ARMSTRONG CONSULTING ENGINEERS LIMITED Project Portfolio November 1, 2021 ARMSTRONG Maria House, Bugolobi, Kampala.

ARMSTRONG CONSULTING ENGINEERS LIMITED

Embed Size (px)

Citation preview

ARMSTRONG CONSULTING ENGINEERS LIMITED

Project Portfolio

November 1, 2021 ARMSTRONG

Maria House, Bugolobi, Kampala.

1

CONTENTS 1. CATEGORY: HEALTH .......................................................................................................................................... 3

1) Paediatric & Surgical wards and mortuary block .................................................................................. 4

2) Rehabilitation and Remodelling of Thirteen Health Centres (lot 3) in Kabale, Ntungamo and Bushenyi Districts. Under the Support of the Health Sector Strategic Plan Project (SHSSPP) 5

3) Renovation Activities by USAID/RHITES-E Saving Mothers Giving Life (SMGL) Infrastructure Improvement at Selected Health Facilities in Eastern Uganda ..................................... 6

4) Iranian Police Hospital ..................................................................................................................................... 7

5) Outpatient Department at Kibuli Muslim Hospital ............................................................................... 8

6) The supply of Structural and Civil engineering Consultancy Services for a surgical Ward Nsambya Hospital ...................................................................................................................................................... 9

2. CATEGORY: COMMERCIAL / OFFICE ........................................................................................................ 10

7) Proposed Office Development .................................................................................................................. 11

8) Completion of Church House .................................................................................................................... 12

9) Office development (Lotis Towers) .......................................................................................................... 13

10) The supply of Structural and Civil Engineering Consultancy Services for Office Development on Luthuli Avenue ....................................................................................................................... 15

11) Office Development (Trust Towers) .................................................................................................... 16

12) Office Block Naguru .................................................................................................................................. 17

13) Nasser Road Shopping Mall .................................................................................................................. 18

14) DFCU Bank Branches ................................................................................................................................ 19

15) Oxford Station ............................................................................................................................................. 20

16) Sama Holdings Ltd – Office development ....................................................................................... 21

17) Acacia Place Ltd – office development .............................................................................................. 22

18) Oasis Shopping Mall ................................................................................................................................. 23

19) Conference Hall Development ............................................................................................................. 24

20) Shopping Mall Fit Out for Cham Towers .......................................................................................... 25

21) Boundary Wall at United Nations High Commission for Refugees ........................................ 26

3. CATEGORY: EDUCATIONAL ......................................................................................................................... 27

22) Construction and Renovation of facilities at National Teachers’ College Kabale – Lot 1 28

23) Africa Renewal University classroom development...................................................................... 29

4. CATEGORY: HOTEL/LUXURY ACCOMODATIONS ............................................................................. 30

24) Luxury Apartment Tower Block ............................................................................................................ 31

25) Kampala Serena (Maisha Guest Rooms) ........................................................................................... 32

2

26) Valley Hill Apartments ............................................................................................................................. 33

5. CATEGORY: GOVERNMENT/PUBLIC INFRASTRUCTURE ............................................................... 34

27) Moroto Municipal Bus Terminal ........................................................................................................... 36

28) Kabaale International Airport ................................................................................................................ 37

29) Extension of Floating Restaurant Entebbe ....................................................................................... 38

30) Directorate of Citizenship and Immigration Control ................................................................... 39

31) Proposed upgrade of DSL@ Laboratories at National Animal Disease Diagnostics and Epidemiology Centre (NADDEC) at Entebbe, Uganda .............................................................................. 40

32) Upgrade of DSL2 Laboratories in Mbale District ................. Error! Bookmark not defined.

33) Veterinary diagnostic Laboratories and National Livestock Resources Research Institute (NALIRRI) in Tororo, Uganda ..................................................................... Error! Bookmark not defined.

34) Development of Kabaale International Airport .................... Error! Bookmark not defined.

35) Laboratory Block at Uganda National Bureau of Standards ..................................................... 41

6. CATEGORY: INDUSTRIAL .............................................................................................................................. 42

36) Data Centre .................................................................................................................................................. 43

37) Construction of Busia Main Market & High-Level Agricultural Value Addition Facilities 44

38) Engine Oils Factory ................................................................................................................................... 45

39) PROPOSED VOGU WORKSHOP AND YARD CONSTRUCTION AT TILENGA DRILLING AND WELLS DEVELOPMENT LAKE ALBERT .................................................................................................... 46

40) Additional Parking at Social Security House ................................................................................... 47

41) DESIGN AND CONSTRUCTION SUPERVISION OF DEI BIOPHARMA ...................................... 48

7. CATEGORY: STORAGE / WAREHOUSING.............................................................................................. 49

42) Warehouse Park ......................................................................................................................................... 50

43) Warehouse Development Park ............................................................................................................. 51

8. CATEGORY: NOT-FOR-PROFIT/ NON-GOVERNMENTAL .............................................................. 52

44) All Saints Cathedral ................................................................................................................................... 53

3

1. CATEGORY: HEALTH

4

Assignment Name: 1) Pediatric & Surgical wards and

mortuary block

Country: Uganda

Location with in the Country: Mubende

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Ministry of Health

No. of Staff 3

Address: Mubende Regional Referral Hospital

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2013

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: This is a referral hospital for the district of Mubende, Mityana, Kiboga and Kyankwanzi. It is a 4 storeyed block with a total floor area of over 6000sqm. The pediatric wards are well designed for exclusive use for children. The room layout allows actual visualization of all patients from the central station. The bed area allows enough space for performing routine ICU procedures such as central lines, chest tube placement as well as for easy access for portable X-ray machines or Ultra sound. The facility has seamless floors in surgical areas to lower risk of infections. Careful selection of finishes was done to easy cleaning and maintenance. All patient rooms have windows for proper air circulation and adequate lighting.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

5

Assignment Name: 2) Rehabilitation and Remodelling of Thirteen

Health Centres (lot 3) in Kabale, Ntungamo and Bushenyi Districts. Under the Support of the Health Sector Strategic Plan Project (SHSSPP)

Country: Uganda

Location with in the Country: Kabale, Ntungamo and Bushenyi Districts

Professional Staff Provided by the Firm: Assistant Civil and Structural Engineer

Name of Client: Ministry of Health and District Local Governments

No. of Staff 2

Address: Kabale, Ntungamo and Bushenyi Districts

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2010

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Assistant Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: The project entailed the rehabilitation of existing health Centre facilities including construction of new buildings and these included staff houses, out-patient department buildings, general wards, maternity wards, attendant’s shelters, theatre buildings, fences among other civil works. Water proof sheets were used to secure damaged roof sections.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

Assignment Name: Country: Uganda

6

3) Renovation Activities by USAID/RHITES-E Saving Mothers Giving Life (SMGL) Infrastructure Improvement at Selected Health Facilities in Eastern Uganda

Location with in the Country: Eastern Uganda

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Republic of Uganda, Ministry of Health

No. of Staff 2

Address: Eastern Uganda

No. of Staff months: Duration of Assignment:

Start Date: 2019 Completion Date: Under Construction

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Engineering Assistant

Narrative Description of Project: A visual assessment of 16 health facilities was carried out and we were to recommend remedial solutions. For cases of expansion, we were supposed to prepare the structural designs. Evidence gathered during the site visits indicates that all structures were single storied masonry units with a few of them tied with columns and a ring beam. Whereas some of the health centers were in fairly functional condition, others had extensive structural damages which needed urgent attention. The 16 health centers include;

Kwapa Health Centre III (Tororo district) Soroti Health Centre III (Soroti district) Kiyeyi Health Centre III (Tororo district) Asamuk Health Centre III Kapchorwa Hospital (Kapchorwa district) Kabarwa Health Centre III Kaserem Health Centre III (Kapchorwa district) Bumbo Health Centre III (Namisindwa district) Budaka Health Centre IV (Budaka district) Pallisa Health Centre III (Pallisa district) Butebo Health Centre IV (Butebo district) Bukedea Health Centre IV (Bukedea district) Ochero Health Centre (Kaberamaido district) Kanyum Health Centre III (Kumi district) Kasasira Health Centre IV (Kibuku district) Kibuku Health Centre IV (Kibuku district)

Description of Actual Services Provided by Our Staff: Structural appraisal Preparation of Civil and Structural Engineering designs Supervision of Construction works

7

Assignment Name: 4) Iranian Police Hospital

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: The Embassy of the Islamic Republic of Iran, Kampala

No. of Staff 1

Address: Naguru Nakawa Division

No. of Staff months: Duration of Assignment:

Start month: June 2012 Completion Date: 2015

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: This hospital was funded by Iranian government and constructed on police land in Naguru, Nakawa Division next to IOV offices. The floor area of the building is approximately 2200sqm. The 30-bed facility was designed as a two-storey building with a ground and first floor. The roof level of the building had both pitched and flat roof areas. The pitched roof areas were specially designed out of timber trusses which were to support the roofing sheets. The flat roof areas were designed as RC solid slabs to avoid leakages and also water proofed to enhance their water tightness.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

8

Assignment Name: 5) Outpatient Department at Kibuli

Muslim Hospital

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Structural Engineer

Name of Client: The Registered Trustees of the Young Men’s Muslim Association

No. of Staff 1

Address: Kibuli Muslim Hospital

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2006

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Assistant Structural Engineer Narrative Description of Project:

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

9

Assignment Name: 6) The supply of Structural and Civil

engineering Consultancy Services for a surgical Ward Nsambya Hospital

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Nsambya Hospital

No. of Staff 4

Address: Nsambya

No. of Staff months: Duration of Assignment: 14

Start Date: 15 July 2013 Completion Date: September 2014

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer – Assistant Project Engineer – Engineering Assistant Narrative Description of Project: The building houses physiotherapy wards, 50 beds, labor wards and surgical theaters. it also houses administrative offices. The building has 4 stories and was built-up on a floor area of 2973sqm. The hospital has spacious specialized theaters easy to clean and well-lit, typically with overhead surgical lights and have viewing screens and monitors. These operating rooms are generally windowless and feature controlled temperature and humidity.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

10

2. CATEGORY: COMMERCIAL / OFFICE

11

Assignment Name: 7) Proposed Office Development

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: M/S Grand Luthuli House Ltd

No. of Staff 3

Address: Plot 15 Hunter/Luthuli Avenue, Nakawa Division, Kampala

No. of Staff months: Duration of Assignment: 48 months

Start Date: May 2019 Completion Date: Under Construction

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: Kenneth Magembe – Project Engineer Martin Mukisa Kuzegera – Assistant Project Engineer

Narrative Description of Project: This is a new, ultra-modern office complex measuring approx. 5,000 sqm. gross area and 3,000 sqm of net lettable area. The ground floor is given over exclusively to tenants’ and visitors’ car parking, and the Nairobi stone of the building’s façade provides a classical finish. The building takes renewable energy usage into consideration through solar panel installations on its roof terrace, which should significantly minimize on-grid power consumption.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural designs: Supervision of Construction works: Quality checks: Ensuring compliance to legal polies especially health and safety.

12

Assignment Name: 8) Completion of Church House

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Church Commissioners Holding Co. Ltd

No. of Staff 3

Address: Plot 34 Kampala Road, Kampala

No. of Staff months: Duration of Assignment: 31 Months

Start Date: 2014 Completion Date: 2018

Approx. Value of services (in current USD):

Name of Associated Consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Project Engineer – Assistant Project Engineer – Engineering Assistant Narrative Description of Project: Church house is a 15-storey commercial development with 2 levels of basement parking. The design comprises a screen detail to the building’s lower façade, which provokes a play of light and shade in the space. Fully clad exterior walls are contrasted with glass curtain walls giving visibility into the different levels premised on natural lighting. Two entry points have been integrated; the main entrance off of Kampala road and the second off of Duster street. The use of concealed lighting, high quality finishes such as polished granite and porcelain tiles, frameless glass, textured paint and brushed stainless steel have been employed. The building’s two wings are connected by a central circulation core consisting of common facilities such as lifts, the main staircase, lavatories and pantries—which provide a space and energy efficient occupancy of the building.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Supervision of Construction works: Quality checks. Advise on technical problems for the progressive works.

13

Assignment Name: 9) Office development (Lotis Towers)

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Lotigo Properties Ltd

No. of Staff 3

Address: Plot 16 Army Avenue

No. of Staff months: Duration of Assignment: 44 Months

Start Date: April 2014 Completion Date: 2018

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants None

Name of Senior Staff Involved and Functions Performed: – Project Engineer – Assistant Project Engineer – Engineering Assistant Narrative Description of Project: The development is a 14-storey building, with 11 office levels, 2-basement parking levels and overhang terraces situated on an uphill slope. The design is a modern office facility with naturally lit and contemporary corporate environments, and a louvered façade to intersect the western sun due to the building’s east-west orientation. Prefabricated material makes up some of the indoor components thus reducing air and soil pollution on site which is created in traditional construction. It allows for better infiltration and increased energy efficiency as effluents and air particles are treated in a controlled environment. During co-ordination and dissemination of information, BIM software was used hence reduced use of paper blueprint drawings which saved a lot of trees. Trees around the plot were maintained and this improve the storm water drainage.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Supervision of Construction works: Quality checks: Advice on the progress of works for the implementation of designs: Assessing sustainability and environmental impact.

15

Assignment Name: 10) The supply of Structural and Civil

Engineering Consultancy Services for Office Development on Luthuli Avenue

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: M/s Acacia Place Ltd

No. of Staff 3

Address: Plot 78 Luthuli Avenue, Bugolobi- Kampala

No. of Staff months: Duration of Assignment: 48 months

Start Date: May 2014 Completion Date: August 2018

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Project Engineer - Assistant Project Engineer – Engineering Assistant Narrative Description of Project: This is a new, ultra-modern office complex measuring approx. 7,000 sqm. gross area and 6,000 sqm of net lettable area. The ground floor is given over exclusively to tenants’ and visitors’ car parking, and the glass paneling of the building’s façade provides a classy yet naturally sustainable day-lighting option. outdoor green areas. The building takes renewable energy usage into consideration through solar panel installations on its roof terrace, which should significantly minimize on-grid power consumption. The building also includes greenery which supports the proper water drainage around the building and maintains the soil strata.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural designs: Supervision of Construction works: Quality checks: Ensuring compliance to legal polies especially health and safety.

16

Assignment Name: 11) Office Development (Trust Towers)

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Sama Holdings Ltd

No. of Staff 3

Address: Plot 4 Kyadondo Road, Nakasero

No. of Staff months: Duration of Assignment: 31 Months

Start Date: May 2015 Completion Date: 2018

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants None

Name of Senior Staff Involved and Functions Performed: – Project Engineer- – Assistant Project Engineer – Engineering Assistant Narrative Description of Project: The development of 10,000sqm comprises of a 12-storey building with 9 levels of office space and 3 basements. It has 4,500sqm of net office space. Located in the heart of Kampala, the building envelope is wrapped in chemically-resistant, heat reflective and light refractive glass which regulates thermal transmittance and keeps the building interior naturally cool or warm. This minimises energy requirements for artificial air-conditioning & lighting. The open spaces around the building exterior are laid with interlocking self-draining pavers which reduce pressure on the existing stormwater drainage system and keeps natural waterways free of debris. Green areas around the building constitute 20% of the plot area, which contributes to the city’s green house gas reduction.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Supervision of Construction works: Quality checks: Ensuring health and safety compliance: Advising on the technical problems during progressive works.

17

Assignment Name: 12) Office Block Naguru

Country: Uganda

Location with in the Country: Kampala District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Next Media Services Limited

No. of Staff 3

Address: Plot No.13, Naguru Summit View Road, Nakawa Division, Kampala

No. of Staff months: Duration of Assignment:

Start Date: 2019 Completion Date: 2022

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Mabaale James - Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: This office building has 10 floors and the total floor area of 3489.8sqm

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

18

Assignment Name: 13) Nasser Road Shopping Mall

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Rafiki Roadways Limited

No. of Staff 3

Address: Plot 37 & 39 Nasser Road

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2015

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: This commercial building has 4 storeys including 1 basement level with a total floor area of 2924.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

19

Assignment Name: 14) DFCU Bank Branches

Country: Uganda

Location with in the Country: Kampala District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Mr. Dan Kairumba (Estates Officer Dfcu Limited)

No. of Staff 1

Address: Plot 17B William Street and Plot 8 Burton Street

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2013

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: With the ever-increasing competition in the banking sector, most of the financial institutions have found it necessary to position themselves closer to their customers. Dfcu bank, one of the biggest banks in Uganda identified various locations in Uganda with a view of opening up more branches so as to be more accessible and visible to its growing customer base. The properties identified are located at the following premises; -Plot 17B William Street and Plot 8 Burton Street Kampala Central Division -Kikuubo Hotel Building, Plot 72 Ben Kiwanuka Street, Kampala Central Division -Commercial building in Elegu trading Centre, Amuru District - Commercial building on plot 1 market road Gulu town - Commercial building in Ruhimbo trading Centre in Isingro district along Mbarara-Kikagate road-Ishaka town - Commercial building in Mulemo along Jinja, Kampala highway - Commercial building on plot 2, 2A, Block 3 Tororo town - Commercial building on plot 9 & 11 Mbale road, Tororo municipality -On social security house located on plot 4 Jinja road Kampala - Commercial building located on plot 17 Wilson road, Kampala All properties are owned by the proprietor. As a policy by the bank, it is mandatory that before a new branch is opened up, the area to be occupied by the bank on the new property and the building in general must be subjected to a structural appraisal by an independent professional.in case the physical condition of the building does not meet the minimum structural requirements then possible recommendations could be made for relevant structural adjustments to make it usable by the bank. Description of Actual Services Provided by Our Staff: -Assess the structural integrity of the buildings and make recommendations on measures to be taken so as to upgrade the structural capacity of the buildings in order to accommodate the banking operations safely.

20

Assignment Name: 15) Oxford Station

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Karibu Investments Limited, Mr. Shirju

No. of Staff 3

Address: Plot 2-4, 7th street, Industrial Area, Kampala

No. of Staff months: Duration of Assignment:

Start Date: Completion Date:

Name of Associated consultants if any:

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: The oxford station is a ware house building with a contemporary finishing of 192m long with a buildup area of 2012sqm.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

21

Assignment Name: 16) Sama Holdings Ltd – Office

development

Country: Uganda

Location with in the Country: Kampala District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Mr. Francis Twagirumukiza

No. of Staff 3

Address: Plot 4, Kyadondo Road Nakasero, Kampala

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2018

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: The office development is a 12-storey project of 10,000sqm with 3 basements and the top 9 stories leased for office space. It has 4,500 sqm of net office space. The elevation is bold and modernistic hence stands out because of its design, creative allocation of space and stunning façade adding an understated elegance to the whole building. The open plan areas have been configured to suit client requirements. The long spans allow space to be arranged to suit open plan offices, different layouts of cellular offices and variations in office layout throughout he height of the building. Where integrated beam construction is used, the flat soffit gives complete flexibility of layout allowing all internal walls to be relocated, making the building fully adaptable.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

22

Assignment Name: 17) Acacia Place Ltd – office

development

Country: Uganda

Location with in the Country: Kampala District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Mr. Idro Taban

No. of Staff 3

Address: Plot 78 Luthuli Avenue – Acacia Place Ltd, Uganda

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2018

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: The office building within Bugolobi suburb, is on a 0.55 acres plot. The bulk of lettable space comprises mainly of 560 sqm of retail space at the ground floor, 630 sqm of office space on each of the 3 floors above, 450 sqm for two penthouse offices along with an apartment on the 4th floor. Each of the 5 floors from ground to 4th floor can be potentially utilized as one, two or four units.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

23

Assignment Name: 18) Oasis Shopping Mall

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client:

No. of Staff 3

Address: Plot 88-94 Yusuf Lule Road

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2008

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: This property comprises of an ultra-modern shopping mall together with a number of other high end shops, restaurants and cinemas. It has a multi-level parking and the entire floor area is 8500sqm.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

24

Assignment Name: 19) Conference Hall Development

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Mr. Phenny Mwesigwa

No. of Staff 3

Address: Plot 14-18 Barracks Drive, Makindye Division, Kampala

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: June 2019

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: The development is on 4.5-acre site and it comprises of a 3-storey conference block with mainly conference block with mainly conference rooms and large multi-purpose halls. It also has large outdoor events, gardens with associated facilities.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

25

Assignment Name: 20) Shopping Mall Fit-Out for Cham

Towers

Country: Uganda

Location with in the Country: Mukono District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: GS Limited

No. of Staff 3

Address: Plot 12 Kampala Road

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2014

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: This is a 16-storey high rise building with 15,400sqm of commercial space. The Project was about remodelling the basements, ground and first floor levels of the building. There was a lot of demolitions and retrofitting structural elements. It also included the changing of the 15m wide main entrance canopy completely. The main atrium is bordered by shops and large circular rectangular pillars to support the structure of the building. The escalators provide access to the mezzanine level from which shoppers have a glaring view of the atrium and its events.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

26

Assignment Name: 21) Boundary Wall at United Nations

High Commission for Refugees

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: United Nations High Commission for Refugees

No. of Staff 2

Address: Plot 11/13 Mackenzie Close in Kololo

No. of Staff months: Duration of Assignment:

Start Date: 2019 Completion Date: 2020

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer Narrative Description of Project: Following a heavy downpour and hailstorm on the 2nd of September 2019, a portion of the perimeter wall at the UNHCR offices catastrophically collapsed and as such the client(UNHCR) sought redress from the landlord. The landlord engaged a consultant who prepared a design for the replacement wall. However, due to the collapse, the client was concerned about the stability of almost the entire perimeter wall as well as the design of the replacement wall. As a result, there was a proposal to investigate the cause of the collapse section of the wall, the effectiveness of the replacement wall and the stability of the existing walls.

Description of Actual Services Provided by Our Staff: Investigation into the cause of collapse of a section of the perimeter wall Carrying out a structural integrity exercise of the existing wall Design review of proposed replacement wall

27

3. CATEGORY: EDUCATIONAL

28

Assignment Name: 22) Construction and Renovation of

facilities at National Teachers’ College Kabale – Lot 1

Country: Uganda

Location with in the Country: Kabale

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Ministry of Education and Sports, Government of Uganda

No. of Staff 3

Address: National Teachers’ College, Kabale

No. of Staff months: Duration of Assignment: 22 Months

Start Date: October, 2018 Completion Date: August, 2020

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Acom Barbara – Assistant Project Engineer Narrative Description of Project: The project comprised of a new library, resource center, staff complex, main administration block, lecture rooms, principal’s house, kitchen, dining hall, boys’ and girls’ hostels, kindergarten among others. The facilities are fitted with a solar power harvesting capacity of 150KW, which enables off-grid operation for extended time periods. Bio-gas harvesting from farm manure meets all the institution’s cooking needs, and the institution’s sewer system is also fully able to treat sludge locally, so that only clean and non-contaminated effluent is released into the ground water cycle. The greenery was maintained so as to maintain storm water management and sequester carbon. The overall design them of the project was premised on green technology where the buildings are largely energy efficient with all buildings utilizing natural lighting and ventilation as much as possible. Bioswales were designed and used to take care of the high volumes of storm water runoff.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Supervision of Construction works: Quality checks: Assessing sustainability and environmental impact.

29

Assignment Name: 23) Africa Renewal University

classroom development

Country: Uganda

Location with in the Country: Wakiso District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Vice Chancellor, Mr. David Fugoyo

No. of Staff 1

Address: Plot 700 Block 314 Buloba Wakiso District

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2016

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: This forms the 1st phase of the new ARU campus expansion. The 3 level classroom block forms the latest addition to the university lecture spaces and is to house the senior students. The block embodies the sublime essence of tranquility radiated by the surrounding lands. The 3 levels comprise of 7 large classrooms all made accessible by way of ramp and stairs strategically located to take advantage of the sloping landscape. The uppermost floor has the biggest room which could double as a chapel from time to time.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

30

4. CATEGORY: HOTEL/LEISURE

31

Assignment Name: 24) Luxury Apartment Tower Block

Country: Uganda

Location with in the Country: Kampala District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Assafali Wissanji & Nasmin Wissanji

No. of Staff 3

Address: Plot 10, Naguru Hill Drive Kampala

No. of Staff months: Duration of Assignment:

Start Date: Completion Date:

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: - Civil and Structural Engineer - Assistant Project Engineer - Assistant Project Engineer Narrative Description of Project: This modern apartment complex consists of 17 storeys including 1 basement floor. It has other facilities blocks. The total floor area is 9260sqm. This brand-new state of the art luxury apartments for rent is set in a modern complex at the top of Naguru hill with a 360-degree view of Kampala including the amazing Lake Victoria. It opens to a very spacious lounge and dining area with access to a wide balcony capturing breathtaking views. Each floor is serviced by a lift and the building has ample parking space.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

32

Assignment Name: 25) Kampala Serena (Maisha Guest

Rooms)

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Tourism Promotion Services Uganda Limited

No. of Staff 3

Address: Plot 16 – 20 Nile Avenue,

No. of Staff months: Duration of Assignment:

Start Date: 2014 Completion Date: 2017

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants None

Name of Senior Staff Involved and Functions Performed: – Project Engineer - Assistant Project Engineer – Engineering Assistant Narrative Description of Project: This project was executed in phases with phase 1 comprising of extending the Maisha Block by another 5 levels housing luxurious rooms and a presidential suite. Phase 2 was about remodeling a number of public areas of the main hotel Block.

Description of Actual Services Provided by Our Staff: Structural assessment on the existing building/Preparation of Civil and structural designs/preparation of as built drawings/supervision of construction.

33

Assignment Name: 26) Valley Hill Apartments

Country: Uganda

Location with in the Country: Kampala District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client:

No. of Staff 1

Address: Plot 210 Block 250, Kyadondo County

No. of Staff months: Duration of Assignment:

Start Month: September 2012 Completion Date:

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: This is a commercial housing project with twin blocks. These blocks were initially designed as five storeyed buildings but due to anticipated increase in demand for accommodation, the proprietors extended the blocks by 5 extra floor levels. The decision to vertically extend the block by the 5 extra levels was made on the basis of a structural appraisal that was carried out on the buildings to assess their ability to carry the anticipated loading.

Description of Actual Services Provided by Our Staff: Structural Appraisal to assess the stability requirements of the twin block structures

34

5. CATEGORY: GOVERNMENT/PUBLIC INFRASTRUCTURE

35

Assignment Name: 1) Proposed Construction of the

Chancery Building and Two Staff Apartments for Uganda Embassy, Juba.

Country: Uganda

Location with in the Country: Juba, South Sudan

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Moroto Municipal Council

No. of Staff 2

Address: Moroto

No. of Staff months: Duration of Assignment:

Start Date: 2020 Completion Date: Under Construction

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Project Manager – Assistant Project Engineer Narrative Description of Project: The project comprises of a Chancery Building, two staff apartments and a Consular building covering approximately 2562m2 of land. The Chancery building is to accommodate the embassy administrative offices, conference facilities, gym, cafeteria, stores, ambassadors’ offices, a self-contained security bunker and many others. The two staff apartments will accommodate the staff and a Consular building which is meant for handling the day-to-day operations of the embassy related to Visa issuance and the main service point for the general public.

Description of Actual Services Provided by Our Staff: Provision of Project Management services, preparation of Civil and Structural Engineering designs: Supervision of Construction works: Quality checks.

36

Assignment Name: 2) Moroto Municipal Bus Terminal

Country: Uganda

Location with in the Country: Moroto

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Moroto Municipal Council

No. of Staff 2

Address: Moroto

No. of Staff months: Duration of Assignment:

Start Date: 2020 Completion Date: Under Construction

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Engineering Assistant Narrative Description of Project: Moroto Bus Terminal brings the first impression to a visitor as a focal point at the entrance of Moroto District. This project was executed in phases, Phase 1 – 3 of the bus terminal construction was completed and now on the last phase which comprises of the perimeter wall fence, access ramp/fire escape and passenger shed. The Moroto bus terminal site on which the proposed additional works are constructed was seated on black cotton soils. Black cotton soils are mainly composed of clay minerals and is highly expansive when exposed to moisture. Given the nature of these soils, they were removed and replaced with new compacted murram soil fill and a raft foundation was used. Geotechnical investigations were carried out to facilitate the ramp and market shed design. A strict quality control schedule for all aspects of works was developed that will include approvals and rejection criteria such as standard material tests for the contractor to use during construction of the additional works.

Description of Actual Services Provided by Our Staff: Undertake supervision of construction completion works on behalf of Moroto municipal council while ensuring that the works are completed on time, within budget and meeting the required engineering specifications.

37

Assignment Name: 3) Kabaale International Airport

Country: Uganda

Location with in the Country: Hoima District.

Professional Staff Provided by the Firm: Civil Engineers

Name of Client: The Government of the Republic of Uganda

No. of Staff 3

Address: Buseruka sub-county, Hoima District.

No. of Staff months: Duration of Assignment: 48 Months

Start Date: March 2018 Completion Date: Under Construction

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: The development consists both of buildings and runway infrastructure. The Runway is 3.5m by 45m with 2 shoulders of 15m, a run way strip width of 300m, a taxiway of 190m length with width of 26m and 60m including shoulders for code F compliance. The buildings include the Cargo terminal which is 3240sqm, Employee housing, an Electrical main substation and a Fuel farm. The design included the landslide road system to protect the infrastructure from soil covers.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Managing the Client’s budget: Quality checks: Supervision of Construction works: Ensuring health and safety compliance: Assessing sustainability and environmental impact. Ensuring project packages meet the agreed specifications.

38

Assignment Name: 4) Extension of Floating Restaurant

Entebbe

Country: Uganda

Location with in the Country: Wakiso District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Ministry of Tourism, Wildlife and Antiquities

No. of Staff 3

Address: Entebbe

No. of Staff months: Duration of Assignment:

Start Date: Completion Date:

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: - Civil and Structural Engineer - Project Manager - Assistant Project Engineer Narrative Description of Project: The Uganda Wildlife Education Centre (UWEC) desires to complete the existing Floating Pier Hotel on Lake Victoria which currently has the ground and first floor slabs. The proposal at hand is to add at least two levels and as such there would be need to ascertain the structural capacity of the existing building to accommodate the proposed extension. This implies that as part of the design phase, there was a need to undertake a structural integrity exercise and the purpose of this report is to give the structural capacity of the building or possible remedies to improve its structural capacity to carry the anticipated loading. In order to safely support the building to the ground, a new foundation system was designed. For adequate bearing into firm ground on the lake bed, a pile foundation system was recommended and the foundation system was incorporated before the other modifications and additions were done.

Description of Actual Services Provided by Our Staff: Structural integrity assessment Preparation of Civil and Structural Engineering designs Supervision of Construction works

39

Assignment Name: 5) Directorate of Citizenship and

Immigration Control

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client:

No. of Staff 2

Address:

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2020

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer Narrative Description of Project: This is a 3 level building on plot 65 – 67, port bell road under ministry of internal affairs.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

40

Assignment Name: 6) Proposed upgrade of DSL@

Laboratories at National Animal Disease Diagnostics and Epidemiology Centre (NADDEC) at Entebbe, Uganda

Country: Uganda

Location with in the Country: Mbale and Tororo District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: CH2M/DEMA

No. of Staff 2

Address: Entebbe District

No. of Staff months: Duration of Assignment:

Start Date: Completion Date:

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: This instituted, complete remodeling of the existing laboratories at Entebbe. The upgrade of the laboratories included both civil works and laboratory equipment bound on design developed by DEMA an American Agency and CH2M the lead consultants. Diagnostic laboratories support national veterinary services in diagnosis of diseases, analysis of animal production inputs and products and other analyses intended to study the properties, composition, structure, chemical and biological processes of animals and their products.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

41

Assignment Name: 7) Laboratory Block at Uganda National

Bureau of Standards

Country: Uganda

Location with in the Country:

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Uganda National Bureau of Standards (UNBS)

No. of Staff 2

Address:

No. of Staff months: Duration of Assignment:

Start Date: August 2021 Completion Date: June 2022

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: The National Metrology Laboratory will ensure that the equipment in the National Food Safety Laboratory and other agro-food processing laboratories in Uganda are calibrated to ensure accurate measurement and reliable test results to support exports and consumer safety. The construction is a 3-storey building, in addition to a basement level and a water tank slab elevated 2.7m above the roof level. We designed the entire structural frame of the building, and provided for a unique lift shaft base with double slabs, owing to the problematic bearing soils underneath.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

42

6. CATEGORY: INDUSTRIAL

43

Assignment Name: 8) Data Centre

Country: Uganda

Location with in the Country: Mukono District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: RAXIO Data Centre Ltd

No. of Staff 3

Address: Plot 781, Block113 Namanve Mukono District.

No. of Staff months: Duration of Assignment: 30 Months

Start Date: March 2018 Completion Date: Under Construction

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: The state-of-the-art Data Centre is located on a 2.2 Acre piece of land. It is a portal frame building with a data room that can accommodate up to 400 ICT racks with an executive office and facilities. The ICT racks will make use of a cooling Economizer and free cooling shall be done by removing heat through low-temperature ambient air and aquatic cooling fins. The data center also aims to reduce energy loss and waste by 25% through high-efficiency transformers, PDUs and UPS devices. Construction waste ending up in a landfill has been reduced by 5% so far, on account of optimized design and construction methodology. A greening master plan was designed to ensure that project blends in the natural surrounding green vegetation. The project will include a high-tech bio digester that will help in the recycling of the waste water.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Managing the Client’s budget: Quality checks: Supervision of Construction works: Ensuring health and safety compliance: Assessing sustainability and environmental impact. Ensuring project packages meet the agreed specifications.

44

Assignment Name: 9) Construction of Busia Main Market &

High-Level Agricultural Value Addition Facilities.

Country: Uganda

Location with in the Country: Busia

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Government of Uganda (Ministry of Local Government)

No. of Staff 3

Address: Busia Municipal Council

No. of Staff months: Duration of Assignment: 31 Months

Start Date: April 2018 Completion Date: November 2020

Approx. Value of services (in current USD):

Name of Associated Consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants None

Name of Senior Staff Involved and Functions Performed: – Project Engineer – Assistant Project Engineer – Engineering Assistant Narrative Description of Project: The construction of Busia main Market and a High-Level Agricultural value-addition Facility in Busia Municipal Council was done under the Markets and Agricultural Improvement Program (MATIP-2). The market has 3 levels, and is fitted with energy-efficient bio-mass burning stoves. The use of translucent sheets above the stalls allows for natural lighting while the configuration of the stalls and shops allows for natural air ventilation. The value-addition facility consists of a 3,000-ton pre-cleaning, drying and storage complex; an 80-tonne weigh bridge; a 2-3 ton/hr maize milling plant; and a 1.5-2 ton/hr feed milling and pelleting plant complete with all accessories. The facility stores organic produce from the farmers and processes them without chemicals.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Quality checks: Advising on the technical issues arising for the construction works: Supervision of Construction works: Checking the specifications are as the designs.

45

Assignment Name: 10) Engine Oils Factory

Country: Uganda

Location with in the Country: Kyaggwe East Buganda

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Verma Company Limited

No. of Staff 3

Address: Plot 514, Block 174, Kyaggwe East Buganda

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2019

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: - Civil and Structural Engineer - Assistant Project Engineer - Assistant Project Engineer Narrative Description of Project: The development is a factory manufacturing engine oil. The complex comprises of 8 number of tanks each 100,000m2 of raw oils, blenders for the oils, filling areas and finished goods area.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

46

Assignment Name: 11) Proposed Vogu Workshop and

Yard Construction at Tilenga Drilling and Wells Development Lake Albert

Country: Uganda

Location with in the Country: Hoima/Buliisa District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: VALLOUREC OIL & GAS UGANDA (VOGU)

No. of Staff 3

Address: Plot 14, HANNINGTON ROAD, SM Chambers Building Kampala

No. of Staff months: Duration of Assignment: 10 Months

Start Date: September 2021 Completion Date: Under Construction

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: 5

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer Narrative Description of Project: The PROPOSED VOGU WORKSHOP AND YARD CONSTRUCTION is located AT TILENGA DRILLING AND WELLS DEVELOPMENT, along the shores of LAKE ALBERT in Buliisa District, Uganda. The development sits on 11.2 acres, and consists of various structures like inspection facilities, rack machine shops, office buildings, equipment storage, and pipe spare part sheds. We are required to provide structural designs for each of the constituent structures, and also design the project civil works to ensure efficient drainage of the site. The major structural systems comprise of portal frame buildings for the inspection and rack machine shops; and RC frames for the offices. The rack shed spans a length of 125m, of which a portal warehouse frame in structural steelwork has been designed as the most structural optimal solution.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs: Managing the Client’s budget: Quality checks: Supervision of Construction works: Ensuring health and safety compliance: Assessing sustainability and environmental impact. Ensuring project packages meet the agreed specifications.

47

Assignment Name: 12) Additional Parking at Social Security

House

Country: Uganda

Location with in the Country: Kampala

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: National Social Security Fund (NSSF)

No. of Staff 2

Address: Plot 2 – 4 Jinja Road

No. of Staff months: Duration of Assignment:

Start Date: Completion Date:

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer - Assistant Project Engineer Narrative Description of Project: The parking building is located behind Social Security House and has a basement floor and 3 parking floors. The basement floor is currently occupied by Stanbic bank and 2 parking floors are to be added to the building due to insufficient parking space. This structure was specially designed for parking. The design loads for car parks are often less than the office buildings hence the long floor spans that permit cars to park in rows without supporting columns in between. The parking facility is typically an exposed structure and was designed to withstand all aspects of environmental conditions for safe use by both automobile and pedestrians, with non-slip floor surface and good ventilation to avoid carbon monoxide buildup.

Description of Actual Services Provided by Our Staff: Structural integrity assessment Preparation of Civil and Structural Engineering designs Supervision of Construction works

48

Assignment Name: 13) Design and Construction Supervision

of Dei Biopharma

Country: Uganda

Location with in the Country: Matugga, Wakiso District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: DEI Pharmaceutical Industries Ltd (Natural Products International Limited)

No. of Staff 3

Address: Dei Group Ltd. Plot 22, Ring Road, Luzira Industrial Park P. O. Box 35854 Kampala, Uganda

No. of Staff months: Duration of Assignment: 10 Months

Start Date: August 2021 Completion Date: Under Construction

Approx. Value of services (in current USD): 1.5 million

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: 10

Name of Senior Staff Involved and Functions Performed: – Project Manager & Civil and Structural Engineer – Assistant Project Manager/Engineer – Assistant Project Manager/Engineer Narrative Description of Project: The project comprises of two Production Buildings, Quality Control Building, Warehouse, Biotech Building, Oncology Building, Cephalosporins and the two office blocks. These shall be used to produce pharmaceuticals and have been designed to use natural light to save on the energy.

Description of Actual Services Provided by Our Staff: Provision of Project Management services, preparation of Architectural, Civil and Structural, Mechanical and Electrical Engineering designs: Quantity Surveying, Land Surveying.

49

7. CATEGORY: STORAGE / WAREHOUSING

50

Assignment Name: 14) Warehouse Park

Country: Uganda

Location with in the Country: Mukono District.

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: Sable Investments Limited

No. of Staff 1

Address: Plot 31, Block112 Namanve Business Park

No. of Staff months: Duration of Assignment:

Start Date: Completion Date: 2013

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer Narrative Description of Project: The development comprises of mainly warehouse facilities for storage purposes. The 5-acre piece of land was divided into two zones A & B each to be rented out separately. Each of the zones has an open yard which is a provision for future expansion of the warehouses in case of an increase in demand for more storage. The administration block on each warehouse is a three-storey reinforced concrete building. The staff facilities block is a two-storey reinforced concrete building and it provides space for changing rooms and a canteen. The site is between two access roads and therefore each zone has two accesses on opposite sides. The floors for the warehouses were elevated by 1.2m above the parking level so as to simplify loading and offloading of trucks. A stringer ground beam 600m deep was therefore introduced above the plinth wall so as to enhance the stability of the 1.2m wall. The ground floor concrete will be power floated and will contain contraction joints at grids of 4.5m with an appropriate sealant.

Description of Actual Services Provided by Our Staff: Preparation of Civil and Structural Engineering designs Supervision of Construction works

51

Assignment Name: 15) Warehouse Development Park

Country: Uganda

Location with in the Country: Kawempe

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: M/s Grid Energy Systems Limited

No. of Staff 4

Address: Plot 3243 Block 208 Bwaise (Kyadondo) Kawempe

No. of Staff months: Duration of Assignment:

Start Date: 21 August 2017 Completion Date: Under Construction

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer – Engineering Assistant

Narrative Description of Project:

Description of Actual Services Provided by Our Staff: Inspect and verify whether structural engineering works executed by the contractor on site conform to designs and specifications Advise the project management team on structural engineering issues that maybe important on site based on generally acceptable standards for building construction To issue instructions on site on structural nature as need may arise Visit the site as required and be available for consultation meetings.

52

8. CATEGORY: NOT-FOR-PROFIT/ NON-GOVERNMENTAL

53

Assignment Name: 16) All Saints Cathedral, Kampala

Country: Uganda

Location with in the Country: Kampala District

Professional Staff Provided by the Firm: Civil and Structural Engineer

Name of Client: The Registered Trustees of the Church of Uganda

No. of Staff 3

Address: Plot 6 Lugard Road, Kampala District

No. of Staff months: Duration of Assignment: 20 Months

Start Date: May 2016 Completion Date: December 2019

Approx. Value of services (in current USD):

Name of Associated consultants if any: None

No. of Months of Professional Staff Provided by Associated Consultants: None

Name of Senior Staff Involved and Functions Performed: – Civil and Structural Engineer – Assistant Project Engineer – Assistant Project Engineer Narrative Description of Project: The ultra-modern Cathedral has a clear roof span of 30m with two gallery levels and 2 basements, parking space. The total built up floor area is 11,787sqm with a bell tower that is 50m above ground. Construction materials were sourced within 500 miles of the site thus reducing the environmental impact of long-distance transportation. Some of the Cathedral’s materials were recycled and energy-saving lighting options have been incorporated. The central atrium provided by a ring of slanting beams allows for natural circulation and minimizes the need for artificial ventilation. Greenery was maintained around the compound which helps during natural filtration.

Description of Actual Services Provided by Our Staff: Preparation of Structural Integrity and Structural Engineering designs: Checking for Quality and advising on the progress of works: Resolving design and developmental problems: Ensuring compliance to the legal requirements especially health and safety.

54