Upload
dohanh
View
215
Download
0
Embed Size (px)
Citation preview
10.0 ARCHITECTURAL DRAWINGS
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013
CARPARK87 CARS
CARPARK223. CARS
TOTAL310. CARS
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 28
LEVEL O PLAN - RL 1.9
1:500@A310m5
EXISTING CAIRNS CONVENTION
CENTRE BASEMENT
FUTURE BASEMENT
HOTEL LOADING
SUB STAGE
ORCHESTRA PIT
STAGE DOOR
RAINWATER TANK
CARPARK87 CARS
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 29
LEVEL O PLAN - RL 1.9
1:500@A310m5
EXISTING CAIRNS CONVENTION
CENTRE BASEMENT
58m
78m
74m
3
1
4
2
BAR
1:500@A310m5
FFL 5.35
FFL 4.35
FFL 4.35
RL 1.34
ENTRYFFL 5.35
PLAZA
500 SEAT FLEXIBLE THEATRE
FOYER
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 30
LEVEL A PLAN - RL 5.35
EXISTING CAIRNS CONVENTION
CENTRE
CAIRNS CONVENTION
CENTRE EXPANSION
HOTELFOYER
STALLS
FOYER
TOILETS
TOILETS
BOH
BOH
3
1
4
2
GREEN ROOM
LOADING DOCK
STAGEFFL 5.35
STAGEFFL 5.35
VOID TO BELOW
VOID TO CONVENTION
CENTRE EXPANSION
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 31
LEVEL B PLAN - RL 8.15
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL
VOID TO STAGE
STALLS
VOID TO FOYER
TOILETS
BOH
BOH
BOH
VOID TO LOADING
VOID TO STAGE
1:500@A310m5
3
1
4
2
VOID TO STAGE
BALCONY
FOYER
VOID
TERRACE
VOID
VOID TO CONVENTION
CENTRE EXPANSION
VOID TO LOADING
VOID TO STAGE
BOH
BOH
BOH
TOILETS
TOILETS
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 32
LEVEL C PLAN - FFL 10.95
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL
1:500@A310m5
3
1
4
2
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 33
LEVEL D PLAN - FFL 13.75
BALCONY SEATING
VOID TO LEVEL BELOW
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL
AHU
AHU
1:500@A310m5
3
1
4
2
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 34
LEVEL E PLAN - FFL 16.25
CATWALK LEVELAHU
AHU
AHUCHILLER PLANT
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL
1:500@A310m5
3
1
4
2
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 35
LEVEL F PLAN - FFL 21.35
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL
1:500@A310m5
3
1
4
2
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 36
LEVEL G PLAN - FFL 25.85
GRID
HOTEL
EXISTING CAIRNS CONVENTION
CENTRE
1:500@A310m5
3
1
4
2
NO. ROOM AREA
1.00 THEATRE
1.01 Auditorium Shell 30m x 26m = 780 m2
Seating area stalls 700 seats (includes aisles) 600
Balcony with side galleries 300 seats (includes aisles) 300
1.02 Sound locks to stalls level 20
1.03 Sound locks to balcony level 20
1.04 Stage area 390
1.05 Stage apron 1.5m minimum deep stage apron 30
1.06 Orchestra pit to accommodate up to 40 players 90
1.07 Orchestra pit lift pit 52
1.08 Seating wagon store 60
1.09 Assembly area 8
1.10 Pit assembly area 20
1.12 Rear crossover 3m wide 90
1.13 Lighting & box booms 50
1.14 Lighting bridges 54
1.15 Perimeter access to lighting bridges 140
1.16 Speaker bridge across proscenium 40
1.17 Grid 375
1.18 Loading gallery 26
1.19 Fly gallery 180
1.20 Trap room under stage 260
1.22 Dimmer room 12
1.23 Comms Room 8
1.24 Scenery, props and touring road case store at rear of stage 80
1.25 DDA lift or ramp in trap room from trap room to orchestra
pit
10
Sub total m2 2,915
2.00 STUDIO
2.01 Studio - 20m wide by 28m long by 10m high 560
Retractable Seating storage at end of Studio 16m x 1.5m = 27m2
2.02 Balcony to audience side 60
2.03 Balcony to 2 sides and stage end 105
2.04 Catwalks to perimeter 92
2.05 Catwalks across studio 90
2.06 Sound locks to floor level 16
2.07 Sound locks to balcony level 16
2.08 Dimmer Room 10
2.09 Comms Room 8
2.10 Scenery dock at rear of studio 80
2.11 Crossover to stage area on 2 levels 60
Sub Total m2 1,097
3.00 BACK OF HOUSE (TECHNICAL)
3.01 Loading dock 100
3.02 Holding area/temporary store 50
3.03 Rostra and chair store 30
3.04 Piano store 18
3.05 Instrument store 15
3.06 Scenery workshop 40
3.07 Lighting store and workshop 40
3.08 Sound, bideo, electronics workshop 30
3.09 Rack rooms (building comms) 40
3.10 Production office 12
3.11 Technician offices 25
3.12 Technical staff change room, amenities, showers 40
3.13 Wardrobe/costume repair 25
3.14 Laundry 10
3.15 Rubbish store 10
3.16 Lift 20
Sub total m2 505
4.00 BACK OF HOUSE (PERFORMERS)
4.01 Theatre: Star dressing rooms, 2 at 20m2 40
4.02 Theatre: 5 person dressing rooms with en-suite bathroom 3 at 20m2 60
4.03 Theatre: 20 person dressing rooms with en-suite bathroom 3 at 70m2 140
4.03 Studio: 5 person dressing rooms with en-suite bathroom 2 at 20m2 40
4.03 Studio: 15 person dressing rooms with en-suite bathroom 2 at 50m2 100
4.04 Shared: Assembly room (musicians/choirs/children) for 100 people 100
4.05 Shared: Wet & dry dressing room - wet and dry change
room for body painting
20
4.06 Wig and makeup room 10
4.07 Toilets BOH common areas 50
4.08 First aid room 15
4.09 Green room to accommodate 100 people 120
4.09 Stage door reception with waiting lobby 32
Sub total m2 727
5.00 FRONT OF HOUSE (TECHNICAL SPACES)
5.01 Sound control porch at rear of auditorium 15
5.02 Lighting control room at rear of auditorium 15
5.03 Audio/visual control room at rear of auditorium 15
5.04 Crying room/directors/interpreters room at rear of auditorium 15
5.05 Projection suite at rear of auditorium 15
5.06 Translation/viewing room at rear of auditorium 15
5.07 Follow spot room at catwalk level at rear of auditorium in centre 18
Sub total m2 108
6.00 FRONT OF HOUSE (INCLUDING ADMIN)
6.01 Theatre Foyer Stalls 800
6.02 Theatre Foyer Balcony 200
6.03 Studio Foyer Stalls 400
6.04 Studio Foyer Balcony 100
6.05 Box Office Connect to general office 20
6.06 Box Office Manager 10
6.07 Female toilets 44 WC distributed (studio and theatre) 105
6.08 Male toilets 6 WC and 16 urinals distributed 60
6.09 Disabled toilets 2 Unisex 16
6.10 General office 115
6.11 Manager’s office 19
6.12 Friends of theatre office 16
6.13 Office store and tea area 21
6.14 Cloakroom close to entrance 10
6.15 Store for bollards, display boards, etc 10
6.16 Artwork store 25
6.17 Sick room 18
6.18 Bars 50
6.19 Bar store 20
6.20 Lift 12
Sub total m2 2,027
SUMMARY
1.00 THEATRE 2,915
2.00 STUDIO 1,097
3.00 BACK OF HOUSE (TECHNICAL) 505
4.00 BACK OF HOUSE (PERFORMERS) 727
5.00 FRONT OF HOUSE (TECHNICAL SPACES) 108
6.00 FRONT OF HOUSE (INCLUDING ADMIN) 2,027
TOTAL AREA m2 7,379
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 37
ROOM SCHEDULE (THEATRE BRIEF)
LEVELS
LEVELS
LAKE STREET
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 39
SECTION 1 THROUGH 1000 SEAT AUDITORIUM
1000 SEAT AUDITORIUM
HOTEL BEHIND
STAGE
GRID AND FLY TOWER
FOYER
SUB STAGECARPARKING
CONVENTION CENTRE EXPANSION
EXISTING CAIRNS CONVENTION
CENTRE
BACK OFHOUSE
1:500@A310m5
LEVELS
500 SEAT FLEXIBLE THEATRE
EXISTING CAIRNS CONVENTION
CENTRE
LEVELS
HOTEL BEHIND
STAGE
CONVENTION CENTRE EXPANSIONFOYER
CARPARKING
BACK OFHOUSE
LAKE STREET
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 40
SECTION 2 THROUGH 500 SEAT FLEXIBLE THEATRE
1:500@A310m5
LEVELS
EXISTING CAIRNS CONVENTION
CENTRE
HOTEL BEHIND
LOADING DOCK
CONVENTION CENTRE EXPANSIONFOYER
CARPARKING
LAKE STREET
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 41
SECTION 3 THROUGH FOYER AND LOADING
1:500@A310m5
LEVELSLEVELS
1000 SEAT AUDITORIUM
500 SEAT FLEXIBLE THEATRE
HOTEL BEHIND
BACK OFHOUSE
BACK OFHOUSE
WHARF STREET HARTLEY STREET
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 42
SECTION 4 THROUGH THEATRES
1:500@A310m5
CARPARKING
CAIRNS PERFORMING ARTS CENTRE
FEASIBILITY STUDY
FINAL REPORT 6th June 2013 43
KEY SPACES
500 SEAT FLEXIBLE THEATRE SECTION
500 SEAT FLEXIBLE THEATRE PLAN
1000+ SEAT AUDITORIUM SECTION
1000+ SEAT AUDITORIUM PLAN
STAGE AREA
10m X 14m
PERIMETER GALLERY
GALLERY ABOVE
RETRACTABLE SEATING
SOFT PROSCENIUM
9m
16m
26m
24m
31m28.3m 13.7m
1.2m 1.2m
2.8m
2.8m
2.8m
2.8m5.6m