP water for various purpose,

Last Year’s Sale

Sale of Fly Ash : 206106 MT

Sale of MS Scrap : 30.7 MT

Sale of Wood / Garbage : 7.67 MT

37

PRODUCTIVE UTILIZATION OF WASTE

Page 38: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

10. AMOUNT OF REPLICATION DUE TO BEST

PRACTICES IMPLEMENTED THROUGH ASSOCIATES

ENCON PROJECTS IMPLEMENTED

BY COAL HANDLING CONTRACTOR

Annual

MU

Saved

Annual

Savings

In Rs in Lacs

Luff motor (18.5 kw) Delta connection converted to star

connection. 0.027 1.4

YC-1 conveyor is being run on low speed of 1200 rpm

compared to 1400 rpm full speed as per the Belt loading. 0.105 5.4

Dust Suppression Spray run in place of Fire Pump 0.547 28.5

During stacking in Stacker Reclaimer-1/2/3

Slew / bucket wheel power pack ( 200 kw ) and luff power pack

(18.5 kw) was running continuously in auto mode.

Both power packs removed from auto sequence enabling

operator to start as per requirement

0.96 50

1.64 85.3

Our Coal handling Contractor visited EPGL site and replicated various ENCON

Measures.

38

Page 39: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Essar Power Gujarat Ltd. 39

CORPORATE SOCIAL RESPONSIBILITY

Page 40: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

2016-17

Training Excellence SILVER Award

CII Excellent Energy Efficiency Award

IPPAI best innovative practices award in Energy efficiency

Young HR Champion GOLD Award

CII Most useful presentation Award

Mission Energy Award for

O&M Excellence

CIO of the year (Coal Logistic Management )

OSHAI innovation in HSE award 2016

Mission Energy Award for 100% Ash

Utilization

40

11. WINNING AWARDS REGULARLY…..

(TOTAL 9 AWARDS IN YEAR 2016-17)

Page 41: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

2014 2015 IIMA award for Training Excellence

Greentech Gold

safety award

Digital Transformation of technology award

(e-negotiations for Coal Procurement)

Greentech Gold Award for Innovation in retention strategies

Lowest SO2 Emissions amongst Power plant in India

Data Quest Award (E Negotiation for coal procurement)

Green-tech Gold Award for HR Practices

Greentech Gold Award for

Environment

Next 100 Future CIO Award

41

WINNING AWARDS REGULARLY……….

Page 42: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

42

AWARD FOR ENERGY EXCELLENCE 2016…..

Page 43: 18th National Award for Excellence in Energy Management …greenbusinesscentre.com/energyaward2017presentations/Power/Essar... · 1200 MW ( 2 X 600 MW ) THERMAL POWER PLANT 1. 2 INDEX

Let us Not be

Conservative in Energy Conservation

AGGRESIVE APPROACH

REAPS BETTER FRUITS

Articles in Newspaper

Environment Focus

Safety Awards

Recognition at Power Gen

IMS and ISO Certification

CEA Recognized Learning Center

Foreign Delegation

visits

CII Awards

O&M Meet