REQUEST FOR PROPOSAL No. 2152
Sewer Pipeline CCTV, Manhole Inspection and Related Cleaning
Addendum No. 1
March 19, 2018
This Addendum shall form an integral part of the project scope of Work and shall be read in conjunction therewith. This Addendum shall take precedence over related specifications as they relate to the information below, and of the previously issued scope of Work with which it may prove to be a variance, unless otherwise clarified by the City. Please note that all Proponents shall sign and include this Addendum with their submission. Failure to do so may result in a non-compliant submission and the bid may be rejected. Questions and Answers Q1. Page 26, Item 3.1 Sewer Cleaning. If after the 1.5 hours the Contractor finds the line is
not completely free of debris, what is the process for the Contractor? Is it possible to video at 1.5 hours?
A1. The Contractor is to contact the City (General Foreman/Contract Administrator) to authorize if extra time is required and to provide the appropriate billing code for any approved hours. Flush and video will be at the discretion of the City.
Q2. Page 27, Item 3.3 Water Supply. Water supply from hydrants, is there a protocol to
follow?
A2. The Fire Department must be made aware of any hydrant use. The Contractor is to call Fire Dispatch prior to use. The number will be made available at the start-up meeting for the project.
Q3. Is the City using WRC or PACP for this contract?
A3. The initial contract will be WRC. Any change will be discussed with the Contractor prior to implementation for any subsequent contract renewal.
Q4. Page 29, Item 1.5.5 if a second visit is required could the Contactor simply move to 1.5.6?
A4. The Contractor will inform the City (General Foreman/Contract Administrator) and each will be decided on a case by case basis.
PURCHASING DEPARTMENT
The City of Nanaimo 2152 - Addendum 1 Page 2 of 3
Q5. Page 40, Item 3.12 Coding Accuracy Water Supply. Is this for the Contractor to create?
A5. The City will be relying on the accuracy of the information collected by the Contractor. Deficiencies will be noted upon the completion of Book One, the database and SD cards at a debrief meeting to prevent duplication through the balance of the Books. Contractors are to code with a critical view and are to capture Active, Inactive and No Flow lines.
Q6. Are there templates to further understand the City’s requirements?
A6. Templates are included in this Addendum and labelled Attachment A - Templates.
Q7. Page 38, is it possible to provide a project map with markup?
A7. The City recommends the use of Adobe Pro (or similar software) with notes on the City supplied scale drawings. See 3.8.k Map to be attached to final report.
Q8. Is it the City’s intent to start the naming convention with number 1?
A8. Yes
Q9. Can the City’s provide an example of Value Add they are looking for?
A9. It is the City’s expectation that Proponents will develop their own examples but one would be lateral insertion to identify infiltration.
Bidder: ___________________________________ Date: ______________________ Signature: ______________________________________________________________
Note: All forms that require a signature must be signed by a person authorized to legally bind the Bidder to statements made in response to this RFP. End of Addendum 1
Pre Video Header Page
Time of Day: [hh.mm.ss]Date: [yyyy-mm-dd]
Company Name: [City of Nanaimo]
Direction of Travel: [U – Upstream or D - Downtream]
AsBuilt #: [#####-yy]
Utility Type: [F – Foul (Sanitary) or S – Surface (Drainage)]Manholes: [DMH # - DMH# or SMH# - SMH#]
Inspection Report #: [######]
Pipe Size: [#### mm]Line ID: [######]
Location: [Road Name]
Pipe Material: [AAAA]
WRc CITY OF NANAIMO CCTV STRUCTURAL DATA TABLE FILE FORMAT - MARCH 2018
Structural Data Page: 1 of 3
FIELD NAME DATA TYPE FIELD PROPERTIES FORMATID AutoNumber Long Integer Increment - No DuplicatesPLR Text 255JOBNUMBER Text 12 No DuplicatesTOTAL SCORE Number Double AutoPEAK SCORE Number Double AutoICG Number Double AutoSPG Text 255IOG Text 255
One to One relationship for structural data table to header table
WRc CITY OF NANAIMO CCTV HEADER TABLE FILE FORMAT - MARCH 2018
Header Page: 2 of 3
FIELD NAME DATA TYPE FIELD PROPERTIES FORMATID AutoNumber Long Integer Increment - No DuplicatesSURVEYEDBY Text 12CONTRACTNUMBER Text 8JOBNUMBER Text 12 No DuplicatesCATCHMENT Text 10DIVISION Number Byte AutoDISTRICT Text 3PIPELENGTHREF Text 11DATE Date/Time yyyy-mm-dd ####\-##\-##;0;_TIME Date/Time Short TimeLOCATION Text 50STARTMANHOLE Text 12SDEPTH Text 50SCOVER Number Single AutoSINVERT Number Single AutoFINISHMANHOLE Text 12FDEPTH Text 50FCOVER Number Single AutoFINVERT Number Single AutoUSESEWER Text 1 F - Foul; S - SurfaceDIRECTION Text 1 D - Downstream; U - Upstream
SIZE1 Number Integer AutoSIZE2 Number Integer AutoSHAPE Text 1MATERIAL Text 4LINING Text 3PIPELENGTH Number Single decimal place -1TOTALLENGTH Number Single decimal place -1YEARLAID Text 4VIDEONUMBER Text 8COMMENTS Text 50 UPPERCASEPURPOSE Text 1SEWERCATEGORY Text 1PRECLEANING Text 1WEATHER Text 1LOCATIONCODE Text 1FURTHERDETAILS Text 48Call Number Text 8Invoice Text 8EWO Text 24Project Area Text 40Project Location Text 120CPMS # Text 8MPGVideo1 HyperlinkMPGVideo2 HyperlinkMPGVideo3 HyperlinkCivic Text 12Easement Text 15
One to Many relationship for header table to condition details
WRc CITY OF NANAIMO CCTV CONDITIONDETAILS DATA TABLE FILE FORMAT - MARCH 2018
ConditionDetails Page: 3 of 3
FIELD NAME DATA TYPE FIELD PROPERTIES FORMATID AutoNumber Long Integer Increment - No DuplicatesVIDEONUMBER Date/Time \0hh:nn:ss ##\:##\:##;0;_PHOTOGRAPHNUMBER Number Integer decimal place -0DISTANCE Number Single 0.000; decimal place - 3CONTINOUSDEFECT Text 2CODE Text 4DIAMETER_DIMENSION Number Integer decimal place -0CLOCKFROM Number Integer 00; decimal place -0CLOCKTO Number Integer 00; decimal place -0PERCENTAGE Number Byte 00; decimal place -0INTRUSION Number Integer 00; decimal place -0JOBNUMBER Text 12 Duplicates OKREMARKS Text 34
DATE TAPE START FINISH LINE ID LOCATION SURVEY # CAPTURED LENGTH
City of Nanaimo - Public Works Operations
Nanaimo, BC V9T 6J9
2020 Labieux Road
Tel: 250-758-5222 (Office)
Tel: 250-756-5322 (Storm)
Tel: 250-756-5314 (Sewer)
Client: City of Nanaimo
Use: F
V202-021 16019
DIR FCode
Project SS ENG. CAPITAL 2016-16019-P18
CPMS#:
House # RW #
Tape # CON Video #
PRE
CLEAN
2016-10-202016-10-202016-10-202016-10-20 V202-021V202-021V202-021V202-021 6344634463446344 4173417341734173 504535504535504535504535 FOSTER STFOSTER STFOSTER STFOSTER ST 2016-5162016-5162016-5162016-516 76.976.976.976.9DDDD FH FH FH FH 439439439439 VIP35269RWVIP35269RWVIP35269RWVIP35269RW YYYY
76.9Total Length (meters):TAPE # V202-021V202-021V202-021V202-021
Page: 1 of 1
Call # 366356366356366356366356 Invoice 7021 7021 7021 7021VIDEO # 16019160191601916019 EWO
AREA SHEPHERD AVE, GEORGIA AVE, FOSTER ST, AYSGARTH ST, ALLEY AND RW SHEPHERD AVE, GEORGIA AVE, FOSTER ST, AYSGARTH ST, ALLEY AND RW SHEPHERD AVE, GEORGIA AVE, FOSTER ST, AYSGARTH ST, ALLEY AND RW SHEPHERD AVE, GEORGIA AVE, FOSTER ST, AYSGARTH ST, ALLEY AND RW
AREASAREASAREASAREAS
Date: YYYY-MM-DD Survey: [Survey / Jobnumber (2018-001)]
Road Name
On Screen Format
while video Playing
Meters
On Screen Observation Deficiency Defect Code
- Placement Variable(to avoid covering / masking Video Concerns)
PLR: [Pipe Length Reference #]MH# - MH#
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
CCTV Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
CCTV P.O.:COST CENTER: CCTV CALL #: INVOICE #:
PLACE: TAPE:
CON VIDEO:
File Path: C:\Eng_Capital_2018_CCTV_Program\02_CON_CCTV_Guidelines_Specifications_2018\Name: CCTV_Flush_Chainage_Log-Contractor.xlsx Sheet: Flushing Log
DATE Utility (SS, SD, or Culverts) Hours Length Size Times
Pulled Location / Pipe_ID Comments / Remarks
Signature _______________________________Unit _______________________________
Sanitary Sewer, Storm Drainage, and Storm CulvertsFlushing Chainage Log Sheet
CCTV P.O.:COST CENTER: CCTV CALL #: INVOICE #:
PLACE: TAPE: CON VIDEO:
File Path: C:\Eng_Capital_2018_CCTV_Program\02_CON_CCTV_Guidelines_Specifications_2018\Name: CCTV_Survey_Deficiency_Record_Sheet-Contractor.xlsx Sheet: Deficiency_Marking
DATE Utility (SS, SD or Culverts) Survey # Pipe_ID Deficiency
Code Distance Comments / Remarks Field Located / Marked (Y/N)
Signature
Unit
___________________________________________________________
___________________________________________________________
Sanitary Sewer, Storm Drainage, and Storm CulvertsCCTV Survey - Deficiency Record Sheet
Contractor Reporting - Fuel Consumption Worksheet
Company Name:
Address:
Phone Number:
Contact Person:
Title:
Contact Phone:
Contract Description:
Contract Number / Identifier:
Reporting Period:*
*(Annual reporting is the minimum requirement) FROM: dd/mm/yyyy TO: dd/mm/yyyy
Fuel Consumption Categories: Type of Fuel Total Consumption Unit of Measure
Light Duty Vehicle
- Two door passenger cars � Gasoline ______________ ______________
- Four door passenger cars � Diesel ______________ ______________
- Station wagons � Propane ______________ ______________
� Natural Gas ______________ ______________
� Other ________________ ______________ ______________
Light Duty Truck
- SUV's � Gasoline ______________ ______________
- Minivans � Diesel ______________ ______________ - Minivans � Diesel ______________ ______________
- Full size vans � Propane ______________ ______________
- Pickup trucks GVWR under 3856Kg (8,500 lbs) � Natural Gas ______________ ______________
and curb weight under 2722 Kg (6,000 lbs) � Other ________________ ______________ ______________
Heavy Duty Truck
- Road vehicles with a GVWR over 3,856 Kg (8,500 lbs) � Gasoline ______________ ______________
and curb weight over 2722 Kg (6,000 lbs) � Diesel ______________ ______________
� Propane ______________ ______________
� Natural Gas ______________ ______________
� Other ________________ ______________ ______________
Off Road Vehicles and Portable Equipment
- Vehicles and equipment not licensed for road use � Gasoline ______________ ______________
- Snowmobiles � Diesel ______________ ______________
- ATV's � Propane ______________ ______________
- Lawnmowers and trimmers � Natural Gas ______________ ______________
- Tractors � Other ________________ ______________ ______________
- Construction equipment
I / we certify that the above fuel consumption data represents the most accurate estimate of fuel consumption available for the reporting period.
_______________________________________________ __________________________ _________________
Signature Title Date (dd/mm/yyyy)
City of Nanaimo Manhole Inspection ReportTape # City #
Sewerage or
Catchment Area
Project
Inspection #
Inspector
Manhole #
Date
Street Name
MH Cover Elevation
Rung Spacing (mm)
First Rung Size (mm)
Manhole Type
Pipe Condition
Pipe Material
Diameter 1 Width (mm)
Depth to Invert (m)
Flow Direction
Depth of Flow (mm)
Line of Sight
Comments
Chimney Height (mm)
Barrel Dia 1 (mm)
Time
Carbon Monoxide
Surcharge Depth (mm)
Debris/Silt Depth (mm)
Service Status
Surface Cover
Weather
ExplosiveOxygen
Outside Manhole PhotographInside Manhole Photograph
Cover
Frame
Grade Rings
Cone (donut)
Wall
Benching
Channel
Steps (rungs)
Metered?
Surcharge evidence?
Surface ponding?
Debris/Silt build-up?
TYPE TEST
STRUCTURAL
DETERIORATION
(0-5)
IRON /
STAINING
(0-5)
INFILTRATION
NORTH SOUTH EAST WEST
Hydrogen Sulfide
OTHER
COMPASS
ANGLE
Riser Rings
Pipe Shape
Diameter 2 Height (mm)
Cover Dia (mm)
Barrel Shape
Barrel Dia 2 (mm)
MH Chimney inline
with Ladder Rungs?
Is there a Manhole
Drop Structure?
House
Easement #
Page 1 of 2
Inspection #Manhole # Date
Call # Invoice # CPMS #
City of Nanaimo Manhole Inspection ReportTape # City #
Cleaned MH Photograph
MH Deficiency Photograph
Page 2 of 2
Inspection #Manhole # Date
Call # Invoice # CPMS #
CITY OF NANAIMO FILE FORMAT - MANHOLE INSPECTION TABLE
CITY OF NANAIMO Standard Database File Format - Manhole Inspections - March_2018.xlsx Page: 1 of 4
CITY OF NANAIMO FIELD NAME DATA TYPE FIELD
PROPERTIES Format
Manhole # Text 12Inspection # Text 50 no duplicatesSewerage Area Text 50Street Name Text 20Inspector Text 50Date Date/Time Long Date yyyy-mm-dd (####\-##\-##;0;_)Project Text 50Time Date/Time Short Time hh:mm (##\:##;0;_)Weather Text 50Carbon Monoxide Test Text 50Oxygen Test Text 50Explosive Test Text 50Hydrogen Sulphide Test Text 50Cover Type Text 50Riser Rings Type Text 50Frame Type Text 50Grade Rings Type Text 50Cone (donut) Type Text 50Wall Type Text 50Benching Type Text 50Channel Type Text 50Steps (rungs) Type Text 50Cover Test Text 50Riser Rings Test Text 50Frame Test Text 50Grade Rings Test Text 50Cone (donut) Test Text 50Wall Test Text 50Benching Test Text 50Channel Test Text 50Steps (rungs) Test Text 50Cover Deterioration Number ByteRiser Rings Deterioration Number ByteFrame Deterioration Number ByteGrade Rings Deterioration Number ByteCone (donut) Deterioration Number ByteWall Deterioration Number ByteBenching Deterioration Number ByteChannel Deterioration Number ByteSteps (rungs) Deterioration Number Byte
CITY OF NANAIMO FILE FORMAT - MANHOLE INSPECTION TABLE
CITY OF NANAIMO Standard Database File Format - Manhole Inspections - March_2018.xlsx Page: 2 of 4
CITY OF NANAIMO FIELD NAME DATA TYPE FIELD
PROPERTIES Format
Cover Iron/Staining Number ByteRiser Rings Iron/Staining Number ByteFrame Iron/Staining Number ByteGrade Rings Iron/Staining Number ByteCone (donut) Iron/Staining Number ByteWall Iron/Staining Number ByteBenching Iron/Staining Number ByteChannel Iron/Staining Number ByteCover Infiltration Text 50Riser Rings Infiltration Text 50Frame Infiltration Text 50Grade Rings Infiltration Text 50Cone (donut) Infiltration Text 50Wall Infiltration Text 50Benching Infiltration Text 50Channel Infiltration Text 50N Compass Number Single decimal Places - 0N Pipe Material Text 50N Pipe Shape Text 50N Diameter Number SingleN Diameter2 Number SingleN Depth to Invert Number SingleN Flow Direction Text 50N Depth of Flow Number SingleN Line of Sight Text 50N Pipe Condition Text 50S Compass Number Single decimal Places - 0S Pipe Material Text 50S Pipe Shape Text 50S Diameter Number SingleS Diameter2 Number SingleS Depth to Invert Number SingleS Flow Direction Text 50S Depth of Flow Number SingleS Line of Sight Text 50S Pipe Condition Text 50E Compass Number Single decimal Places - 0E Pipe Material Text 50E Pipe Shape Text 50E Diameter Number Single
CITY OF NANAIMO FILE FORMAT - MANHOLE INSPECTION TABLE
CITY OF NANAIMO Standard Database File Format - Manhole Inspections - March_2018.xlsx Page: 3 of 4
CITY OF NANAIMO FIELD NAME DATA TYPE FIELD
PROPERTIES Format
E Diameter2 Number SingleE Depth to Invert Number SingleE Flow Direction Text 50E Depth of Flow Number SingleE Line of Sight Text 50E Pipe Condition Text 50W Compass Number Single decimal Places - 0W Pipe Material Text 50W Pipe Shape Text 50W Diameter Number SingleW Diameter2 Number SingleW Depth to Invert Number SingleW Flow Direction Text 50W Depth of Flow Number SingleW Line of Sight Text 50W Pipe Condition Text 50O Compass Number SingleO Pipe Material Text 50O Pipe Shape Text 50O Diameter Number SingleO Diameter2 Number SingleO Depth to Invert Number SingleO Flow Direction Text 50O Depth of Flow Number SingleO Line of Sight Text 50O Pipe Condition Text 50Rung Spacing (mm) Number SingleFirst Rung Size (mm) Number SingleChimney Height (mm) Number SingleChimney inline with Ladder? Yes/No Yes/NoCover Dia (mm) Number SingleBarrel Shape Text 50Barrel Dia (mm) Number SingleBarrel Dia2 (mm) Number SingleSurface ponding? Yes/No Yes/NoMH Cover Elevation Text 50Metered? Yes/No Yes/NoManhole Drop? Yes/No Yes/NoManhole Type Text 50Surcharge evidence? Yes/No Yes/No
CITY OF NANAIMO FILE FORMAT - MANHOLE INSPECTION TABLE
CITY OF NANAIMO Standard Database File Format - Manhole Inspections - March_2018.xlsx Page: 4 of 4
CITY OF NANAIMO FIELD NAME DATA TYPE FIELD
PROPERTIES Format
Surcharge Depth (mm) Number DoubleDebris/Silt build-up? Yes/No Yes/NoDebris/Silt Depth (mm) Number DoubleService Status Text 50Surface Cover Text 50Comments MemoInside Manhole Photograph OLE ObjectOutside Manhole Photograph OLE ObjectCleaned Photograph 1 OLE ObjectCleaned Photograph 2 OLE ObjectDeficiency Photograph 1 OLE ObjectDeficiency Photograph 2 OLE ObjectDeficiency Photograph 3 OLE ObjectDeficiency Photograph 4 OLE ObjectTape # Text 12CON Video # Text 12Call Number Text 12Invoice Text 12CPMS# Text 30Civic Text 12Easement Text 12
Ro
ad
or
Ease
men
t N
am
e
Rep
ort
#:
201
8-
##
#
SM
H #
#### o
r D
MH
####
#
Date
: 201
8-#
#-#
# (
yyyy-m
m-d
d)
Man
ho
le In
sp
ec
tio
n
Pic
ture
An
no
tati
on
Fo
rmat
Fo
r re
siz
ed
im
ag
es
64
0 x
48
0
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Contractor Name
MH Inspection Report Sanitary Sewer or Storm Sewer
Area Name Contractor Tape: XXXXXX
Reports 2018-XXX to 2018-XXX Dated: MARCH 2018
Insp
ect
#In
sp
ect
#In
sp
ect
#In
sp
ect
#M
H #
MH
#M
H #
MH
#M
H T
ype
MH
Typ
eM
H T
ype
MH
Typ
eS
tre
et
Na
me
Str
ee
t N
am
eS
tre
et
Na
me
Str
ee
t N
am
eS
ew
era
ge
Are
aS
ew
era
ge
Are
aS
ew
era
ge
Are
aS
ew
era
ge
Are
aIn
sp
ecto
rIn
sp
ecto
rIn
sp
ecto
rIn
sp
ecto
rC
om
men
tsC
om
men
tsC
om
men
tsC
om
men
ts
Cit
y o
f N
an
aim
o M
an
ho
le T
itle
Pag
eT
ap
e #
Vid
eo
#
Pro
ject
:
CP
MS
#D
ate
Date
Date
Date
Ho
use
#H
ou
se
#H
ou
se
#H
ou
se
#E
ase
me
nt#
Ea
se
me
nt#
Ea
se
me
nt#
Ea
se
me
nt#
Tota
l M
H I
nsp
ecti
on
s =
T
ota
l M
H I
nsp
ecti
on
s =
T
ota
l M
H I
nsp
ecti
on
s =
T
ota
l M
H I
nsp
ecti
on
s =
0 000
P PPPa aaa
g ggge eee
1 111 o ooo
f fff 1 111
Inv
oic
e #
Ca
ll #
Recommended