Upload
jackson-lambert
View
68
Download
5
Embed Size (px)
DESCRIPTION
工程流程類流程領域 (PA). 大綱. 工程流程類簡介 相互關係 各流程介紹 (1) 需求發展 (Requirements Development) (2) 需求管理 (Requirements Management) (3) 技術解決方案 (Technical Solution) (4) 產品整合 (Product Integration) (5) 驗證 (Verification) (6) 確認 (Validation). CMMI 流程領域 (PA) 分類. - PowerPoint PPT Presentation
Citation preview
PA
(PA)(1) (Requirements Development)(2) (Requirements Management)(3) (Technical Solution)(4) (Product Integration)(5) (Verification)(6) (Validation)
2CMMI(PA)3
5(OID)(CAR)4(QPM)(OPP)3(IPM)(RSKM)(OPF)(OPD)(OT)(RD)(TS)(PI)(VER)(VAL)(DAR)2(PP)(PMC)(SAM)(REQM)(MA)(PPQA)(CM)1PA()(1) (Requirements Development)(2) (Requirements Management)(3) (Technical Solution)(4) (Product Integration)(5) (Verification)(6) (Validation)566
7:
PA
(RD)()(TAS)()(REQM)(VER)(VAL)(PI)
RDSG 1 SP 1.1 SP 1.2 SG 2 SP 2.1 SP 2.2 SP 2.3 SG 3 SP 3.1 (Scenario)SP 3.2 SP 3.3 SP 3.4 SP 3.5 1515SG 1 SP 1.1 SP 1.2
16RDRDSG 2 SP 2.1 SP 2.2
17RDSG 3 SP 3.1 (Scenario)SP 3.2 SP 3.3 SP 3.4
18RDTS
SG 1 SP 1.1 SP 1.2 SG 2 SP 2.1 SP 2.2 SP 2.3 SP 2.4 SG 3 SP 3.1 SP 3.2
19TS
SG 1 SP 1.1 SP 1.2 20TS
SG 2 SP 2.1 SP 2.2 SP 2.3 SP 2.4 21TS
SG 3 SP 3.1 SP 3.2 22REQM
SG 1 SP 1.1 SP 1.2 SP 1.3 SP 1.4 SP 1.5
23REQM
SG 1 SP 1.1 SP 1.2 SP 1.3 SP 1.4 SP 1.5 24PI
SG 1 SP 1.1 SP 1.2 SP 1.3 SG 2 SP 2.1 SP 2.2 SG 3 SP 3.1 SP 3.2 SP 3.3 SP 3.4
25PI
SG 1 SP 1.1 SP 1.2 SP 1.3 26PI
SG 2 SP 2.1 SP 2.2 27PI
SG 3 SP 3.1 SP 3.2 SP 3.3 SP 3.4 28VER
SG 1 SP 1.1 SP 1.2 SP 1.3 SG 2 SP 2.1 SP 2.2 SP 2.3 SG 3 SP 3.1 SP 3.2
29VER
SG 1 SP 1.1 SP 1.2 SP 1.3 30VER
SG 2 SP 2.1 SP 2.2 SP 2.3 31VER
SG 3 ,SP 3.1 SP 3.2 32VAL
SG 1 SP 1.1 SP 1.2 SP 1.3 SG 2 SP 2.1 SP 2.2
33VAL
SG 1 SP 1.1 SP 1.2 SP 1.3 34VAL
SG 2 SP 2.1 SP 2.2 35