01 What is Project Lifecycle Mangement 03 (1)

Embed Size (px)

Citation preview

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    1/12

    Slide no. 1

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Lifecycle Management

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    2/12

    Slide no. 2

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Lifecycle Program

    A group of related projects managed together

    Vision of the final result broken up into projects

    Projects may be done in parallel or in serial

    Project SDLC and SMLCDefineGoal

    PlanProject

    ExecutePlan

    CloseProject

    Evaluate

    `

    Plan Analyze DevelopDesign Implement

    SMLCMaintenance

    & Support

    System Development Life Cycle (SDLC)

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    3/12

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    4/12

    Slide no. 4

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Initiation Defining what the project will do and why:

    What is the business case? Why are we doing this?

    What is in scope? What is not in scope?

    What is the estimated cost?

    How long a time do we estimate it to take to complete?

    Who are the stakeholders. What stakes are theysupporting or opposing the project for?

    Project Charter : the Customers need & sanction

    Project Champion from client Defining who the project team will be

    Defining method of work by the team

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    5/12

    Slide no. 5

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Planning Defining how the project will be done:

    Documenting the Project Plan

    What is the Work Breakdown Structure (WBS) ?

    What are the milestones to deliver?

    What are the important tasks? How long witheach take? Who is responsible to deliver it?

    Estimating effort (resource requirement) and time(schedule)

    What are the risks, assumptions and constraints? Getting Customer Signoff on the Plan

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    6/12

    Slide no. 6

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Execution Doing what the Plan says would be done

    Procuring resources Deploying resources

    Directing the Resources on specific planned activities

    Monitoring actuals v/s plan Quality verification

    Scope completion measurements Risk factor oversight

    plan v/s actuals: Scope, Cost, Schedule

    Regular Review Meetings to monitor progress and identify problems

    Reporting to client and management Client report on progress .Eg. FIDIC Clause 14 Client Billing

    Management Reporting

    Forecast for project completion

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    7/12

    Slide no. 7

    May 17, 2012

    Author: Dilip ThosarFor BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Closure Handing the project to the client

    Delivery gate-pass meet : Customer signoff

    Document and signoff future commitments

    Gauge customer satisfaction

    Report final cost and time

    Document lessons learnt: technical, PM, RM, ?

    Archive documentation (and source code for sw)

    Raise final bill to customer

    Report closure to top management

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    8/12

    Slide no. 8

    May 17, 2012

    Author: Dilip Thosar

    For BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Generic Project Total Progress

    contractors progress v/s early finish curve

    Banana Curve

    100%90%

    80%70%60%50%40%30%

    20%10%0

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    9/12

    Slide no. 9

    May 17, 2012

    Author: Dilip Thosar

    For BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Time and Energy for each Phase

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    10/12

    Slide no. 10

    May 17, 2012

    Author: Dilip Thosar

    For BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Risk Management in Project Lifecycle Impact of project risks on lifecycle

    Probability of a disaster decreases during the lifeof a project

    Cost to recover from a problem increases during

    the project Essence of PM is RM!

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    11/12

    Slide no. 11

    May 17, 2012

    Author: Dilip Thosar

    For BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Managing Change Re-iterative mini-cycle of project lifecycle for

    change

    Impact analysis

    Major and Minor changes

    Re-schedule and re-bid for major changes

    Feature maps

    Version control Parallel developments

  • 7/31/2019 01 What is Project Lifecycle Mangement 03 (1)

    12/12

    Slide no. 12

    May 17, 2012

    Author: Dilip Thosar

    For BVUAmplifyDITMJanuary 2009

    Project And Product Lifecycle ManagementProject Lifecycle Management

    Project Lifecycle in Manufacturing Lean Manufacturing

    Flexible Manufacturing : Market of 1

    Variations of SDLC : Iterative Phases, Agile

    Feasibility study as a consultancy project Takt Time