NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 1 of 20
GENERATIONINCENTIVESCHEME
Preamble:
Thefollowingsaretheessential featuresofthemodifiedPower GenerationIncentive Scheme which is enclosed as Annexure:-
1. Theprovisionsoftheschemeareapplicablew.e.f.1.4.2005.
2. BasicpayforthepurposeofpaymentofIncentivewillbeactualbasic
pay(w.r.t.1997paystructure)andspecialpay,ifany.However,basic
pay will not include any Dearness pay, DA,PersonalPay,Personal
Adjustment.
3. The Incentive payment will continue to be linked with the
performanceparameter,theEquivalentAvailabilityFactor%.
4. Theincentive willbe paidin two components i.e. monthly and
quarterly.
5. The employees, for the purpose of Incentive payment, will be
categorized into Direct(Group-A)and Indirect (Group-B/C)and the
maximum quantum of Generation Incentive payable to each
category/groupindifferentstagesofprojectwillbeasunder:-
DuringO&Mphase During Expansion/
Concurrentphase
Group-A
(O&Memployees)
Amount as
per
performance-
payment matrix as
Amount as per
performance-payment
matrix as given in
scheme(para7.2)
Group-B
(Common serviceemployees)
85% of
amountpayable to
85% of amount payable
to employees in Group-A
Group-C
( Project Const.employees)
N.A. 30% of amount payable
to employees in Group-A
7/21/2019 0601 Generation Incentive
2/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 2 of 20
6. The oil linked incentive/disincentive as applicable to only for
Operation & Maintenance employees in group-A, will continue to bepaidasperexistingscheme.
7. Inrespectofemployeeswhohave beentransferredfromoneproject
to another after 1.4.2005, payment for the period where the
employee had worked at the transferor project will be made by the
project where he is presently working. For this purpose, the
transferor project should send the amount payable in respect of
employee transferred to other projects/units within a period of one
monthofissueofcircular.
8. The Scheme shall not be applicable forTandaTPS for which a
separateschemeisinoperation.
7/21/2019 0601 Generation Incentive
3/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 3 of 20
Annexure
GENERATIONINCENTIVESCHEME
1.0 SHORTTITLE
The Scheme shall be called "NTPC PowerGeneration Incentive
Scheme".
2.0 BASICCONSIDERATIONS
2.1 The purpose of any Incentive Scheme is to motivate theemployees to give their best. In the case of a power plant, the
incentive plan also takes into account the maintenance
aspect of the plant while motivating employees to maximize
generation. Any Scheme which encourages maximization of
Generation only in the short term may be self defeating as it
leadstoirreparabledamagetoplantsandmachinerybecause
of insufficient motivation to employee for the proper upkeep
and regular maintenance of the Plant. A successful Incentive
Scheme, hence, should strike a balance between short range
and long range plant requirements and should achieve a good
blend of the two in such a way as to optimize generation on a
sustained long range basis. Further, increase in Generation
may not lead to desirable results if increased costs are
allowed to eat away the substantial surplus as a result of
higher generation. From this point of view, it is desirable to
build the fuel costs and their impact on the economics of
generation into the scheme itself so that reasonable norms of
fuelconsumptionaremaintained.
2.2 The following objectives have been considered in designing the
incentivescheme.
2.2.1To keep the Generating station in readiness to deliver e
x-busoutputexpressedas%ofratedinstalledcapacity so
that the available resources are optimized based on the
merit order operation thereby bringing about an
overalleconomyingeneration.
2.2.2To maximize generation of electrical energy through
7/21/2019 0601 Generation Incentive
4/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 4 of 20
d
e
ve areeasily measurable and have a direct co-relation to the
2.2.3 the scheme by the
employees, smooth implementation and amenability to
2..2.4 rameters for payment have been determined to
encourage better maintenance for higher availability of
2.2.5 e
while at
same time,ensuring thatpaymentsareconsistent
economictermswiththelevelofperformance.
3.0r
ion, morale and the team spirit among the
employees, the followings are the principal objectives of the
b) n of generation of Electrical energy through
d other allied
c) Reductionofcostperunitofenergygenerated. d)
inabsenteeism.
4.0loyeesofNTPCotherthanTanda
TPS,directlyor indirectlyengaged inGenerationofElectricity.The
em
a) ApprenticesunderApprenticesActandTrainees b)
optimum use of installed power plant capacity an
reduction of cost per unit of energy generated. Th
factors recommended for payment of incenti
extentofachievementoftheaboveobjectives.
To ensure easy understanding of
simpleunambiguouscomputations.
The pa
plant.
Thequantumof incentiveoffered toemployeeshas tob
enough to motivate them to put in extra effort
the
in
OBJECTIVES
Withtheaboveasbackgroundandapa tfromthe generalpurposeof
promoting motivat
IncentiveScheme:
a) TokeeptheGeneratingstation in readinesstodeliverex-bus
maximumoutputexpressedas%ofratedinstalledcapacity.
Maximizatio
optimum utilization of installed plant capacity an
resources.
Reduction
APPLICABILITY
TheSchemecoversallregularemp
Sch ewillnotbeapplicableto:-
Casualordailyratedemployees
7/21/2019 0601 Generation Incentive
5/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 5 of 20
5.0 RECOMMENDEDFACTORSFORINCENTIVEPAYMENTT
ac
of po and cost reduction, a multi-factor scheme has beendesigned
i)
To hieve the twinobjectivesofavailabilityofplant forgeneration
werincorporatingthefollowingfactors:
Generation Incentive based on Equivalent Availability Factor
%:-
pa
EAF% orked outasper formulagiven
below
a) Thestation AF%shall
, as
certif
H of DC is issue
termsofMU
PaymentlinkedwithEquivalentAvailabilityFactor(EAF%)will
be id monthly and quarterly to eligible employees.The
forastationshallbew
:
swhereABTisinoperation,theE
becalculatedasunder:
EAF(%)= Declared Capacity(%) / Availability(%)iedby concernedAuthority.
owever, in case the certification din
theEAF%willbecalculatedasunder:
DeclaredCap.(MU),ascertifiedbythe
concernedAuthorityEAF(%) = Ex-bus Generation (MU) at installed
capacity
x 10
0
b) StationswhereABTisnotinoperation,EAFwillinclude
shortfall in g o don
t structions
RLDC/REB/C
Actual Gen.(MU)+Shortfall in Gen.
EAF(%) = duetobackingdown(MU)
eneration due to backing d wn (base
he certificate issued) on the in of
EAandwillbecalculatedasunder:
Generation(MU)atinstalledcapacity
x 10
7/21/2019 0601 Generation Incentive
6/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 6 of 20
The responsibility of obtaining the relevant certificate
from the above authorities will be of the
concerned Project/Station. If capacity declared isfound to be wrongandpenalty imposedonNTPCon
accountof the falsedeclaration, theamount of
penalty shall be recovered from the
incentive payable to employee in proportion to their
basic pay. The maximum amount of recovery will
be restricted to the total amount of Generation
Incentivepaidinthatmonth.
d) Based on the EAF of the station, the incentive willbe
payableasperperformance-paymentmatrix inpara7.2
below.
(ii) Oil Consumption linked Incentive:- Payment will be made
monthly only to the employees directly and exclusively
engaged in operation and maintenance of the plant as per
para8.0below.
6.0 GENERATIONLINKEDINCENTIVEBASEDONEAF%The Generation Incentive Scheme based on EAF% will have
monthly and quarterly components of payment linked with the
corresponding performance levels as detailed below.There willbegraded increase in rate of Incentive for increase in EAF% above
70% EAF.The maximum Incentive will be payable at EAF of 90%
andabove.ThePerformancePaymentmatrixshowingmonthlyand
quarterlypayments isgiven intheClause7.2.Thecapacity for the
purposeofcomputingEAF%shalltake intotheaccountderationof
newlycommissionedunitsduring the firstyearasgiven inclause
7.1.ThetotalpaymentlinkedwithEAF%willbeasunder:-
a) At70%EAF-incentivepaymentwillbe7.5%ofbasicpay.
70% there will
for every 1%
b) For EAF% above
incentive payment
be graded increase in
increase in EAF% with
7/21/2019 0601 Generation Incentive
7/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 7 of 20
maximum incentiveequal to30.0%ofbasicpayat90%EAF.
The graded increase in rate of Incentive payment has been
madeasperdetailsgivenbelow:-
6.1 MonthlyIncentive6.1.1Themonthly incentivewillbepaidbasedonEquivalent
AvailabilityFactor(EAF%)achievedduringthemonth.
6.1.2 Performance-PaymentRelationship
At 70% EAF, the incentive payable is 5.625% of basic
payand therewillbegraded increase in Incentive rate
with maximum incentive equal to 22.50%ofbasicpay,
payableat90%EAF.
6.2 QuarterlyIncentive6.2.1The quarterly incentive will be paid once in three
months based on the average EAF% achieved during
corresponding period. The performance period for
paymentofquarterlyincentivewillbeasunder:
1st quarter - ApriltoJune
2nd quarter - ApriltoSeptember
3rdquarter - ApriltoDecember
4th quarter - ApriltoMarch
6.2.2 Performance-PaymentRelationship
At70%EAF, the total incentivepayable for thequarter,includingmonthlycomponentis7.50%ofbasicpayand
there will be graded increase in Incentive rate with
maximumIncentivebeing30.0%ofbasicpaypayableat
90%EAF.
6.3 An illustrationshowingcomputationofmonthlyandquarterly
incentiveratesareenclosedforreference.
7.0 CAPACITYANDPERFORMANCE-PAYMENTRELATIONSHIP
7.1 Capacity
Installedcapacitywillbetakenasthebasisforcomputationof
EAF%. When the capacity is de-rated/re-rated, theEAFwill
be calculated on that basis. Reviewin capacitywillbedone
with the approval of Competent Authority. In case of newly
commissionedUnit, thecapacity tobe taken intoaccountfor
thecomputationofEAF%willbedeterminedasfollows:
7/21/2019 0601 Generation Incentive
8/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 8 of 20
a) CoalS
ii) Inthesubsequent four (04)months, itwillbe70%
lled/Ex-buscapacityand thereafter, itwill
beequalto100%ofinstalled/Ex-buscapacity.
b) GasS
tations
i) In the first two (02) months from the date ofcommercial operation, it will be 60% of
installed/Ex-buscapacity.
ofinsta
tations
i) In the first month from the date of commercial
ii) In thesubsequent two (02)months, itwillbe70%
c) EAF%
shallbe roundedoff to thenearest integer.Decimalof
0.5 and above will be rounded off to the next higher
integerwhiledecimalsbelow0.5willbeignored.
operation, it will be 60% of installed/Ex-bus
capacity.
ofinstalled/Ex-buscapacityandthereafter, itwill
beequalto100%ofinstalled/Ex-buscapacity.
Forthepurposeofcalculatingincentiverates,the
7/21/2019 0601 Generation Incentive
9/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 9 of 20
7.2 PerformancePaymentMatrix:
Incentivepayable (%ofBasicpay)EAF(%)Monthly Quarterly Total
70
71
7273
74
7576
77
7879
8081
82
8384
8586
87
8889
90&above
05.625
06.075
06.52506.975
07.425
07.87508.625
09.375
10.12510.875
12.15013.050
13.950
14.85015.750
16.65017.550
18.450
19.80021.150
22.500
1.875
2.025
2.1752.325
2.475
2.6252.875
3.125
3.3753.625
4.0504.350
4.650
4.9505.250
5.5505.850
6.150
6.6007.050
7.500
07.50
08.10
08.7009.30
09.90
10.5011.50
12.50
13.5014.50
16.2017.40
18.60
19.8021.00
22.2023.40
24.60
26.4028.20
30.00
8.0 INCENTIVELINKEDTOOILCONSUMPTIONFACTOR
The incentive will be payable monthly only if the Specific oil
consumption of the station is 2.00ml/kwh or less in a particular
month. Similarly, there will be dis-incentive if the Specific oil
consumption of the station in any month is more than the 4.00
ml/kwh.8.1 PerformancePaymentTableforIncentive-The
matrixofpaymentswillbeasunder:-
OilConsumptionin
ml/kwh
Incentive as % of
monthlybasicpay
Above2.00 Nil
2.001.76 0.70
1.751.51 1.00
7/21/2019 0601 Generation Incentive
10/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 10 of 20
1.501.26 1.30
1.251.01 1.60
1.000.76 1.900.750.51 2.20
8.2 There will be no incentive foroil consumption between 2.00
8.3 e forexcessiveoilconsumption -Thematrix fordis-incentivewithrespecttoexcessiveoilconsumptionwillbe
asu :
Oil on
inm
0.50&below 2.50
ml/kwhand4.01ml/kwh.
Dis-incentivnder -
Consumpti
l/kwh
Dis-ince as %ntive
ofmonthlybasicpay
4.014.25
4.264.50
4.514.75
4.765.00
5.015.25
5.265.50 2.20
5.51&Above 2.50
0.70
1.00
1.30
1.60
1.90
8.4 disincentive for excessive oil consumption for themonthwillbesubjecttoamaximumof25%oftotal incentive
8.5
n
theEAF%inanymonthislessthan70%,there
will be no incentive/disincentive on account of oil
8.6
nwill
bemoderated in thesimilarmannerduring first six months.
sm t
a) Duringfirst2monthsafter =60%ofoilconsumption
The total
payable.
The above incentive on account of oil consumption will be
payableo lywhen thebase levelofgeneration i.e. 70%EAF
isachieved.If
consumption.
For the purpose of generation linked incentive, the capacity
for computation of EAF% for a newly commissioned unit, is
derated to 60% in the first 2 months and to 70% in the
subsequent4months.Theactualspecificoilconsumptio
Thi oderationwillbecarriedou inthefollowingway:
7/21/2019 0601 Generation Incentive
11/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 11 of 20
0.6)
dateofcommercialoperation (Moderating factor-
b) Duringsubsequent = 70%ofoilconsumption04months (Moderatingfactor-0.7)
c) After06monthsof = 100%ofoilconsumption
commercialoperation (Moderatingfactor-1.0)
8.7 Thespecificoilconsumption (x)ofthestation forthepurpose
ofoillinkedincentivewillbecomputedasfollows:-
Ci * Mfx(ml/kwh) = ---------------------------------------
TotalgenerationofstationinMU
Ci = OilconsumptioninK.LiterforUnit`i'
Mf = ModeratingFactorforunitasgivenin
para8.6above.
8.8 There may be situation in a project when some of the units
maynothavecompleted 06monthsofcommercialoperation.
Under this situation, the calculation of station specific oil
consumption for thepurposeof incentiveshallbecarriedout
asperexamplegivenbelow:-
a) Totalnumberofunits - 5
b) No.ofunit(s)monthswhichhavecompleted
06 of commercialoperation
- 3(Unit
I,II&III)
c) No. of unit(s) which have completed 03-06
monthsofcommercialoperation
- 1(Unit
IV)
d) No. of unit(s) which have completed less
than03monthsofcommercialoperation
- 1(UnitV)
e) Oilconsumptionofindividualunits:
UnitI C1 K.Liter
UnitII C2 K.Liter
UnitIII C3 K.Liter
UnitIV C4 K.Liter
UnitV C5K.Liter
7/21/2019 0601 Generation Incentive
12/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 12 of 20
f) Station specific oil consumption (x) for oil linked
incentivepurposewillbe:
C1+C2+C3+0.7*C4+0.6*C5x = ----------------------------------------
TotalgenerationofstationinMU
The above station specific oil consumption `x' will then
be compared with the incentive/disincentive matrix
givenaboveand incentive/disincentivewillapply,asthe
casemaybe.
8.9 Theoil incentivepayment ispayableonlytotheemployees in
Group-`A'.The disincentive due to excessive oil consumption
willalsobeapplicabletotheemployeesinGroup-`A'only.
9.0. CLASSIFICATION OF EMPLOYEES FOR THE INCENTIVESCHEMES
9.1 For thepurposeofpaymentof incentivesunder this scheme
GroupA' : Eligible engaged
commiss
GroupB' : asspecifAll other
theemployeeswillbeclassifiedintothefollowinggroups:-
employees directly and exclusively
in Operation & Maintenance of the
onedunitorunitsincludingAuxiliaries
iedinPara9.2eligible employees not covered under
Group `A'above inrespectofastationwhereall
units are declared under commercial operation.
Thisgroupwill includeemployeesasspecifiedin
Para9.2(i).GroupC' : The employees posted in Civil Construction &
Equipment Erection department during
expansion/concurrent phase. This group will
includeemployeesasspecifiedinPara9.2(ii).
9.2 Deptt./areasundereachgroupwillbeasunder:
Deptts/Areasunder
DirectCategory(Group-
A)
Deptts/AreaunderIndirectCategory
(Group-B/C)
7/21/2019 0601 Generation Incentive
13/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 13 of 20
,EEMG,
e
Plannin
Operations,Chemis
FuelHandling
try,
FuelTransportation/
MGR, Maintenanc
Group-B
HeadofProject,Commercial,
PlantCivilMntce,R&M,T/shipCivil&Electrical
(i)
Mntce.,HR,
Autobase,Const.Workshop, EMMechanical G,
7/21/2019 0601 Generation Incentive
14/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 14 of 20
ElectricalandC&I
Maintenance
(excluding nisterialanddrivers)
mistaff
Note:-
includingthosepostedinO&M.
(ii)
F&A,C&M,ETP,TS(P&S,FQA,FE),
e, s .
Allministerialstaffanddrivers
R&R,IT/CommnSafety.Tel.
Exchang Medical,A hUtln ,Vigilance,TQM
Group-C
Erection&CivilConstruction
(i) The clarifications regarding any Department/Area not
cate entive
ill be obtained from Corporate HR Division.
h time, the r edemployeewillbepaidincenti nd .
( artment/a s be the sis for
cate roup pur of incentive. The
al area/function assigned, if any, will not
e incentive category/group of an individual
10.0 QUANTU INCENTIVEthe Performance Payment
10.2 e oyees posted in
irect category (group-B)willbe
un
GroupA
Indirect
Category
covered above, its gory for the purpose of inc
payment w
Till suc matte is clarifi the concernedveofthei irectcategory
ii) The dep rea of po ting will ba
gory/g for the pose
addition
chang
employee.
MOF10.1 The Incentive rates indicated in
relationship Matrix are to be applied on the Basic Pay forcorresponding period in respect of Equivalent Availability
Factor (%)both forCoal&Gasstations andinrespectofOil
Linked Incentive(para 8.0), forCoal stationsonly,onmonthly
basic.
Th generation incentive payment to empl
common service group i.e. ind
as der:-
DirectCategory
GroupB
100%ofIncentivepayableonEAF%as
indicatedinthePerf.PaymentMatrix.In
additionemployeesunderthiscategory
wouldalsobeentitledforIncentive,as
perPara8.0,forSp.OilConsp.
r factor
o
85%ofGroup-'A'
rates indicated
inPerf.Payment
Matrix fo
fEAF %
7/21/2019 0601 Generation Incentive
15/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 15 of 20
10.3 Indirect Category Group-C during Expansion/Concurrent
phase:- The employees posted in Civil Construction &
Equipment Erection department will get 30% ofapplicablerateofGenerationIncentiveofGroupA.
10.4 The Generation Incentive payable during various stages of
project i.e. during O&M and concurrent phase/expansion
phase to all categories of employees is given below as
illustration:
Stage/phase of the
Project/Station
GenerationIncentiveRate
Deptt/Areas O&M Service Erection&CivilFunction
Construction
O&MPhase
(a Units inll
Commercial
operation)
Group-A
( ) 5100%
Group-B
(8 %)
-
Expansion/Concurren
tPhase
Group-A
(100%)
Group-B
(85%)
Group-C
(30%)
11.011.1
iftheperformanceisbelowstandard:
11.2
12.0 OTHERGENERALCONDITIONS
REDUCTIONININCENTIVEPAYMENTS
Inordertocontrolthecostofgenerationandimproveworkingand performance of the power station, management in its
absolute discretion may introduce,from time to time,oneor
moreofthefollowingfactorsforwhichreductionsinincentive
rateswillbemade
a) Controlonauxiliarypowerconsumption
b) Timelywagonunloading
c) Cleanliness
d) Excessiveovertimepayments
e) Anyotherrelevantfactor
Thetotaldeductionsonaccountofalltheabovefactorsshall
not exceed 40% of the total incentive payable including
disincentive foroilconsumption.Dependingon the relevance
and requirements, the introduction/discontinuance and
extentofdeductionmayvaryfromstationtostation.
7/21/2019 0601 Generation Incentive
16/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 16 of 20
12.1
rata
trainincasua
purpo
12.2 e a
payn
not c r
Rent
comp
Fund, .
12.3 Employees may be tra red fromonedepartment/division
toanother. Insuchcases theirentitlement for incentivewill
be determined as per the entitlement of the
department/divisioninwhichtheyareactuallyposted.
12.4 Relevant particulars and data relating to generation, oil
consumption,attendanceetc.,willbefinalizedonthebasisof
recordsandaccountsmaintainedbytheCompany.
12.5 The management reserves the right to review/modify the
scheme at its own discretion from time to time keeping inviewefficiencyoftheplantbeingincreased/improvedthrough
installation of more or better equipment or by improving the
mechanical/process/technology/methods/systemsand
procedures.
12.6 ComputationofEAF%andspecificOil consumption (ml/kwh)
forthepurposeofthiswillbemadebyHRinconsultationwith
F&AonthebasisofcertifieddatafromHeadofO&M,withthe
approvalofHeadofStation/Project.AtRegionalHeadquarter
in respect of EAF% will be done by Regional HR in
consultationwithRegionalF&Aon thebasisofcertifieddataprovided by Regional OS/Commercial, with the approval of
RegionalED.Similarly,atCorporateCentreprocessingw.r.t.
EAF% will be done by Corporate HR in consultation with
Corporate Finance on the basis of certified data provided by
Corporate OS/Commercial or Regional Commercial/OS,with
theapprovalofGM(HR).
12.7 GenerationIncentivepaymenttoCC&RHqsemployees
Theemployeeswillbeentitled to incentivepaymentsonpro-
basis for actual period of attendance. The period of
g in India for a duration of not more than 15 days,l leave and RH will be treated as attendance for the
seofincentivepayment.
Th mount of Incentive earnings will neither be termed as
orallowance,norwages.Accordingly,thisamountwould
ount fo any service benefits i.e. computation of House
Allowance, Compensatory Allowance, cash
ensation, encashment of leave, pay fixation, Provident
PensionorGratuityetc
nsfer
7/21/2019 0601 Generation Incentive
17/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 17 of 20
a) Generation Incentive rate in respect of Corporate
Centre employees will be worked out based on the
weighted av it ialof licable incentive ra of the indirect category-
Gro BineachoftheStati ProjectofNT
the applicable Generation Incentive rates of
al Head rter employees will be worked out
ed on the apaci
commercialoperatio plic n erat
o - ineach the jects
therespectiveregions.
-
The
erage on capac y in commerc operationapp
up-
te
on/
PC.
b) Similarly,
Region
bas
qua
w
r
eigh
nof
up
ted
ap
B
aver
abl
age
e in
of
on
ce
c
tiv
pro
ty
ft
ith
in
he
in
eo
wry-G
--o
-
indirectcatego
7/21/2019 0601 Generation Incentive
18/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 18 of 20
M+Q AddlinQtr.
Monthly EAF Monthly
(a) (b) (c) d=(c)-(b) (a) (b)
IllustrationforcalculationofGIrates-MonthlyandQuarterlycomptation-I tatio
EAFGIRates
1.1 April 86.00% 17.55% 74.00% 7.43%
Sl. S S
Month
1.2 May 86.00% 17.55% 73.00% 6.98%1.3 June 84.00% 15.75% 71.00% 6.08%
1.4 TotalGIpaid(1.1-1.3) 50.85% 20.48%
1.5 1stQtr(April-June) 86.00% 70.20% 19.35%
73.00%
2.1 July 88.00% 19.80% 77.00% 9.38%
2.2 August 81.00% 13.05% 41.00% 0.00%
2.3 September 93.00% 22.50% 65.00% 0.00%
2.4 TotalGIpaid(1.1-2.3) 125.55% 37.28%
2.5 2ndQtr(April-Sept) 86.00% 140.40% 14.85% 67.00%
3.1 October 86.00% 17.55%
70.00% 5.63%
3.2 November 94.00% 22.50% 74.00% 7.43%
3.3 December 99.00% 22.50% 78.00% 10.13%
3.4 TotalGIpaid(1.1-3.3) 202.95% 60.45%
-
7/21/2019 0601 Generation Incentive
19/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive Scheme
Section:0601
Issue No: II Rev.No.:0
Issue Date: 26.09.2011
Updated as on: 31.01.2012
Page: 19 of 20
4.1 January 90.00% 22.50% 4.0 7.43%
4.2 February 100.00% 22.50% 0.00% 12.15%
4.3 March 95.00% 22.50% 81.00% 13.05%
4.4 TotalGIpaid(1.1-4.3) 321.30% 93.08%
5.0 4thQtr(April-March) 90.00% 360.00% 38.70% 71.00%
6.0 AvgIncinFY 30.00%
N.B. Quarterly,Incentivewillbepayableonlywhentotalm y centivepaid inthe
minimumbasedEAF%ofthequarter.Ifitislessthan it llbetreatedaszero.
7
8
0%
on
zer
thl
o,
in
wi
7/21/2019 0601 Generation Incentive
20/20
NTPC Limited
Corporate Human Resources Division
HR Policy Manual
Generation Incentive
Section:0601
Issue No: II Rev.No.:0
Issue Date: 31.01.2012
Updated as on: 31.01.2012
Page: 20 of 20
RECORD OF REVISIONS
Section-Clause No. Revision
No.
Revision
Date
Amendment Details
0601-Record ofRevisions
0 13.02.2012 Provision Added
PREPARED BY REVIEWED BY APPROVED BY
D P GiriM(HR)
P K SenapatiM(HR)
D S RaoAGM(HR)