31
www.tecnosistemsp a.it C C ompany ompany P P rofile & rofile & R R eferences eferences 1

Presentazione Tecnosistem 15 03_2013

Embed Size (px)

Citation preview

Page 1: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

CCompanyompany P Profile & rofile & RReferenceseferences

1

Page 2: Presentazione Tecnosistem 15 03_2013

22

1. History2. Organization 3. Capabilities4. Reference

Index

Page 3: Presentazione Tecnosistem 15 03_2013

33

History: Milestones

Acquisition of the first railway underground infrastructure project beyond Line 1, Naples Metro System

Tecnosistem was established

Design&Engineering of public railways and high-speed links such as Rome-Naples, Milan-Bologna and Genoa-Milan

Design&Engineering of electro-mechanical works for railway and underground railway lines (Florence high-speed and Line B1 and C for Rome Metro System)

Diversification into Civil and Hospital

constructions

• Design&Engineering of electro-mechanical works for Turin IDP• Naples/Alifana, Capodichino-Centro Direzionale lines. Naples Metro System• Line 1, driveless Turin Metro System

• Design&Engineering of electro-mechanical works for Cilea junction and line 1, Piscinola-Capodichino. Naples Metro System• Works management for the completion of Piscinola-Aversa Metro System

1976

1980

1987

1998

2000

2004

The new Top Management team started to diversify

into transport related engineering

services (automotive, rail, aeronautics, aerospace etc.)

2005

Page 4: Presentazione Tecnosistem 15 03_2013

44

INFRASTRUTTURE Expansion into “turn-

key” civil projects• Design&Engineering of the new Line C, Rome Metro System• Design, engineering and works management of NTV high-speed depot. (AGV train)• Final design&engineering of Line M4, Milan Metro System• Final design&engineering of Kongens N. station within Cityringen, Copenhagen

History: Milestones

MAgn

aghi

M346 M

ain Landing G

ear

Proge

ttazione attrezza

ture per

prove

statich

e e prove

a fatica

Alenia

A380-800

Proge

ttazione di

componenti E

CS ATA21

MAG

Agusta

-Westl

and AW-101

Alenia

BOMBARDIER CSE

RIES

outer wing s

poilers

Cira

HAPD

Primary

structu

re &

Landing G

ear Alenia

BOMBARDIER CSE

RIES

H-Stab TRAILI

NG EDGE

& TIP

Alenia

A320P2F Cargo

Conversi

on MDCD &

FLOOR G

RIDS M

AG

Agusta

-Westl

and AW-101

Turkmenistan Airli

nes

OMA Su

d

SKY CAR

Design N

ose &

Main

Landing G

earTecnosistem becames the “Centro di eccellenza” for Firema Engineering activities

20072008

20092010

20112012

20062005

INDUSTRIAL

MAG

Galley S

audi

Sicamb

A380 CARGO

MDCD &

FLOOR G

RIDS

Firema

FdC

Firma

Alfa*

Pre-design RM

-VT

SCM

T MCNE

Firma

SCM

T Aln663

Caronte

SSB D146

Firema

Concept F

VG

FDS

Concept

interiors

cabin

MCNE-SE

PSA

R&D TEXT X

Firema

SCM

T Aln668

Static T

est M

CNE

Firema

Concept I

sraele

Metro

-Forta

lesa

Focus Industrial Group

CIRA

Feasib

ility St

udy

Landing G

ear USV

FTB1 Pollu

ce

ThalesAleniaSp

ace

BLAGOVEST

Static,

venting,

random

analysis

Q BAND LN

A 4 PACKS

Alenia

C27-J Stru

ctural

Analysis

Page 5: Presentazione Tecnosistem 15 03_2013

55

Organization : Business Unit

Page 6: Presentazione Tecnosistem 15 03_2013

66

Headquarters Napoli

Industrial Design Center

Consorzio IL SOLE Pomigliano

Organization : Sites

Page 7: Presentazione Tecnosistem 15 03_2013

77

In addition, the Tecnosistem is has:

A.P. (Abilitazione Preventiva - Preventive Qualification)N.O.S. (Secrecy Clearance) for the performance of confidential classified projects and work

Organization : Certification

Page 8: Presentazione Tecnosistem 15 03_2013

88

Turnover & Profits

Page 9: Presentazione Tecnosistem 15 03_2013

99

Workforce & Expertise

Page 10: Presentazione Tecnosistem 15 03_2013

1010

R&D R&D AREA Programs Technical Scope

Project Value(€M

)Partners

Rail/Infrastructure

COMPO.S.I.T.ES.Composite for infrastructure networks safety subject to extreme conditions

Engineering principles for galleries passive safety systems through multi-layers materials. Physical

and mechanical simulation under fire and explosion events

0,3

Automotive/RailV.E.R.O.

Virtual Engineering for Railway and automotive

Project objective is to achieve validation procedures for a drive simulator applied to

ergonomics and passive safety4

Rail/Infrastructure

IN.SIS.T. New technologies applied to transport

systems

The project envisages to realize a network of clusters in order to model and simulate advanced engineering applications for transport systems’

safety and environmental sustainability

5

Rail/Infrastructure

MA.STR.I.Intelligent materials and structures

within innovative technological networks

Micro and nanotechnology applied to the development of new sensors and actuators,

structural and functional materials, nanostructure and composites materials,

environmental friendly polymers

4

Automotive/Rail

Digital Pattern Product Development

Pattern Driven approach for industrial product design, simulation and

manufacturing

The project aims to improve quality while reducing time and costs for product development through an extensive use of knowledge and tools

integration.

12

AeroA.S.I.A.

Wing innovative processes and structural architectures

The research project aims to perform innovative structural solutions to be applied for the wing

structure of a regional transport. The Research scope is the cost-weight optimization

17

RailSICUR.FER

Innovative technologies for train safety circulation

The project envisages the study of innovative diagnostic units for the optimization of railway

systems safety levels10

Automotive/RailA.N.F.IA AUTOMOTIVE /CTIFCluster for Innovation in Logistics &

Transport

The Project aims to develop resource efficient transportation system that respects the

environment, allow for better mobility, more safety and security

120

InfrastructureSMART LOGIPLAT SMART LOGISTICS PLATFORM

Intelligent platform for logistic services

The project envisages the development of intelligent logistic platforms characterized by the

integration of ICT and innovative systems10

Page 11: Presentazione Tecnosistem 15 03_2013

1111

TCS operates through an Enterprise Resource Planning

Microsoft Dynamics NAV Management of internal processes through ERP Microsoft Dynamics NAV. The system is fully integrated with Kumavision PSA (Project and Service Administration) which allows projects’ control across the full spectrum of activities, from budgeting to real-time monitoring including financial analysis

Management Control: ERP

The ERP main modules include: Projects Personnel Purchases Stock Sales Management control Accounting

Page 12: Presentazione Tecnosistem 15 03_2013

1212

Customers : Our Goodwill

Page 13: Presentazione Tecnosistem 15 03_2013

1313

Capabilities: Industrial

INTEGRATED SYSTEM

DESIGN & STYLING

MECHANICAL SYSTEMS

INSTALLATION

COMPUTATIONAL FLUID DYNAMICS

PRIMARY AND SECONDARY STRUCTURES

INTERIOR DESIGN

Page 14: Presentazione Tecnosistem 15 03_2013

1414

Capabilities: Infrastructures & Civil Engineering

ENGINEERING, PROCUREMENT,

CONSTRUCTION

INTEGRATED PROJECT

WORKS MANAGEMENT

DESIGN & ENGINEERING OF

CIVIL WORKS

DESIGN & ENGINEERING OF RAILWAY AND CIVIL

SYSTEMS

TECHNICAL ASSISTANCE TO THE PUBLIC

ADMINISTRATION

SPECIAL ANALYSIS AND NUMERICAL

SIMULATIONS

Page 15: Presentazione Tecnosistem 15 03_2013

1515

Capabilities

Integrated engineering (CAD/CAM/CAE) FEA,FEM ,CFD, CRASH, NVH Analysis Certificate Documentation e Data

Management Industrialization and Product Support

INTEGRATED SYSTEM

Transportation Systems Design Interior Design 3D Modelling & Rendering Virtual Animation Ergonomic Control

DESIGN & STYLING

Concept layout definition Routing and cabling design Manufacturing models/drawings Integration e Testing Procedure

MECHANICAL SYSTEMS INSTALLATION

Steady and transient analysis on internal flow Coniugate heat transfer and radiation problems Multicomponent multiphase flows and free

surface treatment Passenger cabin thermal comfort analysis Coupled CFD, thermal & stress analysis

COMPUTATIONAL FLUID DYNAMICS

Preliminary sizing Structural component design Finite Element Analysis Stress Analysis (Linear & Non linear static

analysis; Stationary & Non stationary Thermical Analysis; Fatigue Analysis; Crash Analysis)

Manufacturing models/drawings Dynamic analysis (normal modes, frequency

response and transient analysis);

PRIMARY AND SECONDARY STRUCTURES

Seat Component Design Manufacturing

models/drawings Production support

INTERIOR DESIGN

Page 16: Presentazione Tecnosistem 15 03_2013

1616

References

Page 17: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

17

Space & Defense References

- Design of mechanical system- Electronic Packaging Systems Development- Layout and wiring design- Support innovative sensors development- Planning and Control, Logistics- Industrialization and validation Production lines- Qualifications, Audit and Suppliers Expediting

Page 18: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

18

Space & Defense References

KA BAND TELEMETRY TRANSMITTER (THALES)Static and dinamic (random) analysis cover rack trasmitter.

Radome Antenna Sensor E0092936

Static, bird and hail impact , vibration and shock analysis Radome Antenna Sensor E0092936 (sandwich panel)

Page 19: Presentazione Tecnosistem 15 03_2013

1919

Space & Defense References

ProgramUSV POLLUCE Landing Gear

Activities Performed Feasability Studies

Trade off analysis

Nose & Main Landing Gear preliminary design

Page 20: Presentazione Tecnosistem 15 03_2013

2020

Aeronautics References

Page 21: Presentazione Tecnosistem 15 03_2013

2121

Aeronautics References

ProgramAlenia C27-J

Activities Performed

Stress

Structural Analysis of FLOOR PANELS FOR HARD RUBBER WHEEL LOADINGFatigue Analysisof CENTER AND REAR FUSELAGE (MATERIAL CHANGE)RADOME STRUCTURAL ANALYSIS DUE TO INCREASED GAPS AT COCKPIT INTERFACE

Page 22: Presentazione Tecnosistem 15 03_2013

2222

Aeronautics References

Page 23: Presentazione Tecnosistem 15 03_2013

2323

Concept Design References

Page 24: Presentazione Tecnosistem 15 03_2013

2424

Concept Design References

Page 25: Presentazione Tecnosistem 15 03_2013

2525

Concept Design References

Page 26: Presentazione Tecnosistem 15 03_2013

2626

CFD References

Page 27: Presentazione Tecnosistem 15 03_2013

2727

CFD References

Page 28: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

28

Metro Campania Nord Est

Rail References

MCNE-SEPSA

Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction

Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction

Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction

Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis

Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis

Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Page 29: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

29

RM-VT & FDS

Roma Viterbo

Rail References

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Concept StyleConcept Style

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D

model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis

Composite Cab - Feasibility Study Composite Cab - Feasibility Study

Concept StyleConcept Style

Page 30: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

30

Automotive References

Packaging

Crash Analysis

SIEE

Product Engineering/Gasoline Controls

CFD analysis

Body Design

Ergonomics Check

Test & Validation

Product Engineering/Controls

Page 31: Presentazione Tecnosistem 15 03_2013

ww

w.te

cnos

iste

msp

a.it

31

Vico II S. Nicola alla Dogana, 9 80133 – NapoliPBX 081 5512292FAX 081 5520290

www.tecnosistemspa.it

Grazie