    Chapter 2 Reorder Point and Storage Location

    Planning

    Reorder point planning

    Ordering procedure for external procurement

    Storage location MRP

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    2/18

    SAP AG

    R

    Chapter 2 Objectives

    you will know the business background for reorder

    point planning

    you will have learned the reorder point planning

    procedure in the SP system !net re"uirements

    calculation# lot$si%e calculation&

    you will know the options you have in the R'( system

    for organi%ing the link between materials planning

    and purchasing

    you will have learned the functions available in

    storage location MRP

    )y the end of this chapter*

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    3/18

    SAP AG

    R

    Reorder Point Planning

    Replenishment

    lead time

    Stock Lot si%e

    Reorder point

    Safety stock

    Reorder point Point of delivery +ime

    The basis of reorder point planning is the comparison of stock and firmed receipts with the reorder point.

    The reorder point should cover consumption quantities during the replenishment lead time.

    If stock levels fall below the reorder point, procurement is triggered for the amount of the lot size.

    Safety stock is used to cover unplanned requirements during the replenishment lead time. It forms a part of thereorder point stock.

    If sales orders and manual reservations are to be included in planning, a separate reorder point procedure isavailable with eternal requirements!.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    4/18

    SAP AG

    R

    ,et Re"uirements -alculation for Reorder Point

    Planning

    Reorder point

    Purchase orders

    .irmed planned orders

    .irmed purchase

    re"uisitions

    Order proposal for

    lot si%e "uantity

    Stock

    Shortage

    -omparison

    " material shortage eists, when total stock plus firmed order proposals is less than the reorder point.

    If a material shortage eists, procurement is carried out for the amount of the lot size.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    5/18

    SAP AG

    R

    Reorder Point Planning* .orward Scheduling

    for /xternal Procurement

    Today (release date) Delivery date MRP date

    Processing time for

    prchasing Planned delivery time

    Goods receipt

    processing time

    In forward scheduling, to determine the #$% date &that is, the date by which the material is to be available for

    processing', the system starts from the date of the planning run and calculates in the future.

    In forward scheduling, starting from today(s date, the system adds the processing time required by thepurchasing department, then the planned delivery time in calendar days and finally the goods receipt processingtime in workdays.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    6/18

    SAP AG

    R

    Ordering Procedure for /xternal Procurement

    0ork list for

    purchasing

    Prchaseorder

    Plannedorder

    Schedlingagreement

    !"#"$%

    !"&"$%

    Prchasere'isition

    Manal

    Materials PlanningMaterials Planning

    Pr"Re'"

    Pr"Re'"

    Pr"Re'"

    Prchasere'isition

    Atomatic

    )epending on the link between materials planning and purchasing, the work lists of both departments can be

    separated.

    %lanned orders can also be created for eternal procurement so that the #$% controller can coordinate plannedquantities and dates in materials planning before they are passed on to the purchasing department.

    *owever, purchase requisitions can also be created directly in the planning run.

    In purchasing, the purchase requisitions created in the planning run can automatically be converted intopurchase orders.

    If a scheduling agreement eists for the vendor, schedule lines can also be created directly in the planning run.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    7/18

    SAP AG

    R

    1etermining Source of Supply via Source List

    1etermining source of supply1etermining source of supply

    Sched2agmt

    !"%"$

    !"#"$

    3uota

    arrangements

    3uota3uota

    arrangementsarrangements

    4endor

    )* 567* 867

    Source list

    /xactly one valid

    entry for materials planning

    Reference to scheduling

    agreements and automaticschedule lines allowed

    Schedule lines created

    during the planning run

    Source list

    +hen planning eternally procured materials, the source of supply can be determined using the source list or by

    quota arrangements.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    8/18

    SAP AG

    R

    Storage Location MRP !9&

    Stock shortage in separately

    planned storage location

    Stock transfer reservation in plant

    Replenishment per stock transfer

    between storage locations

    Stock transfer

    between storagelocations

    Plant 9666

    Storagelocationsplanned inplant

    Storagelocationplannedseparately

    Procedure* stock transfer within a plant

    In inventory management, the transfer posting to the storage location planned separately is carried out with

    reference to a stock transfer reservation.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    9/18

    SAP AG

    R

    Storage Location MRP !:&

    Stock shortage in separately

    planned storage location

    Procurement directly for separately

    planned storage location !in$house

    production'external

    procurement'consignment&

    ;oods receipt directly for the separately

    planned storage location

    Plant 9666Plant 9666

    Storage locationsplanned in plant

    Storage locationplanned separately

    Procedure* separate procurement for the storage location

    Procurementand ;R posting

    Procurementand ;R posting

    The special procurement keys for storage location #$% &eternal procurement, inhouse production, stock

    transfer from another plant' are defined in -ustomizing.

    In this procedure, the planned order or the purchase requisition contains the separately planned storagelocation.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    10/18

    SAP AG

    R

    Storage Location MRP !(&

    Stock shortage in separately plannedstorage location in plant 9666

    Stock transport re"uisition in separatelyplanned storage location in plant9666Release order re"uisition in plant 9:66

    Replenishment per stock transferbetween plants

    Plant 9666Plant 9666

    Stge locs2planned inplant

    Stge loc2plannedseparately

    (((

    Stge locs2planned inplant

    Plant 9:66Plant 9:66

    Stocktransfer

    from anotherplant

    Procudure* stock transfer between plants

    The special procurement keys for storage location #$% &eternal procurement, inhouse production, stock

    transfer from another plant' are defined in -ustomizing.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    11/18

    SAP AG

    R

    Storage Location MRP !5&

    Plant 9666Plant 9666

    Stge locs2planned inplant

    Storage locationsexcluded from theautomatic planning run

    Stock shortages in storage locations

    that are excluded from materials

    planning are not included in the

    planning run

    /xcluding the storage location from materials planning

    The stocks of the storage locations ecluded from materials planning are not included in plant stock.

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    12/18

    SAP AG

    R

    Chapter 2 Review !9&

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    13/18

    SAP AG

    R

    Chapter 2 Review !:&

    stock can be transferred to a storage location from

    another plant

    a storage location can be completely excluded from

    materials planning at plant level

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    14/18

    -hapter : /xercises* Reorder Point Planning

    Storage location MRP

    ne storage location (***2) for the ne+ ra+ material ,2MM-.. is to /e planned separately" Storage location (***!) that yoalready created in e0ercise ! is sed as the central +arehose"Procrement for storage location ***2 is to /e carried ot asfollo+s1 the prchase re'isition is directly created for the storagelocation as the vendor delivers direct to the storage location andthe goods receipt is also directly posted for this storage location"

    Therefore yo have to create storage location ***2 in thematerial master record for the ra+ material ,2MM-.. and yomst set the indicator for storage location MRP" Then yo haveto carry ot the single-item planning rn for the material andorgani3e replenishment for the separately planned storagelocation"

    !" Create the ne+ data in the material master record1

    4n the material master select1

    Material Create special Raw material.

    5nter the material nm/er ,2MM-.."5nter the indicator for the indstry sector mechanicalengineering"Select the psh/tton Select view(s) and only select the vie+MRP :1

    Select Continueand the screen for the organi3ational levelsappears" 5nter plant !*** and storage location ***2"

    4n the section of the screen entitled Storage location MRPenter the MRP indicator for planning storage locationsseparately" Select 650ternal procrement7 for the specialprocrement type maintain a reorder point of 8** pieces and

    a replenishment 'antity of 2*** pieces"9hat is the prpose of the reorder point for a material planned

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    15/18

    sing reorder point planning:

    ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;

    Save the material master record"

    2" Carry ot the planning rn for the material"

    Access the men for materials planning1

    Logistics Materials management Materials planning MRP

    To carry ot the planning rn select1

    Planning run Sng-item, sng-level.

    Carry ot the planning rn sing creation indicator 2 (prchasere'isitions in opening period other+ise planned orders)" AnMRP list is al+ays to /e created for the planning reslts"

    After having e0ected the planning rn display the MRP listand discss the reslts" Display the te0ts for the e0ceptionmessages" To do this position the crsor on the e0ception

    indicator and select1

    EditDispl.ecept.message.

    8" Carry ot replenishment for storage location ***21

    rders are made directly for storage location ***2" To do thisconvert the prchase re'isition in the MRP list into aprchase order"

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    16/18

    Position the crsor on the prchase re'isition and select1

    Environment Convert Pur.re!. pur.ord.

    4n the initial screen for creating prchase orders enter theprchasing organi3ation !***" The material is to /e orderedfrom vendor !*88 as this vendor provides the fastest service"

    Transfer the data of the prchase re'isition" The prchaseorder already contains the target storage location"

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    17/18

    Chec= any changes in the stoc=>re'irements list"

    9hat +old the reslt have /een if the goods receipt had/een completely posted:

    ;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;

  • 8/12/2019 03_LO525_Reorder Point and Store Location Planning.doc

    18/18

    -hapter : Solutions* Reorder Point Planning

    Storage Location MRP

    +o 92 0hat is the purpose of the reorder point for amaterial planned using reorder point planning=The reorder point shold cover the average consmptionin the replenishment lead time" 4f the stoc= level falls/elo+ the reorder point the material mst /e replenishedfor the amont of the lot si3e"

    +o :2 0hat would the result have been if the goodsreceipt had been posted for the complete "uantity=As only half of the 'antity +as posted the prchaseorder remains - redced /y the goods receipt 'antity"Plant stoc= +as also increased /y the goods receipt'antity"4f the goods receipt had /een for the complete 'antityplant stoc= +old have /een increased /y the completeprchase order 'antity and the prchase order +old nolonger /e visi/le in the stoc=>re'irements list"