INTEGRATED SUPPLY CHAIN & LOGISTICS OFFERINGPart 2

byZubin Poonawalla

Page 2: Tata project scm logistics offereing scc part 2

Clientele who are using the technologies

Page 3: Tata project scm logistics offereing scc part 2

Customers

Page 4: Tata project scm logistics offereing scc part 2

IVTS Features

Page 5: Tata project scm logistics offereing scc part 2

Dashboard

Page 6: Tata project scm logistics offereing scc part 2

Dashboard

Page 7: Tata project scm logistics offereing scc part 2

Daily Summary Report

Page 8: Tata project scm logistics offereing scc part 2

Monthly Summary Report

Page 9: Tata project scm logistics offereing scc part 2

Plant Performance Report

Page 10: Tata project scm logistics offereing scc part 2

Transporter Score Card

Page 11: Tata project scm logistics offereing scc part 2

Temperature Rating Report

Page 12: Tata project scm logistics offereing scc part 2

Temperature Graph for a trip

Page 13: Tata project scm logistics offereing scc part 2

Trip Play Back Path

Page 14: Tata project scm logistics offereing scc part 2

Visibility & Traceability in Supply Chain

& Logistics Domain

Automating Demand/Supply Synergy

Page 15: Tata project scm logistics offereing scc part 2

Contents

• Project Objective & Approach• GPS/RFID Technology & Detection• Solutions for Tata Projects

Page 16: Tata project scm logistics offereing scc part 2

Project Objective

• A comprehensive solution eliminate inefficiencies from supply chain & logistics activities.

• Visibility and traceability across the project site/lifecycle for better decision making

• Automation on the material handling & Inventory management.

• Minimize paperwork & dependency on people.

• Improve people & project safety.

• Improve service level to client & on time project completion.

Page 17: Tata project scm logistics offereing scc part 2

Contents

• Project Objective & Approach• GPS/RFID Technology & Detection• Solutions for Tata Projects

Page 18: Tata project scm logistics offereing scc part 2

GPS Technology

Page 19: Tata project scm logistics offereing scc part 2

RFID Technology

Page 20: Tata project scm logistics offereing scc part 2

RFID Detection

Page 21: Tata project scm logistics offereing scc part 2

Contents

• Project Objective & Approach• RFID Technology & RFID Detection• Solutions for Tata Projects

Page 22: Tata project scm logistics offereing scc part 2

Visibility over InventoryChallenges:

Solution – Auto inventory

Benefits:

Updates & entries are manual, prone to errors and not frequent Tracking & tracing a product manually is time consuming Delayed & inefficient project operation Frequent out of stocks, need to maintain more stocks due to lack of visibility

RFID technology can be employed for automated inventory management at the contractor & Project sites

Equipment & Material Tagged with RFID , RFID readers with GPRS/WI-FI connectivity

The system is constantly updated with the whereabouts of the equipment & material at every node in the project supply chain

Electronic, real – time & accurate inventory data

The solution can be feature extended into a WMS, primarily having production threshold at manufacturer level & orders at contractor & project site level depending on present inventory

Page 23: Tata project scm logistics offereing scc part 2

Material Tracking &Management

Page 24: Tata project scm logistics offereing scc part 2

Bundle Tagging & RFID with GPS Installed on Crane

Page 25: Tata project scm logistics offereing scc part 2

Transmission Project Inventory Tracking

Page 26: Tata project scm logistics offereing scc part 2

Order / Delivery management

Challenges:

Solution – Supplier Collaboration:

Benefits:

No collaborative planning with the suppliers, Contractor & Project Manager No POD, authentication & confirmation of material reached at project site Delayed delivery of material to the project site. Frequent out of stock, Maintenance of extra inventory High shipment error rates, Project site & material delivered mismatch.

Web based solution that handles order management, processing of orders, delivery of product, shipping notices and invoices (NOVIPOD)

Collaboration pre-empts errors & facilitates effective transaction management between suppliers, Contractor & Project Manager along the supply chain.

Purchase orders can be extracted & processed through software such that the transactions are seamless & speedy

Decisions can be made proactively, to avoid supply chain issues around shipping, distribution & deliveries

Shipping notices & invoices can be handled systematically providing better visibility

Page 27: Tata project scm logistics offereing scc part 2

Material delivery

Page 28: Tata project scm logistics offereing scc part 2

Process

Page 29: Tata project scm logistics offereing scc part 2

Project Operational Inefficiencies

Challenges:

Solution – RFID for Plant Synergy and Efficiency :

Benefits:

Disorganized movement of material & people into the project site No visibility of people / operations within the project Manual searching is labor intensive & security compromised. Delay in project process due to material & people not present at right time.

Completely automated system using RFID technology & system to track people in different area of site engaged in process & manage it efficiently.

Increased workflow speed & efficiency in operations Real – time in – site tracking Theft prevention & Perimeter security Locate people in case of need & control access to restricted areas Policy enforcement

Page 30: Tata project scm logistics offereing scc part 2

Project Operational Inefficiencies

Page 31: Tata project scm logistics offereing scc part 2

Locating & Remote Monitoring of Heavy Equipments

Challenges:

Solution – RFID for Plant Synergy and Efficiency :

Benefits:

Staff hours spent locating equipment & time spent maintaining equipment log books Unsafe equipment operation leading to more accidents & increased company liability Unnecessary maintenance based on arbitrary schedules & Idle assets not being used Bogus claims for overtime & Fuel theft

Completely automated system using RFID /GPS technology in combination with GSM/GPRS services for send & receiving heavy equipment performance details & whereabouts.

Report on start & stop times for accurate billing or bidding on new work. Stay on top of preventative maintenance with accurate usage details & automatic service alerts. Uncover fuel theft & Bogus overtime by monitoring usage compared to expected consumption. More successful bidding on new contracts with accurate costing Faster recovery of stolen assets

Page 32: Tata project scm logistics offereing scc part 2

Locating & Remote Monitoring of Heavy Equipments

Page 33: Tata project scm logistics offereing scc part 2

Remote Condition Monitoring for Water, Oil & Gas Project