Rockaway Boardwalk Reconstruction CB14 Parks Committee Meeting
November 18, 2013 7:00 P.M. Knights of Columbus
2
Agenda
Rockaway Reconstruction
• Recap
• Community Meetings To Date
• Surface Treatment Survey Results
• Initial Construction Area
• Scope of Work
• Project Area Schematic and Renderings
• Amenities
• Surface Treatment Concepts
3
Previous Community Meetings
Rockaway Reconstruction
Meeting Date
September 17, 2013 CB14 Parks Committee
Presentation – Background and
Constraints
September 23, 24, 25, 2013 Neighborhood Listening Sessions –
Access, Surface, Recreation and
Boardwalk Design
October 8, 2013 Full CB 14 Meeting – Update and
General Design Principles
October 23, 2013 Community Listening Session –
Access, Surface and Amenities
4
Rockaway Reconstruction
Surface Survey Results 680 Respondents
0
50
100
150
200
250
300
Feel on your feet/roughness Ability to stay cool/temperature Unique Identity
Walking down the boardwalk, which of the following would you rate as most
important? Please choose 1.
0
50
100
150
200
250
300
350
400
450
Bright Color Sparkle Special Material (shells or glass)
Sandy Memorial (examples on boards)
5
Rockaway Reconstruction
If you had to choose a way to highlight special areas of the boardwalk, what
would be your top choice? Please choose 1 or 2.
Surface Survey Results 680 Respondents
0
50
100
150
200
250
300
350
400
450
Lighter (cooler but with more glare) Darker (warmer but less glare)
6
Rockaway Reconstruction
Which color preference is more important? Please choose 1.
Surface Survey Results 680 Respondents
7
Rockaway Reconstruction
For special areas, which do you prefer for decorative finish? Please choose 1.
0
50
100
150
200
250
300
350
400
Tumbled Recycled Glass Colored Stone
Surface Survey Results 680 Respondents
8
Rockaway Reconstruction
0
50
100
150
200
250
300
350
Entrances Playgrounds Sitting areas
0
10
20
30
40
50
60
What types of areas should have special accents (e.g. playgrounds, sitting areas,
entrances, etc.)
Please choose 1 or 2.
Surface Survey Results 680 Respondents
0
50
100
150
200
250
300
350
Designated bike lane Informal bike lane Yes, bike lane No bike lane
9
Rockaway Reconstruction
Would you like to have a designated bike lane (marked with striped or special
paving) or an informal bike lane (with just signs)?
Surface Survey Results 680 Respondents
10
Rockaway Reconstruction
0
50
100
150
200
250
300
350
Positive
Negative
Mixed
Overall Aesthetics Durability Texture Walking, Jogging,
and Biking
Do you like the existing precast planks on the boardwalk between Beach 77 and
Beach 81? Why or why not?
Surface Survey Results 680 Respondents
11
Initial Construction Area Overall Site Plan
Rockaway Reconstruction
12
Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design
Rockaway Reconstruction
13
Boardwalk Accent Preliminary Concepts Option B: Bubble Design
Rockaway Reconstruction
14
Boardwalk Accent Preliminary Concepts Option C: Wave Design
Rockaway Reconstruction
15
Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design
Rockaway Reconstruction
16
Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design
Rockaway Reconstruction
17
Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design
Rockaway Reconstruction
18
Boardwalk Accent Preliminary Concepts Option A: Graphic Text Design
Rockaway Reconstruction
19
Boardwalk Accent Preliminary Concepts Option B: Bubble Design
Rockaway Reconstruction
20
Boardwalk Accent Preliminary Concepts Option B: Bubble Design
Rockaway Reconstruction
21
Boardwalk Accent Preliminary Concepts Option B: Bubble Design
Rockaway Reconstruction
22
Boardwalk Accent Preliminary Concepts Option C: Wave Design
Rockaway Reconstruction
23
Boardwalk Accent Preliminary Concepts Option C: Wave Design
Rockaway Reconstruction
24
Boardwalk Accent Preliminary Concepts Option C: Wave Design
Rockaway Reconstruction
Boardwalk Lighting Height Options
Rockaway Reconstruction
Lighting Option: 30’ Davit Pole
Boardwalk Lighting Height Options
Lighting Option: 16’ Davit Pole
Rockaway Reconstruction
27
Lighting Options
Rockaway Reconstruction
City Light LED
Fixture
Solar LED Lighting Davit Pole with
LED Cobra
Head
TBTA Pole
28
Lighting Option Davit Pole with Cobra Head
Rockaway Reconstruction
29
Lighting Option TBTA Pole with Teardrop Head
Rockaway Reconstruction
30
Lighting Option City Light
Rockaway Reconstruction
31
Lighting Option Solar Swan – 25’
Rockaway Reconstruction
32
Lighting Option Solar Swan – 15’
Rockaway Reconstruction
33
Boardwalk Elevation Initial Construction Area
Rockaway Reconstruction
34
Boardwalk Construction Engineering Elements
Rockaway Reconstruction
35
Boardwalk Construction Pile Cap Removal and Pile Extensions
Rockaway Reconstruction
Demolition of Existing Pile Cap Pile Cap
Extension Detail
36
Boardwalk Construction Engineering Elements
Rockaway Reconstruction
37
Benches
Rockaway Reconstruction
1964 World’s Fair Bench with RPL Slats
and Galvanized Steel Legs
1964 World’s Fair Backless Bench with
RPL Slats and Galvanized Steel Legs
38
Drinking Fountains
Rockaway Reconstruction
Haws Fountain WXY Prototype as seen at Transmitter
Park
39
Foot Showers
Rockaway Reconstruction
40
Railing Options
Rockaway Reconstruction
Pipe Railing – Potential for South Side DPR Standard Rail
41
Bike Racks
Rockaway Reconstruction
DPR Standard Bike Rack
42
Trash Receptacles
Rockaway Reconstruction
Trash and Recycle Receptacles
43
Questions and Discussion