15
TW@ESI 23 rd October 2016 Hope all of you had a good weekend The following is a record of what was done during the past week and a forecast of the next week.....

TW@ESI 23rd October 2016

Embed Size (px)

Citation preview

Page 1: TW@ESI 23rd October 2016

TW@ESI23rd October 2016

Hope all of you had a good weekend

The following is a record of what was done during the past week and a forecast of the next week.....

Page 2: TW@ESI 23rd October 2016

A General Note before we start-

•I don’t feel I have to repeat this but I will- we all need to strive to increase and optimise our efficiency all the time ... Every time... When we do something we must do it well and close it not to have to return it again! Don’t over engineer ... We are always working on a budget and estimates!•I need to remind all of you to periodically give me a short list of what you have achieved and what you intend to achieve over a short period (a week or two weeks or even a month) – You all have short term targets which I would like you to share• We will have tow new interns Kristiyan Aleksandrov will join CCI/CVA and Stoyan Sergeev Ivanov will join SSA/CFH from 01 November till 01 March.

Page 3: TW@ESI 23rd October 2016

Projects and deadlines• 16_007_LeMeridien_BMS_upgrade- Last week I made the internal Kick off for Le

Meridien which is a large project spread over a year- we have done our site survey and now we have to start working on phase 1 panels – phase 1 which has to be completed by Feb 2017- next steps are– Start planning the design and purchasing planning for the first panels and once materials are

here, we will need to execute the change over on site• 15_044_Hilton_Restaurant_Kitchen_AHU and 15_034_Hilton_Calorifier_Monitoring.

We are targeting to complete in the next weeks• 15_008 - Aurobindo PH02 BMS- lets close off with all documentation , O&M et.. by

the first weeks of Nov 2016• 12_027- Parliament –We have updated Maxpro and now and conclude all

documentation (this needs to be done by 2nd week of Nov) and finally integrate ProWatch

• 14_069- Q019 AS410 – Material from Siemens has been received, RFIs are still unanswered from client

• 14_069- Q021_TF4- panel modifications and documentation

Page 4: TW@ESI 23rd October 2016

Projects and deadlines• 16_015_RSM- this lighting control project is to be completed by Beginning of

December 2016 we need to really keep a good eye on what is happening on site by the main contractor- we must ensure the wiring and terminations are done properly

• 13_070- SCM Lagoona Plant room We need to conclude all pending installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue

• 15_038_new_HA_Ovt and 15_026_Apap Residence are two home automation projects scheduled for Q1 2017 – we have nearly completed panel design and it is now down to panel build (for Apap we are working on the second DDC/Lighting panel)

• 16_023_GGY- is another home automation project which is on a much faster track- we need to conclude on all works here (especially IT/BMS/Lighting- Savant will be at a later stage)

• 14_083_Intercontinental – We have started works to start up the plant and start commissioning here- software development has also now advanced on this project. Commissioning is planned to be done by mid Nov 2016 We are also advanced on the second Pool Panel- which is now completed

Page 5: TW@ESI 23rd October 2016

DesignLast week• RSM DALI – draught Clifton’s feedback on Panel Design• Implement As built feedback on: Nestle LCP / Apap LTG-B• OTM - Q021 5DP02-EXT – release for Panel build – to Dennis,

Shridar (incl Silvio)• OTM – Q020 Netherlocks – completed 1st sample Panel Design,

now on-hold, awaiting client feedback & further info to Silvio• Meridien – meeting (JGH, SAA, CVA) re: way-forward on

Design / site implementation– Phase 1 Panels Points brief to SAA

• FM Env. - Printed Labels for next Panel Build (D5-690)• RSM DALI – Printed labels for Panel Build• Aurobindo – P&IDs As Built update as per CVA feedback

Page 6: TW@ESI 23rd October 2016

DesignNext Week:• OTM - Q021 5DP02 - re-drawing of old Circuit• Sliema Graham Apartments – Panel Design for

BMS

Page 7: TW@ESI 23rd October 2016

InstallationThis past week: • Wiring of ATEX termination boxes at OTM • OTM panel modifications and updates of panel drawings• Passed IR cables for A/C’s in Kitchen and workshop• Assisted Claudio at Fimbank• Completed Intercontinental PanelNext week: • OTM panel modifications and updates of panel drawings• Assist Claudio at Hilton• Start data terminations at GGY• Fix additional frames at offices• Assist Stefan at GGY

Page 8: TW@ESI 23rd October 2016

Panel Build

Project name Project number Target panel build Completion Date

Intercontinental HVAC Panel 14_083 Wednesday, October 12, 2016

OTM Additions 14_069 Tuesday, October 25, 2016

FM Env Control Panels 15_023 Friday, October 28, 2016 RSM DALI 16_015 Friday, November 11, 2016 Graham Sliema Apts Blk 15_011 Wednesday, November 23, 2016

Page 9: TW@ESI 23rd October 2016

Mater DeiThe team at Mater Dei is going through some though changes with the

resignation of Simon Florian and most recently of Michael Abdilla.

The whole team at MDH have to dig deep and work as a team until we find the required replacements for these team members. If any of you out there know of people who can join the MDH team as technicians/electricians, we presently have two vacancies to fill- hopefully soon we will have new people joining

Page 10: TW@ESI 23rd October 2016

Development and Commissioning• The last issues on the DAC for SCM PH2- IT IS NOW A

PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION

• 12_043_Life Sciences – we need to call for an inspection of snags to close everything down- we also need to start scripting on the tenant building module

• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

• The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission

Page 11: TW@ESI 23rd October 2016

Development and Commissioning• OTM on going works and some large orders

(AS410 upgrade and TF4 )• 14_081_Siggiewi School- Lets move on

concluding issues related to Data acquisition and analysis.... Well done to all who have helped conclude this – we need to now present what we have done internally scheduled for 17th Nov 2016

• 13_031_CCA- still issues with values on ILPS/Intruder/Acs/IT connectivity- We need to get issues sorted here once and for all!!

Page 12: TW@ESI 23rd October 2016

Sales and Business Development

We are working on quotes for lighting control systems is Qatar and trying to secure a large BMS project in malta as well as working on large scale integrations overseas.

We have also offered an AHU control solution for Baxter

Page 13: TW@ESI 23rd October 2016

Birthday wishes go to

Paul Vassallo30th October

Page 14: TW@ESI 23rd October 2016

Team ESI• I urge you all to follow this blog and keep up to date with

what is happening at ESI • I await all your feedback on all the ESI discussions –

without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group

• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

Page 15: TW@ESI 23rd October 2016

Team ESI

• Lets all work to get the work done on time, on budget and to the required quality

• We need to communicate, pull the rope in the same direction to make our projects a success and profitable