    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 1 of 20

    GENERATIONINCENTIVESCHEME

    Preamble:

    Thefollowingsaretheessential featuresofthemodifiedPower GenerationIncentive Scheme which is enclosed as Annexure:-

    1. Theprovisionsoftheschemeareapplicablew.e.f.1.4.2005.

    2. BasicpayforthepurposeofpaymentofIncentivewillbeactualbasic

    pay(w.r.t.1997paystructure)andspecialpay,ifany.However,basic

    pay will not include any Dearness pay, DA,PersonalPay,Personal

    Adjustment.

    3. The Incentive payment will continue to be linked with the

    performanceparameter,theEquivalentAvailabilityFactor%.

    4. Theincentive willbe paidin two components i.e. monthly and

    quarterly.

    5. The employees, for the purpose of Incentive payment, will be

    categorized into Direct(Group-A)and Indirect (Group-B/C)and the

    maximum quantum of Generation Incentive payable to each

    category/groupindifferentstagesofprojectwillbeasunder:-

    DuringO&Mphase During Expansion/

    Concurrentphase

    Group-A

    (O&Memployees)

    Amount as

    per

    performance-

    payment matrix as

    Amount as per

    performance-payment

    matrix as given in

    scheme(para7.2)

    Group-B

    (Common serviceemployees)

    85% of

    amountpayable to

    85% of amount payable

    to employees in Group-A

    Group-C

    ( Project Const.employees)

    N.A. 30% of amount payable

    to employees in Group-A

  • 7/21/2019 0601 Generation Incentive

    2/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 2 of 20

    6. The oil linked incentive/disincentive as applicable to only for

    Operation & Maintenance employees in group-A, will continue to bepaidasperexistingscheme.

    7. Inrespectofemployeeswhohave beentransferredfromoneproject

    to another after 1.4.2005, payment for the period where the

    employee had worked at the transferor project will be made by the

    project where he is presently working. For this purpose, the

    transferor project should send the amount payable in respect of

    employee transferred to other projects/units within a period of one

    monthofissueofcircular.

    8. The Scheme shall not be applicable forTandaTPS for which a

    separateschemeisinoperation.

  • 7/21/2019 0601 Generation Incentive

    3/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 3 of 20

    Annexure

    GENERATIONINCENTIVESCHEME

    1.0 SHORTTITLE

    The Scheme shall be called "NTPC PowerGeneration Incentive

    Scheme".

    2.0 BASICCONSIDERATIONS

    2.1 The purpose of any Incentive Scheme is to motivate theemployees to give their best. In the case of a power plant, the

    incentive plan also takes into account the maintenance

    aspect of the plant while motivating employees to maximize

    generation. Any Scheme which encourages maximization of

    Generation only in the short term may be self defeating as it

    leadstoirreparabledamagetoplantsandmachinerybecause

    of insufficient motivation to employee for the proper upkeep

    and regular maintenance of the Plant. A successful Incentive

    Scheme, hence, should strike a balance between short range

    and long range plant requirements and should achieve a good

    blend of the two in such a way as to optimize generation on a

    sustained long range basis. Further, increase in Generation

    may not lead to desirable results if increased costs are

    allowed to eat away the substantial surplus as a result of

    higher generation. From this point of view, it is desirable to

    build the fuel costs and their impact on the economics of

    generation into the scheme itself so that reasonable norms of

    fuelconsumptionaremaintained.

    2.2 The following objectives have been considered in designing the

    incentivescheme.

    2.2.1To keep the Generating station in readiness to deliver e

    x-busoutputexpressedas%ofratedinstalledcapacity so

    that the available resources are optimized based on the

    merit order operation thereby bringing about an

    overalleconomyingeneration.

    2.2.2To maximize generation of electrical energy through

  • 7/21/2019 0601 Generation Incentive

    4/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 4 of 20

    d

    e

    ve areeasily measurable and have a direct co-relation to the

    2.2.3 the scheme by the

    employees, smooth implementation and amenability to

    2..2.4 rameters for payment have been determined to

    encourage better maintenance for higher availability of

    2.2.5 e

    while at

    same time,ensuring thatpaymentsareconsistent

    economictermswiththelevelofperformance.

    3.0r

    ion, morale and the team spirit among the

    employees, the followings are the principal objectives of the

    b) n of generation of Electrical energy through

    d other allied

    c) Reductionofcostperunitofenergygenerated. d)

    inabsenteeism.

    4.0loyeesofNTPCotherthanTanda

    TPS,directlyor indirectlyengaged inGenerationofElectricity.The

    em

    a) ApprenticesunderApprenticesActandTrainees b)

    optimum use of installed power plant capacity an

    reduction of cost per unit of energy generated. Th

    factors recommended for payment of incenti

    extentofachievementoftheaboveobjectives.

    To ensure easy understanding of

    simpleunambiguouscomputations.

    The pa

    plant.

    Thequantumof incentiveoffered toemployeeshas tob

    enough to motivate them to put in extra effort

    the

    in

    OBJECTIVES

    Withtheaboveasbackgroundandapa tfromthe generalpurposeof

    promoting motivat

    IncentiveScheme:

    a) TokeeptheGeneratingstation in readinesstodeliverex-bus

    maximumoutputexpressedas%ofratedinstalledcapacity.

    Maximizatio

    optimum utilization of installed plant capacity an

    resources.

    Reduction

    APPLICABILITY

    TheSchemecoversallregularemp

    Sch ewillnotbeapplicableto:-

    Casualordailyratedemployees

  • 7/21/2019 0601 Generation Incentive

    5/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 5 of 20

    5.0 RECOMMENDEDFACTORSFORINCENTIVEPAYMENTT

    ac

    of po and cost reduction, a multi-factor scheme has beendesigned

    i)

    To hieve the twinobjectivesofavailabilityofplant forgeneration

    werincorporatingthefollowingfactors:

    Generation Incentive based on Equivalent Availability Factor

    %:-

    pa

    EAF% orked outasper formulagiven

    below

    a) Thestation AF%shall

    , as

    certif

    H of DC is issue

    termsofMU

    PaymentlinkedwithEquivalentAvailabilityFactor(EAF%)will

    be id monthly and quarterly to eligible employees.The

    forastationshallbew

    :

    swhereABTisinoperation,theE

    becalculatedasunder:

    EAF(%)= Declared Capacity(%) / Availability(%)iedby concernedAuthority.

    owever, in case the certification din

    theEAF%willbecalculatedasunder:

    DeclaredCap.(MU),ascertifiedbythe

    concernedAuthorityEAF(%) = Ex-bus Generation (MU) at installed

    capacity

    x 10

    0

    b) StationswhereABTisnotinoperation,EAFwillinclude

    shortfall in g o don

    t structions

    RLDC/REB/C

    Actual Gen.(MU)+Shortfall in Gen.

    EAF(%) = duetobackingdown(MU)

    eneration due to backing d wn (base

    he certificate issued) on the in of

    EAandwillbecalculatedasunder:

    Generation(MU)atinstalledcapacity

    x 10

  • 7/21/2019 0601 Generation Incentive

    6/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 6 of 20

    The responsibility of obtaining the relevant certificate

    from the above authorities will be of the

    concerned Project/Station. If capacity declared isfound to be wrongandpenalty imposedonNTPCon

    accountof the falsedeclaration, theamount of

    penalty shall be recovered from the

    incentive payable to employee in proportion to their

    basic pay. The maximum amount of recovery will

    be restricted to the total amount of Generation

    Incentivepaidinthatmonth.

    d) Based on the EAF of the station, the incentive willbe

    payableasperperformance-paymentmatrix inpara7.2

    below.

    (ii) Oil Consumption linked Incentive:- Payment will be made

    monthly only to the employees directly and exclusively

    engaged in operation and maintenance of the plant as per

    para8.0below.

    6.0 GENERATIONLINKEDINCENTIVEBASEDONEAF%The Generation Incentive Scheme based on EAF% will have

    monthly and quarterly components of payment linked with the

    corresponding performance levels as detailed below.There willbegraded increase in rate of Incentive for increase in EAF% above

    70% EAF.The maximum Incentive will be payable at EAF of 90%

    andabove.ThePerformancePaymentmatrixshowingmonthlyand

    quarterlypayments isgiven intheClause7.2.Thecapacity for the

    purposeofcomputingEAF%shalltake intotheaccountderationof

    newlycommissionedunitsduring the firstyearasgiven inclause

    7.1.ThetotalpaymentlinkedwithEAF%willbeasunder:-

    a) At70%EAF-incentivepaymentwillbe7.5%ofbasicpay.

    70% there will

    for every 1%

    b) For EAF% above

    incentive payment

    be graded increase in

    increase in EAF% with

  • 7/21/2019 0601 Generation Incentive

    7/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 7 of 20

    maximum incentiveequal to30.0%ofbasicpayat90%EAF.

    The graded increase in rate of Incentive payment has been

    madeasperdetailsgivenbelow:-

    6.1 MonthlyIncentive6.1.1Themonthly incentivewillbepaidbasedonEquivalent

    AvailabilityFactor(EAF%)achievedduringthemonth.

    6.1.2 Performance-PaymentRelationship

    At 70% EAF, the incentive payable is 5.625% of basic

    payand therewillbegraded increase in Incentive rate

    with maximum incentive equal to 22.50%ofbasicpay,

    payableat90%EAF.

    6.2 QuarterlyIncentive6.2.1The quarterly incentive will be paid once in three

    months based on the average EAF% achieved during

    corresponding period. The performance period for

    paymentofquarterlyincentivewillbeasunder:

    1st quarter - ApriltoJune

    2nd quarter - ApriltoSeptember

    3rdquarter - ApriltoDecember

    4th quarter - ApriltoMarch

    6.2.2 Performance-PaymentRelationship

    At70%EAF, the total incentivepayable for thequarter,includingmonthlycomponentis7.50%ofbasicpayand

    there will be graded increase in Incentive rate with

    maximumIncentivebeing30.0%ofbasicpaypayableat

    90%EAF.

    6.3 An illustrationshowingcomputationofmonthlyandquarterly

    incentiveratesareenclosedforreference.

    7.0 CAPACITYANDPERFORMANCE-PAYMENTRELATIONSHIP

    7.1 Capacity

    Installedcapacitywillbetakenasthebasisforcomputationof

    EAF%. When the capacity is de-rated/re-rated, theEAFwill

    be calculated on that basis. Reviewin capacitywillbedone

    with the approval of Competent Authority. In case of newly

    commissionedUnit, thecapacity tobe taken intoaccountfor

    thecomputationofEAF%willbedeterminedasfollows:

  • 7/21/2019 0601 Generation Incentive

    8/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 8 of 20

    a) CoalS

    ii) Inthesubsequent four (04)months, itwillbe70%

    lled/Ex-buscapacityand thereafter, itwill

    beequalto100%ofinstalled/Ex-buscapacity.

    b) GasS

    tations

    i) In the first two (02) months from the date ofcommercial operation, it will be 60% of

    installed/Ex-buscapacity.

    ofinsta

    tations

    i) In the first month from the date of commercial

    ii) In thesubsequent two (02)months, itwillbe70%

    c) EAF%

    shallbe roundedoff to thenearest integer.Decimalof

    0.5 and above will be rounded off to the next higher

    integerwhiledecimalsbelow0.5willbeignored.

    operation, it will be 60% of installed/Ex-bus

    capacity.

    ofinstalled/Ex-buscapacityandthereafter, itwill

    beequalto100%ofinstalled/Ex-buscapacity.

    Forthepurposeofcalculatingincentiverates,the

  • 7/21/2019 0601 Generation Incentive

    9/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 9 of 20

    7.2 PerformancePaymentMatrix:

    Incentivepayable (%ofBasicpay)EAF(%)Monthly Quarterly Total

    70

    71

    7273

    74

    7576

    77

    7879

    8081

    82

    8384

    8586

    87

    8889

    90&above

    05.625

    06.075

    06.52506.975

    07.425

    07.87508.625

    09.375

    10.12510.875

    12.15013.050

    13.950

    14.85015.750

    16.65017.550

    18.450

    19.80021.150

    22.500

    1.875

    2.025

    2.1752.325

    2.475

    2.6252.875

    3.125

    3.3753.625

    4.0504.350

    4.650

    4.9505.250

    5.5505.850

    6.150

    6.6007.050

    7.500

    07.50

    08.10

    08.7009.30

    09.90

    10.5011.50

    12.50

    13.5014.50

    16.2017.40

    18.60

    19.8021.00

    22.2023.40

    24.60

    26.4028.20

    30.00

    8.0 INCENTIVELINKEDTOOILCONSUMPTIONFACTOR

    The incentive will be payable monthly only if the Specific oil

    consumption of the station is 2.00ml/kwh or less in a particular

    month. Similarly, there will be dis-incentive if the Specific oil

    consumption of the station in any month is more than the 4.00

    ml/kwh.8.1 PerformancePaymentTableforIncentive-The

    matrixofpaymentswillbeasunder:-

    OilConsumptionin

    ml/kwh

    Incentive as % of

    monthlybasicpay

    Above2.00 Nil

    2.001.76 0.70

    1.751.51 1.00

  • 7/21/2019 0601 Generation Incentive

    10/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 10 of 20

    1.501.26 1.30

    1.251.01 1.60

    1.000.76 1.900.750.51 2.20

    8.2 There will be no incentive foroil consumption between 2.00

    8.3 e forexcessiveoilconsumption -Thematrix fordis-incentivewithrespecttoexcessiveoilconsumptionwillbe

    asu :

    Oil on

    inm

    0.50&below 2.50

    ml/kwhand4.01ml/kwh.

    Dis-incentivnder -

    Consumpti

    l/kwh

    Dis-ince as %ntive

    ofmonthlybasicpay

    4.014.25

    4.264.50

    4.514.75

    4.765.00

    5.015.25

    5.265.50 2.20

    5.51&Above 2.50

    0.70

    1.00

    1.30

    1.60

    1.90

    8.4 disincentive for excessive oil consumption for themonthwillbesubjecttoamaximumof25%oftotal incentive

    8.5

    n

    theEAF%inanymonthislessthan70%,there

    will be no incentive/disincentive on account of oil

    8.6

    nwill

    bemoderated in thesimilarmannerduring first six months.

    sm t

    a) Duringfirst2monthsafter =60%ofoilconsumption

    The total

    payable.

    The above incentive on account of oil consumption will be

    payableo lywhen thebase levelofgeneration i.e. 70%EAF

    isachieved.If

    consumption.

    For the purpose of generation linked incentive, the capacity

    for computation of EAF% for a newly commissioned unit, is

    derated to 60% in the first 2 months and to 70% in the

    subsequent4months.Theactualspecificoilconsumptio

    Thi oderationwillbecarriedou inthefollowingway:

  • 7/21/2019 0601 Generation Incentive

    11/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 11 of 20

    0.6)

    dateofcommercialoperation (Moderating factor-

    b) Duringsubsequent = 70%ofoilconsumption04months (Moderatingfactor-0.7)

    c) After06monthsof = 100%ofoilconsumption

    commercialoperation (Moderatingfactor-1.0)

    8.7 Thespecificoilconsumption (x)ofthestation forthepurpose

    ofoillinkedincentivewillbecomputedasfollows:-

    Ci * Mfx(ml/kwh) = ---------------------------------------

    TotalgenerationofstationinMU

    Ci = OilconsumptioninK.LiterforUnit`i'

    Mf = ModeratingFactorforunitasgivenin

    para8.6above.

    8.8 There may be situation in a project when some of the units

    maynothavecompleted 06monthsofcommercialoperation.

    Under this situation, the calculation of station specific oil

    consumption for thepurposeof incentiveshallbecarriedout

    asperexamplegivenbelow:-

    a) Totalnumberofunits - 5

    b) No.ofunit(s)monthswhichhavecompleted

    06 of commercialoperation

    - 3(Unit

    I,II&III)

    c) No. of unit(s) which have completed 03-06

    monthsofcommercialoperation

    - 1(Unit

    IV)

    d) No. of unit(s) which have completed less

    than03monthsofcommercialoperation

    - 1(UnitV)

    e) Oilconsumptionofindividualunits:

    UnitI C1 K.Liter

    UnitII C2 K.Liter

    UnitIII C3 K.Liter

    UnitIV C4 K.Liter

    UnitV C5K.Liter

  • 7/21/2019 0601 Generation Incentive

    12/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 12 of 20

    f) Station specific oil consumption (x) for oil linked

    incentivepurposewillbe:

    C1+C2+C3+0.7*C4+0.6*C5x = ----------------------------------------

    TotalgenerationofstationinMU

    The above station specific oil consumption `x' will then

    be compared with the incentive/disincentive matrix

    givenaboveand incentive/disincentivewillapply,asthe

    casemaybe.

    8.9 Theoil incentivepayment ispayableonlytotheemployees in

    Group-`A'.The disincentive due to excessive oil consumption

    willalsobeapplicabletotheemployeesinGroup-`A'only.

    9.0. CLASSIFICATION OF EMPLOYEES FOR THE INCENTIVESCHEMES

    9.1 For thepurposeofpaymentof incentivesunder this scheme

    GroupA' : Eligible engaged

    commiss

    GroupB' : asspecifAll other

    theemployeeswillbeclassifiedintothefollowinggroups:-

    employees directly and exclusively

    in Operation & Maintenance of the

    onedunitorunitsincludingAuxiliaries

    iedinPara9.2eligible employees not covered under

    Group `A'above inrespectofastationwhereall

    units are declared under commercial operation.

    Thisgroupwill includeemployeesasspecifiedin

    Para9.2(i).GroupC' : The employees posted in Civil Construction &

    Equipment Erection department during

    expansion/concurrent phase. This group will

    includeemployeesasspecifiedinPara9.2(ii).

    9.2 Deptt./areasundereachgroupwillbeasunder:

    Deptts/Areasunder

    DirectCategory(Group-

    A)

    Deptts/AreaunderIndirectCategory

    (Group-B/C)

  • 7/21/2019 0601 Generation Incentive

    13/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 13 of 20

    ,EEMG,

    e

    Plannin

    Operations,Chemis

    FuelHandling

    try,

    FuelTransportation/

    MGR, Maintenanc

    Group-B

    HeadofProject,Commercial,

    PlantCivilMntce,R&M,T/shipCivil&Electrical

    (i)

    Mntce.,HR,

    Autobase,Const.Workshop, EMMechanical G,

  • 7/21/2019 0601 Generation Incentive

    14/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 14 of 20

    ElectricalandC&I

    Maintenance

    (excluding nisterialanddrivers)

    mistaff

    Note:-

    includingthosepostedinO&M.

    (ii)

    F&A,C&M,ETP,TS(P&S,FQA,FE),

    e, s .

    Allministerialstaffanddrivers

    R&R,IT/CommnSafety.Tel.

    Exchang Medical,A hUtln ,Vigilance,TQM

    Group-C

    Erection&CivilConstruction

    (i) The clarifications regarding any Department/Area not

    cate entive

    ill be obtained from Corporate HR Division.

    h time, the r edemployeewillbepaidincenti nd .

    ( artment/a s be the sis for

    cate roup pur of incentive. The

    al area/function assigned, if any, will not

    e incentive category/group of an individual

    10.0 QUANTU INCENTIVEthe Performance Payment

    10.2 e oyees posted in

    irect category (group-B)willbe

    un

    GroupA

    Indirect

    Category

    covered above, its gory for the purpose of inc

    payment w

    Till suc matte is clarifi the concernedveofthei irectcategory

    ii) The dep rea of po ting will ba

    gory/g for the pose

    addition

    chang

    employee.

    MOF10.1 The Incentive rates indicated in

    relationship Matrix are to be applied on the Basic Pay forcorresponding period in respect of Equivalent Availability

    Factor (%)both forCoal&Gasstations andinrespectofOil

    Linked Incentive(para 8.0), forCoal stationsonly,onmonthly

    basic.

    Th generation incentive payment to empl

    common service group i.e. ind

    as der:-

    DirectCategory

    GroupB

    100%ofIncentivepayableonEAF%as

    indicatedinthePerf.PaymentMatrix.In

    additionemployeesunderthiscategory

    wouldalsobeentitledforIncentive,as

    perPara8.0,forSp.OilConsp.

    r factor

    o

    85%ofGroup-'A'

    rates indicated

    inPerf.Payment

    Matrix fo

    fEAF %

  • 7/21/2019 0601 Generation Incentive

    15/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 15 of 20

    10.3 Indirect Category Group-C during Expansion/Concurrent

    phase:- The employees posted in Civil Construction &

    Equipment Erection department will get 30% ofapplicablerateofGenerationIncentiveofGroupA.

    10.4 The Generation Incentive payable during various stages of

    project i.e. during O&M and concurrent phase/expansion

    phase to all categories of employees is given below as

    illustration:

    Stage/phase of the

    Project/Station

    GenerationIncentiveRate

    Deptt/Areas O&M Service Erection&CivilFunction

    Construction

    O&MPhase

    (a Units inll

    Commercial

    operation)

    Group-A

    ( ) 5100%

    Group-B

    (8 %)

    -

    Expansion/Concurren

    tPhase

    Group-A

    (100%)

    Group-B

    (85%)

    Group-C

    (30%)

    11.011.1

    iftheperformanceisbelowstandard:

    11.2

    12.0 OTHERGENERALCONDITIONS

    REDUCTIONININCENTIVEPAYMENTS

    Inordertocontrolthecostofgenerationandimproveworkingand performance of the power station, management in its

    absolute discretion may introduce,from time to time,oneor

    moreofthefollowingfactorsforwhichreductionsinincentive

    rateswillbemade

    a) Controlonauxiliarypowerconsumption

    b) Timelywagonunloading

    c) Cleanliness

    d) Excessiveovertimepayments

    e) Anyotherrelevantfactor

    Thetotaldeductionsonaccountofalltheabovefactorsshall

    not exceed 40% of the total incentive payable including

    disincentive foroilconsumption.Dependingon the relevance

    and requirements, the introduction/discontinuance and

    extentofdeductionmayvaryfromstationtostation.

  • 7/21/2019 0601 Generation Incentive

    16/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 16 of 20

    12.1

    rata

    trainincasua

    purpo

    12.2 e a

    payn

    not c r

    Rent

    comp

    Fund, .

    12.3 Employees may be tra red fromonedepartment/division

    toanother. Insuchcases theirentitlement for incentivewill

    be determined as per the entitlement of the

    department/divisioninwhichtheyareactuallyposted.

    12.4 Relevant particulars and data relating to generation, oil

    consumption,attendanceetc.,willbefinalizedonthebasisof

    recordsandaccountsmaintainedbytheCompany.

    12.5 The management reserves the right to review/modify the

    scheme at its own discretion from time to time keeping inviewefficiencyoftheplantbeingincreased/improvedthrough

    installation of more or better equipment or by improving the

    mechanical/process/technology/methods/systemsand

    procedures.

    12.6 ComputationofEAF%andspecificOil consumption (ml/kwh)

    forthepurposeofthiswillbemadebyHRinconsultationwith

    F&AonthebasisofcertifieddatafromHeadofO&M,withthe

    approvalofHeadofStation/Project.AtRegionalHeadquarter

    in respect of EAF% will be done by Regional HR in

    consultationwithRegionalF&Aon thebasisofcertifieddataprovided by Regional OS/Commercial, with the approval of

    RegionalED.Similarly,atCorporateCentreprocessingw.r.t.

    EAF% will be done by Corporate HR in consultation with

    Corporate Finance on the basis of certified data provided by

    Corporate OS/Commercial or Regional Commercial/OS,with

    theapprovalofGM(HR).

    12.7 GenerationIncentivepaymenttoCC&RHqsemployees

    Theemployeeswillbeentitled to incentivepaymentsonpro-

    basis for actual period of attendance. The period of

    g in India for a duration of not more than 15 days,l leave and RH will be treated as attendance for the

    seofincentivepayment.

    Th mount of Incentive earnings will neither be termed as

    orallowance,norwages.Accordingly,thisamountwould

    ount fo any service benefits i.e. computation of House

    Allowance, Compensatory Allowance, cash

    ensation, encashment of leave, pay fixation, Provident

    PensionorGratuityetc

    nsfer

  • 7/21/2019 0601 Generation Incentive

    17/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 17 of 20

    a) Generation Incentive rate in respect of Corporate

    Centre employees will be worked out based on the

    weighted av it ialof licable incentive ra of the indirect category-

    Gro BineachoftheStati ProjectofNT

    the applicable Generation Incentive rates of

    al Head rter employees will be worked out

    ed on the apaci

    commercialoperatio plic n erat

    o - ineach the jects

    therespectiveregions.

    -

    The

    erage on capac y in commerc operationapp

    up-

    te

    on/

    PC.

    b) Similarly,

    Region

    bas

    qua

    w

    r

    eigh

    nof

    up

    ted

    ap

    B

    aver

    abl

    age

    e in

    of

    on

    ce

    c

    tiv

    pro

    ty

    ft

    ith

    in

    he

    in

    eo

    wry-G

    --o

    -

    indirectcatego

  • 7/21/2019 0601 Generation Incentive

    18/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 18 of 20

    M+Q AddlinQtr.

    Monthly EAF Monthly

    (a) (b) (c) d=(c)-(b) (a) (b)

    IllustrationforcalculationofGIrates-MonthlyandQuarterlycomptation-I tatio

    EAFGIRates

    1.1 April 86.00% 17.55% 74.00% 7.43%

    Sl. S S

    Month

    1.2 May 86.00% 17.55% 73.00% 6.98%1.3 June 84.00% 15.75% 71.00% 6.08%

    1.4 TotalGIpaid(1.1-1.3) 50.85% 20.48%

    1.5 1stQtr(April-June) 86.00% 70.20% 19.35%

    73.00%

    2.1 July 88.00% 19.80% 77.00% 9.38%

    2.2 August 81.00% 13.05% 41.00% 0.00%

    2.3 September 93.00% 22.50% 65.00% 0.00%

    2.4 TotalGIpaid(1.1-2.3) 125.55% 37.28%

    2.5 2ndQtr(April-Sept) 86.00% 140.40% 14.85% 67.00%

    3.1 October 86.00% 17.55%

    70.00% 5.63%

    3.2 November 94.00% 22.50% 74.00% 7.43%

    3.3 December 99.00% 22.50% 78.00% 10.13%

    3.4 TotalGIpaid(1.1-3.3) 202.95% 60.45%

    -

  • 7/21/2019 0601 Generation Incentive

    19/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive Scheme

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 26.09.2011

    Updated as on: 31.01.2012

    Page: 19 of 20

    4.1 January 90.00% 22.50% 4.0 7.43%

    4.2 February 100.00% 22.50% 0.00% 12.15%

    4.3 March 95.00% 22.50% 81.00% 13.05%

    4.4 TotalGIpaid(1.1-4.3) 321.30% 93.08%

    5.0 4thQtr(April-March) 90.00% 360.00% 38.70% 71.00%

    6.0 AvgIncinFY 30.00%

    N.B. Quarterly,Incentivewillbepayableonlywhentotalm y centivepaid inthe

    minimumbasedEAF%ofthequarter.Ifitislessthan it llbetreatedaszero.

    7

    8

    0%

    on

    zer

    thl

    o,

    in

    wi

  • 7/21/2019 0601 Generation Incentive

    20/20

    NTPC Limited

    Corporate Human Resources Division

    HR Policy Manual

    Generation Incentive

    Section:0601

    Issue No: II Rev.No.:0

    Issue Date: 31.01.2012

    Updated as on: 31.01.2012

    Page: 20 of 20

    RECORD OF REVISIONS

    Section-Clause No. Revision

    No.

    Revision

    Date

    Amendment Details

    0601-Record ofRevisions

    0 13.02.2012 Provision Added

    PREPARED BY REVIEWED BY APPROVED BY

    D P GiriM(HR)

    P K SenapatiM(HR)

    D S RaoAGM(HR)