R10.x Implementation Project for a leading Auto Manufacturer
An ITC Infotech Case Study
May 2012
© 2012, ITC Infotech
Customer
Our customer is one of the largest & fastest growing Global Automobile Manufacturer with presence in over 170 countries and Annual Revenues exceeding USD 14+ billion.
BUSINESS STRATEGY SOLUTION APPROACH To reduce the Product
Development costs by using an Enterprise PLM System
Customer selected PTC as their Strategic Partner for their Enterprise PLM initiative
Adoption of Windchill 10.0 by the Customer as their Enterprise PLM System
Utilization of data available in existing legacy systems
Enhanced User Interface features
Customization of Windchill 10.0 as per Customer requirements for seamless integration with downstream legacy systems
Customization related to Part Master, Concept Document, BOM Compare and BOM Editor Modules
© 2012, ITC Infotech
Realized Value and BenefitsREALISED VALUE
PROJECT PHASE I OBJECTIVES
SOLUTION CENTRE INVOLVEMENT
Better and more Insightful visibility with integration of new Windchill 10.0 to their existing legacy systems
Improving accuracy and reducing the amount of time necessary to find accurate design information with an enterprise-level single source of truth for product information linking the BOM to design data and change information
Implementation of Engineering Bill of Materials & Change Management- CATIA Data Management- Digital Mock Up (DMU)- Engineering Order
User Management & License Management
Complex requirements were detailed, designed and developed
Reusable components were developed wherever feasible in the modules
Classroom training for skilled Java resources on Windchill 10.0 customization by relevant Technical Leads
BENEFITS FROM PTC BENEFITS FROM ISC
Successful adoption of Windchill 10.0 as their Enterprise PLM Solution
Effective design & scalable solution
High quality solution
Cost effective service
Flexibility in operations
Timely delivery
“This engagement will be absolutely one of the key success factor for this project. I really appreciate your help and contribution for our project. It was great opportunity of collaboration and it worked really great !! I hope we will have another chance to co-work with you. “ - PTC GS Program Manager
PTC GS PROGRAM MANAGER SPEAKS
© 2012, ITC Infotech
Client (Onsite)
PTC + Solution Center (Onsite)
India Solution Center(Offshore - Bangalore)
Execution Model
TEAM STRUCTURE
Team Size: 15
CULTURAL PRINCIPLES
Leadership:– Complete ownership of the development work– Tackling all obstacles and issues faced in the process
Teamwork & Networking:– Opportunity to collaborate with development teams across 3
continents– Networking with the onsite Solution Teams (Solution Architects &
Client Consultants)
Commitment to Outcome:– Consultants worked above and beyond timelines to meet tight
deadlines; High level of commitment– Testing performed according to Client’s test data
Knowledge & Expertise:– High quality design & coding for the Modules– Adherence to all development guidelines
Operational Impact:– Ability of the team to perform quality work from offshore– Opportunity to work in one of the large scale Windchill 10.0
Customization Project
WorkPackage
Coordinator
5