7
MEETING SUMMARY PROJECT: Brookwood District 167 – Brookwood Middle School PROJECT NO: 14022 MEETING DATE: June 11, 2014 LOCATION: Brookwood School District Administration Office PARTICIPANTS: Jennifer Costanzo, Colby Lewis – STR Partners (STR) Douglas Lim – Gilbane Company (GBC) Dr. Valorie Moore, Ms. Roslon Seals, Ms. Jan Barry, Mr. Alan Wilson, Mr. Robert Marcinski, Mr. Charles Anderson, Mr. Leon Fields, Ms. Onquanette Pierce, Mr. Andrew Ziegler, Mr. John Dixon, Mr. Michael Engel – Brookwood District 167 (D167) DISTRIBUTION: To Dr. Moore and STR/GBCO/RE via email Please distribute to other participants and others as deemed necessary. PURPOSE: Brookwood Middle School – Preliminary Building Bubble Diagrams Outline of Discussion Action by 1. STR presented 4 design concepts for consideration (options are attached for your use) a. All options accommodate a single phase of construction 1. Option 4B – 50,800 SF Two story with classrooms on 1 st and 2 nd floors on south side Expansion to the west Common spaces sized for future population 2. Option 4C – 50,800 SF Two story with classrooms on 1st and 2nd floor on north side Expansion to the west Common spaces sized for future larger population 3. Option 5 – 49,250 SF Two story with all classrooms and art on second floor Expansion to east Common spaces sized for current population – expansion planned with future classroom expansion 4. Option 6 – 51,220 SF Three Story with classrooms on 2nd and 3rd floor Expansion to east Common spaces sized for current population – expansion planned with future classroom expansion

140611 meeting summary · 2017. 10. 20. · s t r p a r t n e r s brookwood middle school - district 167 200 east glenwood-lansing road, glenwood, illinois 60425 preliminary space

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • MEETING SUMMARY

    PROJECT: Brookwood District 167 – Brookwood Middle School PROJECT NO: 14022

    MEETING DATE: June 11, 2014 LOCATION: Brookwood School District Administration Office

    PARTICIPANTS: Jennifer Costanzo, Colby Lewis – STR Partners (STR) Douglas Lim – Gilbane Company (GBC) Dr. Valorie Moore, Ms. Roslon Seals, Ms. Jan Barry, Mr. Alan Wilson, Mr. Robert Marcinski, Mr. Charles Anderson, Mr. Leon Fields, Ms. Onquanette Pierce, Mr. Andrew Ziegler, Mr. John Dixon, Mr. Michael Engel – Brookwood District 167 (D167)

    DISTRIBUTION: To Dr. Moore and STR/GBCO/RE via email Please distribute to other participants and others as deemed necessary.

    PURPOSE: Brookwood Middle School – Preliminary Building Bubble Diagrams Outline of Discussion Action by 1. STR presented 4 design concepts for consideration (options are attached

    for your use) a. All options accommodate a single phase of construction

    1. Option 4B – 50,800 SF • Two story with classrooms on 1st and 2nd floors on south side

    • Expansion to the west

    • Common spaces sized for future population

    2. Option 4C – 50,800 SF • Two story with classrooms on 1st and 2nd floor on north side

    • Expansion to the west

    • Common spaces sized for future larger population

    3. Option 5 – 49,250 SF • Two story with all classrooms and art on second floor

    • Expansion to east

    • Common spaces sized for current population – expansion planned with future classroom expansion

    4. Option 6 – 51,220 SF • Three Story with classrooms on 2nd and 3rd floor

    • Expansion to east

    • Common spaces sized for current population – expansion planned with future classroom expansion

  • Brookwood District 167 – Brookwood Middle School Summary of Meeting 6/11/14 Page 2 of 3 STR Partners LLC 14022

    2. Option Selection – Option 5 a. Gilbane advised that in order to stay on schedule, a scheme needed

    to be selected so that the design team can move forward. b. The committee has selected Option 5

    • It meets the needs of the school and the goals of the Board. • Best space utilization • Principal likes that all teaching spaces are on a single floor • Flexibility in securing different areas of the building for after

    school use • Flexibility in accommodating a population bubble as all

    classrooms are on one level

    3. Decision-Making Procedures a. The Board will vote on formal approval of this option at the next

    meeting schedule for June 23. b. Gilbane and STR requested permission to proceed with developing this

    scheme in order to keep on schedule. c. The committee agreed this is acceptable. d. The committee discussed future decision-making procedures. Gilbane

    advised that the schedule couldn’t be maintained if the Board must make formal approvals for each design decision. Mr Dixon suggested the following procedure:

    • The committee will make decisions during the committee meetings while keeping the Board members apprised of the project’s progress.

    • Input from the Board may be provided after these meetings • STR and Gilbane are approved to act upon the committee

    decisions and shall incorporate Board decisions where required. • The BOE will provide approval at key project milestones

    o Schematic Design o Design Development o 50% Construction Document Completion o 100% Construction Document Completion

    D167 D167

    4. Design Process – Next Steps a. Now that an option has been selected, STR will develop the concept

    into a more “real” plan – changing bubbles to walls. b. Each of the Bubbles currently represents a department. c. STR will begin to fill in those bubbles with the rooms that make up each

    department • Options for how these departments are arranged will be the

    agenda items of the future meetings • STR will update the Design Meeting Schedule according to our

    current status showing which departments will be discussed at which meetings.

    • D167 will then be able to invite appropriate personnel according to the department scheduled.

    STR STR STR D167

  • Brookwood District 167 – Brookwood Middle School Summary of Meeting 6/11/14 Page 3 of 3 STR Partners LLC 14022

    5. Budget

    a. Gilbane has provided an updated concept Budget. b. Option 5 is approximately $1.4 million over budget c. However, STR and Gilbane can now collaborate on the building as a

    whole using Option 5, and attempt to reduce cost by reducing the cost of construction.

    • Materials • height of building • structural systems • exterior wall system • mechanical systems

    d. It may also be necessary to reduce the square footage of the building to align with the budget. However, STR and Gilbane would like to further develop the design as the first step.

    STR/GBC

    6. Next Steps a. Next Meeting: Wednesday June 25, 2014 @ 9:00am b. STR will forward an updated Design Decision Schedule in the near

    future

    STR

    END OF SUMMARY The above summarizes the author’s understanding of the topics covered in the meeting. If exception is taken to, or additions are requested of, the above, please contact Jennifer Costanzo for a written addendum to be made. Prepared by: STR Partners LLC Jennifer Costanzo, AIA, LEED AP Principal Architect

  • 12'-0" 274'-0" 30'-0"

    8'-0

    "62

    '-0"

    8'-0

    "25

    '-0"

    12'-

    0"14

    0'-0

    "12

    '-0"

    25'-

    0"

    BASKETBALL COURT

    PARENT DROP-OFF

    GLENWOOD LANSING ROAD

    BERMIN

    G O

    R DETEN

    TION

    RHO

    DES A

    VEN

    UE

    EBERHA

    RT AV

    ENU

    E

    GLEN

    WO

    OD

    DYER

    ROA

    D

    GATE

    30 FTSETBACK

    30 F

    TSE

    TBA

    CK

    27.5

    FT

    SETB

    AC

    K

    30 FTSETBACK

    30 FT

    SETBACK

    DETENTION

    ABANDONCURB CUT

    ABANDONCURB CUT

    NEW CURBCUT

    ABANDONCURB CUT

    EXISTINGCURB CUT

    BUS DROP-OFF

    HARD SURFACE PLAY AREA

    LAWN

    GATE

    REPLACE CULVERT

    RESURFACE EBERHART ROAD

    NEW CURBCUT(EGRESS FROM

    EBERHART ROAD)

    NEWCURB CUTG

    ATE

    EXTENSION OF EBERHART ROAD

    RESURFACE RHODES AVE.

    PAVING OPTIONFOR NEW GARAGE

    NEW PAVINGFOR GARAGE

    28 SPA

    CES P

    ARKIN

    G

    61 SPACES PARKING

    June 11, 2014

    S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425

    PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN

    OPTION

    GYM

    ADMIN

    LRC

    G

    1F

    2F

    CAFEMUSIC

    KITCHEN1,350

    LOADING

    GIRLS

    BOY

    S

    GYM6,700

    STAGE1,500

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    CAFE3,710

    CORE/MAINT.1,200

    GIR

    LS

    BOY

    S

    MUSIC2,080

    GIR

    LS

    BOY

    S

    PREP450

    ADMIN2,980

    3,900(MEDIA CENTER)

    LRC

    FUTURE ADDITION NEW BUILDING 2F

    CORE/MAINT.1,000

    1,100STEM

    TEAM

    TEAM

    TERRACE

    PREP4501,100

    STEM

    GIRLS

    BOYS

    CORE

    ART1,250

    A A

    C

    B B

    C

    APPROXIMATE AREA TABULATION:

    SECOND FLOOR: 17,300 SFGROUND FLOOR: 33,500 SF

    TOTAL AREA: 50,800 SF CLASSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    OPEN TOBELOW

    2 STORY 2 CLASSROOM LEVEL

    ADMIN

    ART

    EXPANSION

    CLASSROOMCLASSROOMCLASSROOM

    CLASSROOMCLASSROOMCLASSROOM

    EXPANSION

    G

    1F

    2F

    EXPANSION

    EXPANSION CLASSROOMCLASSROOMCLASSROOM

    CLASSROOMCLASSROOMCLASSROOM

    TEAM/TERRACE

    LRC GYM

    G

    1F

    2FLRC

    CLASSROOMCAFE

    KITCHEN

    CLASSROOM

    ART

    STEM

    STEM

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"

    4

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"

    3

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION CSCALE 1/32" = 1'-0"

    5

    CLASSROOMSTEM

    LRC

    ADMIN

    CAFE

    ARTFUTURE ADDITION

    GYM

    MUSIC

    4

    4B

    00 10' 100'50'25'

    BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"

    1

    N

    EXISTING ADMIN BUILDING

    NEW GARAGE

    BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE

    2

  • 12'-0" 274'-0" 30'-0"

    8'-0

    "62

    '-0"

    8'-0

    "25

    '-0"

    12'-

    0"14

    0'-0

    "12

    '-0"

    25'-

    0"

    BASKETBALL COURT

    PARENT DROP-OFF

    GLENWOOD LANSING ROAD

    BERMIN

    G O

    R DETEN

    TION

    RHO

    DES A

    VEN

    UE

    EBERHA

    RT AV

    ENU

    E

    GLEN

    WO

    OD

    DYER

    ROA

    D

    GATE

    30 FTSETBACK

    30 F

    TSE

    TBA

    CK

    27.5

    FT

    SETB

    AC

    K

    30 FTSETBACK

    30 FT

    SETBACK

    DETENTION

    ABANDONCURB CUT

    ABANDONCURB CUT

    NEW CURBCUT

    ABANDONCURB CUT

    EXISTINGCURB CUT

    BUS DROP-OFF

    HARD SURFACE PLAY AREA

    LAWN

    GATE

    REPLACE CULVERT

    RESURFACE EBERHART ROAD

    NEW CURBCUT(EGRESS FROM

    EBERHART ROAD)

    NEWCURB CUTG

    ATE

    EXTENSION OF EBERHART ROAD

    RESURFACE RHODES AVE.

    PAVING OPTIONFOR NEW GARAGE

    NEW PAVINGFOR GARAGE

    28 SPA

    CES P

    ARKIN

    G

    61 SPACES PARKING

    June 11, 2014

    S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425

    PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN

    OPTION

    4C

    2 STORY 2 CLASSROOM LEVEL

    KITCHEN1,350

    LOADING

    GIRLS

    BOY

    S

    GYM6,700

    STAGE1,500

    CAFE3,710

    CORE/MAINT.1,200

    GIR

    LS

    BOY

    S

    MUSIC2,080

    CLA

    SSRO

    OM

    840

    GIR

    LS

    BOY

    S PREP450

    3,900(MEDIA CENTER)

    LRC

    CORE/MAINT.1,000

    1,100STEM

    TEAM

    TEAM

    TERRACE

    PREP4501,100

    STEM

    GIRLS

    BOYS

    CORE

    ART1,250

    ADMIN2,980

    AA

    C

    B B

    C

    GYM

    G

    1F

    2F

    ADMIN

    LRC

    G

    1F

    2F

    ADMIN

    ART

    EXPANSION

    CLASSROOMCLASSROOMCLASSROOM

    CLASSROOMCLASSROOMCLASSROOM

    EXPANSION

    G

    1F

    2F

    EXPANSION

    EXPANSION CLASSROOMCLASSROOMCLASSROOM

    CLASSROOMCLASSROOMCLASSROOM

    TEAM/TERRACE

    LRC GYM

    LRC

    CLASSROOMCAFE

    KITCHEN

    CLASSROOM

    ART

    CAFEMUSIC

    STEM

    STEM

    FUTURE ADDITION NEW BUILDING

    APPROXIMATE AREA TABULATION:

    SECOND FLOOR: 17,300 SFGROUND FLOOR: 33,500 SF

    TOTAL AREA: 50,800 SF

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    OPEN TO BELOW

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"

    4

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"

    3

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION CSCALE 1/32" = 1'-0"

    5

    CLASSROOM

    STEM

    LRC

    ADMIN

    CAFE

    ART

    FUTURE ADDITION

    GYM

    MUSIC

    00 10' 100'50'25'

    BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"

    1

    N

    EXISTING ADMIN BUILDING

    NEW GARAGE

    BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE

    2

  • 12'-0" 274'-0" 30'-0"

    8'-0

    "62

    '-0"

    8'-0

    "25

    '-0"

    12'-

    0"14

    0'-0

    "12

    '-0"

    25'-

    0"

    BASKETBALL COURT

    PARENT DROP-OFF

    GLENWOOD LANSING ROAD

    BERMIN

    G O

    R DETEN

    TION

    RHO

    DES A

    VEN

    UE

    EBERHA

    RT AV

    ENU

    E

    GLEN

    WO

    OD

    DYER

    ROA

    D

    GATE

    30 FTSETBACK

    30 F

    TSE

    TBA

    CK

    27.5

    FT

    SETB

    AC

    K

    30 FTSETBACK

    30 FT

    SETBACK

    DETENTION

    ABANDONCURB CUT

    ABANDONCURB CUT

    NEW CURBCUT

    ABANDONCURB CUT

    EXISTINGCURB CUT

    BUS DROP-OFF

    HARD SURFACE PLAY AREA

    LAWN

    GATE

    REPLACE CULVERT

    RESURFACE EBERHART ROAD

    NEW CURBCUT(EGRESS FROM

    EBERHART ROAD)

    NEWCURB CUTG

    ATE

    EXTENSION OF EBERHART ROAD

    RESURFACE RHODES AVE.

    PAVING OPTIONFOR NEW GARAGE

    NEW PAVINGFOR GARAGE

    28 SPA

    CES P

    ARKIN

    G

    61 SPACES PARKING

    June 11, 2014

    S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425

    PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN

    OPTION

    CLASSROOM CLASSROOMSTEM

    CORE

    COREMUSIC CAFE

    EXPANSION

    EXPANSION

    CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM

    GYM

    G

    1F

    2F

    G

    1F

    2F

    ADMINMUSIC

    5

    ART1,250

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    MUSIC2,080

    ADMIN2,980

    CAFE2,600

    KITCHEN1,250

    CORE/MAINT.

    FUTURE ADDITIONNEW BUILDING

    STAGE1,500

    BOY

    S

    GIR

    LS

    GIR

    LSBO

    YS

    2,600(MEDIA CENTER)

    LRC

    CORE/MAINT.

    BOY

    S

    GIR

    LS

    1,10

    0ST

    EM

    450PREP

    1,10

    0ST

    EM

    EXPA

    NSI

    ON

    840

    EXPA

    NSI

    ON

    840

    EXPANSION

    1,400

    EXPANSION

    1,400

    EXPANSION

    600

    1,600

    600

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    LOADING

    A A

    B

    B

    TRASH

    APPROXIMATE AREA TABULATION:

    SECOND FLOOR: 21,200 SFGROUND FLOOR: 28,050 SF

    TOTAL AREA: 49,250 SF

    OPEN TO

    BELOW

    6,700GYM

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"

    4

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"

    3

    2 STORY 1 CLASSROOM LEVEL

    FUTURE ADDITION (CLASSROOM)

    CLASSROOM

    ADMIN

    ART

    GYM

    LRC

    FUTURE ADDITION (LRC)

    FUTURE ADDITION (CAFE)

    STEM

    00 10' 100'50'25'

    BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"

    1

    N

    EXISTING ADMIN BUILDING

    NEW GARAGE

    BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE

    2

  • 12'-0" 274'-0" 30'-0"

    8'-0

    "62

    '-0"

    8'-0

    "25

    '-0"

    12'-

    0"14

    0'-0

    "12

    '-0"

    25'-

    0"

    BASKETBALL COURT

    PARENT DROP-OFF

    GLENWOOD LANSING ROAD

    BERMIN

    G O

    R DETEN

    TION

    RHO

    DES A

    VEN

    UE

    EBERHA

    RT AV

    ENU

    E

    GLEN

    WO

    OD

    DYER

    ROA

    D

    GATE

    30 FTSETBACK

    30 F

    TSE

    TBA

    CK

    27.5

    FT

    SETB

    AC

    K

    30 FTSETBACK

    30 FT

    SETBACK

    DETENTION

    ABANDONCURB CUT

    ABANDONCURB CUT

    NEW CURBCUT

    ABANDONCURB CUT

    EXISTINGCURB CUT

    BUS DROP-OFF

    HARD SURFACE PLAY AREA

    LAWN

    GATE

    REPLACE CULVERT

    RESURFACE EBERHART ROAD

    NEW CURBCUT(EGRESS FROM

    EBERHART ROAD)

    NEWCURB CUTG

    ATE

    EXTENSION OF EBERHART ROAD

    RESURFACE RHODES AVE.

    PAVING OPTIONFOR NEW GARAGE

    NEW PAVINGFOR GARAGE

    28 SPA

    CES P

    ARKIN

    G

    61 SPACES PARKING

    June 11, 2014

    S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425

    PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN

    OPTION

    6

    CLASSROOM

    CLASSROOM

    CLASSROOM

    MUSICADMIN

    EXPANSION

    EXPANSION

    CLASSROOM CLASSROOM CLASSROOM

    CLASSROOM CLASSROOM CLASSROOM

    GYM ART

    EXPANSION

    PREP STEM CLASSROOM

    CORE

    G

    1F

    2F

    G

    1F

    2F

    PREP STEM

    ARTCAFE

    GYM6,700

    STAGE1,500

    3,000(MEDIA CENTER)

    LRC

    MUSIC2,080

    ART1,250

    1F

    CORE/MAINT.1,100

    ADMIN2,950

    CORE/MAINT.1,500

    BOYS

    GIRLS

    KITCHEN1,350 CAFE

    3,700

    3F

    2F

    EXPANSION700

    EXPANSION1,000

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    TEAM

    PREP450

    STEM1,100

    BOYS

    GIRLSCORE/MAINT.

    TRASH LOADING

    A

    A

    B

    B

    EXPANSION

    EXPANSION

    840

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    CLA

    SSRO

    OM

    840

    TEAM

    PREP450

    STEM1,100

    BOYS

    GIRLSCORE/MAINT.

    EXPANSION

    EXPANSION

    840

    840

    APPROXIMATE AREA TABULATION:

    THIRD FLOOR: 10,750 SFSECOND FLOOR: 10,750 SFGROUND FLOOR: 29,720 SF

    TOTAL AREA: 51,220 SF NEW BUILDING FUTURE ADDITION

    3 STORY 2 CLASSROOM LEVEL

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"

    4

    00 10' 100'50'25'

    BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"

    3

    CLASSROOM

    STEM

    ADMIN

    CAFE

    ART

    FUTURE ADDITIONGYM

    MUSIC

    00 10' 100'50'25'

    BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"

    1

    N

    EXISTING ADMIN BUILDING

    NEW GARAGE

    BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE

    2

    Site Options_Combined.pdfA1A2A3B1B2B3C1C2C3C4C5D1D2D3D4

    140611 Building Organization Plan - Options.pdf140611 Building Organization Plan - Option 4B140611 Building Organization Plan - Option 4C140611 Building Organization Plan - Option 5140611 Building Organization Plan - Option 6