11111
山元 一広
KAGRAの低温懸架系
2015 December 18平成 27年度東京大学宇宙線研究所共同利用研究成果発表会
@東京大学柏キャンパス , 柏市、千葉
22
0. Abstract
Here, I explain 1.Cryostat installation at KAGRA site2.Cryogenic payload 3.Sapphire suspension
33
Contents
1. Introduction2. Cryostat installation3. Cryogenic payload4. Sapphire suspension 5. Summary
44
1. Introduction
4444444
3km3km
MozumiY-end Sakonishi
X-end
AtotsuCenter
Vibration isolation system (Type A), Cryocooler unit, Cryostat, Cryogenic payload
Schematic view of KAGRA interferometer Four mirrors of arm cavity will be cooled.First km scale cryogenic interferometer
Kamioka mine (Underground site)
1. Introduction
55
Thermal noise : Fundamental noise
Suspension thermal noise :
mirror position fluctuation
(vibration of suspension for mirror)
Mirror thermal noise : mirror surface fluctuation
(elastic vibration of mirror itself)
1. Introduction
6
Fluctuation-Dissipation Theorem
Relation between thermal noise
and mechanical loss in suspension and mirror
Amplitude of thermal noise is proportional to
(T/Q)1/2.In general, Q (inverse number of magnitude of dissipation) depends on T (temperature).KAGRA sapphire mirror is at 20K.
1. Introduction
77
3rd generation : 10 times better sensitivity
Cryogenic techniques will be adopted.
Einstein Telescope (Europe), Voyager (U.S.A.)
Einstein Telescope
8
to SAS
View ports
Remote valve unit
4 Low vibration cryocooler unit
Main LASER beam
Cryostat Stainless steel t20mm Diameter 2.6m Height ~3.6m M ~ 10 ton
Cryo-coolers Pulse tube, 60Hz 0.9 W at 4K (2nd) 36 W at 50K (1st)
Outline of cryostatCryogenic
payload
Mirror
1. Introduction
S. Koike
1. Introduction
9
Pulse tube cryocoolers
Pulse tube cryocoolers
Sapphire suspension
Sapphire mirror (About 20K)
Sapphire fiber
Cryo-payload
Schematic view of cryostat and cryo-payload
1. Introduction
10
Pulse tube cryocoolers
Pulse tube cryocoolers
Schematic view of cryostat and cryo-payload
Cryo duct for 300 K radiation
2. Cryostat installation
11
Installation of cryostat is a hard mission !
Cryostats are carried along 3 km tunnel !
12BS
3 km
3 km
IXC
IYC
EYC
EXC
Assembled Cryostat Photos
EYC
N. Kimura
All four cryostats were installed.
2. Cryostat installation
13
Cryo ducts are connected to two cryostats in the center room.
Progress of the cryostat assemble;
•EXC & EYC were assembled as vacuum vessels
without duct shields and cryo-coolers
from the end of 2014.11 to the end of 2015.1.
•IYC & IXC were assembled with all of components
such as duct shields and cryo-cooler units
from the end of 2015.2 to the mid of 2015.4.
EYC
EXCIXC
IYC
• Duct Shield
• 12 mL vacuum duct
• 6 mL +6 mL vacuum
duct
• Cryostat
• Gate Valve
BS
3 km
3 km
Cryo-cooler unit installation
N. Kimura
1515
Outline of vibration isolation and cryostat
1515151515
Pulse tube cryocoolers
Pulse tube cryocoolers
3. Cryogenic payload
Vibration isolation, adjustment, control, damping, …
Cryo-payload
161616
Design
Almost all parts were designed.
A. Hagiwara
3. Cryogenic payload
3. Cryogenic payload
1717
Prototype test of cryogenic payload
Cooling test on December
1818
“Sapphire monolithic lop-eared suspension”
One of the most importantparts of KAGRA : Main sapphire mirrorsare included.
All parts are made from sapphire.
Sapphire lop-eared suspension
4. Sapphire suspension
fiber break
Hydroxide Catalysis Bonding
Full size suspension as prototype
191919191919191919
Sapphire cylinder with flat cuts as dummy mirror
Blade spring
4. Sapphire suspension
Ears
Fibers with nail head
Full size suspension as prototypeAll sapphire parts for full size prototype have already been delivered (IMPEX and Shinkosha).
202020202020202020
Jigs to assemble full size prototype is being prepared.
4. Sapphire suspension Full size suspension as prototype
Some parts were delivered.
212121
Measurement of shape of sapphire bulk and earsFor precise position of ears, the geometrical shape and ears were measured (by K. Enami, Mechanical Engineering Center, KEK).
4. Sapphire suspension Full size suspension as prototype
22
5. Summary Cryostat installation All four cryostats were installed ! Connection to cryo duct are in progress.
Cryogenic payload Almost all parts were designed. Cooling test of prototype will be started soon !
Sapphire lop-eared suspension All sapphire parts for full size prototype are delivered. Assembly jig for full size prototype are being prepared.
2323232323
KAGRA Cryogenics Group
Toshikazu SUZUKI EO and SEO member KEK, Senior Fellow
Nobuhiro KIMURA Cryostat sub-chief KEK, Assoc. Prof.
Kazuhiro YAMAMOTO Cryo-Payload sub-chief ICRR, Assist. Prof.
Takayuki TOMARU Chief KEK, Assoc. Prof.
Tatsuya KUME Surveying, Alignment KEK, Assoc. Prof.
Rahul KUMAR Simulation, Payload KEK, PD
Ayako HAGIWARA CAD KEK, Technical Staff
Shinichi TERASHIMA Machining KEK, Technical Staff
Iwao MURAKAMI Welding, Assembly KEK, Technical Staff
Hiroki TANAKA Cryo-Payload, Q ICRR, Grad. Student
Takahiro MIYAMOTO Cryo-Payload ICRR, Grad. Student
Suguru TAKADA Cryogenics NIFS, Assist. Prof.
2015.Oct.16
By T. Tomaru(Revised by K. Yamamoto)
Kieran CRAIG Payload ICRR, PD
242424
Acknowledgement
24
Supported by
Mechanical Engineering Center, KEK
Machine shop, The Institute for Solid State Physics, The University of Tokyo
2525
Thank you for your attention !
262626
Acknowledgement
26
ELiTES: ET-LCGT interferometric Telescope Exchange of Scientists Grant for collaboration about cryogenic between KAGRA and ET European 7th Framework Programme Marie Curie action (Mar. 2012 - Feb. 2017) European people can visit Japan for KAGRA.
272727
Acknowledgement
272727272727
1st : 3 Oct 2012
2nd : 4 Dec 2013
ELiTES meeting
282828
Acknowledgement
282828282828
3rd : 9 Feb 2015
4th : 2 Dec 2015
ELiTES meeting