39
1 Welcome to Load Participation Orientation Elev Men Women P h o n e s Info Presentation and other Load Participation information will be posted at: www.ERCOT.com Market Participants & Stakeholders Load Participation

1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

Embed Size (px)

Citation preview

Page 1: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

1

Welcome to

Load Participation Orientation

Elev

Men Women

Ph

on

es

Info

Presentation and other Load Participation information will be posted at:www.ERCOT.comMarket Participants & StakeholdersLoad Participation

Page 2: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

2

LaaRs & BULsLoads acting as Resource

Balancing Up Loads

Understanding

&

Page 3: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

3

Page 4: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

4

MarketOverview

Page 5: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

5

Control AreaControl Area

Old World - Before Retail Deregulation

Utilities

Customers

Customer Service

Control Area

Regulated Function

Page 6: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

6

New World - After Deregulation

Transmission

Customers & maybe Resources

Generators

Load ServingEntity

QSE

Distribution

TransmissionOperator

Regulated Function

TDSP

Page 7: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

7

Bilateral Market - Coordination of Resources

Customers & maybe Resources

Generators

Load ServingEntity

QSE

Regulated Function

Contracts are confidentialPrices are not visible

Load

About 90%-95% of Texas Energy Transfer Arranged this way.

Page 8: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

8

What about the other 5% - 10%?

Supported through Ancillary Services

Page 9: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

9

Pre-arranged operating reserves — the ability to call for additional energy to be made available on the system, on varying levels of short notice.

Insurance in case a generating unit goes down, load is higher than anticipated, or other problem emerges.

Ancillary Services (“AS”)

Page 10: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

10

1200 Adjustmen

0600 1800 0000Day Ahead Adjustment Operating

Period

2300 Adjustment Period

0000 Adjustment Period

0100 Adjustment Period

0300 Adjustment Period

0200 Adjustment Period

0400 Adjustment Period

0500 Adjustment Period

0600 Adjustment Period

0700 Adjustment Period

0800 Adjustment Perio

0900 Adjustment Per

1000 Adjustment P

1100 Adjustment

1300 Adjustm

Provide Forecasts

Receive Balanced Schedules

Receive Bids for Ancillary Services

Evaluate Submittals

Resolve

Clear

OP

OP

OPOP

OP

OPOP

March 24, 3002 March 25, 2003

Page 11: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

11

Operating Hour

O p e r a t i n g P e r i o d

Hour Ahead

4 Settlement Intervals per Operating Hour

Page 12: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

12

Time

Pow

er i n

Meg

awat

ts (

MW

)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

ERCOT Forecast LoadScheduled GenerationActual Load

Load vs GenerationThe need for Balance

Page 13: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

131 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Load vs GenerationThe need for Balance

11 12

ERCOT Forecast LoadScheduled GenerationActual Load

Pow

er i n

Kil

owat

t s (

KW

)

Time

Page 14: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

14

Time 11 12

Pow

er i n

Kil

owat

t s (

KW

)

8

RESULT:curtail load increase generationchange system frequency

Up Regulation Service

Up Balancing Service

Down Balancing Service

DownRegulationService

ERCOT Forecast LoadScheduled GenerationActual Load

Load vs GenerationThe need for Balance

Page 15: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

15

Ancillary Services (“AS”)

Response time is critical in determining which AS a resource can qualify for.

30 minutes 10 minutesImmediate

Non-SpinReplacement

Balancing

Responsive

Page 16: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

16

QSE

Most AS can be self-arranged.

QSE has an obligation for AS supply based on “Load Ratio Share”

Page 17: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

17

If not self-arranged, AS will be purchased by ERCOT

Ancillary Services (“AS”)

In the AS markets, a QSE can bid in any resources (generation or loads) that aren't already committed.

This creates an Ancillary Services Market.

Page 18: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

18

Is there money to be made by users of Electricity?

User of electricity = load

$$ Money may be paid $$for a Load reduction on the system –

pending contract & qualification conditions

Page 19: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

19

What is a Resource?

A resource is a $upplier of electricityIn the past this was considered an Electric Generating Unit such as:• Coal Fired Power Plant• Gas (Combustion) Turbine Generator• Nuclear Power Plant• Hydro Power, etc….

Page 20: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

20

What is a Resource?

Electric Generating units create electricity, apply that energy to the Electric Grid, on demand, and are paid $

Page 21: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

21

What is a Load acting as a Resource?

A resource is a $upplier of electricity - Generator or Load

Loads (users of electricity) may reduce or stop their draw of power (curtail), and thus apply unused energy, to the Electric Grid, on demand, for a price $

In this a Load acts as a Resource (LaaR)

Page 22: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

22

Terminology

Capacity

Energy

Telemetry

Protocols

Resource Plan

Operating Guides

The ability to make energy available on demand

Electricity available for use

Real-time system information used for grid operations, not settlements

Rules that govern the Electric Market and System Operations

Specific guidelines grid operations

QSE submittal to ERCOT on available resources for planning and operations

Page 23: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

23

Payment InformationPo

wer

i n M

egaw

atts

(M

W)

Time 1 2 3 4 5 6 7 8 9 101112131415161718192021222324

Load Profiling

ESIID

SettlementsQSEs

Page 24: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

24

Loads acting as Resource (LaaRs)

Balancing Up Loads(BULs)

LaaRs & BULs

Page 25: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

25

Loads acting as Resource (LaaRs)

LaaRs are scheduled in the resource plan similar to generators

LaaRs are telemetered to ERCOT and a component of the QSE’s frequency management program

LaaRs are bid in and are awarded in the day ahead capacity market (capacity payment)

Page 26: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

26

Loads acting as Resource (LaaRs)

LaaRs are deployed during the operating day as needed (energy payment)

Presently 35% of ERCOT Responsive Reserve can be met with Loads qualified for RRS

~570MW of Loads qualified for RRS

~91 MW of Loads qualified for NSRS

Page 27: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

27

Ancillary Services (“AS”)

Response time determines category of Ancillary Service provided

30 minutes 10 minutesImmediate

Non-SpinReplacementBalancing

Responsive

Page 28: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

28

LaaR Qualification Categories

Responsive Reserve Service Loads– Loads on underfrequency relay (UFR):

can be interrupted instantaneously and can be manually interrupted within 10 minutes

Balancing Energy Service Loads – Loads that can be interrupted within 10

minutes

Non-Spin Reserve Service Loads – Loads that can be interrupted within 30

minutes

Page 29: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

29

Loads Qualified for RRS

Responsive Reserve Service,

Non-Spinning Reserve Service,

Replacement Reserve Service, and

Balancing Energy Service

LaaR Services that may be Provided

Page 30: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

30

Loads Qualified for BES

Up Balancing Energy Service,

Non-Spinning Reserve Service, and

Replacement Reserve Service

LaaR Services that may be Provided

Page 31: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

31

Loads Qualified for NSRS

Non-Spinning Reserve Service

LaaR Services that may be Provided

Page 32: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

32

LaaR - BUL

LaaRs may participate in the AS Capacity market, BULs do not

LaaRs are contracted for reliability - subject to OOMBULs, though taken from the Balancing bid stack, participate for economic reasons - not subject to OOM

Page 33: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

33

LaaR - BUL

will be paid a capacity payment if struck in the capacity market, and

receive an energy payment if they are deployed and respond

LaaRs

BULs BULs will not be considered in the

capacity market, but if responsive to BES award will

receive a capacity & energy payment

Page 34: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

34

Markets Loads May Play in if Qualified

Reg Up/Dn

ResponsiveNon-SpnReplacemntUp BalDown BalOOM

GenAGC

RRS BES NSRBULL a a R s

SERVICE Resp MKT

XXXXXXX

X

XX

X

X XX

Imediat Cap

X

X

X

X

10 min

30 min

10 min

10 min

ASAP

Cap

Cap

Cap

Ener

Ener

X

10 min

Page 35: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

35

Balancing Up Loads (BULs)

BUL service will require new Qualification, Annual Capacity Testing and QSE Control, and Performance Measurements Separate Bid curves

than LaaRs & Gens

Page 36: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

36

Timeline for BULs:Deployment May 31, 2003

Balancing Up Loads (BULs)

Block size limited to 50 MW or less

BULs are not telemetered to ERCOT

Page 37: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

37

Load OptionsLoad Type Resource or Service

that can be Provided

Requirements

Load Acting as a Resource (LaaR)

Various ERCOT Ancillary Services (AS)

TelemetryIDR meter (minimum) EPS meter (optional)Qualification

Qualified Balancing Up Load (BUL)

Balancing-Up Load (associated with the Balancing Energy Market only)

IDR meter (minimum) EPS meter (optional)Qualification

Voluntary Load Response

Curtailment or reduction in response to Market Price or other factors

Metering and/or curtailment technology defined in REP contract

Page 38: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Page 39: 1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:

39

Qualified Scheduling Entity (QSE)

E R

C O

T

Transmission/Distribution Service Providers (TDSPs)

Co

nsu

mer/C

usto

mer

ResourcePower

Marketer(Optional)

Aggregator(Optional)

LoadServing

Entity (LSE)

Public Utility Commission of Texas (PUCT)

Non-Opt In Entities (NOIEs)

Regulated Organizations

Non-Regulated Organizations

Power Flow

Key Information Flow