Upload
enrico-viceconte
View
3.091
Download
1
Tags:
Embed Size (px)
Citation preview
ww
w.te
cnos
iste
msp
a.it
CCompanyompany P Profile & rofile & RReferenceseferences
1
22
1. History2. Organization 3. Capabilities4. Reference
Index
33
History: Milestones
Acquisition of the first railway underground infrastructure project beyond Line 1, Naples Metro System
Tecnosistem was established
Design&Engineering of public railways and high-speed links such as Rome-Naples, Milan-Bologna and Genoa-Milan
Design&Engineering of electro-mechanical works for railway and underground railway lines (Florence high-speed and Line B1 and C for Rome Metro System)
Diversification into Civil and Hospital
constructions
• Design&Engineering of electro-mechanical works for Turin IDP• Naples/Alifana, Capodichino-Centro Direzionale lines. Naples Metro System• Line 1, driveless Turin Metro System
• Design&Engineering of electro-mechanical works for Cilea junction and line 1, Piscinola-Capodichino. Naples Metro System• Works management for the completion of Piscinola-Aversa Metro System
1976
1980
1987
1998
2000
2004
The new Top Management team started to diversify
into transport related engineering
services (automotive, rail, aeronautics, aerospace etc.)
2005
44
INFRASTRUTTURE Expansion into “turn-
key” civil projects• Design&Engineering of the new Line C, Rome Metro System• Design, engineering and works management of NTV high-speed depot. (AGV train)• Final design&engineering of Line M4, Milan Metro System• Final design&engineering of Kongens N. station within Cityringen, Copenhagen
History: Milestones
MAgn
aghi
M346 M
ain Landing G
ear
Proge
ttazione attrezza
ture per
prove
statich
e e prove
a fatica
Alenia
A380-800
Proge
ttazione di
componenti E
CS ATA21
MAG
Agusta
-Westl
and AW-101
Alenia
BOMBARDIER CSE
RIES
outer wing s
poilers
Cira
HAPD
Primary
structu
re &
Landing G
ear Alenia
BOMBARDIER CSE
RIES
H-Stab TRAILI
NG EDGE
& TIP
Alenia
A320P2F Cargo
Conversi
on MDCD &
FLOOR G
RIDS M
AG
Agusta
-Westl
and AW-101
Turkmenistan Airli
nes
OMA Su
d
SKY CAR
Design N
ose &
Main
Landing G
earTecnosistem becames the “Centro di eccellenza” for Firema Engineering activities
20072008
20092010
20112012
20062005
INDUSTRIAL
MAG
Galley S
audi
Sicamb
A380 CARGO
MDCD &
FLOOR G
RIDS
Firema
FdC
Firma
Alfa*
Pre-design RM
-VT
SCM
T MCNE
Firma
SCM
T Aln663
Caronte
SSB D146
Firema
Concept F
VG
FDS
Concept
interiors
cabin
MCNE-SE
PSA
R&D TEXT X
Firema
SCM
T Aln668
Static T
est M
CNE
Firema
Concept I
sraele
Metro
-Forta
lesa
Focus Industrial Group
CIRA
Feasib
ility St
udy
Landing G
ear USV
FTB1 Pollu
ce
ThalesAleniaSp
ace
BLAGOVEST
Static,
venting,
random
analysis
Q BAND LN
A 4 PACKS
Alenia
C27-J Stru
ctural
Analysis
55
Organization : Business Unit
66
Headquarters Napoli
Industrial Design Center
Consorzio IL SOLE Pomigliano
Organization : Sites
77
In addition, the Tecnosistem is has:
A.P. (Abilitazione Preventiva - Preventive Qualification)N.O.S. (Secrecy Clearance) for the performance of confidential classified projects and work
Organization : Certification
88
Turnover & Profits
99
Workforce & Expertise
1010
R&D R&D AREA Programs Technical Scope
Project Value(€M
)Partners
Rail/Infrastructure
COMPO.S.I.T.ES.Composite for infrastructure networks safety subject to extreme conditions
Engineering principles for galleries passive safety systems through multi-layers materials. Physical
and mechanical simulation under fire and explosion events
0,3
Automotive/RailV.E.R.O.
Virtual Engineering for Railway and automotive
Project objective is to achieve validation procedures for a drive simulator applied to
ergonomics and passive safety4
Rail/Infrastructure
IN.SIS.T. New technologies applied to transport
systems
The project envisages to realize a network of clusters in order to model and simulate advanced engineering applications for transport systems’
safety and environmental sustainability
5
Rail/Infrastructure
MA.STR.I.Intelligent materials and structures
within innovative technological networks
Micro and nanotechnology applied to the development of new sensors and actuators,
structural and functional materials, nanostructure and composites materials,
environmental friendly polymers
4
Automotive/Rail
Digital Pattern Product Development
Pattern Driven approach for industrial product design, simulation and
manufacturing
The project aims to improve quality while reducing time and costs for product development through an extensive use of knowledge and tools
integration.
12
AeroA.S.I.A.
Wing innovative processes and structural architectures
The research project aims to perform innovative structural solutions to be applied for the wing
structure of a regional transport. The Research scope is the cost-weight optimization
17
RailSICUR.FER
Innovative technologies for train safety circulation
The project envisages the study of innovative diagnostic units for the optimization of railway
systems safety levels10
Automotive/RailA.N.F.IA AUTOMOTIVE /CTIFCluster for Innovation in Logistics &
Transport
The Project aims to develop resource efficient transportation system that respects the
environment, allow for better mobility, more safety and security
120
InfrastructureSMART LOGIPLAT SMART LOGISTICS PLATFORM
Intelligent platform for logistic services
The project envisages the development of intelligent logistic platforms characterized by the
integration of ICT and innovative systems10
1111
TCS operates through an Enterprise Resource Planning
Microsoft Dynamics NAV Management of internal processes through ERP Microsoft Dynamics NAV. The system is fully integrated with Kumavision PSA (Project and Service Administration) which allows projects’ control across the full spectrum of activities, from budgeting to real-time monitoring including financial analysis
Management Control: ERP
The ERP main modules include: Projects Personnel Purchases Stock Sales Management control Accounting
1212
Customers : Our Goodwill
1313
Capabilities: Industrial
INTEGRATED SYSTEM
DESIGN & STYLING
MECHANICAL SYSTEMS
INSTALLATION
COMPUTATIONAL FLUID DYNAMICS
PRIMARY AND SECONDARY STRUCTURES
INTERIOR DESIGN
1414
Capabilities: Infrastructures & Civil Engineering
ENGINEERING, PROCUREMENT,
CONSTRUCTION
INTEGRATED PROJECT
WORKS MANAGEMENT
DESIGN & ENGINEERING OF
CIVIL WORKS
DESIGN & ENGINEERING OF RAILWAY AND CIVIL
SYSTEMS
TECHNICAL ASSISTANCE TO THE PUBLIC
ADMINISTRATION
SPECIAL ANALYSIS AND NUMERICAL
SIMULATIONS
1515
Capabilities
Integrated engineering (CAD/CAM/CAE) FEA,FEM ,CFD, CRASH, NVH Analysis Certificate Documentation e Data
Management Industrialization and Product Support
INTEGRATED SYSTEM
Transportation Systems Design Interior Design 3D Modelling & Rendering Virtual Animation Ergonomic Control
DESIGN & STYLING
Concept layout definition Routing and cabling design Manufacturing models/drawings Integration e Testing Procedure
MECHANICAL SYSTEMS INSTALLATION
Steady and transient analysis on internal flow Coniugate heat transfer and radiation problems Multicomponent multiphase flows and free
surface treatment Passenger cabin thermal comfort analysis Coupled CFD, thermal & stress analysis
COMPUTATIONAL FLUID DYNAMICS
Preliminary sizing Structural component design Finite Element Analysis Stress Analysis (Linear & Non linear static
analysis; Stationary & Non stationary Thermical Analysis; Fatigue Analysis; Crash Analysis)
Manufacturing models/drawings Dynamic analysis (normal modes, frequency
response and transient analysis);
PRIMARY AND SECONDARY STRUCTURES
Seat Component Design Manufacturing
models/drawings Production support
INTERIOR DESIGN
1616
References
ww
w.te
cnos
iste
msp
a.it
17
Space & Defense References
- Design of mechanical system- Electronic Packaging Systems Development- Layout and wiring design- Support innovative sensors development- Planning and Control, Logistics- Industrialization and validation Production lines- Qualifications, Audit and Suppliers Expediting
ww
w.te
cnos
iste
msp
a.it
18
Space & Defense References
KA BAND TELEMETRY TRANSMITTER (THALES)Static and dinamic (random) analysis cover rack trasmitter.
Radome Antenna Sensor E0092936
Static, bird and hail impact , vibration and shock analysis Radome Antenna Sensor E0092936 (sandwich panel)
1919
Space & Defense References
ProgramUSV POLLUCE Landing Gear
Activities Performed Feasability Studies
Trade off analysis
Nose & Main Landing Gear preliminary design
2020
Aeronautics References
2121
Aeronautics References
ProgramAlenia C27-J
Activities Performed
Stress
Structural Analysis of FLOOR PANELS FOR HARD RUBBER WHEEL LOADINGFatigue Analysisof CENTER AND REAR FUSELAGE (MATERIAL CHANGE)RADOME STRUCTURAL ANALYSIS DUE TO INCREASED GAPS AT COCKPIT INTERFACE
2222
Aeronautics References
2323
Concept Design References
2424
Concept Design References
2525
Concept Design References
2626
CFD References
2727
CFD References
ww
w.te
cnos
iste
msp
a.it
28
Metro Campania Nord Est
Rail References
MCNE-SEPSA
Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction
Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction
Crash Absorber Installation :Installation study through 2D e 3D model;Finite element modeling;static and fatigue analysis Crash absorber juction
Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis
Body Design: Frame study 2D and 3D model Finite element modeling Static and Fatigue analysis
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis
Automatic Coupler Installation:Installation study through 2D e 3D model;Finite element modeling;Static and fatigue analysis
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
ww
w.te
cnos
iste
msp
a.it
29
RM-VT & FDS
Roma Viterbo
Rail References
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Concept StyleConcept Style
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Pneumatic Equipment Installation : Pneumatic equipment installation study through 2D e 3D
model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Door Passenger Installation:Installation study 2D e 3D model;3D model brackets welded on frame for door installation ;Finite element modeling;Static and fatigue analysis.
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Elettrical Equipment Installation : Routing and cabling design 2D and 3D Model Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Equipment Installation : Equipment installation study through 2D e 3D model; Finite element modeling; Static and fatigue analysis Manufacturing models/ drawings
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Toilet Installation:Installation study through 2D e 3D model;Toilet tank installation.Finite element modeling;Static and fatigue analysis
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Computational Fluido Dinamics:HVAC System Analysis on a passenger railcarHVAC flexible ducts analysis on a passenger railcarWinter Thermal Confort Analysis on a passenger railcarSummer Thermal Confort Analysis on a passenger railcar
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Concept Design: Interiors Concept Design External concept design Corporate livery design Ergonomic analysis
Composite Cab - Feasibility Study Composite Cab - Feasibility Study
Concept StyleConcept Style
ww
w.te
cnos
iste
msp
a.it
30
Automotive References
Packaging
Crash Analysis
SIEE
Product Engineering/Gasoline Controls
CFD analysis
Body Design
Ergonomics Check
Test & Validation
Product Engineering/Controls
ww
w.te
cnos
iste
msp
a.it
31
Vico II S. Nicola alla Dogana, 9 80133 – NapoliPBX 081 5512292FAX 081 5520290
www.tecnosistemspa.it
Grazie