2
Building on the analytics engine in Fuse, Fuse 360 automates scenario generation and decision support making it the fastest and easiest means of project optimization. As both a planning and execution tool, Fuse 360 can be used to align plans with target dates and project stakeholder expectations and as a means of getting a delayed project back on track. goal-based acceleration // Datasheet Acceleration Achieve faster, cheaper, more aligned schedules through Fuse 360 automated acceleration. Unlike traditional “network crash” techniques, Fuse 360 provides pinpointed focus, intelligent optimization and selects the most efficient means of achieving acceleration goals. Goal-Based With Fuse 360, you set the acceleration goals. Find scenarios that accelerate the schedule by three months, decrease remaining duration by 20%, or even let Fuse 360 find the best finish date possible. Intelligence Only you know where acceleration is physically possible. Fuse 360 captures this insight through criteria, defined by you, directing where to focus acceleration efforts. This means targeting a certain WBS, location, resource, or even a specific activity for acceleration. Recovery Fuse 360 can generate scenario options from any point in the project whether it is the planning phase or after costly delays. Identify the fastest and most efficient means of recovering project delays. efficient schedule compression advanced decision support user-defined goals & criteria automated scenario generation schedule delay recovery XER & XML scenario creation best finish date possible intelligent project acceleration import project schedule data directly from your scheduling tool 1 export the chosen scenario back to P6 or MS Project generate accelerated scenarios 3 Benefits Two-Way Integration +1 512 291 6261 // [email protected] www.projectacumen.com 2

Acumen Fuse 360: Goal-Based Acceleration Datasheet

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Acumen Fuse 360: Goal-Based Acceleration Datasheet

Building on the analytics engine in Fuse, Fuse 360 automates scenario generation and decision support making it the fastest and easiest means

of project optimization. As both a planning and execution tool, Fuse 360 can be used to align plans with target dates and project stakeholder

expectations and as a means of getting a delayed project back on track.

goal-based acceleration// Datasheet

Acce lera t ion

Achieve faster, cheaper, more aligned schedules through Fuse 360

automated acceleration. Unlike traditional “network crash” techniques,

Fuse 360 provides pinpointed focus, intelligent optimization and selects

the most efficient means of achieving acceleration goals.

Goal -Based

With Fuse 360, you set the acceleration goals. Find scenarios that

accelerate the schedule by three months, decrease remaining duration

by 20%, or even let Fuse 360 find the best finish date possible.

I n te l l igence

Only you know where acceleration is physically possible. Fuse 360

captures this insight through criteria, defined by you, directing where

to focus acceleration efforts. This means targeting a certain WBS,

location, resource, or even a specific activity for acceleration.

Recovery

Fuse 360 can generate scenario options from any point in the project

whether it is the planning phase or after costly delays. Identify the

fastest and most efficient means of recovering project delays.

efficient schedule compression

advanced decision support

user-definedgoals & criteria

automated scenario generation

schedule delay recovery

XER & XML scenario creation

best finish date possible

intelligent project acceleration

import project schedule data

directly from your scheduling tool1

export the chosen scenario

back to P6 or MS Project

generate

accelerated

scenarios3

BenefitsTwo-Way Integration

+1 512 291 6261 // [email protected]

www.projectacumen.com

2

Page 2: Acumen Fuse 360: Goal-Based Acceleration Datasheet

Project Quality Optimization

Use the Fuse schedule cleanser to remove

redundancies and constraints, creating a

clean version of the schedule.

Acceleration Script

Define the simulation script, including where

to focus acceleration efforts and how to

prioritize.

Acceleration Goals

Set acceleration goals by percentage,

target date, or let Fuse 360 find the best

date possible.

Visualization

Fuse 360 automatically generates an

optimized and accelerated version of

your schedule. View the results in the

acceleration bar or the Fuse timeline view.

Acceleration

Decision Support

+1 512 291 6261 // [email protected]

www.projectacumen.com

Acum

en F

use®

Tim

elin

e Vi

ewSc

enar

io A

naly

sis

Compare Multiple Scenarios

Use the Fuse timeline view and Forensic Analyzer to compare

scenarios and identify the best acceleration option. Use

Fuse metrics to evaluate the quality and achievability of each

scenario.

Compression Efficiency Factor™

The Fuse 360 compression efficiency factor™ looks at how

much effort is required for acceleration allowing you to easily

identify which contractor, WBS, or phase of the schedule to

provides the highest return.

Run Multiple Simulations

Create acceleration scripts to try multiple acceleration options.

Try accelerating construction activities, changing calendars,

or reducing the remaining duration of a certain WBS, then

compare results.