1 Technical Talk on the Revision of Code of Practice (CoP) for the Electricity (Wiring) Regulations 2015 Edition and its Practical Implementation 10 March 2016

10 March 2016 The HKIE School Ambassadors Programme …bsomes.org.hk/upload_pdf/Reduced CoP(Forms)-KFYee...pdf · appropriate grade or Registered Professional Engineer (RPE) [Electrical

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

1

Technical Talk on the Revision of Code of Practice (CoP) for the Electricity

(Wiring) Regulations 2015 Edition and its Practical Implementation

10 March 2016

Presenter
Presentation Notes
The HKIE School Ambassadors Programme 2015/2016

2

Ir K F Yee 余光輝工程師 BEng(Hons), MSc(Eng), CEng, FCIBSE, FIET, FEI, FBSOMES MHKIE, RPE(BSS, ELL, ENY, FRE), REW(C0, H0), RSO, RSA, REA Recognized Trainer of EMSD - CPD Scheme for REW Honorary Treasurer The Hong Kong Institution of Engineers – Building Services Division Honorary Secretary Energy Institute HK Branch Committee Member (2001-2007) The Hong Kong Institution of Engineers – Safety Specialist Committee Past President (2008-2010) Building Services Operation & Maintenance Executives Society Professional Assessor HKIE – Building Services Division Energy Institute – Hong Kong Branch

Presenter
Presentation Notes
The HKIE School Ambassadors Programme 2015/2016

Technical Talk on the Revision of Code of Practice (CoP) for the Electricity (Wiring) Regulations 2015

Edition and its Practical Implementation

Periodic Review of the CoP

1992

Edition 1997

Edition 2003

Edition 2009

Edition

2015

Edition

BSOMES - Contribution

• BSOMES offered over 50 comments to the WG of CoP • Around 80% comments accepted by the WG of CoP

Collaboration with the Trade

Trade Associations

Government Departments

Professional Institutions Academic Institutes Power Companies

BSOMES – Electrical Chamber

EMSD Appreciation Letter

FORMS • PERMIT-TO-WORK

• ELECTRICAL SAFETY ASSESSMENT FORM

• SANCTION-FOR-TEST (HIGH VOLTAGE)

• H.V. ENCLOSURE LOG BOOK

• H.V. PADLOCK MOVEMENT LOG BOOK

RESPONSIBLE PERSON (負責人員) ‘Responsible Person’ means a Registered Electrical Worker of an appropriate grade assigned by a Registered Electrical Contractor or the Owner of fixed electrical installation to operate and maintain the installation 獲註冊電業承辦商或固定電力裝置擁有人以書面委任操作及維修有關裝置的適當級別註冊電業工程人員。

PERSON IN-CHARGE (負責工作人士) ‘Person in-charge’ means a Registered Electrical Worker of an appropriate grade assigned by a Registered Electrical Contractor or the Owner of an fixed electrical installation to take charge of the carrying out of the electrical work for the installation 獲註冊電業承辦商或固定電力裝置擁有人委派負責為裝置進行電力工作的適當級別註冊電業工程人員。

• ‘Responsible Assessor’ means a Registered Electrical Worker of an appropriate grade or Registered Professional Engineer (RPE) [Electrical / BS discipline] or Registered Safety Officer (RSO) assigned by a Registered Electrical Contractor or the Owner of fixed electrical installation to evaluate electrical safety on carrying out LIVE work and suggest appropriate control measures

• 獲註冊電業承辦商或固定電力裝置擁有人委派評估進行帶電工作的電力安全及建議合適控制措施的適當級別註冊電業工程人員或電機╱屋宇裝備界別的註冊專業工程師或註冊安全主任。

RESPONSIBLE ASSESSOR(負責評估者)

SAFETY PROCEDURES FOR CARRYING OUT ELECTRICAL WORK AT ENERGIZED ELECTRICAL INSTALLATION

Prior to carrying out of electrical work

Responsible Person to prepare & issue “Permit-to-work “ Form

Person in-charge to check & accept “Permit-to-work” Form

Responsible Assessor to prepare & issue “Electrical Safety Assessment”

Form

Person in-charge to check & accept “Electrical Safety Assessment” Form

Responsible Person (Grade H REW) to prepare & issue

“Sanction-for –Test” Form

Person in-charge (Grade H REW) to check & accept

“Sanction-for-Test” Form

Person in-charge or worker

under Person in-charge’s supervision to carry out

work

REC / installation’s owner to keep record of “Permit-to-Work”

Form, “Electrical Safety Assessment”

Form and “Sanction-for-Test” Form for

at least 5 years

For ELV Installation?

No

Yes

For HV installation?

Yes, but confined to testing work only No

No regulation under EO

For live work?

No

Yes

No

COMPARISON

Type of Work CoP 2009 Edition CoP 2015 Edition

Form Persons Involved Form Persons Involved

Electrical Non- Live Works

Permit-to-Work Responsible Person / Person in-charge

Permit-to-Work Responsible Person / Person in-charge

Electrical Live Works

Risk Assessment Report on Live Work

Assessor / Endorser

Electrical Safety Assessment Form

Responsible Assessor / Person in-charge

High Voltage Electrical Works

N/A N/A Sanction-For-Test (High Voltage)

Responsible Person / Person in-charge

H.V. Enclosure Log Book

Registered Electrical Worker

H.V. Enclosure Log Book

Registered Electrical Worker

N/A N/A H.V. Padlock Movement Log Book

Registered Electrical Worker

PERMIT-TO-WORK (PART 1) 2009 CoP 2015 CoP

PERMIT-TO-WORK (PART 1)

Management office

Technical Department

PTW-201600310-01

B4 Main Switch Room

2015 CoP

Management office

Technical Department

PTW-20140310-01

B4 Main Switch Room

2009 CoP

PERMIT-TO-WORK (PART 1) 2009 CoP

2015 CoP

ACB #1

PERMIT-TO-WORK (PART 1)

2009 CoP

2015 CoP

√ P804 Riser

PERMIT-TO-WORK (PART 1) 2009 CoP

2015 CoP

Replacement of Busducts and Joints for Busduct Riser #P804

Switch Room

PERMIT-TO-WORK (PART 1) 2009 CoP

2015 CoP

P804 ACB

Main Terminal inside Switch Room

Main Terminal at Main Switch Room

P804 ACB

P804 ACB

P804 ACB

P804 ACB

Provide appropriate isolation in Main Switch Room

Provide appropriate isolation in Main Switch Room

PERMIT-TO-WORK (PART 1) 2009 CoP

2015 CoP

P804 ACB

Main Terminal inside Switch Room

Main Terminal at Main Switch Room

P804 ACB

P804 ACB

P804 ACB

P804 ACB

Provide appropriate isolation in Main Switch Room

Provide appropriate isolation in Main Switch Room

PERMIT-TO-WORK (PART 1) 2009 CoP

2015 CoP

☺ K F Yee 2118 8885

23 30 10/3/2014

K F Yee ☺ 2118 8885 10/3/2016 23:30

PERMIT-TO-WORK (PART 2, 3 & 4) 2009 CoP 2015 CoP

PERMIT-TO-WORK (PART 2) 2009 CoP

2015 CoP

PERMIT-TO-WORK (PART 2)

2009 CoP

2015 CoP

K F Yee

2118 8885 23:30 10/3/2016

TSL

Yee

K F Yee 2118 8885

23 30 10/3/2014

TSL

Yee

LET’S START .....

PERMIT-TO-WORK (PART 3)

2009 CoP

2015 CoP

Yee 04 00 11/3/2014

Yee 04:00 11/3/2016

PERMIT-TO-WORK (PART 4) 2009 CoP

2015 CoP

04 00 11/3/2014

☺ 04:00 11/3/2016

EVERYTHING RESUME TO NORMAL …

ELECTRICAL SAFETY ASSESSMENT FORM

ELECTRICAL LIVE WORK

ELECTRICAL SAFETY ASSESSMENT FORM

ELECTRICAL SAFETY ASSESSMENT FORM 2009 CoP

2015 CoP

ELECTRICAL SAFETY ASSESSMENT FORM

2015 CoP

2009 CoP

ELECTRICAL SAFETY ASSESSMENT FORM

2015 CoP

2009 CoP

ELECTRICAL SAFETY ASSESSMENT FORM 2015 CoP

SANCTION-FOR-TEST (HIGH VOLTAGE)

SANCTION-FOR-TEST (HIGH VOLTAGE)

SANCTION-FOR-TEST (HIGH VOLTAGE)

SANCTION-FOR-TEST (HIGH VOLTAGE)

H.V. ENCLOSURE LOG BOOK

H.V. PADLOCK MOVEMENT LOG BOOK

HV SWITCHBOARDS

HV SWITCHBOARDS

HV SWITCHBOARDS

45

ELECTRICAL INSTALLATION

46